Loading...
HomeMy WebLinkAboutFinal Agenda Packet CITY OF RENTON AGENDA - City Council Regular Meeting 7:00 PM - Monday, May 12, 2025 Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way Please note that this regular meeting of the Renton City Council is being offered as a hybrid meeting and can be attended in person at the Council Chambers, 7th floor of City Hall, 1055 S Grady Way, Renton, 98057 or remotely through Zoom. For those wishing to attend by Zoom: Please (1) click this link https://us02web.zoom.us/j/84938072917?pwd=TUNCcnppbjNjbjNRMWpZaXk2bjJnZz09 (or copy/paste the URL into a web browser) or (2) call-in to the Zoom meeting by dialing 253-215- 8782 and entering 849 3807 2917 Passcode 156708, or (3) call 425-430-6501 by 5 p.m. on the day of the meeting to request an invite with a link to the meeting. Registration for Audience Comment: Registration will be open at all times, but speakers must register by 5 p.m. on the day of a Council meeting in order to be called upon. Anyone who registers after 5 p.m. on the day of the Council meeting will not be called upon to speak and will be required to re-register for the next Council meeting if they wish to speak at that next meeting.  Request to Speak Registration Form: o Click the link or copy/paste the following URL into your browser: https://forms.office.com/g/bTJUj6NrEE  You may also call 425-430-6501 or email jsubia@rentonwa.gov or cityclerk@rentonwa.gov to register. Please provide your full name, city of residence, email address and/or phone number, and topic in your message.  A sign-in sheet is also available for those who attend in person. Video on Demand: Please click the following link to stream Council meetings live as they occur, or to select previously recorded meetings: Renton Channel 21 Video on Demand 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 2. ROLL CALL 3. PROCLAMATION a) Asian American, Native Hawaiian and Pacific Islander Heritage Month - May 2025 4. SPECIAL PRESENTATION a) Councilmember McIrvin - Association of Washington Cities Advanced Certificate of Municipal Leadership 5. ADMINISTRATIVE REPORT a) Administrative Report 6. AUDIENCE COMMENTS  All remarks must be addressed to the Council as a whole, if a response is requested please provide your name and address, including email address, to the City Clerk to allow for follow-up.  Speakers must sign-up prior to the Council meeting.  Each speaker is allowed three minutes.  When recognized, please state your name & city of residence for the record. NOTICE to all participants: Pursuant to state law, RCW 42.17A.555, campaigning for or against any ballot measure or candidate in City Hall and/or during any portion of the council meeting, including the audience comment portion of the meeting, is PROHIBITED. 7. CONSENT AGENDA The following items are distributed to Councilmembers in advance for study and review, and the recommended actions will be accepted in a single motion. Any item may be removed for further discussion if requested by a Councilmember. a) Approval of Council Meeting minutes of May 5, 2025. Council Concur b) AB - 3820 Public Works Airport recommends execution of a five-year Cooperative Service Agreement with the United States Department of Agriculture and Animal and Plant Health Inspection Service Wildlife Service, in the total amount of $260,166.72, for wildlife hazard mitigation services at the Airport. Refer to Transportation (Aviation) Committee c) AB - 3828 Public Works Maintenance Services recommends authorizing the purchase of one Kenworth T880 Single Axle Plow Dump Truck, from Pape Kenworth Northwest, using State of Washington Contract #03920, in the amount of $247,285.85. The funds to cover this purchase are included in the 2025/2026 biennial budget. Council Concur d) AB - 3829 Public Works Transportation Systems Division reports bid opening on April 3, 2025 for CAG-25-003, Cedar Ave Sidewalk project, and recommends awarding the contract to the lowest responsive and responsible bidder Westwater Construction Co. in the amount of $299.995. Council Concur e) AB - 3819 Public Works Utility Systems Division reports bid opening on April 15, 2025, for CAG-25-075, NE 12th St AC Water Main and Stormwater Replacement project, and recommends awarding the contract to the lowest responsive and responsible bidder, Raudenbush Earthworks, LLC, in the amount of $2,071,559.32. Council Concur 8. UNFINISHED BUSINESS Topics listed below were discussed in Council committees during the past week. Those topics marked with an asterisk (*) may include legislation. Committee reports on any topics may be held by the Chair if further review is necessary. a) Finance Committee: 1) Vouchers; 2) Agreement with Pacific Security for City Center Parking Garage Security b) Planning and Development Committee: 1) SW 41st Street Rezone from Commercial Office to Commercial Arterial* 9. LEGISLATION Ordinance for first reading: a) Ordinance No. 6159: Rezone of 101 SW 41ST ST; King County Parcel No. 3926800040 from CO to CA (See Item 8.b) 10. NEW BUSINESS (Includes Council Committee agenda topics; visit rentonwa.gov/cityclerk for more information.) 11. ADJOURNMENT COMMITTEE OF THE WHOLE MEETING AGENDA (Preceding Council Meeting) 5:00 p.m. - 7th Floor - Council Chambers Hearing assistance devices for use in the Council Chambers are available upon request to the City Clerk CITY COUNCIL MEETINGS ARE TELEVISED LIVE ON GOVERNMENT ACCESS CHANNEL 21 To view Council Meetings online, please visit rentonwa.gov/councilmeetings Armondo Pavone II Mayor WHEREAS,May is the time to recognize and celebrate the role that Asian Americans,Native Hawaiians, and Pacific Islanders have played in our shared history ever since the first Japanese people immigrated to the United States in May 1843;and WHEREAS,the 2025 theme,“a Legacy of Leadership and Resitience,”honors the hard work of Asian, Hawaiian,and Pacific Islander leaders who have established a foundation for future generations to thrive, adapt to change,and adversity;and WHEREAS,Asian Americans,Native Hawaiians,and Pacific Islanders have demonstrated their resilience and fortitude against discrimination and ongoing marginalization;and WHEREAS,Renton’s Asian,Hawaiian,and Pacific Islander populations enrich our community,through their contributions,success,and involvement within Renton’s schools,organizations,city hall,events, and much more;and WHEREAS,Renton is the proud home of many Asian Americans,Native Hawaiian,and Pacific Islanders who have held leadership roles,established thriving businesses,formed organizations,and served as mentors to Renton Residents;and NOW THEREFORE,I,Armondo Pavone,Mayor of the City of Renton,do hereby proclaim May,2025 to be Asian American,Native Hawaiian and Pacific Islander Heritage Month in the City of Renton,and I encourage all residents to join me in this special observance. IN WITNESS THEREOF,I have hereunto set my hand and caused the seal of the Cityof Renton to be affixed this 1 2th day of May 2025. PROCLAMATION HayorArmondo Pavone City of Renton,Washington 1055 S Grady Way,Renton,WA 98057 II rentonwa.gov AGENDA ITEM #3. a) Councilmember Ryan McIrvin City of Renton Presented: 04/11/2025 AG E N D A I T E M # 4 . a ) Mayor’s Office Memorandum DATE: May 1, 2025 TO: James Alberson, Jr., Council President Members of the Renton City Council FROM: Armondo Pavone, Mayor Ed VanValey, Chief Administrative Officer SUBJECT: Administrative Report • The Equity Commission will resume its regular meetings Tuesday, May 13 at 5:30 p.m. in the Renton City Hall Council Chambers. The meeting agenda includes election of new officers and discussion about the Commission’s 2025 work plan. • The Parks and Recreation Department is teaming up with Cascade Cycling Club to promote cycling as a sustainable and healthy transportation option. Stop by the Celebration Station on Bike Everywhere Day, Wednesday, May 14 between 6-10 a.m. on the Cedar River Trail at Logan Avenue North. Look for the pop-up tent will be located at the south end of the Renton Memorial Stadium parking lot. • The 10th Annual Renton Career Fair will be held Wednesday, May 14 and Thursday, May 15 from 3-6 p.m. at Renton Technical College (3000 NE 4th Street; Renton). Wednesday will feature all industries except healthcare and Thursday’s event will focus only on careers in the healthcare field. For more information and to register visit www.rentonwa.gov/Events-Meetings/All-City-Events-Meetings- Calendar/Tenth-Annual-Renton-Career-Fair. • The Renton Police Department Animal Control team is partnering with Eastside Veterinary Associates to host the second pet adoption event Saturday, May 17 from 1-4 p.m. at Eastside Veterinary Associates (1700 NE 44th Street). All pets are fully vaccinated, spayed/neutered, and microchipped. Adoption fees will be 50% off ($50 for dogs and $25 for cats). Visit https://www.24petconnect.com and enter your zip code and shelter Renton Police Department to view some of the pets available for adoption. • Visit the first Safety Fest sponsored by the Parks and Recreation Department, Saturday, May 17 between 11 a.m.