HomeMy WebLinkAboutCAG-20-065 - Duvall - Change Order 12 1 111 Change Order No. 12 Backup Documentation Contract Title: Duvall Avenue NE Contractor: Reed Trucking& Excavating, Inc. Contract No. : CAG-20-065 Federal Aid No. : N/A Attachments: Backup Documentation ® Field Directive ® Equitable Adjustment Determination ® Determination of Additional Working Days ® Engineer's Estimate of Change Order Cost ❑X Engineer's Calculation of Additional Working Days ® Contractor's Quote ® Project Labor List • Contractor's Equipment list including rates per AGC-WSDOT Equipment Agreement o Summary of invoices for rented equipment ® Summary of invoices for materials Change Order No. 012 Sunset Intersection TC Mod Contract Title: Duvall Avenue NE Contract No. CAG -20-065 Page 1 of 1 City of Renton Field Directive No: 13 Project Name: Duvall Ave NE Contractor: Reed Trucking and Excavating,Inc. Contract No: CAG-20-065 By: Federal Aid No: N/A TIB No: N/A Date: Construction Manager: Tani Stafford /2022 The following is documentation of the oral order given by the Resident Engineer per WSDOT Std Spec 1-04.4 The Contractor is directed to do the following changed work: Furnish, install and maintain added channelization devices along the edge of WZE and WZD and at intersection access and driveway accesses within the work zones. Furnish and install Loose Gravel warning signs at driveway accesses and intersection accesses in the work zones,where there is temp gravel or pulverized material surfacing. BI A13 Other Traffic Control Labor per hour for the placement,movement and removals of the channelization devices. BI A14 Construction Signs Class A per SF for furnishing and installing,maintaining and removal of the Loose Gravel warning signs. Cost for furnishing the additional channelization devices to be tracked by force account. Rough Cost Estimate,WSDOT Construction Manual 1-04.4,Changes. Cost Adjustments: The quantity for bid item BI A13 Other Traffic Control Labor is sufficient, no increase anticipated. The quantity for bid item BI A14 Construction Signs Class A is sufficient, no increase anticipated. The approximate quantity increase furnishing the additional channelization devices for the edge of the work zone,driveway accesses,intersection accesses is TBD A Change Order covering this Field Directive will follow immediately. Contractor Date T 1 City of Renton Field Directive No: 16 Project Name: Duvall Ave NE Contractor: Reed Trucking and Excavating,Inc. Contract No: CAG-20-065 / /- Federal Aid No: N/A By. WW_r TIB No: N/A Date: Construction Manager: Tani Stafford • The following is documentation of the oral order given by the Resident Engineer per WSDOT Std Spec 1-04.4 The Contractor is directed to do the following changed work: Provide equipment and labor for bucket truck assistance to install the City-furnished signal head modifications on the center signal head on the north bound mast arm,and to bag or remove the existing left turn sign from the mast arm. Furnish and install 4 EA"Signal Revision Ahead"W20-903 signs 48"x48",one located on each approach to Sunset/Duvall. BI A14 Construction Signs Class A per SF will be used to pay for furnishing and installing,maintaining and removal of the"Signal Revision Ahead"signs. Cost for furnishing equipment and labor to assist the City with the traffic signal modification at Sunset Boulevard/Duvall Avenue to be tracked by force account. Rough Cost Estimate,WSDOT Construction Manual 1-04.4,Changes. Cost Adjustments: The quantity for bid item BI A14 Construction Signs Class A is sufficient, no increase anticipated. The cost for added work to assist the City with the traffic signal modifications will be tracked via force account and paid under a new contract item Signal Modifications. A Change Order covering this Field Directive will follow immediately. Contractor Date Equitable Adjustment Determination - CO No 12 Project Name:Duvall Avenue NE Contractor:Reed Trucking&Excavating Inc. Contract No:CAG 20-065 By: Tani Stafford Construction Manager: Tani Stafford,PE Date:5/12/22 New Contract Item Cost New Contract Quantity Item No. Description Change Unit Unit Price Total 12-A108 Additional Channelization Devices 1 FA $11,000.00 $11,000.00 12-A109 Signal Modification Assistance 1 FA $3,500.00 $3,500.00 New Contract Item Cost $14,soo.00 ESTIMATED CHANGE ORDER COST I $14,500.00 Narrative: An equitable adjustment of $14,500 has been determined based on estimated force account work. FWD No 13 was issued on 5/11/22 directing the Contractor to provide additional temporary channelization devices and Construction Class A signage to supplement the approved TC Plan for Work Zone D and E. The Engineer's Estimate for furnishing the additional channelization devices is $11,000.00 was prepared on 5/6/22. This estimate is based on online pricing for channelization drums and as- suming the devices are needed for approx. 5.5 months to be paid by force account. FWD No 16 was issued on 5/12/22 directing the Contractor to provide additional labor and equipment and signage for a signal modification at the intersection of Sunset Boulevard and Duvall Ave. The Engineer's Estimate for the additional work in FWD 16 is $3,314.96, rounded to $3,500.00 and was prepared on 5/11/22. This estimated is based on assumed force account hours, labor and equipment for the signal modification assistance. The Contractor will be paid for furnishing the additional channelization devices via force account based on rental invoices. The Contractor will be paid via force account for labor and equipment needed for signal modifications, based on actual hours, equipment rates and labor rates docu- mented and accepted. The additional labor to furnish, install, maintain and remove of the additional temporary channel- ization devices and Construction Class A signage will be paid under current Contract Items (A13 and A14). The proposal quantities for these two Items is sufficient for the additional work. Determination of Additional Working Days A determination of zero additional working days was made. r , Engineer's Estimate - City of Renton-Duvall Ave NE,CAG 20-065 Field Directive No 13 Engineer's Estimate Date:5/6/2022 Qty Estimated Item No. _Description Change Unit Price Amount ** Additional Channelization Devices 1 FA $11,000.00 $11,000.00 Total(rounded) $11,000.00 Assumptions: Approx.50 ea additional chan drums required Based on onlice pricing,approx.$2,000 per month for chan drums Based on Baseline Schedule for WZD&WZE approx.5.5 months 1 Engineer's Estimat( City of Renton Duvall Avenue NE G&O 20593 Description: FWD 16-Signal Modification Assistance Engineer's Estimate Dates: 5/11/2022 Prime Contractor Labor: (Reed) Hours Rate Total Foreman Foreman 5 $86.42 $432.10 Labor Cost $432.10 Markup (31%) $133.95 Subtotal Labor Cost $566.05 Prime Contractor Equipment: Hours Reg Rate Total Service Truck FT03 5 $53.55 $267.75 Equipment Cost $267.75 Markup(21%) $56.23 Subtotal Equipment Cost $323.98 Subcontractor Labor: (Totem) Unit Unit Price Total Foreman Electrician 5 $107.24 $536.20 Electrician 5 $99.80 $499.00 Labor Cost $1,035.20 Markup (31%) $320.91 Subtotal Labor Cost $1,356.11 Prime's Markup (12%) $164.09 Subcontractor Labor: (Totem) Unit Unit Price Total Truck 5 $18.50 $92.50 Boom Bucket 5 $88.36 $441.80 Labor Cost $534.30 Markup(21%) $112.20 Subtotal Labor Cost $646.50 Prime's Markup (12%) $78.23 Total Cost: $3,134.96 BLCBA49-Traffic Barrels 49"With Bottom P:—I Rental-Traffic Drum https://brightlots.cor 1--"duct/blcba49-traffic-barrels-49-with-bottom-rin... POLES POLE ACCESSORIES 'd LED FIXTURES v PARKING SAFETY PRODUCTS PARKING SAFETY PRODUCTS RENTAL p BLCBA49 - Traffic Barrels 49" With Bottom Ring I Rental $7,657.94 Crash Barrel 49"Includes bottom ring. PRICING DETAILS Please select dates and quantity to see pricing that applies. • First 7 days$8.5 per day+$1.25 per barrel per day • 8+days-$3.50 per day+$1.25 per barrel per day • Further discounts apply for longer duration Dates 05/05/2022 > 09/01/2022 We're Online! Included Services How may I help you today? U 1 of 5 5/5/2022,2:36 PM BLCBA49-Traffic Barrels 49" With Bottom Ri^-' Rental-Traffic Drum https://brightlots.com/---"uct/blcba49-traffic-barrels-49-with-bottom-rin... to a POLES v POLE ACCESSORIES v LED FIXTURES ' PARKING SAFETY PRODUCTS se Friend $3.50 x 120 days $420.00 25%weekly discount -$104.13 50%monthly discount -$157.94 Services $7,500.00 Total $7,657.94 ADD TO QUOTE Estimated$2,000 per month for 50 drums Add to Wishlist SKU:BLCBA49-1 Categories:Rentals,Cones And Barrels,Parking Safety Products f SOD DESCRIPTION Dimensions:49"H x 35"x 20".Height is 49 in.Bottom OD is 35"and the top is 20 in. Weight: 14 lbs.top portion.22.5 lbs.bottom rubber portion.Total weight:36 lbs Material:Top material is HDPE(High Density Polyethylene).Bottom ring is rubber. Used in parking lots and garages for safety in work zones.Made from HDPE with high corrosion,impact and UV resistance.The barrel will keep its orange color and will stand the harshest of environments.Includes three bands of highly reflective tape.The rubber ring is heavy and is installed at the site by sliding the ring over the the drum.The bottom ring provides stability and is designed to grip the surface it is placed on. Tapered design provides easy stacking.Handle at the top for easy dragging and carrying.Two holes located on either side of the handle accommodate warning lights. We're Online! How may I help you today? ol 2 of 5 5/5/2022,2:36 PM BLCBA49-Traffic Barrels 49"With Bottom P=---'Rental-Traffic Drum https://brightlots.cor"--duct/blcba49-traffic-barrels-49-with-bottom-rin POLES v POLE ACCESSORIES v LED FIXTURES •' PARKING SAFETY PRODUCTS v RELATED PRODUCTS CONES AND BARRELS BUMPERS&WALL PROTECTORS BLTCO28-Traffic Cone 28" BLCPS39EVA-Corner Guard S Series 39" $14.47 $4.45 SHOW DETAILS ADD TO CART CONTACT INFORMATION CORPORATE OFFICE: 800 E.Northwest Hwy,Suite 700 Palatine,IL 60074 OFFICE HOURS: Mon-Fri 8AM-6PM Central Time PHONE: (888)364-8802 We're Online! How may I help you today? oi 3 of 5 5/5/2022,2:36 PM Engineer's Calculation of Additional Working Days The added work will take place during other critical path item work (additional chan devices and sign will be incorporated into approved TC Plan for Work Zones) so no additional days are warranted. ,t Project Labor List - Reed Force Account and Labor Rate and Equipment Rate 2/15/22 Resubmittal Trucking Review 2-19-22 REED i King County Wage Rates-Duvall Ave NE Updated:2/15/2022 raucslTAO 6 EXCAYA1MI6 Reed Trucking and Excavating Inc.-Force Account Labor Rates Trade WAGE SS/Medicare SUTA FUTA L&I ESD EAF REG TOTAL OTTOTAL Foreman $74.28 $5.68 $3.87 $0.45 $2.11 $0.03 $86.42 $129.63 Operator under 15 MT $72.48 $5.54 $3.78 $0-43 $2.11 $0.03 $84.38 $126.57 Pipe Layer $53.35 $4.08 $2.78 $0. $2.11 $0.03 $62.67 $94.01 Pipe Layer Top Man $52.39 $4.01 $2.73 50.31 $2.11 $0.03 $61.59 $92.38 General Laborer $52.39 $4.01 $2.73 $0.31 $2.11 $0.03 $61.59 $92.38 Grade Checker $54.01 $4.13 $2.81 $0.32 $2.11 $0.03 $63.42 $95.14 TCS $50.31 $3.85 $2.62 $0.30 $2.11 $0.03 $59.23 $88.84 Flagger $44.40 53.40 52.31 $0.27 $2.11 $0.03 $52.52 $78.78 Truck&Trailer $64.55 $4.94 $3.36 $0.39 $2.11 $0.03 $75.38 $113.07 Truck Driver $63.71 r $4.87 $3.32 $0. " $2.11 $0.03 $74.43 $111.64 Superintendent $91.34 $5.60 $4.76 $2.11 $0.03 $104.39 $156.59 DESCRIPTION I EQUIPMENT i Regular Rate I Standby RateJ DUMP TRUCK-SOLO(12 CY or 15 TN CAPACITY) DT 6 2000 FREIGHTLINER#716 5 95.00 $ 57.'1 DT73 2000 FREIGHTLINER#731 5 95.00 $ 5.50 DT747 2001 FREIGHTLINER#747 5 95.00 $ 7.50 5S-614 2022 SUPER SOLO DUMP TRUCK(18 CY) $ 95.42 $ 20.17 SS-811 2022 SUPER SOLO DUMP TRUCK(18 CV) $ 95.42 $ 20.17 DUMP TRUCK-T&T(24CYor32TNCAPACITY) SUBMITTAL REVIEW DT716T 2000 FREIGHTLINER#716&TRAILER $ 105.37 $ 39.83 OT731T 2000 FREIGHTLINER#731&TRAILER $ 108.43 39.88 DT747T 2001 FREIGHTLINER#747&TRAILER $ 108.43 39.88 _ No Exceptions Taken PICK-UP x Make Corrections Noted FB01 2005 FORD F-450 FLATBED $ 55 00 $ 27.50 FT01 2014 FORD F-150 FOREMAN TRUCK $ . .00 $ 27.50 Amend &Resubmit FT02 2019 FORD F-450 $ 53.54 $ 7.95 Rejected-See Remarks FT03 2020 FORD F-450 $ 53.55 $ 7.96 FT04 •022 FORD F-350 WATER TRUCK $ 60.00 $ 7.96 IMPORTANT NOTICE:This review WT01 120. INTERNATIONAL 4700(2000 GAL TANK) $ 105.00 $ 52.50 does not relieve the Contractor from WTO2 2014 -NDCO TANKS FREIGHTLINER(2450 GAL TANK) - 110.00 $ 55.00 BACKHOE responsibility to comply&conform BH01 200210H DEERE310SG 5 70.00 5 35.00 with the Plans, Specifications, and BH02 2020 JOHN, ERE 410E $ 80.00 $ 40.00 Contract Documents. DZO t,nna Inuei',Iry• ccnu IT,n_n cnC 15 89.00 I$ 44.50 Replace with the attached SWO is 65.001$ 32.50 Equipment Rates Gray SrOsborrie,Lac. EXO $ 75.00 $ 37.50 ......