HomeMy WebLinkAboutCAG-20-065 - Duvall - Change Order 1 Determination of AdL,dional Working Days
There is no additional work added to the contract by this change, so there are no
additional working days added.
•
Equitable Adjustment Determination
Project Name:Duvall Avenue NE
Contractor:Reed Trucking&Excavating Inc.
Contract No:CAG 20-065
By:
Construction Manager: Tani Stafford,PE Date:12/9/2021
Lump Sum Item Cost
New
Lump
Sum
Item Quantity
No. Description Change Unit Unit Price Total
1-A99 CONTRACT CORRECTION TO REINSTATE RETAINAGE 1 LS $2,585.00 $2,585.00
Lump Sum Item Cost $2,585.00
Total Equitable Adjustment I $2,585.00
Narrative:
The City sent a draft change order to the Contractor on 11/30/2021 to reinstate retainage to the
Contract, and asked which option they preferred:a retainage bond, retainage deposited in an escrow
account(interest bearing account) or retainage deposited in a City account
The Contractor responded on 12/072021 with the preference of a retainage bond.
The Contractor sent the invoice for the retainage bond of$2,585.
The lump sum cost of$2,585 was accepted for the retainage bond.
% Change Order No. 1
Backup
Documentation
Contract Title: Duvall Avenue NE
Contractor: Reed Trucking& Excavating, Inc.
Contract No. : CAG-20-065
Federal Aid No. : N/A
Attachments:
Backup Documentation
❑ Field Directive
® Equitable Adjustment Determination
® Determination of Additional Working Days
❑ Engineer's Estimate of Change Order Cost
❑ Engineer's Calculation of Additional Working Days
® Contractor's Quote
• Project Labor List
❑ Contractor's Equipment list including rates per AGC-WSDOT Equipment Agreement
❑ Summary of invoices for rented equipment
❑ Summary of invoices for materials
Change Order No. 1—Contract Correction to Reinstate Retainage
Contract Title: Duvall Avenue NE
Contract No. CAG-20-065
Page 1 of 1
Equitable Adjustment Determination
Project Name:Duvall Avenue NE
Contractor:Reed Trucking&Excavating Inc.
Contract No:CAG 20-065
By:
Construction Manager: Tani Stafford,PE Date:12/9/2021
Lump Sum Item Cost
New
Lump
Sum
Item Quantity
No. Description Change Unit Unit Price Total
1-A99 CONTRACT CORRECTION TO REINSTATE RETAINAGE 1 LS $2,585.00 $2,585.00
Lump Sum Item Cost $2,585.00
Total Equitable Adjustment I $2,585.00
Narrative:
The City sent a draft change order to the Contractor on 11/30/2021 to reinstate retainage to the
Contract, and asked which option they preferred:a retainage bond, retainage deposited in an escrow
account (interest bearing account) or retainage deposited in a City account
The Contractor responded on 12/072021 with the preference of a retainage bond.
The Contractor sent the invoice for the retainage bond of$2,585.
The lump sum cost of$2,585 was accepted for the retainage bond.
Determination of Ad 1 . onal Working Days :-
There is no additional work added to the contract by this change, so there are no
additional working days added.
Contractor Quote
propeL., Please make checks payable and return this portion with your payment to:
iNSURA NfE Propel Insurance PO Box 2940 Tacoma,WA 98401-2940 ATTN:Accounts Receivable
1201 Pacific Avenue
Suite 1000
Tacoma,WA 98402-4321
800.499.0933
INVOICE
Reed Trucking & Excavating Inc. Invoice Date 12/07/21
2207 Inter Ave, Ste. A Invoice No. 661595
Puyallup, WA 98372 Bill-To Code REEDTRUC
Client Code REEDTRUC
Inv Order No. 1*705536
Named Insured: Reed Trucking & Excavating, Inc.
Amount Remitted: $
Please return this portion with your payment.