-2 p.m. at the Renton Community Center (1715 Maple Valley Hwy). Talk with experts, see safety demonstrations, a bike rodeo, and enjoy food trucks. The event will offer giveaways like bike helmets, life jackets, first aid kits, and more. AGENDA ITEM #5. a) James Alberson, Jr., Council President Members of the Renton City Council Page 2 of 2 May 7, 2025 • Help us get ready for the 2025 River Days event. We are now accepting applications for food and bazaar vendors, parade participants, and the chalk art competition. Visit rentonwa.gov/riverdays to submit your application now. • Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.gov/traffic. All projects are weather permitting and unless otherwise noted, streets will always remain open.  Monday, May 12 through Friday, May 16, 8:00am-3:00pm. Intermittent lane closure on Burnett Ave S from the Cedar River to S 2nd Street for construction work. Approved traffic control plans were issued and will be followed. Questions may be directed to Rob Blackburn, 206-379-1489.  Monday, May 12 through Friday, May 16, 8:00am-3:00pm. Intermittent lane closure on Rainier Ave N between SW Victoria St and NW 3rd Pl for construction work. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Joe Nerlfi, 425-757-9657.  Monday, May 12 through Friday, May 16, 8:00am-3:00pm. Intermittent lane closure on Ripley Lane N for construction work. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Tom Main, 206-999-1833.  Monday, May 12 through Friday, May 16, 8:00am-3:00pm. Shifting lane closures both east and west on NE Sunset Blvd between Redmond Pl NE to Union Ave NE for utility installation and frontage improvements. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Brad Stocco, 425-282-2373.  Monday, May 12 through Friday, May 16, 8:00am-3:00pm. Intermittent lane closure on Williams Ave S from the Cedar River to S 2nd Street for construction work. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Rob Blackburn, 206-379-1489.  On-going Street Closure January 21 through May 22, 2025 (City of Renton Resolution No. 4545). FULL STREET CLOSURE on Houser Way N between Lake Washington Blvd N and Lowe’s Business Access Road in support of WSDOT I-405 Renton to Bellevue Widening and Express Toll Lane project. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Justin Johnson, 425-902-7102.  AGENDA ITEM #5. a) May 5, 2025 REGULAR COUNCIL MEETING MINUTES CITY OF RENTON MINUTES - City Council Regular Meeting 7:00 PM - Monday, May 5, 2025 Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way CALL TO ORDER AND PLEDGE OF ALLEGIANCE Mayor Pavone called the meeting of the Renton City Council to order at 7:00 PM and led the Pledge of Allegiance. ROLL CALL Councilmembers Present: James Alberson, Jr., Council President Carmen Rivera, Council Position No. 2 Valerie O'Halloran, Council Position No. 3 Ryan McIrvin, Council Position No. 4 Ed Prince, Council Position No. 5 Ruth Pérez, Council Position No. 6 Kim-Khánh Vǎn, Council Position No. 7 Councilmembers Absent: ADMINISTRATIVE STAFF PRESENT Armondo Pavone, Mayor Ed VanValey, Chief Administrative Officer Shane Moloney, City Attorney Jason Seth, City Clerk Maryjane Van Cleave, Parks & Recreation Department Administrator Melissa McCain, Deputy City Clerk Lori Fleming, Human Services Coordinator Commander Steve Morris, Police Department Attended Remotely: Kimberly Register, Chief of Staff - temp Kari Roller, Finance Administrator Martin Pastucha, Public Works Administrator David Topaz, Human Resources / Risk Management Administrator Amanda Free, Economic Development Director Ron Straka, Public Works Utility Systems Director AGENDA ITEM #7. a) May 5, 2025 REGULAR COUNCIL MEETING MINUTES PROCLAMATION Municipal Clerks Week - May 4 - May 10, 2025: A proclamation by Mayor Pavone was read declaring May 4 - May 10, 2025, as Municipal Clerks Week in the City of Renton, and extending appreciation to all Municipal Clerks for the vital services they perform and their exemplary dedication to the communities they represent. Melissa McCain, Deputy City Clerk, accepted the proclamation with appreciation. MOVED BY ALBERSON, SECONDED BY PÉREZ, COUNCIL APPROVE THE PROCLAMATION AS PRESENTED. CARRIED. ADMINISTRATIVE REPORT CAO Ed VanValey reviewed a written administrative report summarizing the City’s recent progress towards goals and work programs adopted as part of its business plan for 2025 and beyond. Items noted were: • The 10th Annual Renton Career Fair will be held Wednesday, May 14 and Thursday, May 15 from 3-6 p.m. at Renton Technical College (3000 NE 4th Street; Renton). Wednesday will feature all industries except healthcare and Thursday’s event will focus only on careers in the healthcare field. For more information and to register visit www.rentonwa.gov/Events-Meetings/All-City-Events-MeetingsCalendar/Tenth- Annual-Renton-Career-Fair. • The Organizational Development and Performance Division of the Executive Services Department, in collaboration with ReconMR, is currently finalizing the 2025 Community Survey in preparation for distribution. Survey results provide important feedback that advances the city’s understanding and performance metrics regarding the residents’ and business community’s experience with city services. Results also help advise city leaders as they assess future projects and programs desired by the community. The survey will be available in mid-May and open for approximately one month. Once compiled, survey results will be presented to City Council and provided on the website. For any questions or comments please email rentonsurvey@rentonwa.gov. • Preventative street maintenance will continue to impact traffic and result in occasional street closures. AUDIENCE COMMENTS • Sheryl Friesz, Renton, spoke about a new association comprised of Renton residents called For a Better Renton. She noted that five neighborhoods are represented by the association and the group intends to be active during this year's election season. • Peter Spairring, Renton, noted that he owns a multi-family rental property in Renton and one of his tenant's smokes marijuanas, which the secondhand smoke then blows inside the other tenant's unit. He stated that this caused an infant to be hospitalized and urged Council to pass a law criminalizing secondhand smoke that affects tenants' right to living in a healthy environment. Mayor Law noted that the City's attorneys would investigate the matter. AGENDA ITEM #7. a) May 5, 2025 REGULAR COUNCIL MEETING MINUTES CONSENT AGENDA The following items are distributed to Councilmembers in advance for study and review, and the recommended actions will be accepted in a single motion. Any item may be removed for further discussion if requested by a Councilmember. a) Approval of Council Meeting minutes of April 28, 2025. Council Concur. b) AB - 3824 Community & Economic Development Department recommended concurrence with the Hearing Examiner's recommendation to approve a rezone of the property located at 101 SW 41st St (APN 3926800040) from Commercial Office (CO) to Commercial Arterial (CA) zoning. Refer to Planning & Development Committee. c) AB - 3823 Parks & Recreation Department submitted CAG-22-013, Kiwanis Park Improvements project, contractor Terra Dynamics Inc., and requested acceptance of the project and approval to release the retainage bond 60 days after all State releases have been received and all liens have been legally cleared. Council Concur. d) AB - 3817 Public Works Facilities Division recommends approval to execute an agreement with Pacific Security, in an amount not to exceed $275,000, for security services at the Renton Downtown Parking Garage; and authorization for additional appropriations in the amount of $20,000 to cover the full cost of the agreement. Refer to Finance Committee. MOVED BY ALBERSON, SECONDED BY PÉREZ, COUNCIL ADOPT THE CONSENT AGENDA AS PUBLISHED CARRIED. UNFINISHED BUSINESS Topics listed below were discussed in Council committees during the past week. Those topics marked with an asterisk (*) may include legislation. Committee reports on any topics may be held by the Chair if further review is necessary. a) Transportation Committee: Chair McIrvin presented a report recommending concurrence in the staff recommendation to authorize the Mayor and City Clerk to execute the contract with Westwater Construction, Co. for the Windsock & 243 Bldg. GA Apron & Parking Lot Rehabilitation project, not to exceed $2,404,287.41. MOVED BY MCIRVIN, SECONDED BY PÉREZ, COUNCIL CONCUR IN THE COMMITTEE RECOMMENDATION. CARRIED. LEGISLATION Ordinance for second and final reading: a) Ordinance No. 6158: An Ordinance of the City of Renton, Washington, amending the City of Renton Fiscal Years 2025/2026 Biennial Budget as adopted by Ordinance No. 6147, by increasing the budgeted revenues and expenditures by $56,072,799 and $167,033,277 respectively; amending the 2025 City of Renton salary table as last amended by Ordinance No. 6156; providing for severability, and establishing an effective date. MOVED BY PÉREZ, SECONDED BY O'HALLORAN, COUNCIL ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED. AGENDA ITEM #7. a) May 5, 2025 REGULAR COUNCIL MEETING MINUTES NEW BUSINESS (Includes Council Committee agenda topics; visit rentonwa.gov/cityclerk for more information.) ADJOURNMENT MOVED BY PRINCE, SECONDED BY ALBERSON, COUNCIL ADJOURN. CARRIED. TIME: 7:18 PM Jason A. Seth, MMC, City Clerk Jason Seth, Recorder 05 May 2025 AGENDA ITEM #7. a) Council Committee Meeting Calendar May 5, 2025 May 12, 2025 Monday 2:30 p.m.