Loading...
HomeMy WebLinkAboutP_Site_Plan_250423_v1C-200 4 April 21, 2025 SWP-27-4297SMALL SCALE STORMWATER PROJECT ROLLING HILLS CREEK PIPE REHABILITATION 5 PARAMETRIX JMM JMM JF Public Works Department CITY OF RENTON VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 1-800-424-5555 or 811 UNDERGROUND SERVICE Call 48 Hours Before You Dig BID SET NO.BY DATEREVISION COMMENTS APPR JMM COVER SHEET ROLLING HILLS CREEK PIPE REHABILITATION PROJECT LOCATION VICINITY MAP - ROLLING HILLS CREEK PIPE REHABILITATION NOT TO SCALE GENERAL NOTES GENERAL ESC NOTES 1.ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL LAWS. SEE THE "STANDARD DETAILS" SECTION OF THE PROJECT SPECIFICATIONS FOR REFERENCED CITY OF RENTON (COR) STANDARD DETAILS AND ANY REFERENCED WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT) STANDARD DETAILS. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CITY OF RENTON STANDARDS AND THE CONTRACT SPECIAL PROVISIONS 2.ALL WORK SHALL BE SUBJECT TO INSPECTION BY THE CITY ENGINEER OR DESIGNATED REPRESENTATIVE. 3.PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL MEET WITH THE CITY ENGINEER FOR A PRECONSTRUCTION CONFERENCE. 4.A COPY OF THESE APPROVED PLANS AND PROJECT SPECIFICATIONS MUST BE ON THE SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 5.THE CITY OF RENTON ASSUMES NO LIABILITY FOR THE ACCURACY OF THE RECORD INFORMATION. CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES WITHIN PROPOSED EXCAVATION LIMITS. CONTACT UNDERGROUND UTILITY LOCATE SERVICE (1-800-454-5555) A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION TO OBTAIN ON-SITE UTILITY LOCATIONS. CONTRACTOR SHALL POTHOLE ALL UNDERGROUND GAS, WATER, SERVICE CONNECTIONS, AND ALL OTHER UNDERGROUND UTILITIES PRIOR TO THE START OF CONSTRUCTION AND NOTIFY THE ENGINEER OF ANY CONFLICTS. PRECAUTIONS AND REMEDIAL MEASURES SHALL BE TAKEN AS REQUIRED TO PROTECT PERSONS AND PROPERTY AND TO AVOID DISRUPTION OF SERVICE. UNLESS OTHERWISE NOTED, PROTECT ALL UTILITIES FROM DAMAGE WHICH SHALL INCLUDE PROVIDING TEMPORARY SUPPORT SYSTEMS AND SHORING AROUND UTILITIES DURING EXCAVATION, IF AN EXISTING PRIVATE UTILITY CONFLICTS WITH PROPOSED IMPROVEMENTS, COORDINATE THE RELOCATION OF THE PRIVATE UTILITY WITH THE UTILITY OWNER UNLESS NOTED OTHERWISE OR DIRECTED BY THE ENGINEER. 6.CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARATION OF TRAFFIC CONTROL PLANS. CONTRACTOR SHALL SUBMIT PLANS TO ENGINEER FOR REVIEW AND APPROVAL AT LEAST 10 WORKING DAYS PRIOR TO IMPLEMENTATION. 7.EXISTING WATER LINE BEND AND BLOCKING ARE NOT SHOWN. 8.STORM SEWER LENGTHS ARE MEASURED BETWEEN CENTERS OF MANHOLES AND CATCH BASINS UNLESS OTHERWISE NOTED. 9.EXCEPT AS OTHERWISE NOTED, CATCH BASIN AND MANHOLE RIM ELEVATIONS GIVEN ARE APPROXIMATE. FINAL ELEVATIONS SHALL MATCH FINAL GRADE. 10.SITE CONSTRUCTION LIMITS (PRESERVATION LINES) COINCIDE WITH CITY RIGHT-OF-WAY UNLESS SHOWN OTHERWISE. 11.CONTRACTOR IS ADVISED THAT THERE ARE OVERHEAD POWER AND TELECOM THROUGHOUT PROJECT AREA, INCLUDING DIRECTLY OVER PROPOSED PIPE IMPROVEMENTS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERFORM THE WORK IN A SAFE MANNER AND IN ACCORDANCE WITH ANY REQUIREMENTS SET FORTH BY THE UTILITY OWNER AND APPLICABLE LAWS AND REGULATIONS. 