CAG-20-065 - Duvall - Change Order 18
Change Order No. 18 Backup Documentation Contract Title: Duvall Avenue NE Contractor: Reed Trucking& Excavating, Inc. Contract No. : CAG-20-065 Federal Aid No. : N/A Attachments: Backup Documentation ® Field Directive ® Equitable Adjustment Determination ® Determination of Additional Working Days ® Engineer's Estimate of Change Order Cost ® Engineer's Calculation of Additional Working Days ® Contractor's Quote • Project Labor List • Contractor's Equipment list including rates per AGC-WSDOT Equipment Agreement El Summary of invoices for rented equipment ® Summary of invoices for materials Change Order No. 018 Delete CDF Contract Title: Duvall Avenue NE Contract No. CAG -20-065 Page 1 of 1 City of Renton Field Directive No: 23 Project Name: Duvall Ave NE Contractor: Reed Trucking and Excavating,Inc. Contract No: CAG-20-065 BAssifiat _ ---� Federal Aid No: N/A y TIB No: N/A mim." Date. Construction Manager: Tani Stafford The following is documentation of the oral order given by the Resident Engineer per WSDOT Std Spec 1-04.4 The Contractor is directed to do the following changed work: Due to the Contractor's difficulty in procurement of CDF,the City authorizes the removal and disposal of the existing storm pipes and backfill of the resulting voids for the remaining pipe noted for abandonment in work zone E and work zone D: 1.) The existing 12-inch and 14-inch diameter storm pipe in work Zone E,between Sta 920+49 LT and Sta 926+67 LT(less limited pipe removals approved for fire hydrant stubs and water main connections) 2.)The exiting 30 LF of existing 12-inch diameter storm pipe at approx Sta 916+90 RT in Work Zone D These existing pipes were noted on the Plans to be abandoned by filling with CDF. Delete BI A60 Filling Pipe with CDF,-42CY @$300/CY=-$12,600 Add new Contract Item A110 Remove Storm Pipe in Lieu of Abandon with CDF, 1 LS @$12,600=$12,600. Rough Cost Estimate,WSDOT Construction Manual 1-04.4,Changes. Cost Adjustments: No change in cost associated with these changes. A Change Order covering this Field Directive will follow immediately. Contractor Date Equitable Adjustment Determination - CO No 18 Project Name:Duvall Avenue NE Contractor:Reed Trucking&Excavating Inc. Contract No:CAG 20-065 By: Tani Stafford Construction Manager: Tani Stafford,PE Date:7/9/22 Contract Item Cost Contract Quantity Item No. Description Change Unit Unit Price _ Total A60 Filling Pipe with CDF -42 CY $300.00 -$12,600.00 18-A110 Remove Storm Pipe in Lieu of Abandon with CDF 1.0 LS $12,600.00 $12,600.00 Contract Item Cost $o.00 ESTIMATED CHANGE ORDER COST I $0.00 Narrative: On 6/29/22 the Contractor sent an email to G&O stating that he had issues procuring CDF. On 6/30/22 The City agreed to authorize the removal of the pipes to be abandoned in place with CDF as long as it was a no-cost