* Community Services Committee, Chair O’Halloran Location: Council Conference Room/Videoconference 1. Pros Plan Update 2. Emerging Issues 3:30 p.m.* Finance Committee, Chair Pérez Location: Council Conference Room/Videoconference 1. Agreement with Pacific Security for City Center Parking Garage Security 2. Vouchers 3. Emerging Issues 4:00 p.m. Planning and Development Committee, Chair Prince Location: Council Conference Room/Videoconference 1. Comprehensive Plan – Transportation Element Update 2. SW 41st Street Rezone from Commercial Office to Commercial Arterial 3. Emerging Issues 5:00 p.m. Committee of the Whole, Chair Alberson - Location: Council Chambers 1. King County Long-term Disposal Study 6:00 p.m. Asian American, Native Hawaiian, and Pacific Islander Heritage Month Reception Location: Conferencing Center 7:00 p.m. Council Meeting Location: Council Chambers/Videoconference *Adjusted start time only. AGENDA ITEM #7. a) AB - 3820 City Council Regular Meeting - 12 May 2025 SUBJECT/TITLE: Cooperative Service Agreement with the United States Department of Agriculture and the Animal and Plant Health Inspection Service Wildlife Service for Wildlife Hazard Mitigation at the Airport RECOMMENDED ACTION: Refer to Transportation (Aviation) Committee DEPARTMENT: Public Works Airport STAFF CONTACT: Manny Cruz, Airport Director EXT.: x7476 FISCAL IMPACT SUMMARY: Wildlife Services has created the 5-year work and financial plan, and Cooperative Services Agreement for wildlife hazard mitigation services at the Airport. Specifically, they will provide one wildlife biologist to operate on the Airport over the next 60 months. The new contract is for $260,166.72 and is effective through December 31, 2029. The expenditures will occur over the five years of the contract and are estimated to be within the approved annual budgeted amount for this program (expected annual costs are shown below). The agreement is funded by the Airport’s Professional Services budget number 402.000000.546.20.41.000. SUMMARY OF ACTION: For the past several years the Airport has been receiving wildlife management services from the Wildlife Services branch of the United States Department of Agriculture (USDA) and Animal and Plant Health Inspection Service Wildlife Service (APHIS-WS). The yearly work plan and financial plan between the USDA and the City was up for renewal on January 1, 2025. Over the past contract year our wildlife biologist has: 1. Developed the FAA approved Wildlife Hazard Mitigation Plan. 2. Harassed and removed birds and other wildlife from the Airport during daytime and nighttime hours. 3. Monitored and managed the large-bird trap on the east side of the Airport. 4. Worked with Airport staff to reduce natural attractants on the airside. 5. Provided detailed observations of wildlife activity during his visits. 6. Reduced overall bird and nuisance wildlife populations on the Airport and in the wider geographic area. As noted in the work plan, this multi-year contract has differing annual costs based on operational expenses. The annual costs are expected to be as follows: 2025 - $50,877.80 2026 - $51,559.33 2027 - $52,067.93 2028 - $52,576.53 AGENDA ITEM #7. b) 2029 - $53,085.13 In the past the City and the USDA executed 5-year Cooperative Service Agreements with an annual work plan and financial plan. The Cooperative Service Agreement is the underlying agreement outlining responsibilities between the parties. Unfortunately, in filing the separate agreements and plans, each was assigned an individual contract number by the city clerk’s office making identifying the correlation between the Cooperative Service Agreement and the work and financial plan difficult to recognize. Therefore, a combined 5-year Cooperative Service Agreement inclusive of the work and financial plan should alleviate this confusion. EXHIBITS: A. Agreement B. 5-Year Work Plan STAFF RECOMMENDATION: Authorize the Mayor and City Clerk to execute the 5-year Cooperative Service Agreement with the United States Department of Agriculture and Animal and Plant Health Inspection Service Wildlife Service for $260,166.72 for wildlife hazard mitigation services at the Airport. AGENDA ITEM #7. b) WS Agreement Number: 25-7353-6373-RA WBS: AP.RA.RX53.73.00310 COOPERATIVE SERVICE AGREEMENT between RENTON MUNICIPAL AIRPORT (COOPERATOR) and UNITED STATES DEPARTMENT OF AGRICULTURE ANIMAL AND PLANT HEALTH INSPECTION SERVICE (APHIS) WILDLIFE SERVICES (WS) ARTICLE 1 – PURPOSE The purpose of this Cooperative Service Agreement is to conduct wildlife damage management (WDM) activities to control nuisance bird and wildlife species on and around Renton Municipal Airport property to reduce human health and safety risks associated with potential wildlife/aircraft collisions and other airport operations. ARTICLE 2 – AUTHORITY APHIS-WS has statutory authority under the Acts of March 2, 1931, 46 Stat. 1468-69, 7 U.S.C. §§ 8351-8352, as amended, and December 22, 1987, Public Law No. 100-202, § 101(k), 101 Stat. 1329-331, 7 U.S.C. § 8353, to cooperate with States, local jurisdictions, individuals, public and private agencies, organizations, and institutions while conducting a program of wildlife services involving mammal and bird species that are reservoirs for zoonotic diseases, or animal species that are injurious and/or a nuisance to, among other things, agriculture, horticulture, forestry, animal husbandry, wildlife, and human health and safety. ARTICLE 3 - MUTUAL RESPONSIBILITIES The cooperating parties mutually understand and agree to/that: 1. APHIS-WS shall perform services set forth in the Work Plan, which is attached hereto and made a part hereof. The parties may mutually agree in writing, at any time during the term of this agreement, to amend, modify, add or delete services from the Work Plan. 2. The Cooperator certifies that APHIS-WS has advised the Cooperator there may be private sector service providers available to provide wildlife damage management (WDM) services that the Cooperator is seeking from APHIS-WS. 3. All equipment with a purchase price of $5,000 or more per unit, purchased directly with funds from the cooperator for use on this project shall be subject to disposal according to APHIS policy, and shall be specifically listed in the attached work plan and financial plan. Property title/disposal shall be determined when this project (including all continuations and revisions of this agreement) terminates, or when the equipment is otherwise directed to other projects, whichever comes first. If the equipment is sold prior to the project end, the proceeds should be allocated according to APHIS policy. Continuations and revisions to this agreement shall list any equipment with a purchase price of $5,000 or more per unit, carried over from a purchase directly with funds from the cooperator for use on this AGENDA ITEM #7. b) WS Agreement Number: 25-7353-6373-RA WBS: AP.RA.RX53.73.00310 project. All other equipment purchased for the program is and will remain the property of APHIS-WS. 4. The cooperating parties agree to coordinate with each other before responding to media requests on work associated with this project. ARTICLE 4 - COOPERATOR RESPONSIBILITIES Cooperator agrees: 1. To designate the following as the authorized representative who shall be responsible for collaboratively administering the activities conducted in this agreement; Cooperator Name, Address, Phone Number, Email Manuel O. Cruz, Director Renton Municipal Airport/Clayton Scott Field 243 West Perimeter Road Renton, Washington 98057 425-430-7476 mcruz@rentonwa.gov 2. To authorize APHIS-WS to conduct direct control activities as defined in the Work Plan. APHIS-WS will be considered an invitee on the lands controlled by the Cooperator. Cooperator will be required to exercise reasonable care to warn APHIS-WS as to dangerous conditions or activities in the project areas. 3. To reimburse APHIS-WS for costs, not to exceed the annually approved amount specified in the Financial Plan. If costs are projected to exceed the amount reflected in the Financial Plan, the agreement with amended Work Plan and Financial Plan shall be formally revised and signed by both parties before services resulting in additional costs are performed. The Cooperator agrees to pay all costs of services submitted via an invoice from APHIS-WS within 30 days of the date of the submitted invoice(s). Late payments are subject to interest, penalties, and administrative charges and costs as set forth under the Debt Collection Improvement Act of 1996. 4. To provide a Tax Identification Number or Social Security Number in compliance with the Debt Collection Improvement Act of 1996. 