12.NO STAGING AREA IS PROVIDED TO THE CONTRACTOR. ALL STAGING AREAS SHALL BE ON A CONTRACTOR SECURED AREA. ALL TESC REQUIREMENTS APPLY TO THE CONTRACTOR'S OBTAINED STAGING AREA. 13.CONTRACTOR SHALL COORDINATE WITH CITY OF RENTON WATER UTILITY ABOUT ANY RELOCATION OR MODIFICATION TO SERVICE LINES. TEMPORARY WATER SERVICE RELOCATION INCLUDES SERVICE LINE AND CONNECTION FITTINGS AND SHALL BE INCIDENTAL TO OTHER PAYMENT ITEMS. 14.ALL STORM DRAINAGE PIPES SHALL HAVE WATERTIGHT JOINTS PER MANUFACTURER RECOMMENDATION. 15.CONTRACTOR SHALL REPLACE ANY SURVEY MONUMENTS DISTURBED IN ACCORDANCE WITH SECTION 1-05.4 OF THE SPECIAL PROVISIONS AND CITY OF RENTON SURVEY STANDARDS AT NO ADDITIONAL COST TO THE CITY OF RENTON. 1.THE TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) BMPS SHOWN ON DWG C201 ARE CONCEPTUAL. THE CONTRACTOR IS REQUIRED TO SUBMIT A FINAL TEMPORARY WATER POLLUTION AND EROSION CONTROL PLAN IN ACCORDANCE WITH SPECIAL PROVISIONS SECTION 1-07.15. 2.THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/ESC SUPERVISOR UNTIL ALL CONSTRUCTION IS APPROVED. 3.THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUNCTION WITH ALL CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS, DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES IS MINIMIZED. 4.THE ESC FACILITIES SHOWN ON THESE PLANS OR SPECIFIED HEREIN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G., ADDITIONAL SUMP PUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.). 5.THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/ESC SUPERVISOR AND MAINTAINED TO ENSURE CONTINUED PROPER FUNCTIONING. WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE ESC FACILITIES DURING THE WET SEASON (OCT. 1 TO APRIL 30) AND OF MONTHLY REVIEWS DURING THE DRY SEASON (MAY 1 TO SEPT. 30). 6.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.). 7.ANY AREA NEEDING ESC MEASURES NOT REQUIRING IMMEDIATE ATTENTION SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS. 8.THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN FORTY-EIGHT (48) HOURS FOLLOWING A STORM EVENT. 9.AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM. 10.WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF 2 TO 3 INCHES. 11.NO STOCKPILING/STAGING WILL BE CONDUCTED WITHIN THE RIGHT OF WAY OR CITY OWNED SITE. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ITS OWN STOCKPILE/STAGING AREAS. 12.PUBLIC STREETS SHALL BE CLEANED ONCE PER DAY OR AS DIRECTED BY THE CITY. FLUSHING OF STREETS WITH WATER WILL NOT BE ALLOWED. 13.IN ACCORDANCE WITH THE DEPARTMENT OF ECOLOGY REQUIREMENTS, WASTEWATER FROM CEMENT CONCRETE MASONRY, OR ASPHALT CONCRETE CUTTING, OR POURING OPERATIONS SHALL NOT BE DISCHARGED INTO STORM DRAINAGE SYSTEMS OR SURFACE WATERS. IMPERVIOUS SURFACES CONTAMINATED WITH SEDIMENT FROM GRIT AND CUTTING, PLANING OR PULVERIZING OPERATIONS SHALL BE VACUUM-CLEANED TO PREVENT CONTAMINANTS FROM ENTERING THE STORM DRAINAGE SYSTEM OR SURFACE WATERS. 14.CATCH BASIN INSERTS SHALL BE PLACED AT ALL CATCH BASINS ALONG PIPE ALIGNMENT. SEE CITY OF RENTON STANDARD PLAN 216.30. 15.INSTALL SILT FENCING AROUND ENTIRE STAGING/STOCKPILE AREAS PER COR STANDARD PLAN 214. 