change. On 7/1/22 PMX estimated the project wide CDF quantity and confirmed that the pipe abandonment with CDF was a cost savings measure in lieu of removal of the pipe. On 7/1/22 FWD No 23 was issued which directed the Contractor to remove and dispose of the remaining storm pipe on the project that was noted on the Plans to be abandoned in pl'ace with CDF. An equitable adjustment determination of a net zero cost change was made on 7/1/22. Determination of Jitional Working Days A determination of zero additional'working days was made. Engineer's Estimate Contract Item Cost Contract Quantity item No. Description Change Unit Unit Price Total AGO Filling Pipe with CDF -42 CV $300.m0 $12„600.00 1 -A110 Remove Storm Pipe in Lieu of Abandon with COP 1.0 IS $12,600.00 $12,600.00 Contract item Cost doom - Engineer's Calculation of Additional Working Days The changed work will not result in a reduction or addition of working days. The Contractor has been allowed to work expanded hours and has kept up to the original base schedule. { Contractor Quote Tani Stafford From: Dustin Wright <DWright@reedtrucking.com> Sent: Thursday,June 30,2022 8:24 AM To: 'Tani Stafford' Cc: 'PHIL VANEARWAGE';Tiffani Barquist;Shawn Reed;Jordan Ausbun Subject: RE: Duvall. Tani Looking at the bi#A60 if the city says that bid item at 100%42 cy I can remove the storm for that cost. Thank you Dustin Wright Vice President (360)701-0997 Original Message From:Tani Stafford [mailto:tstafford@g-o.com], Sent:Wednesday,June 29,2022 1:12 PM To: Dustin Wright<DWright@reedtrucking.com> Cc: 'PHIL VANEARWAGE'<pvanearwage@g-o.com>;Tiffani Barquist<tbarquist@reedtrucking.com>;Shawn Reed <SReed@reedtrucking.com>;Jordan Ausbun<JAusbun@reedtrucking.com> Subject: RE: Duvall. Dustin-If the City allows removal of storm pipe,they won't want to pay more than what they would have paid for filling pipes with CDF. Will Reed Trucking remove the storm pipe and fill in the void for the price of the CDF? If so I can find out if they will accept that. Tani Tani Stafford,P.E. 1206.284.0860 office 1206-498-2888 cell 1206.283.3206 fax Gray&Osborne, Inc. 11130 Rainier Avenue South,Suite 300,Seattle,WA,98144 Please consider the environment before printing this email. Electronic File Transfer- Note that these electronic files are provided as a courtesy only. Gray&Osborne, Inc. in no way guarantees the accuracy or completeness of the digital data contained within these files. Furthermore,Gray&Osborne, Inc.assumes no liability for any errors or omissions in the digital data herein. Anyone using the information contained herein should consult the approved or certified hard copy drawings or reports for the most current information available. Original Message From: Dustin Wright[mailto:DWright@reedtrucking.com] Sent:Wednesday,June 29,2022 12:11 PM To:Tani Stafford<tstafford@g-o.com> 