Loading...
HomeMy WebLinkAboutCAG-20-065 - Duvall - Change Order 11 11R Change Order No. 11 Backup Documentation Contract Title: Duvall Avenue NE Contractor: Reed Trucking& Excavating, Inc. Contract No. : CAG -20-065 Federal Aid No. : N/A Attachments: Backup Documentation O Field Directive O Equitable Adjustment Determination O Determination of Additional Working Days O Engineer's Estimate of Change Order Cost ® Engineer's Calculation of Additional Working Days O Contractor's Quote ❑ Project Labor List ❑ Contractor's Equipment list including rates per AGC-WSDOT Equipment Agreement E Summary of invoices for rented equipment ❑ Summary of invoices for materials Change Order No. 11 Multi-Stem Tree Removal in WZB Contract Title: Duvall Avenue NE Contract No. CAG -20-065 Page 1 of 1 City of Renton Field Directive No: 15 m Project Name: Duvall Ave NE Contractor: Reed Trucking and Excavating,Inc. Contract No: CAG-20-065 By: Federal Aid No: N/A TIB No: N/A Date: Construction Manager: Tani Stafford V 5 /2022 The following is documentation of the oral order given by the Resident Engineer per WSDOT Std Spec 1-04.4 The Contractor is directed to do the following additional work: Remove the multiple stem tree at Sta 904+11 LT,see below photo. The Plans note this tree as a 10"diam.tree to be removed.lt is not possible to grind the roots from this tree due to the embankment,the tree trunk shall be cut down as close as possible to existing grade. The additional work required to remove and dispose of this tree,above what is required for the removal on one 10"diam.tree,will be paid via a new contract item at the lump sum price based on the invoice to be provided by the nt 4Ltar4fik b � Rough Cost Estimate,WSDOT Construction Manual 1-04.4,Changes. Cost Adjustments: The added work will be paid at a new contract item Multiple Stem Tree Removal for the lump sum price of $4,907.28. A Change Order covering this Field Directive will follow immediately. %� 5aArcu. 5/6/2022 Contractor 0 Date Equitable Adjustment Determination - CO No 11 Project Name:Duvall Avenue NE Contractor:Reed Trucking&Excavating Inc. Contract No:CAG 20-065 By: Tani Stafford Construction Manager: Tani Stafford,PE Date:5/10/22 New Contract Item Cost New Contract Quantity Item No. Description Change Unit Unit Price Total 11-A107 Multiple Stem Tree Removal 1 LS $4,907.28 $4,907.28 New Contract Item Cost $4,907.28 CHANGE ORDER COST I $4,907.28 Narrative: The equitable adjustment for this work was determined to be a lump sum amount of $4,907.28. FWD No 15 was issued on 5/6/22 directing the Contractor perform additional work re- quired to remove the multi-stem tree in lieu of a single 10-inch tree, but not grind out roots. The Engineer's Estimate for the increased of removal of a multi-stem tree -vs- a single 10- inch tree was estimated to be $4,000, based on a previous invoice received for the triple tree removal work. The Contractor provided a quote for the additional work to remove the multiple tree, over and above removal of a 10-inch tree @ $4,907.28 and the quote was accepted. Determination of Additional Working Days A determination of zero additional working days was made. Engineer's Estimate based on 1 r ious invoice Combined Cutting Contractors, Inc. MEMBER of Ie;_5^E3 PROPOSAL ' , D.B.A. P&D Tree Service Better ��'11. (425)432-7636.1-877-766-4882•Fax(425)413-7991 Business Ask about our low impact Lic.#CCPNDLOLT867QQ • UBI 601-439-180 Bureau crane removal program! _444 t ix. www.panddtreeservice.com Visa/Mastercard panddlogging@comcast.net Fully Insured and Bonded �ustomer Name: ckk y S jKGrn.va ble,C DATE: 1— ADDRESS: 8.6 Dv v o t 0 Ave, A I h HOME PHONE: CITY/ZIP: I`Q,y +Oln WORK PHONE: E-MAIL: CELL: FAX: COMMENTS: ' • D•Jsh'll • We hereby submit specifications and estimate for: �a` `1 ( ..G7......_�._J � t"...... I'... CGS...................G�.......f )h le-et , J� I,/o v t dr % `; 3)' Gam►ly___.._._.1 ..s,.. _.._ .100 `. �' .__ .�,. .w w.�_ ......_._.. .. ._. _ •Ck LA a 0.4. 7). 9). 10). Based on Phil's field observations,.,work to remove tree at SIa,,,..04+11 S.-,,.,. .__._._ ii). approximately between the above quoted cottonwood and maple ($3,750). `""��"__...."Assume a-credit'of$750 forW'10"tine noted on P?ans�"Asume ReecTs slupport -�� 12). crewsimiliar-to-FWD..09.. ..e$1,000.n...... ., .._......._.._w..:.