Make checks payable to: Propel Insurance
Effective Date Policy Period • _ Cover Coverage Description . Transaction Amount j
12/07/21 12/07/21 Merchants Bonding Company (Mutual)
to Policy No. WA100891
12/07/22 *New - SU - Bond -Cntrt Perf/Pay 2, 585 . 00
City of Renton - Retainage Bond
- Duvall Avenue NE, Contract
No. CAG-20-065 - Bond Amount:
$258,484. 88
Invoice Number: 661595 Amount Due: 2, 585 . 00
•
*Premiums-Due and Payable on Effective Date
AAKOO Page: 1 ORIGINAL INVOICE
CAG-20-065, CO #1-21
ife -
Change Order No. 1
Contract Title: Duvall Avenue NE
Contractor: Reed Trucking&Excavating Inc.
Contract No. : CAG-20-065
Federal Aid No. : N/A
I ® Ordered by Engineer
i ❑ Proposed by the Contractor(VECP)
❑ Unilateral 1
Amount Working Days
Original Contract: 260
$5,218,171.95 _
Current Contract: $5,218,171.95 260
Estimated Net Change This Order: $2,585.00 0
New Contract: $5,220,756.95 260
Prepared By: IA . By:
12-t3 it /Arm._ Pa - 2��
ent' er_ Date Engineer(city of Renton Transportation Date
Design Manager)
Reviewed By: Consent By: _-----
ngineer of Record Date Surety(Great %cost and/or 20% Date
crease)
Reviewed By: Endorsed By:
12/13/2021 /G Ua,yi' zt- 12/13/21
• f Re Project Manager Date ConcY Date
Reviewed By: Executed By:
,--o«„sIg,,ed by
Approved by Cheryl Beyer via 12/10/2021 email Martin Pastucha 12/28/2021 I 1:27 PM P5
City Attorney Date City of Renton Public Works Date
Administrator/ Mayor
Change Order No. 1
Contract Title: Duvall Avenue NE
Contract No. CAG-20-065
Page 1 of 3
LUI.UJIIyII CIIveuupe IL/. I IUr-I I I4Y-44I"1-oJtiJ-.)u P% 0ULJUr I
• a
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
• Add the following bid item(s) to the contract:
o Bid Item No. 1-A99, CONTRACT CORRECTION TO REINSTATE RETAINAGE
Quantity = 1 L.S., Unit Price = $2,585.00 per L.S.
• Delete Special Provision Section 1-09.9(1) Retainage from the contract.
o The following language is deleted from the Special Provisions:
SECTION 1-09.9(1)
(June 27, 2011 WSDOT GSP)
Section 1-09.9(1) content and title is deleted and replaced with the following:
Vacant
By this, Retainage is required pursuant to WSDOT Spec 1-09.9.
Reason for Change:
For non-FHWA funded projects, the Revised Code of Washington (RCW) 60.28 requires public
improvement contracts to provide and public bodies to reserve, a contract retainage not to
exceed five percent (5%) of the moneys earned by the contractor as a trust fund for the
protection and payment of claims of any person arising under the contract and the state with
respect to taxes, increases and penalties imposed pursuant to Titles 50, 51 and 82 RCW which
may be due from such contractor.
Materials:
No changes to materials.
Plans:
No changes to the Plans.
Adjustment:
This Change Order includes changes as defined in 1-04.4. Specifically, the altering of
specifications (e.g. reinstate retainage).
Extension of Time:
The Time for Completion is extended 0 Working Days.
Equitable Adjustment:
This Change Order includes an equitable adjustment in the unit price of the new bid item. The
unit price for the new bid item is as follows:
• Bid Item No. 1-A99,CONTRACT CORRECTION TO REINSTATE RETAINAGE,
Unit Price=$2,585.00 per L.S.
Change Order No. 1
Contract Title: Duvall Avenue NE
Contract No. CAG-20-065
Page 2 of 3
UULL101911 CI I VCIUpe IU. I IWr/ IUU-: 144-4G/4-0:J4J-00UPWOUGJOr I
el, i
Sections 1-04.4 and 1-04.5 of the 2021 WSDOT/APWA Standard Specifications shall govern
this Change Order.The Work of the referenced Contract is modified to include the changes
detailed herein.The payment provided for herein shall constitute the complete and final
settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all
other claims that may be made by the Contractor as a result of this change.
Attachments:
❑ Plans
Change Order No. 1
Contract Title: ' Duvall Avenue NE
Contract No. CAG-20-065
Page 3 of 3