1 • Cc: PHIL VANEARWAGE<pvanearwage@g-o.com>;Tiffani Barquist<tbarquist@reedtrucking.com>;Shawn Reed <sreed@reedtrucking.com>;Jordan Ausbun<jausbun@reedtrucking.com> Subject: Re: Duvall. They are not taking any pre orders. First come first serve and a daily basis Sent from my iPhone >On Jun 29, 2022,at 12:03 PM,Tani Stafford<tstafford@g-o.com>wrote: >Why not see if Ralph's can order it for themselves? Tani >Tani Stafford, P.E. 1206.284.0860 office 1206-498-2888 cell >206.283.3206 fax Gray&Osborne, Inc. I 1130 Rainier Avenue South, >Suite 300,Seattle,WA,98144 > Please consider the environment before printing this email. >Electronic File Transfer- > >Note that these electronic files are provided as a courtesy only. Gray&Osborne, Inc. in no way guarantees the accuracy or completeness of the digital data contained within these files. Furthermore,Gray&Osborne, Inc.assumes no liability for any errors or omissions in the digital data herein. Anyone using the information contained herein should consult the approved or certified hard copy drawings or reports for the most current information available. > Original Message >From: Dustin Wright[mailto:DWright@reedtrucking.com] >Sent:Wednesday,June 29, 2022 11:58 AM >To:Tani Stafford<tstafford@g-o.com>; PHIL VANEARWAGE ><pvanearwage@g-o.com> >Cc:Tiffani Barquist<tbarquist@reedtrucking.com>;Shawn Reed ><sreed@reedtrucking.com>;Jordan Ausbun<jausbun@reedtrucking.com> >Subject: Duvall. >Tani. >Well we have a problem.We can't place a advance order for cdf. Due to the cement shortage. It's a call the day before and see if we can help you scenario.Well that doesn't work when I have to schedule Ralph's concrete pumping in advance. Please advise but the options I see are grout plugs or full removal. >Thank you >Sent from my iPhone 2 DocuSign Envelope ID:0D5257D0-F354-4DD9-A; 6C4EBC9BD4C CAG-20-065,CO#18-22 ° Change Order No. 18 Contract Title: Duvall Avenue NE Contractor: Reed Trucking and Excavating, Inc. Contract No. : CAG 20-065 Federal Aid No. : N/A ® Ordered by Engineer ❑ Force Account X Proposed by the Contractor(VECP) ❑ Bid Item ❑ Unilateral ® Lump Sum Amount Working Days Original Contract: $5,218,171.95 260 Current Contract: $5,354,116.06 262 Estimated Net Change This Order: +$0.00 0 New Contract: $5,354,116.06 262 8-10-22 Prep - By: Is d By: / , R siden Engi Date Enginee ity of Renton Transportation Date Design Manager) Reviewed By: Consent By: N/A Engineer of Record Date Surety(Gr an 25%cost and/or 20% Date • ncrease) Reviewed By: Endorsed By: 8/16/22 City of Renton Project Manager Date Contractor Date Reviewed By: r—DocuSgned by: Approved by Cheryl Beyer via 7/28/2022 email Martin Pastucha 8/24/2022 I 6:39 AM PDT 8B8131FD98B449D City Attorney Date City of Renton Public Works Date Administrator/Mayor Change Order No. 18 Contract Title: Duvall Ave NE Contract