_._,_,__i C ASS CONSULTING ENGINEERS EXO , $ 75.00 $ 37.50 EX.. 2020 KOMATSU PC8B-10 $ 90.00 $ 45.00 2/19/22 EX.• 01: • ' U. :8-.• \ ♦ I $ 90.00 $ 45.00 By: TLS Date: EX05 2020 Komatsu PC138 $ 97.04 $ 28.52 EX06 2020 Komatsu PC138 $ 97.04 $ 28.52 EX07 2003 KOMATSU PC200LC-7/ID '. C(50,000#CLASS) $ 112.00 $ 56.00 EXOB 2006ID 120C MID EXC(28,000 CLAS $ 97.00 $ 48.50 EX09 2022 KOMATSU PC23BUSLC- $ 125.00 $ 62.50 HO-PAC HP09 12008 ALLIED(for 200 Exc $ 32.20 $ 16.10 HP05 2010 ALLIED(for 120 E ) 5 28.75 5 14.38 ROLLER-VIBRATORY CR03 2005 SAKAI 84"D•AM ROLLER $ 105.00 $ 52.50 CR01 2015 CAT CB 24:ASPHALT COMPACTOR $ 105.00 $ 5250 WHEEL LOADER W L01 12006 KOM' U WA250L-5(3 CY CAPACITY) $ 100.00 $ 50.00 WL02 2018 KO -TSU WA270 LOADER 5 110.00 $ 23.65 GRINDING AZO1 12019' PHALT ZIPPER 95.001$ 4/50 COMPRESSOR COMPO1 ID.osan P185 Air Compressor I$ 50.001 PCMS Boards PCMF01 Portable Changable Hydraulic Message Sign $ 25.00 PCMF02 Portable Changable Hydraulic Message Sign $ 25.00 PCMF03 Portable Changable Hydraulic Message Sign $ 5.00 PCMF04 Portable Changable Hydraulic Message Sign $ .00 Arrow Boards ABM 25 Light Solar Powered Arrow Board Trailer $ 20. ABO2 25 Light Solar Powered Arrow Board Trailer $ 20.00 TRAILER ET01 -12003 TRAIL KING TKT50-3 Axle Tilt-top(45,000#Capacity) I$ 45.00 I$ 22.50 TRENCH SAFETY T502 8'x20'800 $ 18.54 $ 9.27 TS03 4'x20'BOX $ 20.79 $ 10.40 T.' 8k8'MANHOLE BOX $ 18.92 $ 9.46 .6 8'x20'STEEL PLATE $ 11.86 $ 93 .. GRAVEL SKIFF $ 18A0 $ 9. Contractor's Equipment list includ _ .ates per AGC- WSDOT Equipment Agreement- Reed Trucking Duvall Avenue NE CAG-20-065 2/19/2022 Equipment Rate Backup Reed Trucking Equipment Equipment Rate Check Equipment Name I Equipment Name 'Equipment Rate Standby Rate description Dump Truck-Solo DT716 2000-2001 Freightliner(12-15CY)#716 2020 Misc 18 YD 70 KGVW On Highway Rear Dump $69.06 $11.77 DT731 2000-2001 Freightliner(12-15CY)#731 2020 Misc 18 YD 70 KGVW On Highway Rear Dump $69.06 $11.77 DT747 2000-2001 Freightliner(12-15CY)#747 2020 Misc 18 YD 70 KGVW On Highway Rear Dump $69.06 $11.77 SS-614 2022 Super Solo Dump Truck(18CY) 2021 8x4 18 YD 85KGVW rear dump $95.42 $20.17 SS-811 2022 Super Solo Dump Truck(18CY) 2021 8x4 18 YD 85KGVW rear dump $95.42 $20.17 Dump Truck-T&T DT716T 2000-2001 Freightliner(12-15CY)#716&Trailer DT with 4 Axle 4 tire 40 FT trailer($39.37 reg,$24.41 $108.43 $36.18 DT731T 2000-2001 Freightliner(12-15CY)#731&Trailer DT with 4 Axle 4 tire 40 FT trailer($39.37 reg,$24.41 $108.43 $36.18 DT747T 2000-2001 Freightliner(12-15CY)#747&Trailer DT with 4 Axle 4 tire 40 FT trailer($39.37 reg,$24.41 $108.43 $36.18 Light Duty Pickup FBO1 2005 Ford F-450 Flatbed,16K GVW 2019 Misc 4x2 30KGVW $32.63 $5.39 FT01 2014 Ford F-150 Foreman truck,300-400 HP 2021 Light Duty Trucks-4x2 360 HP $24.61 $4.44 Add $10 FT02 2019-2020 Ford F-450 2021 4x2 1/2 450 Crew Gas light duty truck $43.54 $7.95 for small FT03 2020 Ford F-450 4x2 1/2 450 Crew Gas $43.55 $7.•. tools for FT04 2022 Ford F-350 2022 F350 On-Highway Light Duty $34.44 $4.23 Water Truck Foreman's WT01 2001 International 4700(2000 gal) 2016 Water Truck-On Highway 4000 gal $54.23 $17.98 Truck WT02 2014 Randco Tanks Freightliner(2450 gal) 2016 Water Truck-On Highway 4000 gal $54.23 $17.98 Backhoe BHO1 2002 John Deere 310SG 2002 Deere 3105G $47.66 $11.98 BH02 2020 John Deere 410L 2020 Deere 410E $79.76 $24.30 Dozer DZ02 2004 John Deere 550H LT(D-4 Size) 2004 Deere 550H LT $83.21 $22.04 Sweeper SW01 2015 Laymore Sweeper 2015 Lay-Mor 6-HB $49.79 $13.21 Excavator EXO1 2019 Kubota Mini Ex KX057 2019 Kubota KX057-4 $50.14 $18.65 EX02 2006 Kubota KX161/JD 75 Mini Ex 2006 Kubota KX161-2 $47.42 $16.34 EX03 2020 Komatsu PC88-10 2020 Komatsu PC88MR-10 $90.07 $30.37 EX04 2020 Komatsu PC88-10 2020 Komatsu PC88MR-10 $90.07 $30.37 EX05 2020 Komatsu PC138 2020 Komatsu PC138USLC-11 $97.04 $28.52 EX06 2020 Komatsu PC138 2020 Komatsu PC138USLC-11 $97.04 $28.52 EX07 2003 Komatsu PC200LC-7/JD 200 Ex 2003 Komatsu PC200LC-7 $106.44 $32.72 EX08 2006 JD 120C Mid Ex 2013 Deere 135D $69.92 $37.27 EX09 2022 Komatsu PC238USLC-11 2022 Komatsu PC238USLC-11 $126.94 $43.13 Ho-Pac HP09 2008 Allied(for 200 Exc) 2010 Allied AR 120B $34.56 $11.09 HPOS 2010 Allied(for 120 Exc) 2010 Allied AR 120E $34.56 $11.09 Roller-Vibratory CR03 2005 Sakai 84"Drum Roller 2012 Dynapac CA 362D(84 In.Roller) $66.86 $20.24 CRO1 2015 Cat CB 24B Asphalt Compactor 2015 Caterpillar CB-24B $42.39 $12.62 Wheel Loader WLO1 2006 Komatsu WA250L-5(3 CY Capacity) 2022 Komatsu WA270-3 $55.65 $18.73 WL02 2018 Komatsu WA270 Loader 2022 Komatsu WA270-3 $55.65 $18.73 Grinding AZO1 2019 Asphalt Zipper Zanitas Road hog-Equipmentwatch $49.20 $14.20 Compressor COMPO1 Doosan P185 Air Compressor Air Compressor 185 cfm,80 hp $15.77 $4.12 PCMS Board PCMF01 I $6.62 $5.82 PCFM02 Portable Changeable Hydraulic Message Sign $6.62 $5.82 PCFM03 Portable Changeable Hydraulic Message Sign $6.62 $5.82 PCFM04 Portable Changeable Hydraulic Message Sign $6.62 $5.82 Arrow Board ABO1 25 Light Solar Powered Arrow Board Trailer Trailer Mounted flashing arrow sign-Caltrans 2021 $9.41 $4.96 AB02 25 Light Solar Powered Arrow Board Trailer Trailer ET01 2003 Trail King TKT50-3 Axle Tilt Top 2001 Tilt Deck Utility Trailers(3 Axle,50000 LB Capacity)- $10.72 $5.82 (45000 LB Capacity) Equipmentwatch Trench Safety TS02 8'x20'Box 8'x8'x24'Box-Caltrans 2021 $18.51 TS03 4'x20'Box 4'x12'x24'Box-Caltrans 2021 $11.38 TSO4 8'x8'Manhole Box 8'x15'x10'box-Caltrans 2021 $9.39 TS06 8'x20'Steel Plate 1.5"thick Steel plate(160 SF)-Caltrans 2021 $3.39 TS08 Gravel Skiff Metal Tank-Caltrans 2021 $7.39 a ; 1 , ) I E q uip mentWatch. � �; t� www.equipmentwatch.com FT03-2020 Ford F-450 All prices shown in US dollars($) Rental Rate Blue Book® September 3,2021 Miscellaneous 4x2112450 CREW GAS • On-Highway Light Duty Trucks A (— 1410 Size Class: 300 HP&Over / Weight: id 1 NIA 1111 Configuration'for 4X2 112 450 CREW GAS �• � -^4 : Axle Configuration 4X2 Cab Type Cre ^y Horsepower 450 hp Power Mode w(Gasoline Ton Rating 112 ` .% ;a Blue Book Rates e;,,,,,r.\ •`FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating.cost._>- Ownership Costs , (( ,J Estimated_Operating FHWA Rate. \ Costs Monthly Weekly Daily ,„_._,-.,,Hourly Hourly Hourly, Published Rates USD'$1,975.00 USD$555.00 USD$140.00 u U(SD�,$21:00 USD:$32.34 USD S43.56 Adjustments •� :S°' Region(100%), - - - •` ' - n, r.' Model-Year(2020:99.9%) (t)SD$1:98) (USD$0:56) (USD$0:14) (USD.50.02) Adjusted Hourly Ownership' - y.^a\`;, - Cost(100%)' �,�\;,4 Hourly Operating Cost(100%) J' ti ' - Total:_ USD$1,973.03 USD S554.45 (US 39.86 USD$20.98 USD S32.34 USD$43.55 ati� .� Non-Active Use Rates ` ,y Hourly ,..asp Standby Rate / •! ( USD$7.96 1 idling Rate ¢ s�.,. s USD$36.60. Rate Element Allocation `� +•er .,,r a 'Element �J Percentage Value Depreciation(ownership) 57% USD$1,125.75/mo Overhaul(ownership) ^ 'A 29% USD S572.75/mo CFC(ownership) - 2% USD$39.50/mo Indirect(ownership) ,^. ro, 12% USD$237:00/mo 'Fuel(operating)®USD,2.97 79%, USD$25.39/hr 84 Revised Date:'3rd quaiter,`2021 These are the most accurate rates-for the selected Revision Date(s).However,due to more-frequent online updates,these rates may not match Rental Rate,Blue Book Print.Visit the Cost Recovery Product-Guide on our Help page for more information. The equipment represented in this report has been exclusively prepared for JODY EVELER (jeveler@ cityoftacoma:org) • All material herein©2003-2021 Informa All rights reserved.Page 1 of 1 r , . EquipmentWatch. FT02-2019 Ford F-450. www.equipmentwatch.com All prices-shown in US dollars($), Rental Rate Blue Book® September 3,..2021 Miscellaneous 4X2 112 450 CREW GAS On-Highway Light Duty Trucks ,+���-- Size Class: ,✓ lliti . 300 HP&Over \ „.-� Weight: 1 NIA 1110161, 5...) Configuration for 4X2 112 450 CREW GAS -- Axle Configuration 4X2 Cab Type Crew, Horsepower 450 hp Power Mode /Gasoline Ton Rating 1/2 iy t Blue Book.Rates s, =\. ., "FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost; , e' Ownershi .Costs d p i( , Estimated Operating FHWA Rate" . r Costs Monthly Weekly Daily -.,Handy Hourly Hourly , Published Rates USD$1;975.00 USD$555.00 USD$140.00 % USD,521.00 USD$32.34 USD$43.56 Adjustments \ Region(100°%) - - - ,, - Model Year(2019::99.8%) (USD$3.95) (USD.$1.i1 °. t, ° ) (USD$0:28)�� (USD$0.04) Adjusted'HourlyOwnersliip - - '' ,..- - Cost.(100%) t A Hourly Operating Cost(100%), - Total: USD$1,971.05 USD$553.89 tips()$139.72 USD$20.98 USD$32.34 USD$43.54 4" �y Non-Active Use Rates ,. '".,h Hourly Standby Rate $, ' I I USD$7.95 I Idling Rate �, '' USD$36.59 -ate• b Rate Element Allocation "L Element. Percentage Value Depreciation(ownership) '�t, 57% USD$1,125.75/mo Overhaul(ownership) TA C 29% USD$572.75/mo CFC(ownership) � �sk 2% USD$39.50/mo Indirect(ownership) 12% USD$237.00/mo Fuel(operating)@ USD 2.97 79% USD 325.39/hr 'k Revised Date:3rd quaiter,2021 These are the most accurate rates for the selected Revision Date(s).However,due-to mare frequent online updates,these rates may not match Rental Rate Blue Book Print.Visit the Cost Recovery'Product Guide on ur Help page for more information. The equipment represented in this report has been exclusively prepared for JODY EVELER (jeveler@cityoftacoma.org) • All material herein©2003-2021 Informa All rights reserved.Page 1 of 1 i' EquipmentWatch. www.equipmentwatch.com EX05-2020 KomatsU PC138 All prices shown in US dollars($) Rental Rate Blue Book®' September 3,2021 Komatsu-PC138USLC-11 Crawler Mounted Hydraulic Excavators \fa. AM 1 Size Class: 14.1-16.0 MTons rr �,t Weight NIA Configuration for PC138USLC-1 . Bucket Capacity 0.34-:1 cu yd' Horsepower 97.2 hp Operating Weight 34563.0 Ibs Power Mode Diesel : i 2, Blue Book Rates gr'k.1,� FHWA Rateis equal to the monthly ownership-cost divided by 176 plus.the hourly estimated operating cost. Ownership Costs Estimated Operating FHWA Rate? en.'Cq .Y Monthly Weekly Daily Hourly ji, Hourly Hourly Published Rates USD$10,255.00 USD S2;870.00 USD S720.00 USD 5110.00 ',:-.:i%'USD.538.83 USD$97.10 Adjustments \\' \ q Region(100%) - - - - Model Year 2020:99.9%) (USD 510.26 (USD S2.6 011 '"•` ( ) T) (USD S0.T2). (UStk,\t` Adjusted Hourly Ownership - - - .;�!A Cost(100%) •a,y HourlyOperating Cost 100% 5 /�- - ' Pe 9 (. ), J, ” Total: USD S10,244.75 USD$2,867.13 USD 5719.28 { USD'$109:89. USD S38.83 USD S97.04 y Non-Active Use Rates =,=",I'c .�y Hourly Standby-Rate •!.. ' l USD S28.52 l Idling Rate 10 USD SUM, �. ;Rate Element Allocation ,- ` " Element 1; -) Percentage Value Depreciation'Ownership) ''t '�, 38% USD$3,896.90lmo Overhaul(ownership) ,i \ 51% USD 55,230.05lmo F CFC(ownership) a\ 3% USD•5307:65/mo wn Indirect.(oership) ,\ 8% US0.