CAG-20-065 - Duvall - Change Order 2
Change Order No. 02 iR Backup Documentation Contract Title: Duvall Avenue NE Contractor: Reed Trucking& Excavating, Inc. Contract No. : CAG -20-065 Federal Aid No. : N/A Attachments: Backup Documentation ® Field Directive ® Equitable Adjustment Determination ® Determination of Additional Working Days ® Engineer's Estimate of Change Order Cost Engineer's Calculation of Additional Working Days ® Contractor's Quote ❑ Project Labor List ❑ Contractor's Equipment list including rates per AGC-WSDOT Equipment Agreement ❑ Summary of invoices for rented equipment ❑ Summary of invoices for materials Change Order No. 02 Electrical Component Revision Contract Title: Duvall Avenue NE Contract No. CAG-20-065 Page 1 of 1 City of Renton Field Directive No: 2 Project Name: Duvall Ave NE Contractor: Reed Trucking and Excavating,Inc. Contract No: CAG-20-065 r By. Federal Aid No: N/A TIB No: N/A f 'M' Date: Construction Manager: Tani Stafford The following is documentation of the oral order given by the Resident Engineer per WSDOT Std Spec 1-04.4 The Contractor is directed to furnish and install the following in the control cabinet assembly:a 12-port wall mounted fiberoptic termination panel with loaded duplex single-mode SC coupler plates and splice tray.(Bid Item A85)The panel shall be a Corning SPH-01P with(1)CCH-CP12-59 coupler plate.This is in lieu of the LC coupler plate called for in S.P.9-29.13(10)A. Rough Cost Estimate,WSDOT Construction Manual 1-04.4,Changes. Cost Adjustments:Increase in cost is TBD. A Change Order covering this Field Directive will follow immediately. Contractor Date _ Equitable Adjustment Determination - CO No 2 Project Name:Duvall Avenue NE Contractor:Reed Trucking&Excavating Inc. Contract No:CAG 20-065 By: Tani Stafford Construction Manager: Tani Stafford,PE Date:2/15/22 Narrative: The equitable adjustment for furnishing and installing a revised FO Termination Panel in the signal cabinet is determined to be $0 The Engineer's estimate of-$22.00 was prepared 1/11/22. FWD 2 was sent out on 1/12/22 and a quote was requested from the Contractor on that date. The Contractor's quote for no cost was received on 2/18/22. The no cost change is accepted. Determination of-,Jditional Working Days A determination of zero additional working day was made. The change is a substitution of materials rather than added work. Engineer's Estimate Change Order Cost City of Renton - Duvall Ave NE, CAG 20-065 Field Directive No 02 Engineer's Estimate Date: 1/11/22 Qty Contract Item No. Description Change Unit Price Amount 1-A85 FO Termination Panel Change 1 LS $0.00 $0.00 Total- $0.00 Assumptions: FO termination panel pricing based on pricing CCH-CP12-59 Panel $90.10 CCH-CP24-A9 Panel $112.00 Difference is negligible ($21.90) - _ H-CP12-59 Lanscape CCH 6 Duplex SC Ports (12 Fibers) Single-Mode 0S2 Coupler Panel __ $90.10 Falcon -ch online Store Ili •• ill visit site I FProduct details eManufacturer Corning Connector Type: SC Duplex Fiber Type: Singlemode OS2 Number of Ports: 12 (6 Duplex) 10 Adapter Color Blue Adapter Housing Material Composite Insert Material- Ceramic Compatibility Corning 0 LANscape ' solutions hardware products Buying in volume? Please contact us about project . + C7 Sponsored similar products !CAT8 1 1 eBay.com $39.99 Track price CM II■ Receive email and browser notifications if the price drops Corning CCH-CP24-A9 Panel 12 LC Duplex 24 Fiber Sing lemode/SM 0S2 NEW Shop with confidence * **'!4 2 product ratings Top Rated Plus Trusted Seller,fast shipping,anc Condition: New easy returns. Learn more Quantity: 1 More than 10 available/140 sold '°7 1 {OALSG' > eBay Money Back Guarantee ceol-cP.. © Get the item you ordered or get .1 Ice: US $112 0 0 BuyIt Now your money back. •.4.•• Learn more ..,e...• No Into _-st it p id in to n 6 {r • `99+' Add to cart • Hove. 7_00M Seller information snappysolutions(.306 *) '; Add to Watchlist 100%Positive feedback Or* 1'AO > 140 sold Free shipping and returns Ships from United States V Save this seller •v Contact seller Shipping: FREE Standard Shipping I See details Visit store Located in: Fergus Falls,Minnesota,United States See other items one to sell? Sell now Delivery: Estimated between Sat.Jan.15 and Wed.Jan.19 to Returns: 30 days returns I Seller pays for returnr shipping I see details Payments: PUY Pay VisA . 