No. CAG 20-065 Page 1 of 4 DocuSign Envelope ID:0D5257D0-F354-4DD9-P 06C4EBC9BD4C THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: Per the Contractor's request, and as required in FWD No 23, the Contractor is directed to remove approximately 618 LF of existing 12-inch and 14-inch diameter storm pipe in work Zone E, between Sta 920+49 LT and Sta 926+67 LT(less limited pipe removals approved for fire hydrant stubs and water main connections)on the west side of Duvall Avenue and to remove the existing 30 LF of existing 12-inch diameter storm pipe at approximate Sta 916+90 RT in Work Zone D on the east side of Duvall Ave. This change order deletes 42 CY of Bid Idem No. A60"Filling Pipe with CDF " and replaces it with a new Lump Sum Item 18-A110 Remove Storm Pipe in Lieu of Abandon with CDF. The following Special Provisions are added: 2-02.4 Measurement (*****) This section is supplemented with the following: There will be no specific unit of measure for the lump sum item "Remove Storm Pipe in Lieu of Abandon with CDF". 2-02.5 Payment (*****) This section is supplemented with the following: "Remove Storm Pipe in Lieu of Abandon with CDF", per lump sum. The lump sum contract price for"Remove Storm Pipe in Lieu of Abandon with CDF" shall be full pay for all work required for the following: • Remove, dispose of and fill in the resulting void per the Contract Provisions for the existing 12-inch and 14-inch diameter storm pipe in work Zone E, between Sta 920+49 LT and Sta 926+67 LT(less limited pipe removals approved for fire hydrant stubs and water main connections) Change Order No. 18 Contract Title: Duvall Ave NE Contract No. CAG 20-065 Page 2 of 4 DocuSign Envelope ID:OD5257D0-F354-4DD9-A, P6C4EBC9BD4C • Remove, dispose of and fill in the resulting void per the Contract Provisions for the existing 30 LF of existing 12-inch diameter storm pipe at approximate Sta 916+90 RT in Work Zone D The quantity for BI A60 Filling Pipe with CDF is deleted,at-42CY @ $300/CY=-$12,600 The quantity for a new Lump Sum Item 18-A110 Remove Storm Pipe in Lieu of Abandon with CDF is 1 LS @$12,600=$12,600. Reason for Change: Due to the Contractor's difficulty in procurement of CDF,the City authorizes the removal and disposal of the existing storm pipes and backfill of the resulting voids for the remaining pipe noted for abandonment in work zone E and work zone D. Affects DBE Work: ❑Yes IN No. No changes to DBE work. Materials: No changes. Plans: SP4-070922 and SP5-070922 Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2021 WSDOT/APWA Standard Specifications. See the attachment. Extension of Time: The Time for Completion is extended 0 Working Days. Sections 1-04.4-and 1-04.5 of the 2021 WSDOT/APWA Standard Specifications shall govern this Change Order.The Work of the referenced Contract is modified to include the