$820.401mo Fuel(operating)©USD 3.27 • ' 15% USD$5.90/hr e Revised Date:3rd quarter 2021 tom' These are the mostaccUrate•rates fo th selected Revision Date(s).Howeve',due.to indre frequent online updates,1hese rates may not match Rental Rate Blue Book Print.Visit the Cost Recovatkpk dudtt Guide on our Help page for more information. +y ti. The equipment rep4esented in this report has been exclusively prepared for JODY EVELER (jeveler@cityoftaccoma.org) r All material herein©2003-2021 Informa All rights reserved.Page 1 of 1 1 , t , t EquipmentWatch- DT731T-2000 Trailer www.equipmentwatch.com All prices shown in US dollars($) Rental Rate Blue Book® September 13,2021 Miscellaneous 4 AXLE 4 TIRE 40' Lowboy Trailers { llit Size Class: All Weight > NIA j Configuration for 4 AXLE 4 TIRE 40' Power Mode Manual tt Blue Book Rates Cw\„"5 "FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. Ownership Costs ,1: _ ,:Estimated Operating FHWA Rate" i3:;.;, � Costs Monthly Weekly Daily t Hourly a Hourly Hourly :b u, r Published Rates USD$5,530.00 USD'$1,550.00 USD$390.00 USD.$59.00 USD$9.24 USD$40.66 Adjustments t� ,? Region(100%) - - - t� , Model Year(2000:95.9%) (USD$226.73) (USD$63.55) (USD$15.99) ' i(USD$2.42) Adst(d Hjurly Ownership - - -rs ,,,NZ' - Hourly Operating Cost(100%) ,`,Nt - Total: USD$5,303.27 USD$1,486.45 USD S374.01 USD$56.58 USD$9.24 ir' '1 p Si= . Non-Active Use Rates Hourly Standby Rate I USD$24.41 Idling Rate ,4 . s USD$30.13• 't, tt Rate Element Allocation . :; kj- Element ,,�, �\ Percentage Value Depreciation(ownership) w 71% USD$3,926.30Imo Overhaul(ownership) ''� 19% USD$1,050.70/mo CFC(ownership) 2% USD$110.60/mo Indirect(ownership) ?y� 8% USD$442.40/mo '., •,• Fuel cost data is not available for these rates. Revised Date:3rd quarter}2021 These are the most accurate rates for the selected Revision Date(s):However,due to more frequent online updates,these rates may not match Rental Rate.Blue Book Print.Visit the;Cpst Recovery Product Guide on our Help page for more information. The equipment represented in this report has been exclusively prepared for JODY EVELER (jevele r@ cityoftacoma.org) All material herein©2003-2021 Informa All rights reserved.Page 1 of 1 EquipmentWatch. SS-614 - 2021 Super Solo Dump Truck www.equipmentwatch.com All prices shown in US dollars($) Rental Rate Blue Book® October 12,2021 Miscellaneous 8X4 18YD 85KGVW On-Highway Rear Dumps Size Class: 60,001 GVW&Over Weight: 21021 lbs 1 f \� Configuration for 8X4 18YD 85KGVW v .re-\ Axle Configuration 8X4 Horsepower _450. J) Maximum Gross Vehicle Weight 85000.0 lbs Power Mode Diesel Struck Capacity 15.0-18.0 cu yd ` Blue Book Rates '\,( a **FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating costt..�` e:" Ownership Costs ,,( 'a Estimated Operating FHWA Rate"* ''� Costs Monthly Weekly Daily .Hourly Hourly Hourly Published Rates USD$5,380.00 USD$1,505.00 USD$375.00 (rUSD.$56.00 USD$64.85 USD$95.42 Adjustments /�� Region(100%) - - :• � - Model Year(2021:100%) - - % - Adjusted Hourly Ownership \ J Cost(100%) Hourly Operating Cost(100%) �. - Total: USD$5,380.00 USD$1,505.00 $375.00 USD$56.00 USD$64.85 USD$95.42 �;LCSD ,r-,-; `.> WWI Non-Active Use Rates , Hourly Standby Rate "� `a\ USD$20.17 Idling Rate .,� \ `'''f. USD$73.06 Rate Element AllocationCli Element s+'`� Percentage Value Depreciation(ownership) c.,,\ 53% USD$2,851.40/mo Overhaul(ownership) S 4> 34% USD$1,829.20/mo y�CFC(ownership) ` `. 2% USD$107.60/mo Indirect(ownership)` 11% USD$591.80/mo Fuel(operating)@ USD 3.371 l�', 66% USD$42.49/hr Revised Date:4th quarte_r,2021 These are the most accurate rates for the selected Revision Date(s).However,due to more frequent online updates,these rates may not match Rental Rate Blue Book Print.Visit the Cost-Recovery Product Guide on our Help page for more information. . The equipment represented in this report has been exclusively prepared for JODY EVELER (jeveler@cityoftacoma.org) All material herein©2003-2021 Informa All rights reserved.Page 1 of 1 t - , • '0 EquipmentWatch. www.equipmentwatch.com All prices shown in US dollars($) Rental Rate Blue Book, Usage Report(Monthly) February 17,2022 Name:Duvall Notes:None so far... Adjustments Note:Values not specified at the fleet level will be taken from individual equipment adjustments. Rate Effective Date:- Rate Effective Date:- Region:- Organization:- Ownership Adjustment:- Operating Adjustment:- Rental Rate Blue Book Rates All prices shown in US dollars($) Equipment Details Rental Rate Blue Book® Adjustments ID Equipment Size Manufacturer Model Year Serial Configuration/Notes Ownership Operating Standby Idling Revision Region Age Ownership Operating FHWA Hours Total Type Class Numbers Hourly Cost 41 . . Rate 10 Tractor- 14'to Deere 310SG 2002 Drive:2WD,Operator USD USD USD USD 2022- 96.53% 10046 �'1100N% USD 1 USD Loader- Under Protection:ROPSIFOPS, $22.19 $25.47 $11.96 $34.40 01-01 Washington: "r,, $47.66 $47.66 Backhoes 15' Power Mode:Diesel 104,8% t' 11 Tractor- 15'to Deere 410E 2020 Power Mode:Diesel USD USD USD USD 2022- 99.89% 10 100% USD 1 USD Loader- Under $45.00 $34.76 $24.30 $61.04 01-01 Washington: t, $79.76 S79.76 Backhoes 16' 104.8% ir 12 Standard 75- Deere 550H LT 2004 Dozer Type:PAT. USD USD USD USD 2022- 100% 100% 100% USD 1 USD Crawler 84 HP Operator $45.93 $37.28 $22.04 $53.78 01-01 Washington: $83.21 $83.21 Dozers Protection:ROPS, 104.7% Power Mode:Diesel '\„\ d 13 Self All Lay-Mor 6-HB 2015 Broom Length:72.0, USD USD USD USD 2022- 9.09% 100% 100% USD 1 USD Propelled Horsepower:31.5, $28.71 $21.08 $13,21 $32.96 01-01/ ashington: $19.79 $49.79 Pavement Power Mode:Diesel, jai 105.99A Brooms Transmission:Hydrostatic \�.;j 14 Crawler 5.1- Kubota KX057-4 2019 Operating Weight:5.5, USD USD USD USD„_,2022-, 99.9% 100% 100% USD 1 USD Mounted 6.0 Operator $29.60 $20.54 $18.65 $36,78 01-01Washington: $50.14 $50.14 Compact MTons Protection:ROPSIFOPS, 104.2% Excavators Power Mode:Diesel 15 Crawler 5.1- Kubota KX161-2 2006 Operating Weight:5.0, USD USD USD USD 022- 100% 100% 100% USD 1 USD Mounted 6.0 Operator $25.93 $21.49 $16.34~$32:21 01-01 Washington: $47.42 $47.42 Compact Minns Protecdon:ROPS/FOPS, 104.2% Excavators Power Mode:Diesel ''��16 Mounted 10.0 Komatsu PC88MR-10 2020 , oweOperatingr Mode:Diesel USD$56.24 $3383\$30`.37 $62.80 01-01 Washington:99'89% 100% 100% $90.07 SD 1 USD $90.07 Hydraulic MTons : `,1 105.3% Excavators 17 No data'a e/far this model 18 No'data avaltablt£for this model 19 Crawler 21.1- Komatsu PC200LC-7 2003 Operating Weight:21.1, USO USD USD USD 2022- 98.89% 100% 100% USD 1 USD Mounted 24.0 Power Mode:Diesel $60.58 $45.86 $32.72 $70.59 01-01 Washington: $106.44 $106.44 Hydraulic MTons ' 105.3% Excavators 20 Crawler 24.1- Komatsu PC238USLC-2022 Operating) y USD USD USD USD 2022- 100% 100% 100% USD 1 USD Mounted 28.0 11 Weight:54230.0'-Power $78.02 $48.92 $42.13 $89.53 01.01 Washington: $126.94 $126.94 Hydraulic MTons Mode:Diesel^ 105.3% Excavators \�09 22 Hydraulic 2,001 Allied AR 1208 2010 Impact,Energgy.2500.0, USD USD USD USD 2022- 94.91% 100% 100% USD 1 USD Impact - ower Made: ydraulic $21.75 $12.81 $11.09 $21.75 01-01 Washington: $34.56 $34.56 Breakers 3,000 106.4% fib I. 23 No data available for this model 24 Tandem 1.8- Caterpillar CB-24B 2015 C2)Drum Wiidth:47.0, USD USD USD USD 2022- 98.04% 100% 100% USD 1 USD Vibratory 2.9 Horsepower:36.2, $27.43 $14.96 $12.62 $30.53 01-01 Washington: $42.39 $42.39 Compactors MTons Power Mode:Diesel 105.1% 25 ' No data available for this model 26 4-Wd 135- Komatsu WA270-3 02 Bucket Capacity:2.8, USD USD USD USD 2022- 100% 100% 100% USD 1 USD Articulated 149 \ Horsepower:141.0, $28.38 $27.27 $18.73 $37.02 01-01 Washington: $55.65 $55.65 Wheel HP Operator 104.5% Loaders Protection:ROPS, Power Mode:Diesel , 27 No data available for this model 28 No data available for this model 3 No data available for this model 31 No data available for this model 4 No data available for this model 5 No data available for this model 6 On-Highway 300 Ford F-350 2022 Axle Configura6on:4.0 X USD USD USD USD 2022- 100% 100% 100% USD 1 USD Light Duty HP& 4.0,Cab Type:Crew, $5.56 $28.88 $4.23 $29.81 01-01 Washington: $34.44 $34.44 Trucks Over Horsepower:385.0, 103.6% Power Mode:Gasoline, Ton Rating:1.0 7 No data available for this model 8 No data available for this model 9 No data available for this model Total: USD 1 $848.47 These are the most accurate rates for the selected Revision Date(s).However,due to more frequent online updates,these rates may not match Rental Rate Blue Book Print. Visit the Cost Recovery Product Guide on our Help page for more information. The equipment represented in this report has been exclusively prepared for JOEY HARNDEN (jharnden@rentonwa.gov) All material herein©2003-2022 Randall-Reilly All rights reserved.Page 1 of 1 r ' • EquipmentWatch. www.eq uipmentwatc h.c om All prices shown in US dollars($) Adjustments for 20212 in All Saved Models December 8,2020 Miscellaneous 6X4 18YD 70KGVW L On-Highway Rear Dumps Size Class: 60,001 GVW&Over Weight: 19702lbs Configuration for 6X4 18YD 7OKGVW Axle Configuration 6X4 Horsepower 400.0 Maximum Gross Vehicle Weight 70000.0 lbs Power Mode Diesel Struck Capacity 12.0-18.0 cu yd Blue Book Rates **FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost Ownership Costs Estimated Operating FHWA Rate** Costs Monthly Weekly Daily Hou tly Hourly Hourly Published Rates USD$4,615.00 USD$1,295.00 USD$325.00 USD$49.00 USD$45.53 USD$71.75 Adjustments y Region(Washington: (USD$78.46) (USD$22.01) (USD$5.53) U (USD%$0.83) 98.3%) �\ Model Year (USD$395.18) (USD$110.89) (USD$ 7.83) '~""",,++(USD$4.20) (2009:91.29%) -? Adjusted Hourly Ownership Cost(100%) Hourly Operating Cost(100%) ~ - Total: USD$4,141.36 USD$1,162.09USD$291.65 USD$43.97 USD$45.53 USD$69.06 Non-Active Use Rates Hourly (:•Q Standby Rate USD$11.77 Idling Rate USD$50.41 Rate Element Allocation Element `•:�' Percentage Value Depreciation(ownership) 51% USD$2,353.65/mo Overhaul(ownership) 33% USD$1,522.95/mo CFC(ownership) 5% USD$230.75/mo Indirect(ownership) 11% USD$507.65/mo Fuel(operating)©US2.4o 59% USD$26.88/hr Revised Date:2nd half 2020 These are the most accurate rates for the selected Revision Date(s).However,due to more frequent online updates,these rates may not match Rental Rate Blue Book Print.Visit the Cost Recovery Product Guide on our Help page for more information. The equipment represented in this report has been exclusively prepared for KALI KNIGHT (Kali.Knig ht@lakesideindustries.com) All material herein©2003-2020 Informs All rights reserved. I 0 EquipmentWatch.. www.equipmentwatch.com All prices shown in US$ Adjustments for 12583 in All Saved Models May 9,2019 Miscellaneous 4X2 1 1/4 360 CONV DSL On-Highway Light Duty Trucks Size Class: } 300 HP&Over Weight: � `' HP Configuration for 4X2 1 1/4 360 CONV DSL {{ � " Axle Configuration 4X2 Cab Type ,iCon`'eeenttiional DI Horsepower 360.0 Power Mode \ Oesel Ton Rating 1 1/4 ' �'`� Blue Book Rates ({ '"FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated'operating cost. Ownership Costs Estimated FHWA Rate" ''\(:?