5. As a condition of this agreement, the Cooperator ensures and certifies that it is not currently debarred or suspended and is free of delinquent Federal debt. 6. To notify APHIS-WS verbally or in writing as far in advance as practical of the date and time of any proposed meeting related to the program. AGENDA ITEM #7. b) WS Agreement Number: 25-7353-6373-RA WBS: AP.RA.RX53.73.00310 7. The Cooperator acknowledges that APHIS-WS shall be responsible for administration of APHIS-WS activities and supervision of APHIS-WS personnel. 8. To obtain the appropriate permits for removal activities for species listed in the Work Plan and list USDA, APHIS, Wildlife Services as sub-permitees. 9. To provide an indoor working space to complete necessary paperwork. 10. The Cooperator will not be connected to the USDA APHIS computer network(s). ARTICLE 5 – APHIS-WS RESPONSIBILITIES APHIS-WS Agrees: 1. To designate the following as the APHIS-WS authorized representative who shall be responsible for collaboratively administering the activities conducted in this agreement. APHIS-WS State Director: Name/Title, Address, Phone Number, Email Brook Zscheile, Acting State Director, Washington 720 O’Leary Street NW Olympia, WA 98502 360-753-9884 mike.a.linnell@usda.gov 2. To conduct activities at sites designated by Cooperator as described in the Work and Financial Plans. APHIS-WS will provide qualified personnel and other resources necessary to implement the approved WDM activities delineated in the Work Plan and Financial Plan of this agreement. 3. That the performance of wildlife damage management actions by APHIS-WS under this agreement is contingent upon a determination by APHIS-WS that such actions are in compliance with the National Environmental Policy Act, Endangered Species Act, and any other applicable federal statutes. APHIS-WS will not make a final decision to conduct requested wildlife damage management actions until it has made the determination of such compliance. 4. To invoice Cooperator monthly for actual costs incurred by APHIS-WS during the performance of services agreed upon and specified in the Work Plan. Authorized auditing representatives of the Cooperator shall be accorded reasonable opportunity to inspect the accounts and records of APHIS-WS pertaining to such claims for reimbursement to the extent permitted by Federal law and regulations. AGENDA ITEM #7. b) WS Agreement Number: 25-7353-6373-RA WBS: AP.RA.RX53.73.00310 ARTICLE 6 – CONTINGENCY STATEMENT This agreement is contingent upon the passage by Congress of an appropriation from which expenditures may be legally met and shall not obligate APHIS-WS upon failure of Congress to so appropriate. This agreement may also be reduced or terminated if Congress only provides APHIS-WS funds for a finite period under a Continuing Resolution. ARTICLE 7 – NON-EXCLUSIVE SERVICE CLAUSE Nothing in this agreement shall prevent APHIS-WS from entering into separate agreements with any other organization or individual for the purpose of providing wildlife damage management services exclusive of those provided for under this agreement. ARTICLE 8 – CONGRESSIONAL RESTRICTIONS Pursuant to Section 22, Title 41, United States Code, no member of or delegate to Congress shall be admitted to any share or part of this agreement or to any benefit to arise therefrom. ARTICLE 9 – LAWS AND REGULATIONS This agreement is not a procurement contract (31 U.S.C. 6303), nor is it considered a grant (31 U.S.C. 6304). In this agreement, APHIS-WS provides goods or services on a cost recovery basis to nonfederal recipients, in accordance with all applicable laws, regulations and policies. ARTICLE 10 – LIABILITY APHIS-WS assumes no liability for any actions or activities conducted under this agreement except to the extent that recourse or remedies are provided by Congress under the Federal Tort Claims Act (28 U.S.C. 1346(b), 2401(b), and 2671-2680). ARTICLE 11 – NON-DISCRIMINATION CLAUSE The United States Department of Agriculture prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual’s income is derived from any public assistance program. Not all prohibited bases apply to all programs. ARTICLE 12 - DURATION, REVISIONS, EXTENSIONS, AND TERMINATIONS This agreement shall become effective on January 1, 2025 and shall continue through December 31, 2029, not to exceed five years. This Cooperative Service Agreement may be amended by AGENDA ITEM #7. b) WS Agreement Number: 25-7353-6373-RA WBS: AP.RA.RX53.73.00310 mutual agreement of the parties in writing. The Cooperator must submit a written request to extend the end date at least 10 days prior to expiration of the agreement. Also, this agreement may be terminated at any time by mutual agreement of the parties in writing, or by one party provided that party notifies the other in writing at least 60 days prior to effecting such action. Further, in the event the Cooperator does not provide necessary funds, APHIS-WS is relieved of the obligation to provide services under this agreement. In accordance with the Debt Collection Improvement Act of 1996, the Department of Treasury requires a Taxpayer Identification Number for individuals or businesses conducting business with the agency. Cooperator’s Tax ID No.: 91-6001271 APHIS-WS’s Tax ID: 41-0696271 Cooperator: Armondo Pavone, Mayor, City of Renton Date UNITED STATES DEPARTMENT OF AGRICULTURE ANIMAL AND PLANT HEALTH INSPECTION SERVICE WILDLIFE SERVICES Brook Zscheile, Acting State Director, WA Date Wendy Anderson, Director, Western Region Date Prepared by (APHIS-WS employee): Evan Moran AGENDA ITEM #7. b) WORK PLAN/FINANCIAL PLAN COOPERATOR: Renton Municipal Airport CONTACT: Manuel O. Cruz, Airport Director 425-430-7476; mcruz@rentonwa.gov COOPERATIVE SERVICE AGREEMENT No.: 25-7353-6373-RA WBS ELEMENT: AP.RA.RX53.73.0310 LOCATION: Renton Municipal Airport DATES: January 1, 2025 – December 31, 2029 In accordance with the Cooperative Service Agreement 25-7353-6373-RA (2024 signature year) between Renton Municipal Airport (RNT) and the United States Department of Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS), Wildlife Services (WS), this Work Plan sets forth the objectives, activities and budget of this project during the period of January 1, 2025 – December 31, 2029. Program Objective Wildlife Services’ objective is to reduce human health and safety risks associated with potential wildlife/aircraft collisions and other wildlife conflicts. APHIS-WS will provide assistance in the form of technical information, recommendations, and wildlife management activities related to minimizing wildlife conflicts. Plan of Action The objectives of this plan will be accomplished in the following manner: 1. APHIS-WS will provide a Wildlife Biologist an average of 16 hours per week not to exceed 800 hours total, to assist with hazardous wildlife management at the airfield. APHIS-WS will provide vehicles, equipment, supplies (other than pyrotechnics), and training necessary to implement management activities. 2. The following control methods will be used for the management activities: technical assistance, hazing, capture and removal of offending wildlife, and shooting. WS will ensure that the most discrete, effective, and safe control tools and techniques available are utilized. 3. Evan Moran, the Western District Supervisor (360) 337-2778 will supervise this project. This project will be monitored by Brook Zscheile, Acting State Director in Olympia, WA (360) 753-9884. 4. APHIS-WS will cooperate with the Washington Department of Fish and Wildlife, the U.S. Fish and Wildlife Service, county and local city governments, and other entities to ensure compliance with Federal laws and applicable State, and local laws and regulations. AGENDA ITEM #7. b) 5. Renton Municipal Airport will provide security access to the airfield and necessary driver and communication training. 6. Renton Municipal Airport will be billed monthly by APHIS-WS only for expenses shown in the Financial Plan and will not exceed the Agreement Total. Personnel Compensation is defined as salary for all hours worked, benefits, differentials, hazardous duty allowances, annual leave, sick leave and awards. The financial point of contact for this Work Plan/Financial Plan is Michelle Rodriguez, Budget Analyst (360) 742-5496. FINANCIAL PLAN For the disbursement of funds from Renton Airport to USDA APHIS Wildlife Services for Assistance with wildlife conflicts at the airport From 01/01/2025 to 12/31/2025 Cost Element Full Cost Personnel Compensation $ 36,264.00 Vehicles $ 3,250.00 Supplies and Materials $ 500.00 Subtotal (Direct Charges) $ 40,014.00 Pooled Job Costs 11.00% $ 4,401.54 Indirect Costs 16.15% $ 6,462.26 Agreement Total $ 50,877.80 The distribution of the budget from this Financial Plan may vary as necessary to accomplish the purpose of this agreement, but may not exceed: $50,877.80 FINANCIAL PLAN For the disbursement of funds from Renton Airport to USDA APHIS Wildlife Services for Assistance with wildlife conflicts at the airport From 01/01/2026 to 12/31/2026 Cost Element Full Cost Personnel Compensation $ 36,800.00 AGENDA ITEM #7. b) Vehicles $ 3,250.00 Supplies and Materials $ 500.00 Subtotal (Direct Charges) $ 40,550.00 Pooled Job Costs 11.00% $ 4,460.50 Indirect Costs 16.15% $ 6,548.83 Agreement Total $ 51,559.33 The distribution of the budget from this Financial Plan