changes detailed herein.The payment provided for herein shall constitute the complete and final settlement for all costs of labor,equipment, materials,overhead,profit,permit fees, and all other claims that may be made by the Contractor as a result of this change. To be attached to Change Order: Change Order No. 18 Contract Title: Duvall Ave NE Contract No. CAG 20-065 Page 3 of 4 DocuSign Envelope ID:OD5257D0-F354-4DD9-A. D6C4EBC9BD4C ® Plans Change Order No. 18 Contract Title: Duvall Ave NE Contract No. CAG 20-065 Page 4 of 4 DocuSign Envelope ID:0D5257DO-F354-4DD9-Ai 6C4EBC9BD4C Equitable Adjustment Determination - CO No 18 Project Name:Duvall Avenue NE Contractor:Reed Trucking&Excavating Inc. Contract No:CAG 20-065 By: Tani Stafford Construction Manager: Tani Stafford,PE Date:7/9/22 Contract Item Cost Contract Quantity Item No. Description Change Unit Unit Price Total A60 Filling Pipe with CDF -42 CY $300.00 -$12,600.00 18-A110 Remove Storm Pipe in Lieu of Abandon with CDF 1.0 LS $12,600.00 $12,600.00 Contract Item Cost $Q,pa ESTIMATED:CHANGEt RDER<;COST :..- , :..__ -. , $0:00 0 0 0 0 G7 a z m STA913487.- LEGEND: N 41.0IT _---_AIGTITORWAY 0 01 1 — — —xRAPORMYCDNSTRurnON EASEMENTCD GAS UNE TO BE v, 5$LFGF r\ ,•••`••°•••, SALVORLR,E — I AEANOONEOARD V' N'P PE LJ� • MCA w11RIUTY SILT FENCE PIA WSD0T f DFACRYAIED,DY a 1 OmtiLS - sTDe1AF110017.01 0 • � . . . . . . . . . . _.•. .. .. ...... . . t,' • • ,. ,. ..... .. ... .. . ... ,. . . . .. . .5'l(('I)f,l:�� iil /lrl•l•i'NLIwgE � BY «.ar"< cn h w ��a(ATCNBWNINSFRT PLR COR'y-t,.�.�� -A y STO MAN 21430 0 N110 PROPOSED CATCH 4ASM,SEE50 SHEETS CAINELu AEMDYF RMENfCONCC1fl T $ DUVALL AVENUE NE �— V w M _.LCD �4j W _ _ ._.—.....-1.-.._.__ .._._..B y'''�..._.._—.�..---4-_ _ D1Wa_00___ _�__ 1117_W�0 _ __—y—-__ O1E<JWN�/ ...�]AAUANDONCEEMLI1�G WALLA MAIN A o i KO DAME 1CRETE a.. OUQCAIICDS i/✓<i N 7."h'•a�9RAPi4i"SIDETYAu y MI"RO�' �1ttT� j O ONGANO GAOANTKy iNM w I•' ......•')OYEMNNGING 00911015 0 .Zi - - - S ASPHALTPULVEAOAMION FOR P x _ _ RV,•I' 11�AS R[[Y[IEOPAVEM1Nf �_ qq I. RIMDYDx ASPHALT CONC Q •• •.'• .. e. r —����2,I ��// �tAYEYFM • 2---- -•r f \ �� PAN NGBRUNWOVS -_, __ 0 P 1 ----•'----• • �PAV[MCNi,2.OKAi wPni 'O Is 091IF 1s T GENERAL NOTES: rn STA 916.80,, `.•. A4D714 • •r to MOLTFRmuio L SEES/4E71AI FOR GENERAL EAMON CONTROL NOTES 0 STA 91b.5Q.-3 �/1�)�( TREE L SUCH PING 10 Co REMOVAI/R(WCATpN 44. • PLAN 45'6Rf Ol 3. nM ASNMl70:0NCRETL DEMI:WROTE LIMITS AEM AP(IOEYAATE, 0 SCAIE:i[R a OIU44T CONCRETE REMOVAL WAITSYCON SNAUDE MANTA M THE CO GIRD GYCONTRACTORAVKI'TCONSTRUCTWNOOSERVOt CO CTAATRAC CIAMY4 l]Y BfSAONSAnF IGAmmunnum OF en 20 40 FIELD MARKING DiMOIOION ACTNmES. I I STA921.13, •� 49SL7 A. CONINLTORSIiALL hf'Al1Y CUTAND CAP EXISTING AIPN.AODN 0 'WEST GASlMETO 'II 7AA'L STA �� BECJ)I TT SYSTEM PIPING ENCOUNIEAED9YITI0NDIE LEMRSINOICATEA FOR BE ADAND00ED 2I EEG:O ,--GAMINE E WELTOi r STA911r25, BEMOVALAND CIEARINGAHOGAUDCING. AND DEACTIVATED, I WI B'IOINERS -'I 910919.6I.L TO BE ABANDONED [NO 11 S. SILT PENCE SHALL BE LIS'INSIDE TNT WARTS OF NOW DATCE. STA 9L9a0.4I.0LT-T 74.717 r - ANC DEACTIVATED, OTXERS IVATED. _f�\ ((((���4nuAnl,s7. DEMOLITION NOTES: SlA61T�\ STA 919,67,I�{1 / LJ /` :are 0 ASA.LT _/ • _•� O -T 5 1 RLMOVEIREE. 