>' 4. Operating Costs Monthly Weekly Daily Hourly Hourly Hourly Published Rates $1,120.00 $315.00 $79.00 $12.00 $18.35 $24.71 Adjustments Region(Washington: ($19.04) ($5.36) ($1,.34° ($0.20) 98.3%) w� Model Year - - °I' - - (2019:100%) Adjusted Hourly - - - - Ownership Cost(100%) Hourly Operating Cost(100%) ® - Total: $1,100.96 $,309�6 $77.66 $11.80 $18.35 $24.61 Non-Active Use Rates Hourly Standby Rate $4.44 Idling Rate $20.39 V).''''' Rate Element Allocatioe Element ) Percentage Value Depreciation(ownecihip), 54% $604.80/mo Overhaul(ownership) 29% $324.80/mo CFC(ownership) 7% $78.40/mo Indirect(ownership) 10% $112.00/mo Fuel(operating)@ 3.27 77% $14.13/hr Revised Date:1st half 2019 These are the most accurate rates for the selected Revision Date(s).However,due to more frequent online updates,these rates may not match Rental Rate Blue Book Print.Visit the Cost Recovery Product Guide on our Help page for more information. The equipment represented in this report has been exclusively prepared for KALI KNIGHT(Kali.Knight@lakesideindustries.com) All material herein©2003-2019 Inforna All rights reserved. t .,)' 1 0 EquipmentWatch.. www.equipmentwatch.com All prices shown in US$ Adjustments for 12467 in All Saved Models March 21,2019 Miscellaneous 4X2 30KGVW DSL On-Highway Flatbed Trucks Size Class: 26,001 33,000 GVW Weight: 8,994 lbs. (tact 1t;ti3irr • Configuration for 4X2 30KGVW DSL %, Axle Configuration 4X2 Power Mode `Diesel Horsepower 217 Maximum Gross Vehicle Weight 30000 lbs Blue Book Rates V\\::\* "FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimate oR tirl cost. Ownership Costs ° �� Estimated FHWA Rate** Operating Costs Monthly Weekly DailyH urly Hourly Hourly Published Rates $1,945.00 $545.00 $135.00 $20.00 $21.85 $32.90 Adjustments Region(Washington ($33.07) ($9.27) ($2:30 ($0.34) DOT: 98.3%) Model Year ($15.30) ($4.29) 0.06) ($0.16) (2016:99.2%) Adjusted Hourly - - - - Ownership Cost(100%) Hourly Operating Cost(100%) - Total: $1,896.63 '$53 ,cr) $131.64 $19.50 $21.85 $32.63 >:' '` Non-Active Use Rates Hourly Standby Rate $5.39 Idling Rate 4l $24.69 A \s"(-- Rate Element Allocation " Element Percentage Value • Depreciation(ownership�\JJ 48% $933.60/mo Overhaul(ownership) 31% $602.95/mo CFC(ownership) 9% $175.05/mo Indirect(ownership) 12% $233.40/mo Fuel(operating)@ 3.27 64% $13.91/hr Revised Date:1st Half 2019 These are the most accurate rates for the selected Revision Date(s).However,due to more frequent online updates,these rates may not match Rental Rate Blue Book Print.Visit the Cost Recovery Product Guide on our Help page for more information. The equipment represented in this report has been exclusively prepared for KALI KNIGHT(Kali.Knight@lakesideindustries.com) • All material herein©2003-2019 Penton All rights reserved. 1 1 EquipmentW.atch- www.equipmentwatch.com Adjustments for 19-003 in JEI Fleet May 9,2016 On-Highway Water Tankers Miscellaneous Models Size Class: Net Hp 200 HP&Over Configuration for On-Highway Water Tankers ;.A� ",c*N, Horsepower 250 Power Mode Diesel' Tank Capacity 4,000 gal Horsepower 250.0 Equipment Notes: Rates include pump and rear spray system. (nC.:1 ' Blue Book Rates , **FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated opera ing•:.:oost. Ownership Costs Estimated FHWA Rate** �'; Operating Costs Monthly Weekly Daily (-uriy Hourly Hourly Published Rates $3,760.00 $1,055.00 $265.00 \4;0.00 $36.25 $57.61 Adjustments , Region ($63.92) ($17.94) ($4.51) ($0.68) (Washington: 98.3%) Model Year(2000: ($532.24) ($149.34) ($37.51,) ($5.66) 85.6%) : v Ownership(100%) Operating(100%) ,=�. b - Total: $3,163.84 $887.72 ,. $222.98 $33.66 $36.25 $54.23 Rate Element Allocation , Element \•, Percentage Value Depreciation(ownership) 51% $1,917.60/mo cC Overhaul(ownership) �` 31% $1,165.60/mo CFC(ownership) f 6% $225.60/mo Indirect(ownership) 12% $451.20/mo Fuel(operating)@$3.46 60% $21.63/hr Revised Date: 2nd Half 2 °°V • All material herein©2003-2016 Penton All rights reserved. Page 17 of 86 No EquipmentWatch� www.equipmentwatch.com Adjustments for 70-013 in JEI Fleet May 9,2016 Deere 135D N. .- , Crawler Mounted Hydraulic Excavators • • Size Class: Operating Weight 14.1 -16.0 MTons Weight: 30,737 lbs. Configuration for 135D Power Mode Diesel Bucket Capacity-Heaped .66 cy Operating Weight 13.9 t Net Horsepower 93.0 hp Equipment Notes: General Purpose bucket included in rate,unless otherwise noted. t1/4/‘. Blue Book Rates **FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. Ownership Costs 0 Estimated FHWA Rate** A, Operating Costs Monthly Weekly Daily Hourly Hourly Hourly Published Rates $6,775.00 $1,895.00 $475.00 , $71.00 $32.65 $71.14 Adjustments Region ($135.50) ($37.90) ($9.50) , ($1.42) (Washington:98%) Model Year(2013: ($79.67) ($22.29) ($5.59) ($0.83) 98.8%) Ownership(100%) - - - - Operating(100%) - Total: $6,559.83 $1,834.81 $459.91 $68.75 $32.65 $69.92 Rate Element Allocation Element Neyb Percentage Value Depreciation(ownership) (17413N6' 36% $2,439.00/mo Overhaul(ownership) 51% $3,455.25/mo CFC(ownership) ICI6% $406.50/mo Indirect(ownership) ,."444\4 7% $474.25/mo Fuel(operating)@$3.46 35% $11.58/hr Revised Date: 2nd Half 2015 %%Ill\ All material herein©2003-2016 Penton All rights reserved. Page 52 of 86 I: EquipmentWatch. www.equipmentwatch.com All prices shown in US$ Rental Rate Blue Book® June 15,2018 Dynapac CA362D(disc.2012) II Single Drum Vibratory Compactors Size Class: 12.0-14.9 MTons _ Weight: 3. C 29,105 lbs. Configuration for CA362D(disc.2012) Drum Type Smooth Drum Width 84 in Power Mode Diesel Net Horsepower 150 hp Blue Book Rates **FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. Ownership Costs Estimated FHWA Rate** Operating Costs Monthly Weekly Daily Hourly Hourly Hourly Published Rates $5,105.00 $1,430.00 $360.00 $64.00 $38.35 $67.36 Adjustments *�M Region(Washington: ($86.79) ($24.31) ($6.12) (6 .92) 98.3%) (2012:2:Year - - its* - (20 Adjusted Hourly Ownership Cost(100%) cil\ Hourly Operating Cost(100%) - Total: $5,018.21 $1,405.69 053.88 $53.08 $38.35 $66.86 Non-Active Use Rates .iQHourly Standby Rate $20.24 Idling Rate $38.53 Rate Element Allocation S:)1\111b Element + Percentage Value Depreciation(ownership) 50% $2,552.50/mo Overhaul(ownership) 29% $1,480.45/mo CFC(ownership) 9% $459.45/mo Indirect(ownership) 12% $612.60/mo Fuel(operating)@ 2.5T 25% $10.02/hr Revised Date: 1st Half 2018 These are the most accurate rates for the selected Revision Date(s).However,due to more frequent online updates,these rates may not match Rental Rate Blue Book Print.Visit the Cost Recovery Product Guide on our Help page for more information. The equipment represented in this report has been exclusively prepared for BILL WARD(roseg@activeconstruction.com) All material herein©2003-2018 Penton All rights reserved. , 1 .S ,• i ifillre EquipmentWatch www.equipmentwatch.com Adjustments for 20-005 in JEI Fleet May 9,2016 Tilt Deck Utility Trailers Miscellaneous Models Size Class: All Configuration for Tilt Deck Utility Trailers ��+`�� Number of Axles 3 Number of Tires 12 Deck Length 18'-25' Capacity 25 0 t /. �1 Equipment Notes: Tow Hitch Type ki Blue Book Rates **FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated ope ating t. Ownership Costs Estimated FHWA Rate** �`ti Operating Costs Monthly Weekly Daily l°,iourly Hourly Hourly Published Rates $1,190.00 $335.00 $84.00 `q 5,$13 00 $4.90 $11.66 ti, Adjustments Region " ($20.23) ($5.70) ($1.43) ($0.22) (Washington: • 98.3%) ,JC Model Year(2001: ($145.05) ($40.83) ,,($10.24) ($1.58) 87.6%) te Ownership(100%) - - �° .- '' - Operating(100%) s,' - Total: $1,024.72 $288.47 $72.33 $11.20 $4.90 i $10.72 Rate Element Allocation tJ"1 \:\, \� Element Percentage Value Depreciation(ownership) ' a 47% $559.30/mo Overhaul(ownership) ,.'•„. 28% $333.20/mo CFC(ownership) ( 5% $59.50/mo Indirect(ownership) 20% $238.00/mo Fuel(operating) Fuel cost data is not available for these rates. Revised Date: 2nd Half 2015' ‘,,,,N-ss•-: 4. All material herein©2003-2016 Penton All rights reserved. Page 20 of 86 IOW Eihrby Equipmentwatchi www.equipmentwatch.com Adjustments for 95-002 in JEI Fleet May 9,2016 . Zanitas Road Hog Custom Weight: N/A Configuration for Road Hog 'fc' ' 36"trench grinder N/A r~ Blue Book Rates a **FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. Ownership Costs Estimated FHWA Rate** p• \ Operating Costs Monthly Weekly Daily HouriyJ Hourly Hourly Published Rates $2,500.00 $700.00 $175.00 ,�—$26:0, $35.00 $49.20 Adjustments (,j'\ Region(100%) - - - ., C Model Year(100%) - - - - Ownership(100%) - - - • - Operating(100%) - - Total: $2,500.00 $700.00 4$175.00 $26.00 $35.00 $49.20 i Revised Date: 2nd Half 2010 , � ' C':',„ . . .:S'' '' '',;C:.',\ All material herein©2003-2016 Penton All rights reserved. Page 73 of 86 EquipmentWatch- www.equ ipmentwatch.com Adjustments for 90-003 in JEI Fleet May9,2016 Portable Light Towers Miscellaneous Models Size Class: Thru 7 KW Configuration for Portable Light Towers Horsepower 11.5 Power Mode Diesel Tower Height 30 ft Number of Lights 4 Horsepower 11.5 Blue Book Rates **FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. Ownership Costs Estimated FHWA Rate** Operating Costs Monthly Weekly Daily Hourly Hourly Hourly Published Rates $1,005.00 $280.00 $70.00 $11.00 $4.45 $10.16 Adjustments Region - - - - (Washington: 100%) Model Year(2000: ($131.65) ($36.68) ($9.17) ($1.44) 86.9%) Ownership(100%) - - - - Operating(100%) - Total: $873.35 $243.32 $60.83 $9.56 $4.45 $9.41 Rate Element Allocation Element .104;11L Percentage Value Depreciation(ownership) \10)‘ lk. 39% $391.95/mo Overhaul(ownership) 52% $522.60/mo CFC(ownership) ala 3% $30.15/mo Indirect(ownership) 6% $60.30/mo Fuel(operating)@$3.46 23% $1.03/hr Revised Date: 2nd Half 2015 .%.%144444 All material herein©2003-2016 Penton All rights reserved. Page 64 of 86 ., „ . , NON-OPERATED EQUIPMENT(DAILY NONOP Metal form,all heights paving,per 3.0 m 0390 $0.04 I (Metal form,all heights paving,per 10 If) RATES) Scaffolding, 1.5 m section,per section 0410 $0.54 DELAY FACTOR= 0.56 OVERTIME FACTOR= 1.00 (Scaffolding,5'section,per section) Note various units for different items. The following allowance is entered on Scaffolding,3.0 m section,per section 0420 $1.20 the extra work bill by using the(unit listed x number of days)in the hours (Scaffolding, 10'section,per section) worked column.The following list is limited to items with long estimated Scaffolding,4.6 m section,per section 0430 $1.59 lives. Additional traffic related items such as cones and barricades,are still listed under TRAFC in this publication. Other non-operated items with short (Scaffolding, 15'section,per section) estimated lives should be treated as materials and should not be"rented". Non Scaffolding,bottom/top section,per 1.5 m 0440 $0.75 rented items are 1)intended to be job specific(amortized over the life of the section(per 5 ft section) project)and 2)have an estimated life measured by number of uses rather than a length of time. Scaffolding,2.1 m high,rolling 0450 $1.13 (Scaffolding,7'high,rolling) MISCELLANEOUS [ MISC I Scaffolding,spider staging,plus air 0460 $24.06 Model Code Rate compressor Casing,450 mm dia,per 0.3 m(Casing, 18" 0120 $0.04 Shoring, 1.1 m deep x 2235 mm wide,per 0510 $1.24 dia,per If) section(Shoring,3.5'dee Casing,650 mm dia,per 0.3 m(Casing,26" 0130 $0.06 section) dia,per If) Shoring, 1.2 m deep x 3.7 m wide box,per 0515 $11.38 Casing,900 mm dia,per 0.3 m(Casing,36" 0140 $0.09 7.3 m(Shoring,4'deepxl2'wide trench r 24') dia,per If) 0 mm dia,per 0.3 m(Casing, 0150 $0.21 Shoring, 1.5 m deep x 2 mm wt e,per 0520 $1.30 Casing, 180 a,180 per lf) section(Shoring,5'deep x 88"wide trench, per section) Casing,2400 mm dia,per 0.3 m(Casing, 0160 $0.26 Shoring,2.1 m deep x 1397 mm wide,per 0530 $1.15 96"dia,per If) section(Shoring,7'deep x 55"wide trench, Casing,2700 mm dia,per 0.3 m(Casing, 0170 $0.29 per section) 108"dia,per If) Shoring,2.1 m deep x 2235 mm wide,per 0540 $1.38 Casing,3000 mm dia,per 0.3 m(Casing, 0180 $0.39 section(Shoring,7'deepx88"wide trench, 120"dia,per If) per sect's Pile,all depths"H"pile,per 45.0 kg(Pile, 0190 $0.04 horing,2.4 m deep x 4.6 m wide,per 3.0 m 0550 $9.3' all depths"H"pile,per hundred-weight) (Shoring,8'deepxl5'wide trench box,per Pipe,250-300 mm dia,per 0.3 m(Pipe, 10- 0200 $0.02 t 12"dia,per If) horing,2.4 m deep x 2.4 m max width,per 0560 $18.51 Plate,22 mm thick,per 9.3 sm(Plate,7/8" 0210 $1.24 7.3 m(8'deep x 8'max width trench box, thick,per 100 sf) ' Plate,25 mm thick,per 9.3 sm(Plate, 1" 0220 $1.42 Shoring,3.0 m deep x .• m -.v •.