__..,..._....M._........_... 13). - 14). Engineer's Estimate=$4,000~ Definitions;Permits are the responsibility of the customer,and shall hold P&D Tree Service harmless.Removal means taking of something down,never does it refer to hauling or stump grinding. Stump grinding.and wood removal are separate charges. Firewood means rounds; to be left where cut-up.Any moving would be additional charges.If logs are taken,firewood means anything too small to go on the truck and too big for the chipper. 6 \%credit card processing fee.Full payment upon completion of job,unless other arrangements have been made.20%interest charge after 30 days.Coupon not to be combined with Visa or MasterCard.All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices.Any alteration or deviation from above specification will become an extra charge over and above the estimate.All agreements contingent upon strikes,accident or delays beyond our control.Homeowner to mark trees if away from work site,and will not hold C.C.C.I.responsible for errors.Any timber tax to be paid by the homeowner.The above prices specifications are hereby accepted.You are authorized to do the work as specified.Payment will be made as outlined above. ..,Signature Date Please see terms and conditions on back REV 01/21 Engineer's Calculation of Additional Working Days The added work will take place during other critical path item work (clearing/grubbing and other tree removals within the same Work Zone) so no additional days are warranted. Contractor's Quote REED Change Order Proposal #16 2207 Inter Ave,Ste.A Puyallup,WA 98372 TRUCKING 6 EXCAVATING Office:(253)841-4837 Fax:(253)841-4816 GC/Owner: City of Renton JSS It: 16 Reed Job No: 156 Project: Duvall Ave NE Date: 5/4/2022 Description: cost differnce from tree size of 10"called out on plans to multi cluster tree in the field at 10th stump is to high up on slope to grind Subcontractor: Labor Costs Regular Overtime Amount Craft Employee Name Hours Rate Hrs Rate* Regular Overtime FM Jordan Ausbun 3 $ 86.42 $ 129.63 $ 259.26 $ - $ - $ - $ - $ $ - $ - $ - $ $ - $ - $ - $ - $ - $ - $ - $ $ - $ - $ - $ *Including Fringe Benef Labor Subtotal $ 259.26 $ - Labor Total $ 259.26 Equipment Costs Equip. Regular Standby Amount fJ Equipment Hrs Rate Hrs Rate' Regular Standby FT03 2020 FORD F-450 3 $ 55.00 $ 27.50 $ 165.00 $ - $ - $ - $ - $ S - $ - $ - $ - $ $ - $ - $ 5 - $ - $ - $ - $ - 5 - $ - $ $ - $ - $ - $ $ - $ - $ - $ Equipment Subtotals $ 165.00 $ - Equipment Total $165.00 Material Costs Supplier Material Invoice(s) Quantity Price Amount $0.00 $0.00 $0.00 $0.00 $0.00 Materials Total_ $0.00 Subcontractor Costs Subcontractor Scope Invoice(s) Quantity Price Amount P And logging tree removal > 1 $3,900.00 $3,900.00 $0.00 $0.00 $0.00 REED c Summary Subcontractor Total $3,900.00 Cost TRUCKING 6 EXCAVATING Total Labor $ 259.26 31% Labor Mark-up $ 80.37 Total Equipment $165.00 Date: 21% Equipment Mark-up $34.65 Total Materials $0.00 21% Material Mark-up $0.00 Contractor Foreman /Superintendent Total Subcontractors $3,900.00 12% Sub Markup up to$25K $468.00 10% Sub Markup$25K-$100K $0.00 Date: 7% Sub Mark-up Over$100K $0.00 Subtotal $ 4,907.28 $ Engineer TOTAL $ 4,907.28 Combined Cutting Contractors, Inc. MEMBER of BBB PROPOSAL .0„ D.B.A. P&D Tree Service Better . (425)432-7636.1-877-766-4882• Fax(425)413-7991 Business Ask about our low impact Lic.#CCPNDLOLT86700 • UBI 601-439-180 Bureau crane removal program! www.panddtreeservice.com Visa/Mastercard panddlogging@comcast.net Fully Insured and Bonded �ustomer Name: Lck -- v dci nc') DATE: Ca 11-z— . ADDRESS: e� V \ICA\ ► 1� HOME PHONE: lJ CITY/ZIP: WORK PHONE: E-M IL: L: FAX: \-t� , UIS-�'erPcd-trVOCLt�.r, , o-1 o I ' b°t.°►' COMMEVt v Sfi r1 We hereby submit specifications and estimate for: �+ I)* I 0 cam! o r. {'k2.. c o�rrt - o T- 1\I I7-3 I d-si- ci Z DV va l/ 2)• r'Y,w�cam A\` . 0rQ 1 74 PIO 0 -I--r&x. 3). s v;tt 1 9S-0 4). I 0 +-I.e I eP(- o p 1 160 ck.Ai..c 4.,4, / r-•P l e 1- / 5)• 1 y 144 ot, re►,o,,{ I/ too 6). 7). L / 011'1(11 IMaplc re wtu,e, hro 8). Tit il.ce. ' s a 15 ram►vlh clUke- 9)• o re uvc (-Jo 1 ft r ' I� )S 0 • 11). Subcontractor cost TO 1 cir a 11 12) for additional work = 1 1 6 00 f TGX $3,900 i 13). 