7 y6♦ �l I STA 921473, $IA 918,04,1/Rl7 ` 11Tq 919rDD,-T 07 STA919.d),- ( •,.•.r, _A 0 35.2'LT Il �'\��� I PROTECT COSTING PENCE. 11 4lA•LT I + 1471C I I -; ti',f f 3 1 PLUG EXISTING W HER MAIN, 4+/fit.'♦ —. - I2 V uo L i I - lwi ri••', --r ,AI�,y�a I _ ARANODN STOMASEWOEPNRGRQHVERT DV PLUG6MDEETHLA / 70 ��, —I- • I�OR �. -�— +� — / �;[ - ' . - NO WITHFILLINGPIPE m ,�,-,�.1 4�« f• ♦ . -( . f4 S REMOVE IRGTWG FIRE HYDRANT. < i-!,•�4'4'4/,l'4',..0 'J(-/el•l•/•C,l c I . f r -I� r / - • . .•, . . . ,.. . , , O W B /� - JV/ As°• .•...7.i + b:r ±r. r4.d.•Af.* • s•�..rr r is r• 6 REMOVE EXISTING umrnPaEt6T mx[ft51. Y, Oat �.J- '' �(f, , "!+P r,a:-e>;,..4as.Ets.•t.'L.rwwaraafa, *sFd�Arar_; ',.?rOS►'rst'kbs94'r lA'%PE ,.-L 114B 1F 01 I. M'� n .. w O7 REMOVE 90UAAD POST 14'PPE I STA920,09." 033 STA919.44, 22SLT Q GONE .wi.O R[MWLORMNACLSTRUCTURE- 01 31T 910,m: STA 919,9$ < _...__ _ 9f9.C6 _- i 0I1WD -— o�9 PROTECT ExlllPVG UTILITY PIXE. VI y _y—' a 'I6.6'lT -. _ _� m+V STA919,73.0 - \ +---m ]D REMOVE STOMA STWEAMPUCIAVERTOR WATER PIPE. z 14RIIT DUVALL AVENUE NE Il RIMOYENAO0NRDANDGURER. = SruEmee R• _ WATER MA V • N O NQi1 53 • REMOVAL Z 15ED. F . •••• _ - 0 O PRLSERYEAND mono IRUist --.� • +.. . .ems} _'p13 • . D a u REMOVE UU4NNillTATptE �-_ 0" ^L1RO ^••"• y/ T6Or T^'`•�.,.,, STA9M,IEl �d4 aAEIOC.a7EEASiiNGTELFPNONE IiNE AS NEEDED,6f DINERS '\fit r..,�, SMUT 35 ROMAN MOMS TE1FP110M=W 6Y OTHERS 9 R T7 5TA919,s9, CAB AM 011EWALR 32 D'R REPAIRAS NEEDED.SEE 0 ZEE PLANS FOR CLROMRED RIUMINAOON AND SIGNAL SULK PUB O , EQUIPMENT REMOVAL MO RELOCATION. 6 STA 913451 I AT.41n PLAN S61f 0 STA919T48,-• SLA919.5G, SCICCFT :,DTR D------F Z SP4-070922- a 3K1.6/:--.- ; e LVR9lTIh wArmAND, SP4 two- — DYWNTT: CO CITY OF RENTON DUVALL AVE NE CONFORMED SET nUYMCA0Orr1IRlWEstM R Ar p A[ mom:: on MIMI TTIITAWT F Parametrix DRAI WAEAb AD ono ARmND �TMI6MR SITE PREPARATION nnR: .m HI MI T.•.ee,. ,w,.uo.,II MOW.,m v. ,n2a `'tvF!�1 O r RmlrcR ENt =_ `7'7!� �SI.71 STA 933WDTOSTA923WU raWOxwxanuH ITAr A+,I ,nN no wGRTTRAIP Ertlr• ��•� Rr, 0RTD SHEET 4 OF S sp1IRD, n w 4` l 0 0 0 C J L(/1 0 m 7 LEGEND: N ----_1]GMt-0FWAY 0 co 10 36, • IIOUOF SINLT — TEMPORARY CONSTtURDN FASFMtEASEMENTll UEGMA 1]'%� mainN LL YYET GAS UNE TO r,.,p OTT ifi1• SAWNE UNE STA 923.66, 0066300N[O 0lGIN 13 IIW/I WHAMYSILT FENCE PER WSDOT 33s1T ANOOfACOVAIEO, 1 STD PLAN I-70.I701 STA 33.31T — ENO LE IX OTHERS STA9)6.11, I 1r I3.R'LTWW, r90lF MGM VWRUIY � i,'YN-A--r'm'-ex-r;ml Q L] NO • I sacra LL J plp Sl FFNQ PER WSDOr AOENmNSfORY SFr MEAN' ,.