•, ►•r 0570 $16.62 s 4.9 m(Shoring, 10'deepx8'max trench Plate,38 mm thick,per 9.3 sm(Plate, 1.5" 0230 $2.12 box,per 16') thick,per 100 sf) Shoring,3.0 m deep x 2.4 m max box,per 0580 $23.12 7.3 m(Shoring, 10'deepx8'max trench SCAFFOLDING,SHORING, [SSFW I box,per 24') FALSEWORK Wood,50 mm x255 mm,per 30.5 m(Wood, 0605 $0.16 Model Code Rate 2"x10",per 100 If) Metal form, 1.8 m x3.0 m,per 14.6 m 0310 $43.23 Wood,50 mm x305 mm,per 30.5 m(Wood, 0610 $0.20 (Metal form,6x10 box culvert,per 48If) 2"x12",per 100 If) Metal form,2.4 m x3.7 m,per 15.2 m 0320 $47.91 Wood, 100mm x100mm,per 30.5 m(Wood, 0615 $0.13 (Metal form,8x12 box culvert,per 50 10 4"x4",per 100 If) Metal form,2.1 m x4.3 m,per 15.2 m 0330 $52.65 Wood, 100 mm x150 mm,per 30.5 m 0620 $0.19 (Metal form,7x14 box culvert,per 50 If) (Wood,4"x6",per 100 10 Metal form,type 25 barrier,per 3.0 m 0340 $2.63 Wood, 100 mm x205 mm,per 30.5 m 0625 $0.27 (Wood,4"x8",per 100 If) (Metal form,type 25 barrier,per 10 If) Wood, 100 mm x305 mm,per 30.5 m 0630 $0.41 Metal form,type 26 barrier,per 3.0 m 0350 $2.78 (Wood,4"x12",per 100 If) (Metal form,type 26 barrier,per 10 If) Metal form,type 27 barrier,per 3.0 m 0360 $2.40 Wood, 150 mm x305 mm,per 30.5 m 0635 $0.68 (Metal form,type 27 barrier,per 10 If) (Wood,6"x12",per 100 If) Metal form,type 50 barrier,per 3.0 m 0370 $2.59 Wood, 150 mm x455 mm,per 30.5 m 0640 $1.09 (Metal form,type 50 barrier,per 10 10 (Wood,6"x18",per 100 If) Metal form, 1.8 m x 3.7 m girder panel,per 0380 $0.16 Wood,205 mm x405 mm,per 30.5 m 0645 $1.34 0.1 sm(6x12 girder panel,per sf) (Wood,8"x16",per 1001f) Wood,305 mm x455 mm,per 30.5 m 0650 $1.51 (Wood,8"x18",per 100 If) 21 .Il , ,I1 Wood,305 tnm x305 mm,per 30.5 m 0655 $1.31 PAVEMENT GRINDERS,TUNGSTEN- (Wood, 12 x12 ,per 100 lt) l PGT-C I Wood form,type 27 barrier,per 2.4 m 0660 $0.28 CARBIDE BITS (Wood form,type 27 barrier,per 810 DELAY FACTOR= 0.12 OVERTIME FACTOR= 0.90 Wide flange beam,all depths,per 45 kg 0670 $0.04 Includes water(but not water truck or trailer),coolant,cutting compounds and (Wide flange beam,all depths,per hundred all attachments and accessories. Replacement bits or tips are included in the wt.) rates listed below. TANK [TANK I BARBER-GREENE [ B-G ] Model Code Rate Model Code Rate Tank,metal,0-2270 liters(0-600 gallons) 0710 $0.74 RX-20 0100 $170.30 Tank,metal,2270-4540 liters(600-1200 0720 $1.00 RX-30 0105 $270.33 gal) RX-40B 0110 $312.30 Tank,metal,4540-9840 liters(1200-2600 0730 $2.49 RX-50 0115 $367.37 gal) Tank,metal,22 710 liters(6000 gallons) 0740 $5.01 RX-80B 0120 $609.53 Tank,metal,28 390 liters(7500 gallons) 0750 $6.29 CATERPILLAR [ CAT I Tank 6.66 Model Code Rate Tank,metal,37 850 liters(10000 gallons) 0770 $7.39 PM-800 0200 $476.22 TRAP PR-105 0201 $83.67 Model Code Rate PR-275 0205 $228.09 PR-450 0210 $332.09 Crash cushion barrel,filled,each 0810 $1.21 K-rail,temporary concrete barrier,per 6.1 0820 $0.48 PR-750 0215 $483.50 m(20 If) PR-750B 0216 $507.69 PAVEMENT GRINDERS,DIAMOND PR-1000 0220 $664.50 [ PGDIA I BLADES C.M.I. I CMI I DELAY FACTOR= 0.09 OVERTIME FACTOR= 0.92 Model Code Rate Includes water(but not water truck or trailer),coolant,cutting compounds and PR-275 RT 0150 $216.57 all attachments and accessories. Replacement blades are included in the rates PR-375 0155 $275.53 listed below. PR-450 0160 $315.56 CONCUT [CCUT ] PR-525 0165 $338.74 Model Code Rate PR-500FL 0170 $371.87 BC-38(136 blades) 0500 $174.43 PR-750 0175 $466.27 BC-244(187 blades) 0505 $216.60 PR-800-7 0177 $510.03 BC-1268(48 blades) 0510 $67.40 PR-1000 0180 $563.40 CUSHION CUT [CUCT ] INGERSOLL-RAND I I-R Model Code Rate Model Code Rate HG-130A(127 blades) 0600 $167.98 MW-175 0280 $94.99 PC-390(l7l blades) 0610 $259.53 MW-250 0285 $102.95 PENHALL [PENH I MW-250C 0286 $124.10 Model Code Rate MT-6520(crawler) 0300 $306.81 G-38(172 blades) 0800 $329.49 MW-6520 0305 $221.98 MW-6520HC 0310 $283.42 TARGET I TARG I MT-7000 0315 $387.58 Model Code Rate CG-65(41 blades) 0900 $104.05 PRM-3804(170 blades) 0905 $362.37 22 Project Labor List - Totem Elec Submittal 16 Totem Electric FA Rates IBEW Local #46 Highway Electrician Wages Effective 08/02/21 through 02/06/2022 (Next L&I and State Unemployment Rate Changes 1/1/22) General Journeyman Leadman Foreman Foreman Journeyman Hourly Rate $ 62.27 62.27 65.38 68.50 74.72 Fringe Benefits Health &Welfare per hour 10.20 SUBMITTAL REVIEW .20 Local Pension per hour 10.38 .38 Annuity-401 K per hour 2.25 No Exceptions Taken 25 Apprentice Training per hour 0.83 -X Make Corrections Noted .83 Amend & Resubmit - National Employee Benefit Fund 3.00% 1.87 Rejected-See Remarks .24 N.E.C.A./A.M.F. 1.00% 0.62 75 IMPORTANT NOTICE:This review ' Substance Abuse Program per hour 0.10 does not relieve the Contractor from .10 L.M.C.0 per hour 0.10 responsibility to comply&conform .10 N.L.M.C.C. per hour 0.01 with the Plans, Specifications, and 01 Paid Sick Leave 1.56 Contract Documents. 87 Total Fringe Benefits 27.92 411ft73 Payroll Taxes Cinesy&Osborne,Inc. Social Security&Medicare 7.65% 4.76 CONSULTING ENGINEERS 72 State Unemployment 4.88% 3.04 By: MB .Date: 3/30/22 65 Federal Unemployment 0.600% 0.37 .,..,.. ...45 Labor and Industries(employer's portion) per hour 1.43415 1.43415 1.43415 1.43415 Family&Medical Leave(employer's share) per hour Total Payroll Taxes 9.61 10.02 10.43 11.24 Total Cost per Hour V 99.80 103.52 V 107.24 114.69 Total Fringe Benefits and Payroll Taxes 37.53 38.13 38.74 39.97 Labor Burden Percentage 60.26% 58.32% 56.56% 53.50% Time&One-Half Rates Premium Portion of Time&One-Half Rates 31.14 32.69 34.25 37.36 Applicable Fringes and Payroll Taxes 5.33 5.60 5.87 6.40 Total Additional Cost per Hour 36.47 38.29 40.12 43.76 Labor Burden Percentage 17.13% 17.13% 17.13% 17.13% Total Cost per Hour 136.27 141.81 147.35 158.45 Double Time Rates Premium Portion of Double Time Rates 62.27 65.38 68.50 74.72 Applicable Fringes and Payroll Taxes 10.67 11.20 11.73 12.80 Total Additional Cost per Hour 72.94 76.58 80.23 87.52 Labor Burden Percentage 17.13% 17.13% 17.13% 17.13% Total Cost per Hour 172.73 180.10 187.47 202.21 Holidays-New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day, Day after Thanksgiving Day, Christmas Day, Martin Luther King's Birthday 3/21/2022 . ,p ,` l IBEW Local #46 Highway Electrician -Apprentice Wages Effective 08/02/21 through 02/06/2022 (Next L&l and State Unemployment Rate Changes 1/1/22) }'P • E..:--'?e..,,- Segmirl:Beriop att,,„x.Period':,G;Foy-tli�Feiioil%-:'< fU.4,;;„iiF:„ x,SizUi,.l-er .. - ., :,,x- - ':4 ". .,i+, e,,r »:k<J.;,.:...a .',x..f�:`:>,...r't�4r� ;3�'_,._Sr''S':'' 1', <;. =6=1'000firs^ . 1'000�-}20.011hts`2 000'-3' OO tirsi Ork5;000. rs•.'5 00o=6.500 rsf 6`50 000j hr5: __... .-.�--.---___�.r__-_- -r._____ _.-_._u _._____< __�._.�_ a. .1_.u_.._ .. ,_..-.5_S .._,6.0"- .^h .� . ,_ .. .Jh F ,_ OcB, ._ Journeyman Hourly Rate $ 62.27 26.15 29.27 ' 32.38 40.48 46.70 52.93 Fringe Benefits Health&Welfare per hour 10.20 10.20 10.20 10.20 10.20 10.20 Local Pension per hour 0.25 0.25 5.40 6.75 7.79 8.82 Annuity-401K per hour 0.25 0.25 1.17 1.46 1.69 1.91 Apprentice Training per hour 0.83 0.83 0.83 0.83 0.83 0.83 National Employee Benefit Fund 3.00% 0.78 0.88 0.97 1.21 1.40 1.59 N.E.C.A./A.M.F. 1.00% 0.26 0.29 0.32 0.40 0.47 0.53 Substance Abuse Program per hour 0.10 0.10 0.10 0.10 0.10 0.10 L.M.C.0 per hour 0.10 0.10 0.10 0.10 0.10 0.1'0 N.L.M.C.C. per hour 0.01 0.01 0.01 0.01 0.01 0.01 Paid'Sick Leave 0.65 0.73 0.81 1.01 1.17 1.32 Total Fringe Benefits 13.44 13.64 19.91 22.08 23.76 25.41 Payroll Taxes Social Security&Medicare 7.65% 2.00 2.24 2.48 3.10 3.57 4.05 State Unemployment 4.88% 1.28 1.43 1.58 1.98 2.28 2.58 Federal Unemployment 0.600% 0.16 0.18 0.19 0.24 0.28 0.32 Labor and Industries(employer's portion) per hour 1.43415 1.43415 1.43415 1.43415 1.43415 1.43415 Family&Medical Leave(employers share) per hour Total Payroll Taxes 4.87 5.28 5.68 6.75 7.56 8.38 Total Cost per Hour 44.46 48.19 57.98 69.31 78.02 .1 86.73 Total Fringe Benefits and Payroll Taxes 18.31 18.92 25.60 28.83 . 31.32 33.80 Labor Burden Percentage 70.03% 64.65% 79.05% 71.22% 67.07% 63.85% - ,hme:'&iOne=Half;Rates.- - _._L i..__.__ s < .,_v,_.___.r i , ,z _.__.: I,r Premium Portion of Time&One-Half Rates 13.08 14.64 16.19 20.24 23.35 26.47 Applicable Fringes and Payroll Taxes 2.24 2.51 2.77 3.47 4.00 4.53 Total Additional Cost per Hour 15.31 17.14 18.96 23.71 27.35 31.00 Labor Burden Percentage 17.13% 17.13% 17.13% 17.13% 17.13% 17.13% Total Cost per Hour 59.78 65.34 76.94 93.02 105.37 117.72 __.. :.';j1.n 'iD-ouble rime,Rates; -. .'- -F1 _ x:-:.;-_... .:_ A ''' r_.. '? "w L , " ` , -, . 777,11Z Premium Portion of Double Time Rates . 26.15 29.27 32.38 40:48 46.70 52.93 Applicable Fringes and Payroll Taxes 4.48 5.01 5.55 6.93 8.00 9.07 Total Additional Cost per Hour 30.63 34.28 37.93 47.41 54.70 62.00 Labor Burden Percentage 17.13% 17.13% 1'7.13% ' 17.13% 17.13% 17.13% Total Cost per Hour 75.09 82.48 95.90 116.72 132.72 146.72 Holidays-New Year's Day,Memorial Day,Fourth of July,Labor Day,Thanksgiving Day,Day after Thanksgiving Day, Christmas Day,Martin Luther King's Birthday 3/21/2022 , •• -7 , ‘. . e---- ,.,---, ..- .____, Locals #252 and #440 Laborers and Flaggers Wages Effective June 10, 2021 through May 31, 2022 (Next L&l and State Unemployment Rate Changes 1/1/22) r---- --:,---,-,77,.:-1--,--:-,-.,--r:7-7.-------.-p---,-,-;-,;,---.:-.7%-;-:7-7,-.,:--z7^: r'',f'5:',71•174*'7!*3;.;';,T:Trattla,7.7,:7,7:',77,T,T176,*: r,,,,,,:7:77-.."'i,:77 F.7777:7: - .4'.''';','.'.','. ':';';',`:P,; ''';',,:<,...-'7,'i''':':' ,-' '''. ; '; „.':,.' ''' •;., 1,;'.'; ';,'',i: ; ....''.;N;;`;.;:. .`,--.`1, '' • ;-''''': '?,'.-:. -:''"',;;;-I ,-•;':,;., :';:l''' i';,-.'.;, `;74.; /Cthil.A r4':;.*;.,-.%Z...''t,;:,': •-'':,'.;;..' I':,'.11.:`,[';'',',4,.,Pi,';',:,;,,,,;r V,.; /*;,'i'-'*. '' ;:',`,`,-,,,,,,-,,.::',';;;T'''.!:'?; ;,.,,, ;-,,,.:.',7 '-'1,,:,;,'; .:;:;',--;,'!*::'•;: ,.;',..;1',;:c .:':;; .Y.*:';';:,-.Z-•:,'L.;';':;....Y.... ;" ,. ,i;'1 ',.., -.=,'-::..,:j ,.:•-,.': ^L'.'.}.i.,..: '':',;.::::::LK,:::',. :',:.:_.,:i,:fr':.r:-':::;: :::::::'- ..L.:1:-... :::_,.:,_:;•.il FlaggerC,::'11.4410e1M*0.11:3 EASKIWIlIkr:ri.GroLIPAYlv, k:,GrupAt. Base Hourly Rate 32.96 39.12 41.29 42.29 . 42.98 Lticr Benefits, Health &Welfare per hour 7.20 7.20 7.20 7.20 7.20 Pension per hour 5.04 5.04 5.04 5.04 5.04 Apprentice Training per hour 0.95 0.95 0.95 0.95 0.95 W.C.I.S.A.P.(Drug Testing) per hour 0.06 0.06 0.06 0.06 0.06 N.W.L.E.C.E.T. per hour 0.14 0.14 0.14 0.14 0.14 Paid Sick Leave 0.82 0.98 1.03 1.06 1.07 Total Fringe Benefits 14.21 14.37 14.42 14.45 14.46 Payroll Taxes Social Security&Medicare 7.65% 2.52 2.99 3.16 3.24 3.29 State Unemployment 4.88% 1.61 1.91 2.01 2.06 2.10 Federal Unemployment 0.60% 0.20 0.23 0.25 0.25 0.26 Labor and Industries(employer's portion) per hour 1.67370 1.67370 1.67370 1.67370 1.67370 Family&Medical Leave(employer's share) per hour Total Payroll Taxes 6.00 6.81 7.10 7.23 7.32 Total Cost per Hour 4 53.17 60.30 4 62.81 63.97 64.76 Total Fringe Benefits and Payroll Taxes 20.21 21.18 21.52 21.68 21.78 Labor Burden Percentage 61..33% 54.14% 52.12% 51.26'Y° 50.69% ...i.',.Y.:,:.:...7,,,..::.i.ntittitittiiii-04. tiftiiiii I'T;-.7:7,-.317--_"1:.:,:;F,:::,:;...:-.LT,.a.l:',"-; .;.',_.-IL;Eq„.:.: in:.,.. ..,-.7,:f.'2,7;:: i.••.,.:::.,,:;,:1,::,;71g, : .,:1::71;:,;.,:,.; Premium Portion of Time&One-Half Rates 16.48 19.56 20.65 21.15 21.49 Applicable Fringes and Payroll Taxes 2.16 2.57 2.71 2.78 2.82 Total Additional Cost per Hour 18.64 22.13 23.36 23.93 24.31. Labor Burden Percentage 13.11% 13.14% 13.13% 13.15% 13.12% Total Cost per Hour 71.81 82.43 86.17 87.89 89.07 ttitiiiiitiiitl'.,2.::ZIT: 1 -:-:'';',],.: -.::,.;7-E-ii.:-.2;.'Lii:C1'1.1:iltE Premium Portion of Double Time Rates 32,96 39.12 41.29 42.29 42.98 Applicable Fringes and Payroll Taxes 4.33 5.14 5.42 5.55 5.64 Total Additional Cost per Hour 37.29 44.26 46.71 47.84 48.62 Labor Burden Percentage 13.14% 13.14% 13.13% 13.12% 13.12% Total Cost per Hour 90.46 104.56 109.52 111.81 113.38 Holidays-New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day, Day after Thanksgiving Day, Christmas Day 3/21/2022 , 3 I 3 • P - - --- ' Locals #302 Operators Wages Effective 06/01/20 through 05/31/21 (Next L&l and State Unemployment Rate Changes 1/1/22) King,Snohomish,Skagit and Whatcom counties . .t. ..; ..,?1.4iirertiforil!