may vary as necessary to accomplish the purpose of this agreement, but may not exceed: $51,559.33 FINANCIAL PLAN For the disbursement of funds from Renton Airport to USDA APHIS Wildlife Services for Assistance with wildlife conflicts at the airport From 01/01/2027 to 12/31/2027 Cost Element Full Cost Personnel Compensation $ 37,200.00 Vehicles $ 3,250.00 Supplies and Materials $ 500.00 Subtotal (Direct Charges) $ 40,950.00 Pooled Job Costs 11.00% $ 4,504.50 Indirect Costs 16.15% $ 6,613.43 Agreement Total $ 52,067.93 The distribution of the budget from this Financial Plan may vary as necessary to accomplish the purpose of this agreement, but may not exceed: $52,067.93 AGENDA ITEM #7. b) FINANCIAL PLAN For the disbursement of funds from Renton Airport to USDA APHIS Wildlife Services for Assistance with wildlife conflicts at the airport From 01/01/2028 to 12/31/2028 Cost Element Full Cost Personnel Compensation $ 37,600.00 Vehicles $ 3,250.00 Supplies and Materials $ 500.00 Subtotal (Direct Charges) $ 41,350.00 Pooled Job Costs 11.00% $ 4,548.50 Indirect Costs 16.15% $ 6,678.03 Agreement Total $ 52,576.53 The distribution of the budget from this Financial Plan may vary as necessary to accomplish the purpose of this agreement, but may not exceed: $52,576.53 FINANCIAL PLAN For the disbursement of funds from Renton Airport to USDA APHIS Wildlife Services for Assistance with wildlife conflicts at the airport From 01/01/2029 to 12/31/2029 Cost Element Full Cost Personnel Compensation $ 38,000.00 Vehicles $ 3,250.00 Supplies and Materials $ 500.00 Subtotal (Direct Charges) $ 41,750.00 Pooled Job Costs 11.00% $ 4,592.50 Indirect Costs 16.15% $ 6,742.63 Agreement Total $ 53,085.13 The distribution of the budget from this Financial Plan may vary as necessary to accomplish the purpose of this agreement, but may not exceed: $53,085.13 AGENDA ITEM #7. b) Mailing Address: Billing Address: RENTON MUNICIPAL AIRPORT Same as mailing 616 W PERIMETER ROAD, UNIT A Financial POC: Manuel O. Cruz, Airport Director RENTON, WA 98057 Tax ID#: 91-6001271 ________________________________________ ____________________ Armondo Pavone, Mayor, City of Renton Date UNITED STATES DEPARTMENT OF AGRICULTURE ANIMAL AND PLANT HEALTH INSPECTION SERVICE WILDLIFE SERVICES _______________________________________ ___________________ Brook Zscheile, Acting State Director, Washington Date _______________________________________ ___________________ Wendy Anderson Director, Western Region Date AGENDA ITEM #7. b) AB - 3828 City Council Regular Meeting - 12 May 2025 SUBJECT/TITLE: Authorization to Purchase Fleet Vehicles RECOMMENDED ACTION: Council Concur DEPARTMENT: Public Works Maintenance Services STAFF CONTACT: Ron Kahler, Fleet Manager EXT.: 2660 FISCAL IMPACT SUMMARY: The total cost of the equipment is $247,285.85 and the total amount budgeted for this equipment is $250,000. SUMMARY OF ACTION: The Fleet Section has obtained a quote from Pape Kenworth Northwest for the purchase of a new 2025 Kenworth T880 Single axle Plow Dump Truck. This equipment will replace an existing 2002 Freightliner FL80, vehicle D105, purchased in 2002. This piece of equipment has reached the end of its useful life and will need to be replaced. The funding for the new loader was approved in the 2025-26 budget. This vehicle is purchased utilizing the State of Washington Contract #03920. Once the new vehicle is received the old vehicle will be sent to auction. EXHIBITS: A. Pape Kenworth Northwest Quote STAFF RECOMMENDATION: Authorize the purchase of one Kenworth T880 from Pape Kenworth Northwest in the amount of $247,285.85. AGENDA ITEM #7. c) Date:4/30/2025 Customer Contact Name Address City, State, Zip Phone # Email Quantity Model / Chassis SALES PRICE FET TOTAL 1 2025 Kenworth T880 Single Ax Plow 160,737.72$ -$ 160,737.72$ 1 Kenworth Local Government Discount (9,000.00)$ -$ (9,000.00)$ WA State DES Contract No. 03920 -$ -$ -$ -$ -$ -$ TOTAL PER TRUCK:151,737.72$ -$ 151,737.72$ Year Make / Model Trade Value Less payoff Trade Equity 2002 Freightliner FL80 Single Ax Dump 25,000.00$ -$ 25,000.00$ -$ -$ -$ -$ -$ -$ Deposit Sales Tax 13,307.46$ $140,045.18 Erik Casebeer CUSTOMER AGREEMENT TRUCK PURCHASE DEPOSIT AGREEMENT rkahler@rentonwa.gov TRUCK INFORMATION TRADE INFORMATION Total Due per Truck Unpaid Balance Finance By:Customer Signature City of Renton Ron Kahler 3555 NE 2nd Street 425-430-7400 Renton, WA 98056 I hereby place a firm order for the Kenworth chassis described on the attached proposal, which includes standard equipment set forth in current Kenworth price lists unless otherwise specified herein, together with the equipment designated on the following page(s); and I agree to pay the full purchase price shown in accordance with terms and conditions contained in this Purchase Order. I understand this Purchase It is agreed and understood by the undersigned that this deposit will be held by Kenworth Northwest Inc. ("Distributor"), and will be appliedtoward the cash purchase price, cash down payment, or initial lease-purchase payments, whichever shall apply at time of delivery. It is further agreed and understood that if the Customer cancels the above referenced Sales Order at any time after the chassis has: (1)entered production at the factory, (2) been purchased by the Distributor from another Distributor, or (3) has undergone Sales Order modification at Distributor expense, that the Distributor shall reserve the right, at its discretion, to hold the deposit until the chassis is sold inthe market or is otherwise satisfactorily disposed of; in which event the Distributor will be allowed to retain from the deposit whatever charges it may incur until the chassis is sold and damages it shall have suffered by reason of such cancellation; provided, in the event thecharges incurred and damages suffered by Distributor exceed the deposit, Customer agrees to pay Distributor the amount of such excess, andin the event there is a balance after said charges and damages, the balance will be remitted to Customer within ten (10) days thereafter. If the Sales Order is cancelled at no loss or inconvenience to the Distributor, the deposit will be returned to Customer upon request. The foregoing shall not be interpreted to give the Customer a right to cancel the aforesaid Purchase Order, but merely sets forth the rights to the use of the purchase deposit in the event the Purchase Order is cancelled with the consent of the Distributor. **The Sales Price has been based on Distributor's Factory List Price in effect on the date hereof. Any increase in List Price in effect on the date of delivery shall be added to the Sales Price and terms of payment shall be adjusted Accordingly.** THE PURHASE ORDER AND DEPOSIT AGREEMENT INCLUDING THE LIMITATION OF WARRANTY IN PARAGRAPH 5 SHALL BE SUBJECT TO THE TERMS AND CONDISTIONS CONTAINED ON THE REVERSE SIDE HEREOF. AGENDA ITEM #7. c) AGENDA ITEM #7. c) AGENDA ITEM #7. c) AGENDA ITEM #7. c) AGENDA ITEM #7. c) AGENDA ITEM #7. c) AGENDA ITEM #7. c) AGENDA ITEM #7. c) AGENDA ITEM #7. c) AGENDA ITEM #7. c) AB - 3829 City Council Regular Meeting - 12 May 2025 SUBJECT/TITLE: Bid Award: Cedar Ave Sidewalk project, Construction Contract CAG- 25-003 RECOMMENDED ACTION: Council Concur DEPARTMENT: Public Works Transportation Systems Division STAFF CONTACT: Bob Hanson, Transportation Design Manager EXT.: 7223 FISCAL IMPACT SUMMARY: The total budget amount for Cedar Ave Sidewalk project is $548,068 including 2024 and 2025 estimated expenditures (317.122109.015.595.61.63.001). This amount includes the additional $500,000 allocated from the Sidewalk Rehabilitation & Replacement Program (122801) as part of the Carryforward/Q1 Budget Adjustment. The anticipated expenditures for the Construction Phase of the project include $299,995 for construction contract, $30,000 for city provided construction inspector/observer, $30,000 for city provided construction management, and $16,300 for engineering support during construction. The total anticipated expenditure for the construction phase is $415,000. The remaining project budget is approximately after estimated expenditures is $133,000. SUMMARY OF ACTION: The Engineer’s Estimate for Cedar Ave Sidewalk construction contract was $332,640.00. The bid submitted by Westwater Construction Company in the amount of $299,995.00 was below the Engineer’s Estimate by $32,645.00. After analysis of the bids, it was determined that the bid is a fair representation of the cost of the work associated with this project. Bids were received on Tuesday, April 1, 2025 and opened on April 3, 2025. A total of eight (8) bids were submitted and are summarized below: BIDDERS TOTAL BID AMOUNT WESTWATER CONSTRUCTION COMPANY $299,995.00 CALLI DENNEY CONSTRUCTION LLC $339,845.00 R.W. SCOTT CONSTRUCTION CO. $346,989.00 SASCON, LLC $357,630.00 NORTHWEST CASCADE, INC. $373,760.00 APCON TECH INC. $408,090.00 DODGE EXCAVATION, LLC $412,739.50 AXUM GENERAL CONSTRUCTION, INC. $420,263.24 ENGINEER'S ESTIMATE $332,640.00 The bid submitted by Westwater Construction Company in the amount of $299,995.00 has been determined to be the lowest responsive and responsible bid per RCW 39.04.350(1) and