14). I l a"1•c., C.4ti+7 J`JL. Definitions: Permits are the responsibility of the customer,and shall hold P&D Tree Service harmless.Removal means taking of something down, never does it refer to hauling or stump grinding. Stump grinding and wood removal are separate charges. Firewood means rounds; to be left where cut-up.Any moving would be additional charges. If logs are taken,firewood means anything too small to go on the truck and too big for the chipper. / 3%credit card processing fee.Full payment upon completion of job,unless other arrangements have been made. 20%interest charge\ after 30 days.Coupon not to be combined with Visa or MasterCard.All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices.Any alteration or deviation from above specification will become an extra charge over and above the estimate.All agreements contingent upon strikes,accident or delays beyond our control.Homeowner to mark trees if away from work site,and will not hold C.C.C.I.responsible for errors.Any timber tax to be paid by the homeowner.The above prices specifications are hereby accepted.You are authorized to do the work as specified.Payment will be made as outlined above. .Signature Date Please see terms and conditions on back REV 01/21 DocuSign Envelope ID:E4A3C429-F475-42BD-A733-001291775E9D CAG-20-065, CO #11-22 • ` • ,, 1 Change Order No. 11 Contract Title: Duvall Avenue NE Contractor: Reed Trucking& Excavating Inc. Contract No. : CAG-20-065 Federal Aid No. : N/A ® Ordered by Engineer 0 Force Account O Proposed by the Contractor(VECP) 0 Bid Item ❑ Unilateral ® Lump Sum Amount Working Days Original Contract: $5,218,171.95 260 Current Contract: $5,333,147.50 262 Estimated Net Change This Order: $4,907.28 0 New Contract: $5,338,054.78 262 Prep red By: Iss y: 5/17/22 A< 4/13/` .. sident E in Date ngineer(City of Renton Transportation Date Design Manager) Reviewed By: Consent By: ��`--� �--- 5/20/22 N/A Engineer of Record Date Surety(Gr an 25%cost and/or 20% Date increase) Reviewed By: Endorsed By: 5/26/2022 c.., -/9-♦20,�� f Renton Project Manager Date ?tractor Date Reviewed By: Executed By: Approved by Cheryl Beyer via 6/3/2022 email martin Pastucha 6/10/2022 I 3:22 PM PDT City Attorney Date City of Renton Public Works Date Administrator/Mayor Change Order No. 11—Multi-Stem Tree Removal in WZB Contract Title: Duvall Avenue NE _ Contract No. CAG-20-065 Page 1 of 3 Vu..U. IyiI CI IVtLE IC IU.C41-Jl..4GU-r4/J-44 DV-/Al JJ-liU IGV III JCCU THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: • Add the following lump sum item to the contract: o Lump Sum Item No. 11-A107 MULTIPLE STEM TREE REMOVAL, Quantity= 1 LS, Unit Price = $4,907.28 As required in FWD No 15 - Remove the multiple stem tree at Sta 904+11 LT. It is not possible to grind the roots from this tree due to the embankment, the tree trunk shall be cut down as close as possible to existing grade. Reason for Change: There was a changed condition. The Plans call for the removal of one 10" diam. tree. The tree is a multiple stem tree. Affects DBE Work: ❑ Yes ® No This Change Order does not affect DBE work. Materials: No changes. Plans: No changes. Equitable Adjustment: This Change Order does not include an equitable adjustment in the new lump sum item as follows, per Section 1-09.4 of the 2021 WSDOT/APWA Standard Specifications. o Lump Sum Item 11-A107 MULTIPLE STEM TREE REMOVAL, per lump sum. See the attached Equitable Adjustment Determination. Extension of Time: The Time for Completion is extended 0 Working Days. Change Order No. 11—Multi-Stem Tree Removal in WZB Contract Title: Duvall Avenue NE Contract No. CAG-20-065 Page 2 of 3 UULUJIYIi CI IVCIU1JC IU.C4MJl..44V—r41 U-4LDU-M!).-loU ILV I I!UC.`JU Sections 1-04.4 and 1-04.5 of the 20xx WSDOT/APWA Standard Specifications shall govern this Change Order.The Work of the referenced Contract is modified to include the changes detailed herein.The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead,profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. To be attached to Change Order: ❑ Plans • • Change Order No. 11—Multi-Stem Tree Removal in WZB Contract Title: Duvall Avenue NE Contract No. CAG-20-065 Page 3 of 3