*: -4-6tifiiiitbIslefTi[.!‘;k Qi).003rtlit.' Base Hourly Rate 51.15 50.50 49.92 Fringe Benefits Health&Welfare per hour 6.97 6.97 6.97 Pension per hour 13.65 13.65 13.65 Supplemental Pension per hour 2.00 2.00 2.00 Apprentice Training per hciur 0.70 0.70 0.70 National Training Fund per hour 0.05 0.05 0.05 Paid Sick Leave 1.28 1.26 1.25 Total Fringe Benefits 24.65 24.63 24.62 Payroll Taxes Social Security&Medicare 7.65% 3.91 3.86 3.82 State Unemployment 4.88% 2.50 ' 2.46 2.44 Federal Unemployment 0.60% 0.31 0.30 0.30 Labor and Industries(employer's portion) per hour 1.67370 1.67370 1.67370 Family&Medical Leave(employer's share) per hour Total Payroll Taxes 8.39 8.30 8.23 Total Cost per Hour 84.19 J 83.43 82.77 Total Fringe Benefits and Payroll Taxes 33.04 32.93 32.85 Labor Burden Percentage 64.59% 65.21% 65.80% IrlimectoOriel;HOIERatei:,;,:::;&I,. ,,,.,f_,\;•,c,,-:;,,1,:.54‘:;:;;:,:i .:-.)Vr:..-; 1 i'11-4N-4,,,-4'`Aiiii "..,.. i-'" .4:,..ts,-, -,- -r,J:.tv Premium:Portion of Time&One-Half Rates 25.58 25.25 24.96 Applicable Fringes and Payroll Taxes 3.36 3.32, 3.28 Total Additional Cost per Hour 28.93 28.57 28.24 Labor Burden Percentage 13.13% 13.13% 13.13% Total Cost per Hour 113.12 112.00 111.01 iii0iiiiiltreiligntit':;:1;:lf all;',-InTraCig TRZlitMt: U., ' .1*,:e °,3v:fitn--,:,;;?.. Premium Portion of Double Time Rates 51.15 50.50 49.92 Applicable Fringes and Payroll Taxes 6.72 6.63 6.55 Total Additional Cost per Hour 57.87 57.1.3 56.47 Labor Burden Percentage 13.13% 13.13% 13.13% Total Cost per Hour 142.05 140.56 139.24. Holidays-New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day, Day after Thanksgiving Day, Christmas Day, Martin Luther King's Birthday 3/21/2022 Contractor's Equipment list including rates per AGC-WSDOT Equipment Agreement-Totem Electric HAUL. LIFT COST ID YEAR DESCR TYPE MAKE MODEL VJ.N. LIC# PWR. HP OVWR GVW AXLES CAP CAP. BOOM ATTACHMENT Al ATTACHMENT i PER HOUR 100 2012 Pickup Pickup Chev 2500 1GC2CVCG9CZ128937 B459295 GAS 240 10000 2 NA NA NA NONE NONE 516.50 102 2018 Pickup Pickup Chev Colorado 1GCGTDEN6J1289513 C99761J GAS 220 2 NA NA NA NONE NONE $16.32 103 2015 Pickup Pickup Chev 1500 1GCNCPEH2FZ330425 C17225D GAS 210 6000 2 NA NA NA NONE NONE $16.65 - 112 2011 Pickup Pickup Chev 2500 1GC2CVCG3BZ394310 B798197 GAS 240 10000 2 NA NA NA NONE NONE $16.50 116 2015 Pickup Pickup Chev 1500 1GCNCPEH7FZ374016 C26871C GAS 600 2 NA NA NA NONE NONE 516.65 125 2013 SUV SW INFIITY RX 255858555525222 AJK9444 GAS 4000 2 NA NA NA NONE NONE $14.32 130 2016 Pickup Pickup Choy 1500 1GCNCNEH7GZ194640 C01109G GAS 6000 2 NA NA NA NONE NONE $16.75 132 2012 Pickup Pickup TOYOTA TUNDRA 5TFUM5F17CX035102 GAS 6000 2 NA NA NA NONE NONE $18,50 139 2019 Pickup Pickup Chev 2500 2GC2KSEGXK1146658 C83415N GAS 10000 2 NA NA NA NONE NONE $22.36 142 2008 Pickup Pickup Toyota Tacoma 5TETX22N98Z563024 B60480G GAS 4000 2 NA NA NA NONE NONE $10.82 143 2012 Pickup Pickup Chev 1500 1GCNCPEA3CZ3414O2 B10728U GAS 6000 2 NA NA NA NONE NONE 510.82 144 2008 Pickup Pickup Toyota Tacoma 5TETX22N88Z537773 B20855H GAS 4000 2 NA NA NA NONE NONE 510.82 146 2016 Pickup Pickup Chev 1500 1GCNCNEHOGZ220320 C11610H GAS 6000 2 NA NA NA NONE NONE $16.75 200 2002 Utility Utility Int 4400 1HTMKADN42H528574 B25282L Diesel 230 40000 2 NA NA NA NONE NONE $18.85 _ 201 2003 Flatbed Flatbed Ford F550 1FDAF56FX3EA23316 B79581S Diesel 205 23000 2 NA NA NA EM3800SX 1057603GCBHT NONE $18.85 203 2013 Wilily Utility Choy 3500 1GB3CZCG6DF110155 B10270U GAS 245 12000 _ 2 NA NA NA NONE NONE $17.96 204 2012 Pickup Pickup Choy 1500 1GCNCPEXXCZ275872 B10727U GAS 200 6000 2 NA NA NA NONE NONE $15.00 207 2007 Flatbed Flatbed Chev C-3500 1GBJC34K07E509547 C00316C GAS 220 12000 2 NA NA NA EM3800SXGOCA-4843789 NONE S18.72 _ 209 2008 Pickup Pickup Ford F150 1FTRF12278KC34002 C73994C GAS 205 6000 2 NA NA NA NONE NONE $14.32 214 2006 Utility Utility Chev 2500 1GBHC24U86E191279 B51377X GAS 230 10000 2 NA NA NA NONE NONE $18.65 216 2008 Pickup Pickup Ford F150 1FTRF122X8KC48881 C73993C GAS 205 6000 2 NA NA NA NONE NONE 512.73 217 2008 Utility Utility Chev 2500 1GBHC24K48E141660 B43122E GAS 325 12000 2 NA NA NA NONE NONE $18.72 223 1999 PICKUP PICKUP Chev C-25 1GCGC24R7XR724560 651372X GAS 210 8000 2 NA NA NA NONE NONE 511.13 224 2001 PICKUP PICKUP Ford RANGER 1FTYR10C21PA64543 B42722H GAS 140 6000 2 NA NA NA NONE NONE $13.42 226 2007 Flatbed Flatbed Chev C-3500 1GBJC34KX7E524315 C00323C GAS 230 12000 2 NA NA NA NONE NONE 518.72 228 2008 Utility Utility Chev 2500 1GBHC24K68E141109 843123E GAS 325 12000 2 - NA NA NA NONE NONE $18.72- 230 2015 Utility Utility Chev 2500 1GC2CUEGOFZ527313 C26870C GAS 325 10000 2 NA NA NA EM4000SX EBRC1007313 NONE $19.05 231 2015 Utility Utility Chev 2500 1GBOCUEGOFZ517439 C26873C GAS 230 10000 2 NA NA NA EM4000SX EBRC1007786 NONE $19.05 232 2007 Utility Utility Chev C-2500 1GBHC24U97E114356 C00315C GAS 220 8000 2 NA NA NA EM3800SX EAMC1012071 NONE $18.72 233 2015 Utility Utility Chev 2500 1GBOCUEG9FZ522221 C26872C GAS 230 10000 2 NA NA NA EM4000SXEBRC1004606 $19.05 234 2003 Stakebed Stakebed Chev C-4500 1GBE4E1173F511385 687786P Diesel 210 17000 2 NA NA NA NONE NONE 513.10 236 2011 Pickup Pickup Chev 2500 1GC2CVG3BZ453159 B798187 GAS 240 10000 2 NA NA NA NONE NONE $13.10 237 2007 Pickup Pickup Chev 2500 1GCHC29U97E200240 C00324C GAS 210 8000 2 NA NA NA NONE NONE $12.68 238 2016 UOIIty Utility Chev 3500 1GC3CYCG7G2309014 C39681H GAS 230 10000 2 NA NA NA EM4000SX EBRC1007787 $19.54 239 2020 Flatbed Flatbed Chev 3500 1GB3YSEY1LF349500 C05457X Diesel 420 14000 2 - NA NA NA magna sine ms-2012 ser v41-08948 NONE $29.78 240 2020 Flatbed Flatbed Chev 3500 1G83YSEY1LF349568 C05456X Diesel 420 14000 2 NA NA NA Magna sine ms-2012serwjl-11499 NONE $29.78 242 2016 Flatbed Flatbed Chev 3500 1GB3CYC80GF202045 C94734H Diesel 420 17000 2 EM4000SX EBRC1007234 $22.36 246 2014 Utility Utility Chev 2500 1GBOCVCG1EF164380 865925Z GAS 230 10000 2 NA NA NA EM4000SXEBRC1001875 NONE $15.61 252 2005 Utility Van Utility Van Int 4300 1HTMMAAL95H156313 838137K Diesel 240 26000 2 NA NA NA PREWA#m1-1 0 4 3 561 4 EM3800SX EAM $17.92 253 2019 Flatbed Flatbed Chev 3500 1GB3KVCYOKF174371 C67980K Diesel 470 17000 2 NA NA NA EM4000SX EBRC1008145 $29.62 254 2019 Flatbed Flatbed Chev 3500 1GB3KVCY1KF175786 C67959K Diesel 470 17000 2 NA NA NA EM4000SX EBRC1008144 529.62 260 1996 UtilltyVan UtilityVan Ford F-700 1FDNF80CBTVA16513 844779U, Diesel 210 26000 2 NA NA NA EM5000SX EBMC-1026570 NONE $17.38 262 2014 Utility Utility Chev 2500 1GCOCVCG9EF183710 865924Z GAS 245 10000 2 EM4000SX EBRC1004594 $15.61 1 263 2006 Flatbed Flatbed Chev 03500 1GBJC34U76E165559 B51376X GAS 305 -2 NA NA NA NONE NONE S21.76 . 271 2005 Utility Utility Choy C-2500 1GBHC24U55E162093 844782U GAS 305 9500 2 NA NA NA EM35003 4583647 NONE $17.92 276 2008 Utility Utility Chev C-2500 1GCHC24K88E173278 543185G GAS 305 10000 2 NA NA NA EM3800SX-4836015 NONE $18.72 301 2007 BoomfAuger Truck Flatbed Ford F-750 3FRXF75R87V514874 627430G Diesel 230 33000 2 NA 24000 4T Terexc4047ser#2080135386 14000 FtLb $160.00 302 2006 Boom/Auger Truck Flatbed Ford- F-750 3FRXF75R17V418634 B25041L Diesel 230 36000 2 NA 24000 47' Terex c4047 ser#2060531019 14000 FtLb $160.00 304 2002 Forklift Forklift Milsu FGC2OK AF82C-01879 LPG 65 4000 2 15' NONE NONE $6.50 305 2005 Scissor Lift Scissore Lift Skyjack 3219 249187 NA Electric 2 19' NONE $5.32 307 2011 Bucket Truck Service Bucket Dodge 5500 3D6WA7EL7BG591584 C28300H Diesel 26000 2 NA 300 42' ETI371H ser#0711C78254 EM4000ser#105 S38.77 318 _ 2018 Beam Truck Flatbed Kenwarth 7440 3BKBLJOX6KE289284 C83064N Diesel 60000 3 Mantles 26101cser#261842 $88.36 319 2006 Forklift Forklift Daewoo G50C-2 KA00090 NA LPG 210 11000 2 NA 15' NONE NONE $6.50 329 1985 Bucket Truck Flatbed Ford F800 1FDXK84N4FVA53529 A70306D Diesel 225 26000 2 FIXED 300 50' Stelco R2450-TG $27.88 331 2006 Bucket Truck Flatbed Intl. 4300 1HTMMAAR26H144820 B37463P Diesel 325 2 FIXED . 750 72' ALTEC AM900ser#0105-R3868 538.88 332 2000 Bucket Truck Service Bucket Ford F550 1FDAF56F7YFA45295 C00322C Diesel 250 17500 2 10000 350 37' Holan H-237 SER#99237006 $38.88 334 1997 Boom Truck Flatbed Ford F700 1FDPF80CGWA04517 A32299M Diesel 205 . 40000 2 FIXED National-425 ser#27392 - 545.32 338 2002 Bucket Truck Service Bucket Ford F450 1FDXF46FX2E012781 B94501H Diesel 205 15000 2 10000 300 37' Telelect TL38Pser#2020719726 536.78 339 1995 BoanVAugerTruck Flatbed Intl. 4900 1HTSHADT7SH695645 A76385R Diesel 230 50000 3 NA 40' Telelect commander 6000 ser#373-60CBB $130.74 340 2019 Bucket Truck Service Bucket Chev 6500 IHTKHPVMXH862901 C83875N Diesel' 375 21000 2 420 37 AltecAT237S,SER#1119GF016e NONE $43.55 341 2000 Bucket Truck Flatbed Intl 4700 1HTSCABN2YH219430 B33689P Diesel 270 33000 2 FIXED 350 45' TelelectTPL40 ser#1991110516 NONE $75.00 342 2001 Scissor Lift Scissor Lift Genie GS1930 37073 NA Electric NA NA 2 NA 700 19' NONE NONE $23.27 343 2009 Bucket Truck Service Bucket Intl _ 4300 1HTMMAM69H130475 B41257K Diesel 220 26000 2 FIXED 350 55' Terex HI Ranger XT55 ser#207013183r NONE _ $40.95 344 2001 Scissor Lift Scissor Lift Genie 2046 40774 NA Electric NA NA 2 NA 600 20' NONE NONE $23.27 347 2006 Scissor Lift Scissor Lift Genie GS1530 GS3006A-86891 NA Electric NA N 2 NA 600 15' NONE NONE $19.22 4 A . E HAUL LIFT COST ID YEAR DESCR TYPE MAKE MODEL V.I.N. LIClf PWR. HP GVWR GVW AXLES CAP CAP. BOOM ATTACHMENT#1 ATTACHMENTS PER HOUR 402 _ 1998 Dump Dump Ford F800 1FDPK8DC2WVA129D7 C99216J Diesel 170 40000 2 5YD NA NA NONE NONE $23.12 403 2002 Dump Dump Intl 2674 1HTGLAHT52H503945 B36355R, Diesel 360 54000 3 12YD NA NA NONE NONE 523.21 406 2001 Dump Dump Ford F750 3FDPF75451MA20546 B50660P Diesel 210 40000 2 5YD NA NA NONE NONE 532.00 415 2001 Dump Dump Intl 4700 1HTSCAAAN71H350067 B36311R Diesel 225 40000 2 7YD NA NA NONE NONE $3200 416 2000 Dump Dump Freightliner FL70 1FUWHJBA9YDH13316 B10063F Diesel 325 40000 2 5 YD NA NA NONE NONE $29.08 418 1999 Dump Dump Freightliner FL112 1FUW3MCAXXPA25364 B25140D Diesel 315 42000 2 7YD NA NA NONE NONE 529.08 419 2000 Dump Dump Freightliner FL70 '1FV6HJBA7YHF06928 A07646K Diesel 250 - 44000 2 7YD NA NA NONE NONE $34.07 420 2000 Dump - Dump Intl 4700 1HTSCABP91H330242 B45429K Diesel 210 40000 2 5YD NA NA NONE NONE $29.08 421 2000 Dump Dump Mack CH612 1M1AA08Y7YW020296 B51788K Diesel 320 40000 .3 10Y0 NA NA NONE NONE 529.08 422 2000 Tractor Tractor Kenworth T-800 1XKDDU9X7YR865590 839649L Diesel 420 70000 3 NA NA NA NONE NONE -699!25 $56.05 600 1999 Backhoe Backhoe Case 58aL JJG0244800 NA Diesel 110 NA NA 1/2YD NA Extendahoe NONE NONE 536.47 602 2006 Backhoe Backhoe Case 580SM N6C411696 NA Diesel 95 NA NA 12YD NA Extendahoe NONE NONE -424,6E $47.68 603 2009 Slab Saw Slab Saw Norton N613D 7091074 NA Diesel 60 NA 2 NA NA NA NONE NONE $29.84 604 2002 Slab Saw Slab Saw Meco M-650CC 5640 NA Diesel 60 NA 2 NA NA NA NONE NONE 568,34 606 2008 Slab Saw Slab Saw Meco 44DWC1 9995 NA Diesel 44 _ NA 2 NA NA NA NONE NONE 519.55 608 . 