Special Provision 1-02.13. Since there is sufficient funding to award the construction contract, we are requesting the Council award the construction contract to Westwater Construction Company in the amount of $299,995.00. AGENDA ITEM #7. d) EXHIBITS: A. Bid Tabulations STAFF RECOMMENDATION: Award the construction contract to Westwater Construction Companyin the amount of$299,995.00 and authorize the Mayor and City Clerk to execute the contract on behalf of the city. AGENDA ITEM #7. d) BID TABULATIONS CEDAR AVE SIDEWALK PROJECT BID DUE DATE: APRIL 1, 2025 BID OPENING DATE: APRIL 3, 2025 ITEM NO.ITEM DESCRIPTION SPEC. SECTION UNIT QUANTITY UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION 1 ADA FEATURE SURVEYING 1-05.4 LS 1 2,000.00 2,000.00 600.00 600.00 1,000.00 1,000.00 1,755.00 1,755.00 650.00 650.00 1,900.00 1,900.00 625.00 625.00 4,435.00 4,435.00 781.80 781.80 2 ROADWAY SURVEYING 1-05.4 LS 1 12,000.00 12,000.00 6,000.00 6,000.00 6,500.00 6,500.00 4,554.00 4,554.00 8,500.00 8,500.00 4,900.00 4,900.00 7,425.00 7,425.00 15,935.00 15,935.00 7,961.90 7,961.90 3 SPCC PLAN 1-07.15(1) LS 1 500.00 500.00 500.00 500.00 500.00 500.00 550.00 550.00 500.00 500.00 500.00 500.00 625.00 625.00 3,435.00 3,435.00 149.30 149.30 4 MOBILIZATION 1-09.7 LS 1 35,000.00 35,000.00 29,500.00 29,500.00 30,000.00 30,000.00 31,876.00 31,876.00 35,000.00 35,000.00 56,500.00 56,500.00 40,000.00 40,000.00 6,935.00 6,935.00 29,590.10 29,590.10 5 PROJECT TEMPORARY TRAFFIC CONTROL 1-10.5(2) LS 1 5,000.00 5,000.00 25,000.00 25,000.00 1,000.00 1,000.00 6,732.00 6,732.00 6,500.00 6,500.00 1,400.00 1,400.00 22,500.00 22,500.00 4,435.00 4,435.00 29,230.10 29,230.10 6 TRAFFIC CONTROL SUPERVISOR 1-10.5(2) LS 1 10,000.00 10,000.00 5,000.00 5,000.00 45,000.00 45,000.00 1,100.00 1,100.00 3,500.00 3,500.00 26,000.00 26,000.00 46,350.00 46,350.00 27,935.00 27,935.00 177.00 177.00 7 PEDESTRIAN TRAFFIC CONTROL 1-10.5(2) LS 1 5,000.00 5,000.00 2,500.00 2,500.00 1,000.00 1,000.00 14,126.00 14,126.00 3,500.00 3,500.00 2,400.00 2,400.00 3,125.00 3,125.00 3,435.00 3,435.00 15,704.50 15,704.50 8 FLAGGERS 1-10.5(2) HR 540 85.00 45,900.00 1.00 540.00 85.00 45,900.00 77.00 41,580.00 42.00 22,680.00 85.00 45,900.00 1.00 540.00 90.00 48,600.00 65.00 35,100.00 9 OTHER TRAFFIC CONTROL LABOR 1-10.5 HR 30 85.00 2,550.00 1.00 30.00 80.00 2,400.00 77.00 2,310.00 50.00 1,500.00 110.00 3,300.00 119.00 3,570.00 156.00 4,680.00 118.00 3,540.00 10 CLEARING AND GRUBBING 2-01.5 AC 0.04 100,000.00 4,000.00 10,000.00 400.00 80,000.00 3,200.00 264,500.00 10,580.00 70,000.00 2,800.00 91,000.00 3,640.00 50,000.00 2,000.00 9,837.50 393.50 135,228.50 5,409.14 11 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 2-02.5 LS 1 10,000.00 10,000.00 19,900.00 19,900.00 2,500.00 2,500.00 9,870.00 9,870.00 24,000.00 24,000.00 14,400.00 14,400.00 12,500.00 12,500.00 8,935.00 8,935.00 7,768.40 7,768.40 12 REMOVING CURB AND GUTTER 2-02.5 LF 130 21.00 2,730.00 20.00 2,600.00 19.00 2,470.00 36.00 4,680.00 15.00 1,950.00 9.00 1,170.00 19.00 2,470.00 30.00 3,900.00 19.50 2,535.00 13 REMOVING CEMENT CONC. SIDEWALK 2-02.5 SY 75 45.00 3,375.00 100.00 7,500.00 33.00 2,475.00 45.00 3,375.00 65.00 4,875.00 20.00 1,500.00 23.00 1,725.00 42.00 3,150.00 66.40 4,980.00 14 REMOVING ASPHALT CONC. PAVEMENT 2-02.5 SY 30 30.00 900.00 100.00 3,000.00 40.00 1,200.00 290.00 8,700.00 75.00 2,250.00 24.00 720.00 41.00 1,230.00 128.00 3,840.00 92.00 2,760.00 15 SAWCUTTING 2-02.5 LF 130 8.00 1,040.00 15.00 1,950.00 7.00 910.00 7.00 910.00 1.00 130.00 5.00 650.00 12.00 1,560.00 29.00 3,770.00 11.20 1,456.00 16 ROADWAY EXCAVATION, INCL. HAUL 2-03.5 CY 220 73.00 16,060.00 75.00 16,500.00 40.00 8,800.00 76.40 16,808.00 67.00 14,740.00 67.00 14,740.00 85.00 18,700.00 84.25 18,535.00 123.90 27,258.00 17 GRAVEL BACKFILL FOR WALL 2-09.5 TN 120 40.00 4,800.00 75.00 9,000.00 60.00 7,200.00 49.00 5,880.00 35.00 4,200.00 35.00 4,200.00 100.00 12,000.00 55.00 6,600.00 96.90 11,628.00 18 LOCATE EXISTING UTILTIES 2-09.5 LS 1 5,000.00 5,000.00 2,500.00 2,500.00 1,500.00 1,500.00 3,000.00 3,000.00 5,000.00 5,000.00 2,450.00 2,450.00 2,500.00 2,500.00 3,435.00 3,435.00 8,956.20 8,956.20 19 POTHOLE 2-09.5 EACH 2 500.00 1,000.00 1,000.00 2,000.00 600.00 1,200.00 1,000.00 2,000.00 850.00 1,700.00 650.00 1,300.00 750.00 1,500.00 3,217.50 6,435.00 354.00 708.00 20 CRUSHED SURFACING TOP COURSE 4-04.5 TON 75 50.00 3,750.00 50.00 3,750.00 54.00 4,050.00 62.00 4,650.00 30.00 2,250.00 60.00 4,500.00 88.00 6,600.00 59.00 4,425.00 105.90 7,942.50 21 CRUSHED SURFACING BASE COURSE 4-04.5 TON 40 50.00 2,000.00 50.00 2,000.00 54.00 2,160.00 65.00 2,600.00 30.00 1,200.00 60.00 2,400.00 88.00 3,520.00 76.00 3,040.00 104.90 4,196.00 22 ADJUST CATCH BASIN 5-04.5 EACH 1 900.00 900.00 1,500.00 1,500.00 750.00 750.00 517.00 517.00 1,200.00 1,200.00 505.00 505.00 1,500.00 1,500.00 2,435.00 2,435.00 762.50 762.50 23 HMA CL. 1/2" PG 58H-22 5-04.5 TON 10 800.00 8,000.00 850.00 8,500.00 400.00 4,000.00 550.00 5,500.00 250.00 2,500.00 200.00 2,000.00 805.00 8,050.00 1,038.50 10,385.00 285.30 2,853.00 24 CEMENT CONC. COPING 6-02.5 CY 15 600.00 9,000.00 1,500.00 22,500.00 1,200.00 18,000.00 2,200.00 33,000.00 1,800.00 27,000.00 1,300.00 19,500.00 3,000.00 45,000.00 652.00 9,780.00 1,988.60 29,829.00 25 CEMENT CONC. STAIR WALL 6-02.5 CY 8 600.00 4,800.00 500.00 4,000.00 2,600.00 20,800.00 2,200.00 17,600.00 5,750.00 46,000.00 3,100.00 24,800.00 5,500.00 44,000.00 1,185.00 9,480.00 3,908.90 31,271.20 26 STAIR RAILING 6-06.5 LS 1 10,000.00 10,000.00 12,000.00 12,000.00 8,000.00 8,000.00 10,574.00 10,574.00 20,000.00 20,000.00 8,900.00 8,900.00 12,500.00 12,500.00 16,555.00 16,555.00 10,980.20 10,980.20 27 DRAIN PIPE, 6 IN. DIAMETER 7-01.5 LF 20 30.00 600.00 150.00 3,000.00 95.00 1,900.00 130.00 2,600.00 65.00 1,300.00 150.00 3,000.00 25.00 500.00 271.75 5,435.00 43.50 870.00 NORTHWEST CASCADE, INC. APCON TECH INC. DODGE EXCAVATION, LLC AXUM GENERAL CONSTRUCTION, INC.SCHEDULE OF BID ITEMS & QUANTITIES ENGINEERS ESTIMATE WESTWATER CONSTRUCTION COMPANY CALLI DENNEY CONSTRUCTION LLC R. W. SCOTT CONSTRUCTION CO. SASCON, LLC CEDAR AVE SIDEWALK PROJECT TED4004098 PAGE 1 OF 2 SCHEDULE OF PRICES 2025 AG E N D A I T E M # 7 . d ) BID TABULATIONS CEDAR AVE SIDEWALK PROJECT BID DUE DATE: APRIL 1, 2025 BID OPENING DATE: APRIL 3, 2025 ITEM NO.ITEM DESCRIPTION SPEC. SECTION UNIT QUANTITY UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION UNIT PRICE* EXTENSION NORTHWEST CASCADE, INC. APCON TECH INC. DODGE EXCAVATION, LLC AXUM GENERAL CONSTRUCTION, INC.SCHEDULE OF BID ITEMS & QUANTITIES ENGINEERS ESTIMATE WESTWATER CONSTRUCTION COMPANY CALLI DENNEY CONSTRUCTION LLC R. W. SCOTT CONSTRUCTION CO. SASCON, LLC 28 CONNECTION TO DRAINAGE STRUCTURE 7-05.5 EACH 1 1,000.00 1,000.00 500.00 500.00 750.00 750.00 1,865.00 1,865.00 1,200.00 1,200.00 950.00 950.00 750.00 750.00 3,435.00 3,435.00 706.50 706.50 29 EROSION CONTROL AND WATER POLLUTION PREVENTION 8-01.5 LS 1 5,000.00 5,000.00 1,000.00 1,000.00 1,000.00 1,000.00 500.00 500.00 7,000.00 7,000.00 12,000.00 12,000.00 1,250.00 1,250.00 13,935.00 13,935.00 2,786.30 2,786.30 30 INLET PROTECTION 8-01.5 EACH 2 70.00 140.00 100.00 200.00 60.00 120.00 35.00 70.00 115.00 230.00 95.00 190.00 75.00 150.00 717.50 1,435.00 74.60 149.20 31 SILT FENCE 8-01.5 LF 95 6.00 570.00 15.00 1,425.00 8.00 760.00 7.00 665.00 13.00 1,235.00 10.00 950.00 6.00 570.00 50.00 4,750.00 7.90 750.50 32 PROPERTY RESTORATION 8-02.5 EST 1 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 33 SOD INSTALLATION 8-02.5 SY 105 15.00 1,575.00 10.00 1,050.00 19.00 1,995.00 30.00 3,150.00 25.00 2,625.00 32.00 3,360.00 34.00 3,570.00 71.00 7,455.00 50.20 5,271.00 34 TOPSOIL, TYPE A 8-02.5 CY 30 100.00 3,000.00 100.00 3,000.00 65.00 1,950.00 71.50 2,145.00 78.00 2,340.00 77.00 2,310.00 81.00 2,430.00 148.00 4,440.00 113.30 3,399.00 35 BARK OR WOOD CHIP MULCH 8-02.5 CY 10 100.00 1,000.00 50.00 500.00 65.00 650.00 77.00 770.00 85.00 850.00 83.00 830.00 88.00 880.00 353.50 3,535.00 129.00 1,290.00 36 CEMENT CONC. TRAFFIC CURB AND GUTTER 8-04.5 LF 135 50.00 6,750.00 50.00 6,750.00 45.00 6,075.00 66.00 8,910.00 85.00 11,475.00 58.00 7,830.00 63.00 8,505.00 52.00 7,020.00 74.00 9,990.00 37 CHAIN LINK FENCE, TYPE 4 8-12.5 LF 110 100.00 11,000.00 70.00 7,700.00 62.00 6,820.00 65.00 7,150.00 65.00 7,150.00 63.00 6,930.00 74.00 8,140.00 106.50 11,715.00 87.90 9,669.00 38 CEMENT CONC. STAIRWAY 8-14.5 SY 7 600.00 4,200.00 1,000.00 7,000.00 2,600.00 18,200.00 2,821.00 19,747.00 1,700.00 11,900.00 3,120.00 21,840.00 1,800.00 12,600.00 778.00 5,446.00 4,015.50 28,108.50 39 CEMENT CONC. SIDEWALK 8-14.5 SY 60 105.00 6,300.00 60.00 3,600.00 90.00 5,400.00 110.00 6,600.00 125.00 7,500.00 120.00 7,200.00 137.00 8,220.00 150.00 9,000.00 152.30 9,138.00 40 CEMENT CONC. CURB RAMP, TYPE SINGLE DIRECTIONAL 8-14.5 EACH 1 3,300.00 3,300.00 6,500.00 6,500.00 12,000.00 12,000.00 4,400.00 4,400.00 3,500.00 3,500.00 9,650.00 9,650.00 4,300.00 4,300.00 2,685.00 2,685.00 9,786.00 9,786.00 41 MAILBOX SUPPORT, TYPE 1 8-18.5 EACH 1 900.00 900.00 2,000.00 2,000.00 650.00 650.00 650.00 650.00 1,100.00 1,100.00 505.00 505.00 1,250.00 1,250.00 1,585.00 1,585.00 721.40 721.40 42 MODULAR BLOCK WALL 8-24.5 SF 620 100.00 62,000.00 75.00 46,500.00 63.00 39,060.00 37.00 22,940.00 55.00 34,100.00 42.00 26,040.00 53.00 32,860.00 122.50 75,950.00 55.00 34,100.00 TOTAL BID AMOUNT FROM PROJECT PROPOSAL=364,000.00 299,995.00 339,845.00 346,989.00 357,630.00 373,760.00 407,840.00 417,216.00 420,263.24 *NOTE: ALL APPLICABLE SALES TAX SHALL BE INCLUDED IN THE UNIT AND LUMP SUM BID PRICE PER SECTION 1-07.2(1) AND WAC 458-20-171. 