HomeMy WebLinkAboutChange Order - 40Docusign Envelope ID: 6CD5CCBB-0361-45DF-8375-196A95724702 0 Contract Title: Change Order No. 40 Rainier Ave S Corridor Improvements -Phase 4 Contractor: Pivetta Brothers Construction, Inc. Contract No.: CAG-22-163 Federal Aid No.: STPUL-1615(005) 1:8! Ordered by Engineer D Force Account D Proposed by the Contractor (VECP) D Bid Item D Unilateral D Bid Item Price Adjustment 1:8! Lump Sum Affects DBE Work: 181 No D Yes If yes, must receive concurrence from Local Programs Original Contract: Current Contract: Estimated Net Change This Order: New Contract: Res dent Engineer Reviewed By: �� Engineer 6f Record Reviewed By: , Jr] 1t luiu�O\, City of Rento aject Manager Reviewed By: City Attorney 40 prior to execution. Date 4/11/2025 Date 4/21/2025 Date Date Amount Working Days $28,284,172.90 500 $35,690,540.85 654 $6,165.60 0 $35,696,706.45 654 Design Manager) Consent By: Surety (Greater than 2S% cost and/or 20% time increase] Endorsed By: Date Date 4/28/2025 Contractor Date Executed By�"�"'""" "" Martin Pastuot}a;202s 1 BBB I 31FB9BB449B ... City of Renton Public Works Date Administrator/ Mayor 4:16 PM PDT Change Order No. Contract Title: Rainier Ave S. Corridor Improvements -Phase 4 Contract No. CAG-22-163 Page 1 of 8 CAG-22-163, CO #40-25 Approved by Cheryl Beyer via email 4/25/2025 Docusign Envelope ID: 6CD5CCBB-0361-45DF-8375-196A95724702 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: The City of Renton directed the Contractor to install approximately 17 linear feet of cured-in-place pipe {CIPP) between proposed SSMH #4 and the existing SSMH 9782 (MH6688) at STA 21+12 LT. Proposal Schedule of Prices: ADD the following to Schedule C: 40-C25 -Furnish and Install 6 In. Diam. CIPP for Sanitary Sewer, 1 LS@ $5,600.00 = $5,600.00 Specification and/or Special Provision: None. Description: None. Materials: None. Measurement: ADD the following to 7-21.4: No specific unit of measurement shall ap ply to the lump sum item of "Furnish and Install 6 In. Diam. CIPP for Sanitary Sewer." Payment: ADD the following to 7-21.5: "Furnish and Install 6 In. Diam. CIPP for Sanitary Sewer," lump sum. Plans: None. Reason for Change: This Change is required because the proposed sewer system was changed when Autozone was constructed. Instead of removing and replacing all of the vitrified clay pipe from the west side of the Autozone parcel to the existing manhole in Rainier Ave., a new manhole was installed behind the sidewalk. This resulted in some existing 6" VCP being left in place. The JUT installed as part of the Rainier Ave. project was later installed over top of this existing sewer pipe. After hearing how difficult any future maintenance would be due to the positioning of the JUT, the sewer department requested that this sewer pipe be lined. Change Order No. Contract Title: Contract No. 40 Rainier Ave S. Corridor Improvements - Phase 4 CAG-22-163 Page 2 of 8 Docusign Envelope ID: 6CD5CCBB-0361-45DF-8375-196A95724702 Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2022 WSDOT/APWA Standard Specifications. See attached. Estimated Cost: $ 6,165.60 Extended Overhead: $ 0.00 Force Account Time Related Damages per 1-09.6.6.d: $ 0.00 Total: $ 6,165.60 40-C25 - Furnish and Install 6 In. Diam. CIPP for Sanitary Sewer An independent estimate was prepared for the cost of installing 17 LF of 6 In. Diam CIPP for sanitary sewer. This cost was calculated to be $6,720.00. The Contractor's quote of $5,600.00 is accepted. Extension of Time: The Time for Completion is extended _Q__ Working Days. Affects DBE Work: No. Sections 1-04.4 and 1-04.5 of the 2022 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor because of this change. To be attached to Change Order: 181 1-Estimated Change Order Cost □2-Plans 181 3-Field Directive/Request for Information Response 181 4-Change Order Quotation □5-Project Labor List D 6-Force Account Equipment Rate Request (DOT Form 422-010 EF) D 7-Equitable Adjustment Determination □8-Additional Working Days Calculation Change Order No. Contract Title: Contract No. 40 Rainier Ave S. Corridor Improvements -Phase 4 CAG-22-163 Page3of8 Docusign Envelope ID: 6CD5CCBB-0361-45DF-8375-196A95724702 Added Cl PP -Estimated Change Order Cost Change Order Cost (Equitable Adjustment) Project Name: Contractor: Contract No: Federal Aid No: Construction Manager: Item No. Rainier Ave S Corridor Improvements -Phase 4 Pivetta Brothers Construction, Inc. CAG-22-163 STPUL-1615(005) Perteet Description Quant,tv Independent Cost Estimate 40-C25 Furnish and Install 6 In. Diam. CIPP for Sanitary Sewer Subcontractor• (Mobilintlon) • lnsrtuform Subcontractor -(Cleaning & Prep) -h1situform Subcontractor - (CIPP Installation) - tnsltuform Suncontractor Markup 40-C25 I Furnish and Install 6 In. Diam. CIPP for Sanitary Sewer I Sales Tax Schedule C !TOTAL CHANGE ORDER COST Summary of Contractors Quotes: Item Quote Location S042 Total Quoted Added Cost: Quoted Cost $5,600.00 1 1 1 1 $6,000.00 Item Change I 1 I I Change Order No. 40 Unit FA EA EA EA By: Shannon Tremper Date: 4/4/2025 Unit Price s 1,500.00 $ 1,000.00 s 2,500.00 Cents/Dollar $ 0.12 CALCULATED TOTAL: ESTIMATED TOTAL: LS Is s,600.00 I $ I 10.10%1 $ I$ Estimated Cost $2,500.00 $1,000.00 $2,500.00 $720.00 $6,720.00 $5,600.00 5,600.00 565.60 6,165.60 Change Order #40, Page 4 of 8 Docusign Envelope ID: 6CD5CCBB-0361-45DF-8375-196A95724702 Added GIPP -Field Directive #52 PERTEET FIELD DIRECTIVE 801 2nd Avenue, Su,fe 302 Seanle, WA 98104 IP 206 436.0515 Pro1ect Name Fede,ol Aid # Contract No. Dote Rainier Ave S Corridor Improvements• Phase 4 (S 3rd ST to NW 3rd PL) STPUL-1615(005) CAG-22-163 11/17/2023 Field D1rect1ve Descnption Field D1rect1ve No. Added CIPP Work 052 Contractor Pivetto Bro1hers Construction The following is documentation of on oral order given by the Engineer per WSDOT Specification 1-04.4. The Contractor shall install Cured In Place Pipe lining between the existing ond proposed monholes ot STA 21-t-11 LT. The City of Renton sewer deportment will perform the initial clearing and television inspection of this line. A Change Order will be prepared for this work based on the proposed cost in the email sent on October 24th. 2023 related to this topic. ProJeC Engineer (or Representative) Doe Jordon How� 11/17 2023 Change Order #40, Page 5 of 8