2006 Backhoe Backhoe Case 580M N6C402363' NA Diesel 60 NA 2 12YD NA xtendahoe NONE NONE $33.00 610 1991 Backhoe Backhoe Case 5BOSK JJG0183477 NA Diesel 110 NA 2 12 YD NA NA NONE NONE 533.86 614 2000 Slab Saw Slab Saw Meco M60DCC 5435 NA Diesel 60 NA 2 NA NA NA NONE NONE $23.13 616 2002 Slab Saw Slab Saw Meco M37WC 5556 NA GAS 37 NA 2 NA NA NA NONE NONE $27.13 617 2009 Slab Saw Slab Saw Wolverine W-60CC 900 NA Diesel 60 NA 2 NA NA NA NONE NONE' 571.35 626 2005 Backhoe Backhoe Case 580SM JJG0377330 NA Diesel 110 NA 2 1/2YD NA Extendahoe NONE NONE $29.65 628 2006 Backhoe Backhoe Case 580M N6C402414 NA Diesel 110 NA 2 12 YD NA Extendahoe NONE NONE $29.65 631 1960 Roller(Large) Roller(Large) Dybpac CC10 594530 NA GAS 45 NA 2 NA NA NA NONE NONE 520.15 635 2005 Backhoe Backhoe Case 580SM N5C387018 NA Diesel 110 NA 2 1/2YD NA Extendahoe NONE NONE 529.65 638 1999 Backhoe Backhoe Case SeaL JJG0239571 NA Diesel 110 NA 2 12YD NA Extendahoe NONE NONE $28.80 639 1999 Backhoe Backhoe Case 580L JJG0236463 NA Diesel 110 NA 2 12YD NA Extendahoe NONE NONE 536,47 640 2007 Excavator Excavator Kubota KX91-3 21020 NA Diesel 30 NA TRACK NA NA NA NONE NONE $22.05 641 2006 Excavator Excavator Kubota KX71 11379 NA. Diesel 28 NA TRACK NA NA NA NONE NONE 522.0; $25.00 644 2018 Excavator Excavator Deere 35G 1FF035GXLJK282786 NA Diesel 32 NA TRACK NA NA NA NONE NONE 531.16 645 2018 Excavator Excavator Deere 35G 1FF035GXEJK282561 NA Diesel 32 NA TRACK NA NA NA NONE NONE $31.16 646 2018 Excavator Excavator Deere 35G 1FF035GXAJK282785 NA Diesel 32 NA TRACK NA NA NA NONE NONE -551.10 $29.20 647 2018 Excavator Excavator Deere 35G 1FF035GXHJK282580 NA Diesel 32 NA TRACK NA NA NA NONE NONE 531.16 700 2009 Pole Trailer Pole Trailer RICE PT-12 4RWUF36109N040555 9242V0 NA NA NA NA 1 NA NA NONE NONE 58.26 701 2012 Utility Trailer Utility Trailer Blacktiawk 2AXLE 184BU1429CC011773 0755XU NA NA 2 NA NA NONE NONE $8.50 702 1986 Pole Trailer Pole Trailer WA78110758 4345UE NA. NA 1 NA NA NONE NONE $4.26 703 1970 Van Van TMO 30' F64990 8066TR NA NA 2 NA NA NONE NONE $9.37 704 1978 Flatbed Trailer Flatbed Trailer Utility 40' 7L92297002 JR1670 NA NA 2 NA NA NONE NONE 59.88 705 1993 Utility Trailer Utility Trailer HM 1 AXLE WA89156844 9901W NA NA 1 NA NA NONE NONE 56.17 706 1993 Utility Trailer Utility Trailer HM 1 AXLE WA89156850 9902W NA NA 1 NA NA NONE NONE $6.17 707 2010 Utility Trailer Utility Trailer Loadtrail 2 AXLE 4ZECH1825A1074801 8659W NA NA 2 NA NA NONE NONE $6.17 708 1987 Utility Trailer Utility Trailer HM 2 AXLE 131910 8065TR NA NA 2 NA NA NONE NONE $6.17 709 1965 Equipment Trailer Equipment Trailer MDNMV 2AXLE 5335 FY8003 NA NA 2 NA NA NONE -NONE $4.26 711 1975 Tar Pot Trailer Tar Pot Trailer Raadr 2 AXLE FEC0573 3794XJ NA. NA 2 NA NA NONE NONE $3.93 712 1972 Flatbed Trailer Flatbed Trailer TIMPT 2 AXLE 22968 5117YX NA NA 2 NA NA NONE NONE $4.26 713 1987 Equip/Saw Trailer Equip/Saw Trailer HM 2 AXLE WA78120818 5122YX NA NA 2 NA NA NONE NONE $4.19 714 1967 Equip/SIGN Trailer Equip/SIGN Traile Halet 2 AXLE 66213FB 5115YX NA NA 2 NA NA NONE NONE $3.84 715 1983 Utility Trailer Utility Trailer HM 1 AXLE WA7884848 5121YX NA NA 1 NA NA NONE NONE $6.17 716 1988 Equip/BackhoeTraile Equip/Backhoe Tr Trail King 2AXLE 1TKCO242ZJM120783 8069TR NA NA 2 NA NA NONE NONE 54.26 717 1991 Equip/Backhoe Traile Equip/Backhoe Tr Trail Max 2 AXLE TD18FBR 8814ZE NA NA 2 NA NA NONE NONE 54.26 718 1994 Equip/BackhoeTraile Equip/Backhoe TrEconoline 2 AXLE '42EDPHE41R1000966 3796XJ NA NA 2 NA NA NONE NONE 54.26 720 2018 Equipment Trailer Equipment Trailer Olympic 18' 1H9TF1825JT726467 09165AC NA NA 2 NA NA NONE NONE 510.23 721 1977 Van Trailer Van Trailer Fruhauf 40' AVC78416 FE9080 NA NA 2 NA NA NONE NONE 510.23 722 1977 Van Trailer Van Trailer Fruhaut 40' CHP142173 N/A NA NA 2 NA NA NONE NONE 59.04 723 1989 Equipment Trailer Equipment Trailer Trail King 2 AXLE 1TKU0162XKM074546 4195YM NA NA 2 NA NA NONE NONE 54.26 724 1961 Tar Pot Trailer Tar Pat Trailer Esick 1 AXLE 62120627 7849ZE NA NA 1 NA NA NONE NONE 53.96 725 1994 Equip/Saw Trailer Equip/Saw Trailer Freeway 2AXLE 45NFS1623R100483 2819VP NA NA 2 NA NA NONE NONE 52.35 727 2018 Equipment Trailer Equipment Trailer Olympic 18' 1H9TF1823JT726466 09166AC NA - NA 2 NA NA NONE NONE 510.23 728 1983 Utility Trailer Utility Trailer HM TRUCKBE WA7884902 5120YX NA NA 1 NA NA NONE NONE 56.17 730 1993 Equipment Trailer EquipmentTrailerCZEng. 2AXLE 4CZTB3028P123G231 3855XJ NA NA 2 NA NA NONE NONE $4.26 731 1980 Tilt Trailer Tilt Trailer Freeway 1 AXLE FW4068 5116YX NA NA 1 NA NA NONE NONE $4.26 _ 732 1988 Equipment Trailer Equipment Trailer Eager Beave 2 AXLE 1120BD205JA080036 3851XJ NA NA 2 NA NA NONE NONE 54,26 733 1980 Van Trailer Van Trailer utility 30' UNKNOWN NA NA 2 NA NA NONE NONE 59.37 _734 1981 Van Trailer Van Trailer Miller 40' T3734 NONE NA NA 2 NA NA NONE NONE $10.23 736 1992 EgiprnentTrailer EgipmentTrailer Econoline 2AXLE 42EDPH442N1000096 5114YX NA NA 24000 2 NA NA NONE NONE 58.26 HAUL LIFT COST ID YEAR DESCR TYPE MAKE MODEL VJ.N- GC# PWR. HP GVWR GVW AXLES CAP CAP. BOOM ATTACHMENT#1 - ATTACHMENT I PER HOUR 737 1978 Van Trailer Van Trailer Aerollner 40' 3835 J43298 NA NA 2 NA NA NONE NONE $10.23 738 1993 Uglily Trailer Utility Trailer HM TRUCKBE WA89156852 9900VY NA NA 1 NA NA NONE NONE $6.17 739 1978 Van Trailer _Van Trailer Strick 40' UNKNOWN NONE NA NA 2 NA NA NONE NONE 510.23 740 1993 Utility Trailer Utility Trailer HM `TRUCKBE WA89156851 2149VZ NA NA _ 1 NA NA NONE NONE 56.17 741 1980 Van Trailer Van Trailer HM 40' UNKNOWN JS6774 NA NA 2 NA NA NONE NONE $10.23 742 1977 Van Trailer Van Trailer Maine 40' 814-693 NONE NA NA 2 NA NA NONE NONE $10.23 743 1976 Van Trailer Trailmobile 40' L91225 NONE NA NA 2 NA NA NONE NONE $10.23 744 1980 Van Trailer Van Trailer Strick 40' UNKNOWN NONE NA NA 2 NA NA NONE NONE $10.23 745 1981 Van Trailer Van Trailer Flexvan 40' 37398 ZA1375 NA NA 2 NA NA NONE NONE $10.23 746 1981 Van Trailer Van Trailer Fruhauf 40' VMN325045 7836JA NA NA 2 NA NA NONE NONE $10.23 747 1975 Utility Trailer Utility Trailer HM 2 AXLE WA 7217749 3798XJ NA NA 2 NA NA NONE NONE $6.17 748 1997 Utility Trailer Utility Trailer Contrail 2 axle 4KNUC1625VL162064 3854XJ NA NA 12000 2 NA NA NONE NONE $7.12 749 1998 Utility Trailer Utility Trailer Contrail 2 axle 4KNUC1620WL162555 2148VZ NA NA 12000 2 NA NA NONE NONE $7.12 750 2015 Utility Trailer Utility Trailer Olympic 2axle 1C9TF1623FT997555 0629ZK NA NA 10000 2 NA NA NONE NONE $7.12 751 1996 Van Trailer Van Trailer laxte NA NA 1 NA NA NONE NONE $10.23 753 2000 Tar Pot Trailer Tar Pot Trailer HM 2AXLE 2853 5119YX NA NA 1 NA NA NONE NONE $9.35 790 2019 Equipment Trailer EglpmentTrailer Olympic 2AXLE 1H9TF262KT726097 09274AC NA NA 14000 2 NA NA NONE NONE $11.15 791 2008 EglpmentTrailer EgipmentTrailer Towmaster T-20 4KNFT20258L163615 6527UN NA NA 2 20.000 NA NA NONE NONE $4.88 801 2007 Locator Locator Rldgid SR-20 213-05572 NA NA NA NA NA NA NA NA NA NONE NONE $8.75 802 2001 Air Compressor AlrCompressor 'Sullivan �210 21641 2820VP Diesel NA 1 NA NA NA NONE None $11.17 804 1996 Generator Generator WRICO 3KW Z600BG-908471 Diesel _ NA NA NA NA NONE NONE 52.00 807 1996 AirCompressor AirCompressor Sullivan 185 16015a 0593LL Diesel NA 1 NA NA NA NONE NONE $10.87 808 2008 Air Compressor Air Compressor Sullalr 225 2.00804E+11 3519UM Diesel NA 1 NA NA NA NONE NONE $11.50 ' 809 2018 TRENCH COMPACTOR WACKER BS50-4A 10895627 NA GAS NA N NA NA NA NA NONE NONE $6.23 810 2018 TRENCH COMPACTOR WACKER BS50.4A 10895628 NA GAS NA N NA NA NA NA NONE NONE $6.23 811 2018 TRENCH COMPACTOR WACKER BS50-4A 10895629 NA GAS NA N NA NA NA NA NONE NONE $6.23 812 2018 TRENCH COMPACTOR WACKER `BS50.4A 10922678 NA GAS NA N NA NA NA NA NONE NONE $6.23 815 1989 Cable Winch/Trailer Cable Winch/Trai Amco TM-2000 1A9UC0817KE189004 4940UM GAS 3500 1 NA 600LB NA CONTROLLER(TM175) NONE $17.26 816 1994 Cable Winch Cable Winch Amco TM-301 F3419 NA NA NA NA NA 600L5 NA CONTROLLER(TM175) NONE $16.46 819 2010 Air Compressor Air Compressor Sullalr 185 201010230023 0420VF Diesel NA 1 NA NA NA NONE NONE $11.50 822 1993 Pavement Breaker Pavement Breake Allied 740 7? NA NA NA NA NA NA NA NA NONE NONE $18.22 823 1993 Generator Generator Honda 650 NA NA GAS NA NA NA NA NA NONE NONE $0.75 824 1993 Generator Generator Honda 3000 NA NA GAS NA NA NA NA NA NONE NONE $1.75 825 1994 Generator Generator Honda 3500 NA NA GAS NA NA NA NA NA NONE NONE $2.00 826 1995 Generator Generator Genera( 3500 NA NA GAS NA NA NA NA NA NONE NONE $2.00 827 2008 Plate Compactor Hoe Pack OKADA OAC-200 B1068 NA NA NA NA NA NA NA NA NONE NONE $7.12 828 1994 Plate Compactor Hoe Pack OKADA OKC20 OKC20-1067 NA NA NA NA NA NA NA NA NONE NONE $3.90 829 2008 Plate Compactor Hoe Pack OKADA OAC-200 B1073 NA NA NA NA NA NA NA NA NONE NONE $7.12 830 1994 TRUCKMOUNTED AE ARROW BOARD FLEXOUTE 2034453 11996 NA NA NA NA NA NA NA NA NONE NONE $5.09 831 1994 TRUCKMOUNT ARR ARROW BOARD FLEXOLITE 2003648 13263 NA NA NA NA NA NA NA NA NONE. NONE $5.09 835 1997 Air Compressor Air Compressor SULLIVAN D210OJD 17064A 3853XJ DIESEL 45 NA 1 NA NA NA NONE NONE $11.17 836 1997 AlrCampressor Air Compressor SULLIVAN D210QJD 17066A 3852XJ DIESEL 45 NA 1 NA NA NA NONE NONE $11.17 837 1998 Air Compressor Air Compressor SULLIVAN D210QH 18162A 2147VZ DIESEL 80 NA 1 NA NA NA NONE NONE $11.93 838 1998 Pavement Breaker Pavement Breake OKADA OKB300 2658 .NA NA NA NA NA NA NA NA NONE NONE $19.68 _ 839 2000 Air Compressor Air Compressor Sullivan D210OH 20612 8064TR Diesel 80 NA 1 'NA NA NA NONE NONE $11.17 ' 841 2001 Arrow Board Arrow Board Amida ODLSE25t 0101.68745 8070TR NA NA NA 1 NA NA NA NONE NONE $5.53 842 2001 Arrow Board Arrow Board Amida ODLSE2510101-68740 8071TR NA NA NA 1 NA NA NA NONE NONE $5.53 843 2016 TRENCH COMPACT(UP RITE WACKER BS50-4A 24272128 NA REG 3 NA NA NA NA NA NONE NONE $5.93 844 2001 Arrow Board Arrow Board Amida ODLSE25 0102-68829 4944UM NA NA NA 1 NA NA NA NONE NONE $5.53 845 2007 Message Board Message Beard Wancb WTLMB 5F125161881000762 2833VP NA NA NA 1 NA NA NA NONE NONE $5.53 846 2015 TRENCH COMPACTOR WACKER BS50-4A 20087863 NA REG 2.3 NA NA NA NA NA NONE NONE $5.93 847 2015 TRENCH COMPACT(UP RITE WACKER BSSO-4A 20286282 NA REG 3 NA NA NA NA NA NONE NONE $5.93 848 2002 TRENCH COMPACTS UP RITE WACKER BS52Y 5308612 NA MIXED 2.3 NA NA NA NA NA NONE NONE $5.93 850 2015 TRENCH COMPACT(UP RITE WACKER BS50-4A 20286287 NA REG 2.3 NA NA NA NA NA NONE NONE $5.93 852 1990 PLATE COMPACTOF HAND Multi quip mikasa P-9639 NA •NA 2 NA NA NA NA NA NONE NONE $3.90 854 2004 TRENCH COMPACT(UP RITE WACKER BS52Y 5481572 NA MIXED 2.3 NA NA NA NA NA NONE NONE $6.10 855 2008 TRENCH COMPACT(UP RITE WACKER BS50-2 5799902 NA MIXED 2.4 NA NA NA NA NA NONE NONE $5.00 856 2016 TRENCH COMPACT(UP RITE WACKER BS50-4A 24256530 NA REG 3 NA NA NA NA NA NONE NONE $5.98 857 2003 TRENCH COMPACT(UP RITE WACKER BS52Y 5404E163 NA MIXED 2.3 NA NA NA NA NA NONE NONE $5.98 858 2016 TRENCH COMPACT(UP RITE WACKER BS50-4A 24256531 NA REG 3 NA NA NA NA NA NONE NONE $5.98 859 2003 TRENCH COMPACT(UP RITE WACKER BS600Y 5250257 NA MIXED 2.9 NA NA NA NA NA NONE NONE $6.10 860 2007 TRENCH COMPACT(UP RiTE WACKER BS50-2 5737609 NA MIXED 2.4 NA NA NA NA NA NONE NONE $7.12 861 2007 TRENCH COMPACT(UP RITE WACKER BS50-2 5737600 NA MIXED 2.4 - NA NA NA NA NA NONE NONE $7.12 862 2008 Plata Compactor HAND WACKER WP1550 6644229 NA REG 3 NA NA NA NA NA NONE NONE $6.10 y HAUL LIFT COST • ID YEAR DESCR TYPE MAKE MODEL V.LN. LICA PWR. HP GVWR GVW AXLES _ CAP CAP. BOOM ATTACHMENT Pi ATTACHMENT 1 PER HOUR 863 2015 TRENCH COMPACT(UP RITE WACKER BS504A 20286281 NA REG 2.4 NA NA NA NA NA NONE NONE $6.10 864 2009 Air Compressor Air Compressor Sullair 225H 4WOAS21108MA08004 7786UX Diesel NA 1 NA NA NA NONE NONE 512.42 865 2009 Air Compressor Air Compressor Sullair 225H 4WOAS21138MA08014 7787UX Diesel NA 1 NA NA NA NONE NONE 512.42 866 2009 TRENCH COMPACT(UP RITE WACKER BS50-2 5869187 NA MIXED 22 NA NA NA NA NA NONE NONE $6.25 867 2009 TRENCH COMPACT(UP RITE WACKER 8S50-2 5869189 NA MIXED 2.2 NA NA NA NA NA NONE NONE 56.25 868 2015 TRENCH COMPACTI UP RITE WACKER BS504A 20286280 NA REG 5 NA NA NA NA NA NONE NONE 56.25 869 