-.a.. l C)1 / 111 ST.UI.10.1D01 '/'/-/1/•/ T f _© -- _ O _ _ _ ®' _ 26)UCII I MI G F N - O STA776.10. I'� '''-'n,,-J UT It/ r - ]x'PB•f 33 ,PL U O O u1t]I pALN won MGM J w rr: /� �' r -" -l0 TLI STA s77.'.,5, S10 MAN 2]G20 b,l - ENO -lO.it p (r]] w. _ O .0-0 Do FREVWE0 GM DANSE SE/5030MS .. v=i:Sf.PAL•L.5t4A+.4.. J• ♦+t�i tt.•..wu•w•+. L ]a A7 LE ENo 11 NF __ ..:.:+:4.•L.•Yr. NS�b•,-L•j• . . . _ .ter fJ' - , Cr-- �ti _ --��-__EIItRANOGUR[R �_,'/'-=.%� -, �...+.4.;- .a.• * . r A•. ' 1/` iii%Va NkittMM/./V AILN 3CCWL ING WATER MIEN En 6 �1. _;'! SiA s]3.8s,)' _�-:� - _. • - • - -•- w!•�41V.03LvY «w3'..1 VI i+$f.> •�•�•+,y.���� + ----=P.-.�.�....w,•.9 IUMwE RwNi wxwETE - -'STA 77].1i.iE, �]].o rOl,e;•c•UNE., X'''STasla.Eo, r'�{ " FAR`. A�KK '!, ►Aiii w..,suxwut _�j 11.1L'lT-' _•;92N00:_ X,-�IRO'L1 Of ,} - ; , `''=a` • ,. - -._ F...:.: QEM011G AMq GfU68WG.1ruM v ,,..._.__ :--r-- 1 _ ,02s a`6`_ 99 ••I oWTuw+cwGOaAxNEs• ._ - `. _F"-,�— _ '•�', ' -,S1A BM�HL .' - ASRYLLTFUIY[ROA11ONFOR CD _�_ FffifLT ) I• I USE AS RER[IEO PAY[MWT i - - . i - / J�JPPALAA YYME wMOFGMel. Arxu wIwNRcAnoL ov Wvs Ni.0 LN • Z •-. - L•AVENUENE _ _ - GENERAL NOTES: - -_L. SEE SHEET GLiORGENERAL EROSION[COMM WOW L _----------------- __ - SEE CH PUWSFOR5IGN RFMOYN/AEIOGTgN. ------------------ —~_❑��"""""� 1. THE aSP[IALTJCON(REiFOEMOlIf10NlIN P10• WAFTS ARE AP70MAT5. W --__—_—T _® ASPHALT CONOIETE REMOVAL LIMITS SHALLB PIE 0EMAIMINE Rf10a,CUNTMCIOR ONO UIT CONSIME0ON OOSEMEA co L-- -- _ CONTRACTOR SIVA BE RESPONSIBLE FOR C OROMATION OF COPLAN - --- 'P-- FNID MMHG Pa0RT0 OEMOUDACTIVITIES.ACTIVITIES.T ACTIVITIES. p - 1 CONIRACIOR SHALL NEATLY CUTAND CAP GUSTING MNIGATION ^--�W�U w SYSTEM PIPING 6 COu0T1EWWTHSI THE WNW INMATE°FOR 0 -SEA 92169, REMOVAL ANDE3EW0.G AND GAMING. 3].1'RE S. SILT EINQ SHALL 0 OS INSIOE 1HELLW150F ROWORTCE. DEMOUTION NOTES: OREMOVE ME. OPROTECT RGTING FENCE. OPLUG E10S11AG WATER MAN. • O TAOEMOITETN Ws10 ORNMVREtR1 PIPE OSRA UD 0PPlUEGMG E OERTMfR 0 A[MOVE EMOTING FIRE MMANE. pREMOVE EIOSTINGU1WTY POLE IRVOTHERS). O REMOVE IMAM POSE 0 REMOVE DRAINAGE STRUCTURE. 0 PROTECT CSTMG URUIY POLL 0 REMOVE SWIM 3.'VRR PIPE@AVEAT WI WATER PIPE. 0 RIMMENA1/CURO AM MUEA 0 NOTUSED. 0 MtESERVEMIDPROTECTTREEIS} OREMOVE ClWfN UEXTi0N. 15 RELOCATE EXISTING TELEPHONE 0IU0 AS NEEDED,B)OMENS. 0 RELOCATE PSTINOTELEPHONE VAULT.SYOMMS, 11 5(OEU R TOMR COVC6WOOILLUMI11ATION AND SIGMA. • l0GTION. I SP5-070922 ✓'A'R.n 1J"F`TTn CITY OF RENTONSPS DUVALL AVEAVf NE ouAVwlq. •*�^'`• o OO1N"E" CONFORMED SET ruacA®LuarFATRrA'r /SUMO MI MIIOD % Af01 00 0'. oYs IPArTmetrlXA�N m'� I.PADro. Dauer w oamrsmaaly SRE PREPARATION EN rrP1w MC STA 923F00 TO END WITWI. ror of M0.1621 .N-.n.m..-m.r.'2ssmw.oaarlo. .,a RP I .3IAm.I'o.t[ I'•T. 103 uuna+vs-s �•• M wn,�.•p� SHEET SOFT WIT No. is or of