4y. INK YR (i7 - - eSay Money Back Guarani Pay, cii CREDIT 'No Interest if paid in full in 6 months on$99+.t See terms and ap now Get the item you ordered Earn up to 5x points when you use your eBay Mastercard E. or your money back- Learn more It's that simple. Engineer's Calculauun of Additional Working Days An estimate of zero additional working day was made. The change is a substitution of materials rather than added work. • Tani Stafford From: Tiffani Barquist <tbarquist@reedtrucking.com> Sent: Friday, February 18, 2022 3:21 PM To: 'Tani Stafford'; Dustin Wright; Shawn Reed Cc: 'Flora Lee'; 'David Roman-Sanchez' Subject: RE: Renton - CAG 20-065 Duvall Ave -CO No2 for Plastic line and electrical components - quote request Hi Tani, Yes,that is the old CO No. 2.Totem just wanted to clarify that there are no changes to the vehicular signal heads. Also,there will be no change to coast for the field directive. Thank you, REEDC. TRUCKING& EXCAVATING Tiffani Barquist 253.841.4837—Office 253.841.4816—Fax From:Tani Stafford [mailto:tstafford@g-o.com] Sent: Friday, February 18, 2022 2:33 PM To:Tiffani Barquist<tbarquist@reedtrucking.com>; Dustin Wright<DWright@reedtrucking.com>; Shawn Reed <SReed@reedtrucking.com> Cc: 'Flora Lee'<flee@rentonwa.gov>; 'David Roman-Sanchez' <droman-sanchez@g-o.com> Subject: RE: Renton-CAG 20-065 Duvall Ave-CO No2 for Plastic line and electrical components-quote request Hi Tiffani—that attachment is from is an older version of the change order 2 which included both plastic line and electrical components. There was a time when Totem proposed all new vehicle signal heads. However it was later determined that the existing ones are to remain. So the actual electrical quote we are looking for is the electrical component change described best in FWD No2, attached. Let me know if that helps. There are no known changes needed for the vehicular signal heads.Thanks-Tani From:Tiffani Barquist [mailto:tbarquist@reedtrucking.com] Sent: Friday, February 18, 2022 2:06 PM To:'Tani Stafford' <tstafford@g-o.com>; Dustin Wright<dwright@reedtrucking.com>;Shawn Reed <sreed@reedtrucking.com> 1 DocuSign Envelope ID:DC9B78CF-9EE4-463C-E SODDDDE31AF3 CAG-20-065, CO #2-22 0 Change Order No. 2 Contract Title: Duvall Avenue NE Contractor: Reed Trucking& Excavating Inc. Contract No. : CAG-20-065 Federal Aid No. : N/A ® Ordered by Engineer ❑ Proposed by the Contractor(VECP) ❑ Unilateral Amount Working Days Original Contract: 260 $5,218,171.95 Current Contract: $5,220,756.95 260 Net Change This Order: $0 0 New Contract: $5,220,756.95 260 Prep ed By• Is By: ;� 2/22/22 25,k,..44.4(„„_ 3/rL422 R: iden�,,i: Date ngineer(City cif Renton Transportation D to Design Manager) Reviewed By: Consent By: 0-------- 2/24/22 N/A Engineer of Record Date Surety(crew 5%cost and/or 20% Date ti • ease) Reviewed By: Endorsed By: 2/24/2022 i. - ' - • 3 t,, f Rep•t¢rt Project Manager Date Contractor Date Reviewed By: —DocuSigned by: Approved by Cheryl Beyer via 2/23/2022 email Martin Pastucha 3/16/2022 1 1:30 PM PDT "-88813 1 FD988449D... City Attorney Date uty or Renton i-'uiattc works Date Administrator/Mayor Change Order No. 2 Contract Title: Duvall Avenue NE Contract No. CAG-20-065 Page 1 of 3 DocuSign Envelope ID:DC9B78CF-9EE4-463C 80DDDDE31AF3 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: Replace the second paragraph of Special Provision 9-29.13(10)A Auxiliary Equipment for NEMA Controllers with the following: 9-29.13(10)A Auxiliary Equipment for NEMA Controllers (******) Fiberoptic Termination Panel The signal cabinet shall include a 12-port wall mounted fiberoptic termination panel with loaded duplex single-mode SC coupler plates and splice tray. The panel shall be a Corning SPH-01P with (1)CCH-CP12-59 coupler plate. This is in lieu of the LC Coupler Plate,CCH-CP49-A9,called for in the Special Provision 9-29.13(10)A(Bid Item A85). By this change order, the fiberoptic termination panel shall meet the requirements of Special Provision 9-29.13(10)A Auxiliary Equipment for NEMA Controllers noted above. Reason for Change: The Special Provisions did not include a more recent City of Renton special provision for the fiberoptic termination panel. Materials: FO Termination Panel Change Plans: No changes to the Plans. Adjustment: This Change Order includes changes as defined in 1-04.4. Specifically,the altering of specifications (e.g. FO Termination Panel). There is no cost associated with this change. Change Order No. 2 Contract Title: Duvall Avenue NE Contract No. CAG-20-065 Page 2 of 3 DocuSign Envelope ID:DC9B78CF-9EE4-463C-5 IODDDDE31AF3 Extension of Time: The Time for Completion is extended 0 Working Days. Equitable Adjustment: This Change Order does not include an equitable adjustment, per Section 1-09.4 of the 2021 WSDOT/APWA Standard Specifications. This is a no-cost change order Sections 1-04.4 and 1-04.5 of the 2021 WSDOT/APWA Standard Specifications shall govern this Change Order.The Work of the referenced Contract is modified to include the changes detailed herein.The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials,overhead,profit,permit fees, and all other claims that may be made by the Contractor as a result of this change. Attachments: Forms to be attached to Change Order Plans l] Equitable Adjustment Determination Change Order No. 2 Contract Title: Duvall Avenue NE Contract No. CAG-20-065 Page 3 of 3