16.TEMPORARY SEDIMENTATION TANK MAY BE REQUIRED IN CONTRACTOR STAGING AREA IF THE SILT FENCING IS NOT ADEQUATE. 17.KEEP PUBLIC AND PRIVATE ROADWAYS/PARKING LOTS, SIDEWALKS, AND TRAILS FREE OF DEBRIS AND SEDIMENT. 18.CONSTRUCT TEMPORARY STORMWATER BYPASSES AS NEEDED DURING CONSTRUCTION TO DIVERT STORMWATER AROUND TRENCHING AND PIPE INSTALLATION ACTIVITIES AND MAINTAIN DRAINAGE OF UPSTREAM STORMWATER. CONTRACTOR IS RESPONSIBLE FOR DESIGN OF STORM DRAIN BYPASS PLAN. UNLESS OTHERWISE NOTED, BYPASSES ARE TO BE DESIGNED TO HANDLE THE VOLUME AND PEAK FLOWS OF THE 2-YEAR STORM EVENT AT A MINIMUM. SUBMIT AS PART OF WATER CONTROL PLAN. STORM DRAIN BYPASS PLAN SHALL ALSO ADDRESS THE DOWNSTREAM SYSTEM AND PREVENTION OF STORMWATER ENTERING THE WORK AREA BY BACKING UP FROM DOWNSTREAM. 19.ALL DEWATERING WATER AND RUNOFF WITHIN CONSTRUCTION AREAS SHALL BE TREATED VIA SEDIMENTATION, FILTRATION THROUGH VEGETATION IN APPROVED AREAS, OR PORTABLE FILTRATION SYSTEMS (UTILIZING TANKS AND FILTERS), AS NEEDED, PRIOR TO DISCHARGE TO DOWNSTREAM SYSTEM IN ORDER TO MEET ALL APPLICABLE LOCAL, STATE AND FEDERAL WATER QUALITY REGULATIONS. CONTRACTOR MAY ALSO DISCHARGE TO THE SANITARY SEWER SYSTEM AFTER OBTAINING APPLICABLE PERMITS AND MEETING PRETREATMENT REQUIREMENTS. HORIZONTAL DATUM: WASHINGTON STATE PLANE COORDINATE SYSTEM, NORTH ZONE, NAD 83/91 VERTICAL DATUM: NAVD 88 PROJECT LOCATION I-405 S RENTON VILLAGE PL TA L B O T R D S SM I T H E R S A V E S S 15TH ST S P U G E T D R B E N S O N R D S IF 7 *) 2()4 3 F 1 ) 57 4 + * 88.43F 1 *3H .3 **7 7 *H.89*7*) 89F 9 * 4+ KF8- . 3 H 943 4/21/2025 FACILITY ID: 162634 EXISTING MANHOLE RIM: 55.81 IE: 32.9-EX 42" CMP (N) IE: 33.3-EX 42" CONC (S) IE: 33.3-EX 18" CONC (E) IE: 34.5-EX 12" CONC (NE) WSDOT STRUCTURE EXISTING MANHOLE FACILITY ID: 130537 EXISTING MANHOLE RIM: 52.33 IE: 25.4-EX 42" VARIABLE (N) IE: 25.4-EX 42" CMP (S) FACILITY ID: 130611 EXISTING CATCH BASIN RIM: 33.63 IE: 25.2-EX 42" CMP (N) IE: 25.2-EX 42" CMP (S) IE: 28.23-EX 12" CONC (E) IE: 28.98-EX 12" CONC (W) FACILITY ID: 118951 42" CMP - 234 LF FACILITY ID: 128514 42" CONC/ADS/CMP - 106 LF FACILITY ID: 136855 EXISTING MANHOLE FACILITY ID: 136855 EXISTING MANHOLE WSDOT STRUCTURE EXISTING CATCH BASIN FACILITY ID: 136854 EXISTING CATCH BASIN FACILITY ID: 111555 EXISTING MANHOLE 1 1 2 2 3 3 4 4 5 5 FACILITY ID: 194503 EXISTING MANHOLE 15 15 15 8 8 I-405 TA L B O T R D S S RENTON VILLAGE PL FACILITY ID: 136856 EXISTING MANHOLE RIM:61.46 IE: 38.5-EX 24" CONC (N) IE: 38.7-EX 24" CMP (S) IE: 38.9-EX 12" CONC (SE) FACILITY ID: 136857 EXISTING MANHOLE RIM:57.57 IE: 36.4-EX 24" CONC (S) IE: 36.4-EX 18" UNKNOWN (N) IE: 36.2-EX 36" CMP (NE) IE: 52.0-EX 12" UNKOWN (W) FACILITY ID: 128467 24" CONC - 66 LF RIGHT-OF-WAY (TYP.) FACILITY ID: 135311 EXISTING CATCH BASIN FACILITY ID: 194512 EXISTING CATCH BASIN ABANDONED STORM FACILITY ID: 162631 EXISTING MANHOLE FACILITY ID: 136855 EXISTING MANHOLE FACILITY ID: 162631 EXISTING MANHOLE LOCATED UPSTREAM OF 24" CMP. APPROXIMATELY 335 FT FROM FACILITY 136856 7 7 7 7 7 23 5 5 5 5 5 69 TA L B O T R D S C-201 5 April 21, 2025 SWP-27-4297SMALL SCALE STORMWATER PROJECT ROLLING HILLS CREEK PIPE REHABILITATION 5 PARAMETRIX JMM JMM JF Public