2008 Plate Compactor HAND Mikasa MVC-SOVI N-1532 NA REG 5 NA NA NA NA NA NONE NONE 57.00 870 2000 Vactrailer vactrailer veneer E550 1VRT20294Y1000140 3856XXJ REG 5 NA NA NA NA NA NONE NONE $31.12 871 2004 Trash pump Trash pump WACKER PT-3 5518895 NA REG NA NA NA NA NA NONE NONE 57.15 892 2011 TRENCH COMPACTI UP RITE WACKER BS504 20056813 NA REG NA NA NA NA NA NONE NONE 55.13 901 1990 Air Tamper hall moon STF07140 NA AIR NA NA NA NA NA NA NA NONE NONE $3.90 903 2009 Air Tamper round Texas TX6TN 2110171 NA AIR NA NA NA NA NA NA NA NONE NONE 57.12 904 2009 Air Tamper hall moan Texas TX6TN 2110187 NA AIR NA NA NA NA NA NA NA NONE NONE $7.12 Rate effect Region Organization Ownership Adjust Operating Adjustment Unique Id Subtype Sae Class Manufacturer Model Year Senal Nun Configurations Notes Adjusted H Hourly Op Standby Co Idling Cost Revision Region Adj Year Adios Ownership Operating Unadjuster Adjusted H Unadjustes Adjusted 0 Unadjusted s Adjusted Week Unadjusted I,Adjusted Mo FHWA 10 Tractor-loader-Backhoes 14'to Under 15' Deere 3105G 2002 Onve.2WD,Operator Protec $22.19 $25.47 $11.98 $34.40 1/1/2022 State/Prov 96.50% 100% 100% $41.00 $41.48 $27000 $273.14 $1,080.00 $1,092.57 $3,860.00 $3,904.92 547.66 11 Tractor.loader-lackhoes 15'to Under 16' Deere 4101 2020 Power Mode:Diesel 545.00 $34.76 524.30 $61.04 1/1/2022 State/Prov 99.90% 100% 100% $80.00 $83.75 5530.00 555485 $2,120.00 $2,219.41 57,565.00 $7,919.75 $79.76 12 Standard Crawler Dozers 75-84 HP Deere 550H LT 2004 Dozer Type'.PAT,Operator Pi $45.93 $37.28 522.04 $5378 1/1/2022 State/Prov 100% 100% 100% $81.00 $84.81 $540.00 5565.38 52,160.00 $2,261.52 $7,72000 58,082.84 $83.21 13 Self Propelled Pavement Brooms All Lay-Mor 6-1-119 2015 Broom Length:72.0,Horsepc $28.71 $21.08 513.21 $32.96 1/1/2022 State/Prov 99.10% 100% 100% $51.00 $53.52 5340.00 5356.78 $1,350.00 $1,416.64 $4,815.00 $5,052.69 $49.79 14 Crawler Mounted Compact Excavators 5.1-6.0 MTons Kubota KX057.4 2019 Operating Weight:5.5,O0er, $29.60 $20.54 $18.65 $36.78 1/1/2022 State/Prov 99.90% 100% 100% 553.00 $55.17 $35000 $364.33 $1,400.00 $1,457.33 $5,005.00 55,209.94 $50.14 15 Crawler Mounted Compact Excavators 5.1-6.0 MTons Kubota 10(161-2 2006 Operating Weight:5.0,00er; $25.93 $21.49 516.34 532.21 1/1/2022 State/Prov 100% 100% 100% 546.00 54793 5305.00 $317.81 $1,225.00 $1,276.45 $4,380.00 54,563.96 547.42 16 Crawler Mounted Hydraulic Excavators 8.1-10.0 MTons Komatsu PC88MR-10 2020 Operating Weight:18739,Po 556.24 $33.83 $30.37 $62.80 1/1/2022 State/Prow 99.90% 100% 100% 59900 $104.10 $660.00 $694.21 $2,635.00 $2,771.72 $9.410.00 $9,898.25 $90.07 17 No data for this model 18 No data for this model 19 Crawler Mounted Hydraulic Excavators 21.1-24.0 MTons Komatsu PC200LC-7 2003 Operating Weight:21 1,Pow $60.58 545.86 $32.72 570.59 1/1/2022 State/Prov 98.90% 100% 100% $110.00 $114.54 $720.00 $74973 $2.870.00 $2,988.50 $10,240.00 $10,662.81 $106.44 20 Crawler Mounted Hydraulic Excavates 24.1-28.0 MTons Komateu PC238USLC-11 2022 Operating Weight:54230.0,1 $78.02 548.92 542.13 589.53 1/1/2022 State/Prov 100% 100% 100% S140.00 5147.42 5915.00 5963.49 $3,650.00 $3,843.45 $13,040.00 $13,731.12 $126.94 22 Hydraulic Impact Breakers 2,601-3,000110 Allied AR 120E 2010 Impact Energy:2500.0,Powe $21.75 $12.81 $11.09 521.75 1/1/2022 State/Prov 94.90% 100% 100% $40.00 $40.39 5265.00 5267.60 $1,060.00 $1,070.40 $3,790.00 53,827.20 $34.56 2 No data for this model 2 Tandem Vibratory Compactors 1.8.2.9 MTons Caterpillar C8-248 2015 Drum Width:47.0,Horsepow $2743 $14.96 $12.62 53053 1/1/2022 State/Prov 98% 100% 100% $50.00 $51.52 $330.00 5340.05 51,310.00 $1,349.89 51,685.00 $4.827.66 $42.39 2 No data for this model 2 4-Wd Articulated Wheel Loaders 135-149 HP Komatsu WA27O3 2002 Bucket Capacity:2.8,Horsep $28.38 $27.27 $18.73 53702 1/1/2022 State/Prov 100% 100% 100% $50.00 552.25 533500 $350.08 $1,340.00 $1,400.30 $4,780.00 54,995.10 555.65 2 No data for this mode 2 No data for this mode No data for this mode 3 No data tor this mode No data for this mode No data for this mode On-Highway Light Duty Trucks 300 HP&Over Ford F-350 2022 Axle Configuration:COX 4.0 55.56 $28.88 54.23 529.81 1/1/2022 State/Prov 100% 100% 100% 510.00 $1036 $6600 568.38 $265.00 $274.54 5945.00 5979.02 534.44 No data for this model No data for this model No data for this model T239 No data for this model 7302 No data for this model 7415 No data for this model 7422 On-Highway Truck Tractors 45,001-60,000 GVW Ketworth 7800 2000 Horsepower:330.0,Power N $14.37 541.68 $9.63 $43.87 1/1/2022 State/Prov 84.80% 100% 100% 530.00 $26.71 $200.00 $176.06 5795.00 $707.80 52,840.00 $2,528.49 $56.05 7602 Tractor-Loader-Backhoes 14'to Under 15' Case 5811 SUPER M 2006 Orion:2WD,Operator Protec $22.32 525.36 512.05 $35.10 1/1/2022 State/Prov 94.20% 100% 100% 542.00 541.46 5280.00 $276.39 $1,115.00 $1,100.61 $3,980.00 $3,928.64 547.68 7641 Crawler Mounted Compact Excavators 2.1-3.0 MTons Kubota KX71 2006 Operating Weight:2.996,0p 513.21 511.79 $8.32 $17.56 1/1/2022 State/Prov 90.70% 100% 100% $26.00 524.56 $175.00 $165.34 $690.00 $651.92 $2,460.00 $2,324.22 525.00 T646 Crawler Mounted Compact Excavators 3.1-4.0 MTons Deere 35G 2018 Operating Weight:8135.0,O 517.86 511.34 $11.25 $20.97 1/1/2022 State/Prov 99.90% 100% 100% 532.00 $33.31 $210.00 $218.60 5845.00 $879.61 $3,020.00 $3,143.69 $29.20 These are the most accurate rates for the selected Revision Datefsl However,due to more frequent online updates,these rates may not match Rental Rate Blue gook Pnnt Visit the Cost Recovery Product Guide on our Help page for more information. NI prices shown in US dollars IS) DocuSign Envelope ID:FOCE5C3F-1517-4323-BC68-14B866E07615 a1 CAG-20-065, CO #12-22 0 Change Order No. 12 Contract Title: Duvall Avenue NE Contractor: Reed Trucking& Excavating Inc. Contract No. : CAG-20-065 Federal Aid No. : N/A ® Ordered by Engineer ® Force Account ❑ Proposed by the Contractor(VECP) 0 Bid Item ❑ Unilateral 0 Lump Sum ' Amount Working Days Original Contract: $5,218,171.95 260 v Current Contract: $5,338,054.78 262 Estimated Net Change This Order: $14,500.00 0 New Contract: $5,352,554.78 262 Prepared By: Issu • L 5/17/22 Resi nt En; :* Date Engineer(city o en on Transportation Date Design Manager) Reviewed By: Consent By: Tl 0"----- 5/20/22 N/A Engineer of Record Date Surety(Gres %cost and/or 20% Date • rease) Reviewed By: Endorsed By: ij/ 5/26/2022 ..--- M g'- /c _a0�� of Renton Project Manager Date Contractor Date Reviewed By: Executed By: Approved by Cheryl Beyer via 6/3/2022 email Martin Pastucha 6/10/2022 I 3:27 PM PDT --____---------- -,-888131F09884490. City Attorney Date City of Renton Public Works Date Administrator/Mayor Change Order No. 12—Sunset Intersection TC Mod Contract Title: Duvall Avenue NE Contract No. CAG-20-065 Page 1 of 4 DocuSign Envelope ID:FOCE5C3F-1517-4323-BC68-14B866E07615 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: • Add the following force account item to the contract: o Force Account Item No. 12-A108 ADDITIONAL CHANNELIZATION DEVICES, Quantity= 1 FA, Estimate Amount=$11,000.00 o Force Account Item No. 12-A109 SIGNAL MODIFICATION ASSISTANCE, Quantity= 1 FA, Estimate Amount =$3,500 As required in FWD No 13 - Furnish, install, and maintain additional temporary channelization devices along the edge of WZE and WZD and at intersection access and driveway accesses within the work zones. As required in FWD No 16—Provide equipment and labor for bucket truck assistance to install the City-furnished signal head modifications on the center signal head on the north bound mast arm,and to remove the existing left turn sign from the mast arm. As required in FWD No 13 and 16—Furnish,install, maintain and remove additional Construction Signs Class A to include: o Loose Gravel warning signs at driveway accesses and intersection accesses in the work zones,where there is temp gravel or pulverized material surfacing. o No Left Turn Signs at the driveways along work zone E. o No Left Turn Sign at the northbound approach to Sunset Boulevard on Duvall Ave. o 4 EA Signal Revision Ahead W20-903 signs 48"x48",one located on each approach to Sunset/Duvall. Bag the "Signal Revision Ahead"signs after 30 calendar days. Remove bags for 30 calendar days when split phasing is removed later in the project. o One Two-Way Traffic sign for southbound traffic on Duvall Avenue at the south leg of the Sunset/Duvall intersection. As required per approved Traffic Control Plan E(TPE-E),dated 4-29-22,furnish, install and maintain pedestrian detour signs per TCP E,as approved by the City. Cost for furnishing the additional channelization devices, based on rental invoices,to be tracked by force account. Cost for furnishing equipment and labor to assist the City with the traffic signal modification at Sunset Boulevard/Duvall Avenue to be tracked by force account. Change Order No. 12—Sunset Intersection TC Mod Contract Title: Duvall Avenue NE Contract No. CAG-20-065 Page 2 of 4 DocuSign Envelope ID:F0CE5C3F-1517-4323-BC68-14B866E07615 - S 4 Costs for furnishing, installing, maintaining and removing the additional Construction Signs Class A are paid.under BI A14 Construction Sign Class A,which has sufficient quantity in the Proposal for the additional signs. Costs for the labor to set up,take down and move the additional channelization devices are paid under BI A13 Other Traffic Control Labor,which has a sufficient quantity in the Proposal for the additional labor required. • Reason for Change: Additional channelization devices and signage is required for Work Zone D and E for pedestrian an�ari sa a -'Th s is an addition to the devices,signage,and flagging shown on fhe Plans for these Work Zones. A signal modification to change the phasing of the traffic signal at Sunset Boulevard and Duvall Avenue is required to a split phase for the NB and SB traffic.This will allow for a northbound left turn movement in conjunction with the required lane closures. The pedestrian detour was required to promote pedestrian safety during • construction. • Affects DBE Work: 0 Yes ® No This Change Order does not affect DBE work. Materials: No changes. Plans: No changes. Equitable Adjustment: This Change Order does not include an equitable adjustment in the new force account item as follows, per Section 1-09.4 of the 2021 WSDOT/APWA Standard Specifications. o Force Account Item 12-A108 ADDITIONAL CHANNELIZATION DEVICES, per Force Account. o Force Account Item 12-A109 SIGNAL MODIFICATION ASSISTANCE, per Force Account. o Unit Price Item A13-OTHER TRAFFIC CONTROL LABOR per hour for the placement, movement, and removals of the channelization devices. No change in the Proposal quantity for this item. Change Order No. 12—Sunset Intersection TC Mod Contract Title: Duvall Avenue NE Contract No. CAG-20-065 • Page 3 of 4 DocuSign Envelope ID:FOCE5C3F-1517-4323-BC68-14B866E07615 Y � o Unit Price Item BI-A14 CONSTRUCTION SIGNS CLASS A per SF for furnishing and . installing, maintaining and removal of the Loose Gravel warning signs. No change in the Proposal quantity for this item. See the attached Equitable Adjustment Determination. Extension of Time: . The Time for Completion is extended 0 Working Days. • Sections 1-04.4 and 1-04.5 of the 2021 WSDOT/APWA Standard Specifications shall govern this Change Order.The Work of the referenced Contract is modified to include the changes detailed herein.The.payment provided for herein shall constitute the complete and final settlement for all costs of,labor,.equipment, materials,overhead,profit,permit fees,and all other claims that may be.made by the Contractor as'a result of this change. To be attached to Change Order: D Plans • Change Order No. 12—Sunset Intersection TC Mod Contract Title: Duvall Avenue NE Contract No. CAG-20-065 Page 4 of 4