373,760.00 408,090.00 412,739.50 420,263.24TOTAL BID AMOUNT = 332,640.00 299,995.00 339,845.00 346,989.00 357,630.00 CEDAR AVE SIDEWALK PROJECT TED4004098 PAGE 2 OF 2 SCHEDULE OF PRICES 2025 AG E N D A I T E M # 7 . d ) AB - 3819 City Council Regular Meeting - 12 May 2025 SUBJECT/TITLE: Bid Award- CAG-25-075 NE 12th St AC Water Main and Stormwater Replacement Project RECOMMENDED ACTION: Council Concur DEPARTMENT: Public Works Utility Systems Division STAFF CONTACT: Jonathan Chavez, Water Utility Project Engineer EXT.: 7208 FISCAL IMPACT SUMMARY: The low bid submitted by Raudenbush Earthworks, LLC, in the amount of $2,071,559.32, is $393,006.58 (16%) below the engineer’s estimate of $2,464,565.90. The project is funded through the Water and Surface Water Utilities approved 2025 Capital Improvement Program (CIP) adjusted budgets. Sufficient funds are available within the respective utility project CIP budgets, as outlined below: Utility Section Total Project Budget Low Bidder’s Amount Water Utility (425.455572) $2,490,757.42 $1,863,263.71 Surface Water Utility (427.475620) $ 400,000.00 $ 208,295.61 Total $2,890,757.42 $2,071,559.32 SUMMARY OF ACTION: The bid opening for this was held on April 15, 2025. Nine (9) bids were submitted and are summarized below in ascending order: Raudenbush Earthworks, LLC $2,071,559.32 RW Scott Construction Co., LLC $2,249,365.60 CR Construction, LLC $2,365,544.18 Fury Site Works, Inc. $2,374,081.79 Marshbank Construction, Inc. $2,382,731.66 NW Cascade, Inc. $2,489,002.82 Johansen Construction Co., LLC $2,593,843.98 Bayshore Construction Co., LLC $2,695,542.30 Laser Underground and Earthworks, Inc. $2,807,333.27 The project includes the installation of 3,070 L.F. of new 12-inch and 8-inch water mains to replace existing 79- year-old asbestos cement water mains along NE 12th Street, Queen Avenue NE, and Piece Avenue NE to increase fire protection capacity and improve water quality. In addition, the project will install 450 L.F. of new storm system to replace aging stormwater infrastructure that is in poor physical condition and to enhance drainage in the area. AGENDA ITEM #7. e) Raudenbush Earthworks, LLC has been registered as a general contractor since April 2022. The company’s owner and foreman have successfully managed and completed comparable public works projects, including the Renton Downtown Utility Improvements Project, as well as various projects for the cities of Enumclaw and Auburn. Determination of responsive bid and responsible bidder Public Works Water Utility staff have reviewed the submitted bids and determined that the bid submitted by Raudenbush Earthworks, LLC is responsive. Additionally, Raudenbush Earthworks, LLC meets the criteria of a responsible bidder as defined in RCW 39.04.350, Renton City Policy 250-02, and Section 1-02.14 of the project specifications. References provided by the bidder have been verified, confirming they possess the necessary experience and expertise to successfully complete the project. There were no irregularities with the low bid, there was more than one bid received and there is sufficient funding for the award of the construction contract. EXHIBITS: A. Final Bid Tabulation B. City Clerk Bid Tabulation Sheet C. Bidder Assessment Form STAFF RECOMMENDATION: Award the construction contract to the lowest responsive and responsible bidder, Raudenbush Earthworks, LLC in the amount of $2,071,559.32 and authorize the Mayor and City Clerk to execute the construction contract CAG-25-075. AGENDA ITEM #7. e) Project NE 12TH ST AC WATER MAIN AND STORM WATER REPLACEMENT PROJECT CAG-25-075 BID OPENING DATE:04/15/2025 Item No. Description Unit Quantity Unit Price Bid Amount Unit Price Bid Amount Unit Price Bid Amount Unit Price Bid Amount Unit Price Bid Amount Unit Price Bid Amount Unit Price Bid Amount Unit Price Bid Amount Unit Price Bid Amount Unit Price Bid Amount SCHEDULE A GENERAL A01 Lump Sum 1 233,000.00$ 233,000.00$ 185,500.00$ 185,500.00$ 270,720.00$ 270,720.00$ 110,000.00$ 110,000.00$ 37,803.61$ 37,803.61$ 130,700.00$ 130,700.00$ 210,215.00$ 210,215.00$ 114,620.00$ 114,620.00$ 245,000.00$ 245,000.00$ 200,000.00$ 200,000.00$ A02 Lump Sum 1 12,000.00$ 12,000.00$ 17,000.00$ 17,000.00$ 25,850.00$ 25,850.00$ 20,000.00$ 20,000.00$ 24,712.57$ 24,712.57$ 18,000.00$ 18,000.00$ 23,500.00$ 23,500.00$ 18,250.00$ 18,250.00$ 22,000.00$ 22,000.00$ 25,000.00$ 25,000.00$ A03 Lump Sum 1 133,000.00$ 133,000.00$ 72,000.00$ 72,000.00$ 182,380.00$ 182,380.00$ 200,000.00$ 200,000.00$ 104,897.24$ 104,897.24$ 148,000.00$ 148,000.00$ 106,000.00$ 106,000.00$ 190,000.00$ 190,000.00$ 178,000.00$ 178,000.00$ 25,000.00$ 25,000.00$ A04 Lump Sum 1 10,000.00$ 10,000.00$ 1,000.00$ 1,000.00$ 10,040.00$ 10,040.00$ 45,000.00$ 45,000.00$ 4,654.48$ 4,654.48$ 15,000.00$ 15,000.00$ 27,500.00$ 27,500.00$ 65,000.00$ 65,000.00$ 4,000.00$ 4,000.00$ 1,000.00$ 1,000.00$ A05 Lump Sum 1 500.00$ 500.00$ 1,200.00$ 1,200.00$ 1,000.00$ 1,000.00$ 1,500.00$ 1,500.00$ 290.05$ 290.05$ 1,600.00$ 1,600.00$ 500.00$ 500.00$ 2,000.00$ 2,000.00$ 1,000.00$ 1,000.00$ 4,500.00$ 4,500.00$ A06 Lump Sum 1 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ A07 Lump Sum 1 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Subtotal Sch A 390,500.00$ 278,700.00$ 491,990.00$ 378,500.00$ 174,357.95$ 315,300.00$ 369,715.00$ 391,870.00$ 452,000.00$ 257,500.00$ Sales Tax 10.3%40,221.50$ 28,706.10$ 50,674.97$ 38,985.50$ 17,958.87$ 32,475.90$ 38,080.65$ 40,362.61$ 46,556.00$ 26,522.50$ Total A 430,721.50$ 307,406.10$ 542,664.97$ 417,485.50$ 192,316.82$ 347,775.90$ 407,795.65$ 432,232.61$ 498,556.00$ 284,022.50$ SCHEDULE B WATER B01 Estimate 1 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ B02 Each 8 500.00$ 4,000.00$ 400.00$ 3,200.00$ 500.00$ 4,000.00$ 1,250.00$ 10,000.00$ 494.47$ 3,955.76$ 900.00$ 7,200.00$ 575.00$ 4,600.00$ 706.00$ 5,648.00$ 800.00$ 6,400.00$ 1,000.00$ 8,000.00$ B03 Lump Sum 1 20,000.00$ 20,000.00$ 7,000.00$ 7,000.00$ 4,500.00$ 4,500.00$ 8,000.00$ 8,000.00$ 2,037.17$ 2,037.17$ 1,500.00$ 1,500.00$ 39,975.00$ 39,975.00$ 5,000.00$ 5,000.00$ 45,000.00$ 45,000.00$ 20,000.00$ 20,000.00$ B04 Ton 60 50.00$ 3,000.00$ 60.00$ 3,600.00$ 105.00$ 6,300.00$ 85.00$ 5,100.00$ 0.06$ 3.60$ 30.00$ 1,800.00$ 51.00$ 3,060.00$ 76.00$ 4,560.00$ 80.00$ 4,800.00$ 100.00$ 6,000.00$ B05 Ton 1600 40.00$ 64,000.00$ 10.00$ 16,000.00$ 53.00$ 84,800.00$ 30.00$ 48,000.00$ 0.01$ 16.00$ 24.00$ 38,400.00$ 45.00$ 72,000.00$ 36.65$ 58,640.00$ 60.00$ 96,000.00$ 60.00$ 96,000.00$ B06 Ton 350 40.00$ 14,000.00$ 18.00$ 6,300.00$ 55.00$ 19,250.00$ 65.00$ 22,750.00$ 22.04$ 7,714.00$ 75.00$ 26,250.00$ 71.00$ 24,850.00$ 91.25$ 31,937.50$ 60.00$ 21,000.00$ 70.00$ 24,500.00$ B07 Cubic Yard 20 300.00$ 6,000.00$ 225.00$ 4,500.00$ 550.00$ 11,000.00$ 215.00$ 4,300.00$ 326.82$ 6,536.40$ 185.00$ 3,700.00$ 340.00$ 6,800.00$ 245.00$ 4,900.00$ 125.00$ 2,500.00$ 300.00$ 6,000.00$ B08 Ton 800 200.00$ 160,000.00$ 135.00$ 108,000.00$ 198.00$ 158,400.00$ 170.00$ 136,000.00$ 208.36$ 166,688.00$ 171.00$ 136,800.00$ 255.00$ 204,000.00$ 222.00$ 177,600.00$ 175.00$ 140,000.00$ 240.00$ 192,000.00$ B09 Ton 930 160.00$ 148,800.00$ 221.00$ 205,530.00$ 154.00$ 143,220.00$ 135.00$ 125,550.00$ 171.56$ 159,550.80$ 200.00$ 186,000.00$ 173.00$ 160,890.00$ 211.50$ 196,695.00$ 150.00$ 139,500.00$ 250.00$ 232,500.00$ B10 Linear Foot 25 160.00$ 4,000.00$ 192.00$ 4,800.00$ 90.00$ 2,250.00$ 220.00$ 5,500.00$ 264.47$ 6,611.75$ 210.00$ 5,250.00$ 100.00$ 2,500.00$ 205.00$ 5,125.00$ 150.00$ 3,750.00$ 130.00$ 3,250.00$ B11 Linear Foot 1600 175.00$ 280,000.00$ 140.00$ 224,000.00$ 100.00$ 160,000.00$ 160.00$ 256,000.00$ 177.41$ 283,856.00$ 175.00$ 280,000.00$ 120.00$ 192,000.00$ 171.00$ 273,600.00$ 160.00$ 256,000.00$ 150.00$ 240,000.00$ B12 Linear Foot 1470 230.00$ 338,100.00$ 181.00$ 266,070.00$ 100.00$ 147,000.00$ 208.00$ 305,760.00$ 230.63$ 339,026.10$ 240.00$ 352,800.00$ 173.00$ 254,310.00$ 225.00$ 330,750.00$ 230.00$ 338,100.00$ 180.00$ 264,600.00$ B13 Linear Foot 111 300.00$ 33,300.00$ 289.00$ 32,079.00$ 215.00$ 23,865.00$ 235.00$ 26,085.00$ 314.46$ 34,905.06$ 200.00$ 22,200.00$ 284.00$ 31,524.00$ 263.00$ 29,193.00$ 250.00$ 27,750.00$ 500.00$ 55,500.00$ B14 Pound 3170 10.00$ 31,700.00$ 5.00$ 15,850.00$ 7.50$ 23,775.00$ 7.00$ 22,190.00$ 0.01$ 31.70$ 6.00$ 19,020.00$ 5.00$ 15,850.00$ 10.00$ 31,700.00$ 5.00$ 15,850.00$ 0.01$ 31.70$ B15 Each 11 2,500.00$ 27,500.00$ 2,000.00$ 22,000.00$ 2,330.00$ 25,630.00$ 2,100.00$ 23,100.00$ 2,234.57$ 24,580.27$ 2,500.00$ 27,500.00$ 3,095.00$ 34,045.00$ 3,800.00$ 41,800.00$ 3,000.00$ 33,000.00$ 3,000.00$ 33,000.00$ B16 Each 17 3,200.00$ 54,400.00$ 3,550.00$ 60,350.00$ 4,305.00$ 73,185.00$ 3,793.00$ 64,481.00$ 4,129.20$ 70,196.40$ 4,500.00$ 76,500.00$ 5,238.00$ 89,046.00$ 5,690.00$ 96,730.00$ 4,500.00$ 76,500.00$ 4,000.00$ 68,000.00$ B17 Each 9 10,000.00$ 90,000.00$ 10,400.00$ 