Works Department CITY OF RENTON VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 1-800-424-5555 or 811 UNDERGROUND SERVICE Call 48 Hours Before You Dig BID SET NO.BY DATEREVISION COMMENTS APPR JMM STORM DRAINAGE PLAN SEE PLANS Feet 0 80 160 PLAN VIEW - SITE A: PIPE 118951 & 128514 KEY NOTES INSTALL TEMPORARY STORM WATER DIVERSION AS NECESSARY IN UPSTREAM STORM STRUCTURE AND BYPASS TO DOWNSTREAM STORM STRUCTURE, FACILITY 136854. STORM STRUCTURES MAY BE REQUIRED TO BE PLUGGED AND/OR REQUIRE COFFER DAMS. SEE STORM DRAINAGE NOTE 1. CLEAN AND REMOVE AND DEBRIS FROM PIPE. FILL ALL VOIDS WITH GROUT. INSTALL 42 INCH CIPP LINER VIA TRENCHLESS METHOD FOR THE ENTIRE LENGTH PIPE. REMOVE TEMPORARY STORM WATER DIVERSION (IF NECESSARY) FROM UPSTREAM STRUCTURE AFTER CIPP LINING IS COMPLETE. INSTALL 24 INCH CIPP LINER VIA TRENCHLESS METHOD FOR THE ENTIRE LENGTH PIPE. INSTALL TEMPORARY STORM WATER DIVERSION AS NECESSARY IN UPSTREAM STORM STRUCTURE AND BYPASS TO DOWNSTREAM STORM STRUCTURE. STORM STRUCTURES MAY BE REQUIRED TO BE PLUGGED AND/OR REQUIRE COFFER DAMS. SEE STORM DRAINAGE NOTE 1. WATER DIVERSION/BYPASS REQUIRED. WATER DIVERSION/BYPASS ONLY REQUIRED IN WET CONDITIONS 1 2 3 4 5 6 7 8 9 STORM DRAINAGE NOTES 1.IT IS ANTICIPATED THAT A STORM WATER DIVERSION WILL BE REQUIRED DUE TO ROYAL HILLS CREEK FLOWING THROUGH PIPES 118951, 128514, AND 128467. IF TEMPORARY STORM WATER DIVERSION IS NECESSARY, CONTRACTOR SHALL SUBMIT TEMPORARY STORM WATER DIVERSION PLAN TO CITY FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. SEE SPECIFICATION SECTION 7-08.3(5) FOR APPROXIMATE 2-YEAR FLOW RATE AND TEMPORARY STORM WATER DIVERSION PLAN REQUIREMENTS. 2.PRESERVE AND PROTECT ALL EXISTING CONNECTIONS WITHIN EXISTING PIPE. 3.CONTRACTOR SHALL MAINTAIN ONE LANE OF TRAFFIC IN EACH DIRECTION AT ALL TIMES DURING CONSTRUCTION. 4.RECOMMENDED CONSTRUCTION SEQUENCE 4.1.MATERIAL, TRAFFIC CONTROL PLAN AND TEMPORARY STORM WATER DIVERSION PLAN (IF NECESSARY) 4.2.ATTEND PRE-CONSTRUCTION MEETING 4.3.CALL FOR UTILITY LOCATES 4.4.INSTALL TEMPORARY TRAFFIC CONTROL SIGNS AND SECURE SITE FROM PEDESTRIAN ACCESS 4.5.INSTALL TEMPORARY STORM WATER DIVERSION (AS NECESSARY) 4.6.CCTV (PRE-CONSTRUCTION) EXISTING 42" AND 24" STORM DRAIN PIPES 4.7.CLEAN EXISTING 42" AND 24" STORM DRAIN PIPES 4.8.CIPP LINE EXISTING 42" AND 24" STORM DRAIN PIPES 4.9.CCTV (POST-CONSTRUCTION) PROPOSED CIPP 42" AND 24" STORM LINE 4.10.REMOVE TEMPORARY STORM WATER DIVERSION 4.11.RESTORE SITE 5.PRESERVE AND PROTECT ALL EXISTING SITE FEATURES WHEN ACCESSING SITE. 6.SITE ACCESS FOR STORM STRUCTURE 162634 SHALL BE FROM SMITHERS AVE S. 7.PRESERVE AND PROTECT EXISTING TREES AND VEGETATION. 8.LIMIT DISTURBANCE AREA AND WORK ZONE TO THE EXTENT NECESSARY TO PERFORM CIPP LINING. 9.ALL EXISTING UTILITIES SHALL BE PRESERVED AND PROTECTED. EXISTING UTILITIES HAVE NOT BEEN CALLED OUT ON THE PLANS BECAUSE NO EXCAVATION IS ANTICIPATED. IF THE CONTRACTOR IS REQUIRED TO EXCAVATE THE CONTRACTOR SHALL COORDINATE WITH THE CITY OF RENTON PROJECT MANAGER AND ADHERE TO REQUIREMENT IN GENERAL NOTE 5. Feet 0 40 80 PLAN VIEW - SITE B: PIPE 128467 LCT G F O EF4P C N F R T 4H GUUK4PCN GPI K P G GT TGI KUVGT GF UVCV G 4H YCU- KPI V 4P 4/21/2025