93,600.00$ 10,032.00$ 90,288.00$ 9,950.00$ 89,550.00$ 10,025.13$ 90,226.17$ 8,600.00$ 77,400.00$ 10,485.00$ 94,365.00$ 10,500.00$ 94,500.00$ 10,000.00$ 90,000.00$ 10,000.00$ 90,000.00$ B18 Each 1 4,000.00$ 4,000.00$ 6,000.00$ 6,000.00$ 6,095.00$ 6,095.00$ 5,693.00$ 5,693.00$ 5,466.95$ 5,466.95$ 4,700.00$ 4,700.00$ 6,765.00$ 6,765.00$ 3,960.00$ 3,960.00$ 4,500.00$ 4,500.00$ 8,000.00$ 8,000.00$ B19 Each 41 3,500.00$ 143,500.00$ 3,415.00$ 140,015.00$ 2,849.00$ 116,809.00$ 2,500.00$ 102,500.00$ 3,227.73$ 132,336.93$ 3,500.00$ 143,500.00$ 3,090.00$ 126,690.00$ 2,465.00$ 101,065.00$ 4,000.00$ 164,000.00$ 4,000.00$ 164,000.00$ B20 Linear Foot 130 50.00$ 6,500.00$ 60.00$ 7,800.00$ 51.00$ 6,630.00$ 235.00$ 30,550.00$ 54.17$ 7,042.10$ 50.00$ 6,500.00$ 184.00$ 23,920.00$ 35.00$ 4,550.00$ 65.00$ 8,450.00$ 100.00$ 13,000.00$ B21 Cubic Yard 25 400.00$ 10,000.00$ 250.00$ 6,250.00$ 225.00$ 5,625.00$ 270.00$ 6,750.00$ 174.03$ 4,350.75$ 550.00$ 13,750.00$ 885.00$ 22,125.00$ 462.00$ 11,550.00$ 700.00$ 17,500.00$ 230.00$ 5,750.00$ B22 Each 9 5,500.00$ 49,500.00$ 5,555.00$ 49,995.00$ 6,311.00$ 56,799.00$ 5,600.00$ 50,400.00$ 12,202.06$ 109,818.54$ 6,000.00$ 54,000.00$ 4,800.00$ 43,200.00$ 3,300.00$ 29,700.00$ 7,500.00$ 67,500.00$ 11,000.00$ 99,000.00$ B23 Lump Sum 1 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 27,340.00$ 27,340.00$ 6,000.00$ 6,000.00$ 2,900.54$ 2,900.54$ 5,000.00$ 5,000.00$ 32,925.00$ 32,925.00$ 6,600.00$ 6,600.00$ 12,000.00$ 12,000.00$ 45,000.00$ 45,000.00$ B24 Linear Foot 100 180.00$ 18,000.00$ 115.00$ 11,500.00$ 90.00$ 9,000.00$ 75.00$ 7,500.00$ 169.71$ 16,971.00$ 145.00$ 14,500.00$ 154.00$ 15,400.00$ 48.50$ 4,850.00$ 180.00$ 18,000.00$ 250.00$ 25,000.00$ B25 Linear Foot 50 100.00$ 5,000.00$ 50.00$ 2,500.00$ 82.00$ 4,100.00$ 190.00$ 9,500.00$ 74.22$ 3,711.00$ 88.00$ 4,400.00$ 73.00$ 3,650.00$ 140.25$ 7,012.50$ 80.00$ 4,000.00$ 100.00$ 5,000.00$ B26 Square Yard 10 150.00$ 1,500.00$ 100.00$ 1,000.00$ 243.30$ 2,433.00$ 500.00$ 5,000.00$ 278.09$ 2,780.90$ 265.00$ 2,650.00$ 155.00$ 1,550.00$ 655.00$ 6,550.00$ 300.00$ 3,000.00$ 200.00$ 2,000.00$ B27 Square Yard 30 200.00$ 6,000.00$ 100.00$ 3,000.00$ 220.50$ 6,615.00$ 350.00$ 10,500.00$ 202.14$ 6,064.20$ 320.00$ 9,600.00$ 236.00$ 7,080.00$ 433.50$ 13,005.00$ 300.00$ 9,000.00$ 250.00$ 7,500.00$ B28 Lump Sum 1 6,000.00$ 6,000.00$ 27,000.00$ 27,000.00$ 13,000.00$ 13,000.00$ 10,000.00$ 10,000.00$ 32,457.00$ 32,457.00$ 10,000.00$ 10,000.00$ 30,550.00$ 30,550.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 35,000.00$ 35,000.00$ B29 Lump Sum 1 20,000.00$ 20,000.00$ 23,000.00$ 23,000.00$ 14,000.00$ 14,000.00$ 20,000.00$ 20,000.00$ 14,826.77$ 14,826.77$ 5,000.00$ 5,000.00$ 36,000.00$ 36,000.00$ 12,535.00$ 12,535.00$ 1,000.00$ 1,000.00$ 35,000.00$ 35,000.00$ B30 Each 2 500.00$ 1,000.00$ 1,250.00$ 2,500.00$ 2,000.00$ 4,000.00$ 250.00$ 500.00$ 2,900.54$ 5,801.08$ 1,500.00$ 3,000.00$ 2,360.00$ 4,720.00$ 2,750.00$ 5,500.00$ 3,500.00$ 7,000.00$ 7,500.00$ 15,000.00$ B31 Estimate 1 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ Sub-Total Schedule B 1,634,800.00$ 1,438,439.00$ 1,329,909.00$ 1,497,259.00$ 1,620,462.94$ 1,618,920.00$ 1,664,390.00$ 1,705,256.00$ 1,722,100.00$ 1,878,631.70$ Sales Tax 10.3%168,384.40$ 148,159.22$ 136,980.63$ 154,217.68$ 166,907.68$ 166,748.76$ 171,432.17$ 175,641.37$ 177,376.30$ 193,499.07$ Total Schedule B 1,803,184.40$ 1,586,598.22$ 1,466,889.63$ 1,651,476.68$ 1,787,370.62$ 1,785,668.76$ 1,835,822.17$ 1,880,897.37$ 1,899,476.30$ 2,072,130.77$ SCHEDULE C SURFACE WATER C1 Estimate 1 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ C2 Each 10 500.00$ 5,000.00$ 400.00$ 4,000.00$ 500.00$ 5,000.00$ 1,250.00$ 12,500.00$ 679.15$ 6,791.50$ 900.00$ 9,000.00$ 630.00$ 6,300.00$ 750.00$ 7,500.00$ 1,000.00$ 10,000.00$ 1,000.00$ 10,000.00$ C3 Lump Sum 1 5,000.00$ 5,000.00$ 1,500.00$ 1,500.00$ 8,000.00$ 8,000.00$ 4,000.00$ 4,000.00$ 4,074.37$ 4,074.37$ 500.00$ 500.00$ 3,340.00$ 3,340.00$ 5,000.00$ 5,000.00$ 15,000.00$ 15,000.00$ 130,000.00$ 130,000.00$ C4 Ton 15 50.00$ 750.00$ 100.00$ 1,500.00$ 95.00$ 1,425.00$ 128.00$ 1,920.00$ 1.77$ 26.55$ 30.00$ 450.00$ 76.00$ 1,140.00$ 81.40$ 1,221.00$ 80.00$ 1,200.00$ 100.00$ 1,500.00$ C5 Ton 110 40.00$ 4,400.00$ 10.00$ 1,100.00$ 53.00$ 5,830.00$ 30.00$ 3,300.00$ 0.01$ 1.10$ 24.00$ 2,640.00$ 45.00$ 4,950.00$ 39.55$ 4,350.50$ 60.00$ 6,600.00$ 60.00$ 6,600.00$ C6 Ton 50 40.00$ 2,000.00$ 18.00$ 900.00$ 55.00$ 2,750.00$ 85.00$ 4,250.00$ 0.01$ 0.50$ 75.00$ 3,750.00$ 71.00$ 3,550.00$ 94.75$ 4,737.50$ 60.00$ 3,000.00$ 70.00$ 3,500.00$ C7 Cubic Yard 30 300.00$ 9,000.00$ 225.00$ 6,750.00$ 550.00$ 16,500.00$ 195.00$ 5,850.00$ 327.25$ 9,817.50$ 175.00$ 5,250.00$ 344.00$ 10,320.00$ 245.50$ 7,365.00$ 125.00$ 3,750.00$ 300.00$ 9,000.00$ C8 Ton 112 200.00$ 22,400.00$ 135.00$ 15,120.00$ 198.00$ 22,176.00$ 170.00$ 19,040.00$ 240.07$ 26,887.84$ 171.00$ 19,152.00$ 257.00$ 28,784.00$ 217.50$ 24,360.00$ 175.00$ 19,600.00$ 240.00$ 26,880.00$ C9 Ton 52 180.00$ 9,360.00$ 135.00$ 7,020.00$ 154.00$ 8,008.00$ 130.00$ 6,760.00$ 150.83$ 7,843.16$ 200.00$ 10,400.00$ 173.00$ 8,996.00$ 235.00$ 12,220.00$ 150.00$ 7,800.00$ 250.00$ 13,000.00$ C10 Lump Sum 1 7,500.00$ 7,500.00$ 5,000.00$ 5,000.00$ 11,890.00$ 11,890.00$ 8,350.00$ 8,350.00$ 36,771.07$ 36,771.07$ 7,500.00$ 7,500.00$ 5,225.00$ 5,225.00$ 10,500.00$ 10,500.00$ 4,000.00$ 4,000.00$ 25,000.00$ 25,000.00$ C11 Linear Foot 430 140.00$ 60,200.00$ 86.00$ 36,980.00$ 93.00$ 39,990.00$ 150.00$ 64,500.00$ 238.65$ 102,619.50$ 180.00$ 77,400.00$ 132.00$ 56,760.00$ 207.75$ 89,332.50$ 185.00$ 79,550.00$ 170.00$ 73,100.00$ C12 Each 11 2,500.00$ 27,500.00$ 1,730.00$ 19,030.00$ 2,128.00$ 23,408.00$ 4,425.00$ 48,675.00$ 4,380.19$ 48,182.09$ 2,000.00$ 22,000.00$ 1,860.00$ 20,460.00$ 2,050.00$ 22,550.00$ 3,000.00$ 33,000.00$ 4,000.00$ 44,000.00$ C13 Each 4 3,000.00$ 12,000.00$ 4,750.00$ 19,000.00$ 5,079.00$ 20,316.00$ 7,198.00$ 28,792.00$ 16,715.59$ 66,862.36$ 4,800.00$ 19,200.00$ 4,175.00$ 16,700.00$ 4,185.00$ 16,740.00$ 8,500.00$ 34,000.00$ 6,500.00$ 26,000.00$ C14 Each 3 1,000.00$ 3,000.00$ 500.00$ 1,500.00$ 1,347.00$ 4,041.00$ 1,595.00$ 4,785.00$ 527.90$ 1,583.70$ 1,200.00$ 3,600.00$ 1,365.00$ 4,095.00$ 616.50$ 1,849.50$ 1,000.00$ 3,000.00$ 1,000.00$ 3,000.00$ C15 Linear Foot 430 5.00$ 2,150.00$ 3.50$ 1,505.00$ 7.00$ 3,010.00$ 12.00$ 5,160.00$ 14.21$ 6,110.30$ 5.00$ 2,150.00$ 2.00$ 860.00$ 4.15$ 1,784.50$ 9.00$ 3,870.00$ 10.00$ 4,300.00$ C16 Linear Foot 430 5.00$ 2,150.00$ 5.00$ 2,150.00$ 10.00$ 4,300.00$ 10.00$ 4,300.00$ 4.05$ 1,741.50$ 4.00$ 1,720.00$ 5.00$ 2,150.00$ 9.20$ 3,956.00$ 8.00$ 3,440.00$ 10.00$ 4,300.00$ C17 Each 2 1,200.00$ 2,400.00$ 2,000.00$ 4,000.00$ 4,986.00$ 9,972.00$ 5,700.00$ 11,400.00$ 9,667.68$ 19,335.36$ 1,000.00$ 2,000.00$ 9,015.00$ 18,030.00$ 2,970.00$ 5,940.00$ 6,800.00$ 13,600.00$ 5,000.00$ 10,000.00$ C18 Linear Foot 100 100.00$ 10,000.00$ 50.00$ 5,000.00$ 80.00$ 8,000.00$ 169.00$ 16,900.00$ 76.79$ 7,679.00$ 135.00$ 13,500.00$ 73.00$ 7,300.00$ 135.00$ 13,500.00$ 80.00$ 8,000.00$ 100.00$ 10,000.00$ C19 Square Yard 15 150.00$ 2,250.00$ 100.00$ 1,500.00$ 193.00$ 2,895.00$ 300.00$ 4,500.00$ 197.85$ 2,967.75$ 265.00$ 3,975.00$ 155.00$ 2,325.00$ 386.50$ 5,797.50$ 300.00$ 4,500.00$ 200.00$ 3,000.00$ C20 Linear Foot 20 180.00$ 3,600.00$ 200.00$ 4,000.00$ 115.00$ 2,300.00$ 80.00$ 1,600.00$ 254.96$ 5,099.20$ 255.00$ 5,100.00$ 205.00$ 4,100.00$ 100.50$ 2,010.00$ 180.00$ 3,600.00$ 400.00$ 8,000.00$ C21 Estimate 1 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ Subtotal Sch C 230,660.00$ 177,555.00$ 239,811.00$ 296,582.00$ 394,394.35$ 249,287.00$ 245,385.00$ 280,714.00$ 297,510.00$ 451,180.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Total Schedule C 230,660.00$ 177,555.00$ 239,811.00$ 296,582.00$ 394,394.35$ 249,287.00$ 245,385.00$ 280,714.00$ 297,510.00$ 451,180.00$ $ 2,464,565.90 $ 2,071,559.32 $ 2,249,365.60 $ 2,365,544.18 $ 2,374,081.79 $ 2,382,731.66 $ 2,489,002.82 $ 2,593,843.98 $ 2,695,542.30 $ 2,807,333.27 * Corrected for mathematical errors. Construction Surveying, Staking, and As-Built Drawings City of Renton Engineer's Estimate Raudenbush Earthworks, LLC RW Scott Const. Co. CR Construction, LLC NWCascade, Inc Johansen Const. Co., LLC Bayshore Const. Co. Laser Underground and Earthworks, Inc. Mobilization & Demobilization (Maximum Bid 10% of Total of All Schedules Excluding Sales Tax) Fury Site Works, Inc Marshbank Const., Inc Controlled Density Fill Project Temporary Traffic Control Erosion Control and Water Pollution Control Spill Prevention, Control and Countermeasure Plan and Implementation Apprenticeship Incentive Apprenticeship Penalty Minor Changes Site Specific Utility Potholing Trench Excavation Safety Systems Removal and Replacement of Unsuitable Foundation Material Gravel Borrow for Trench Backfill Crushed Surfacing Top Course 1-inch Water Service Connection HMA Cl. 1/2-Inch PG 58H-22 for Final Trench Patch HMA Cl. 1/2-Inch PG 58H-22 for Overlay Ductile Iron Class 52 6-inch Diameter Restrained-Joint Water Pipe and Restrained-Joint Fittings with Polywrap Ductile Iron Class 52 8-inch Diameter Restrained-Joint Water Pipe and Restrained-Joint Fittings with Polywrap Ductile Iron Class 52 12-inch Diameter Restrained-Joint Water Pipe and Restrained-Joint Fittings with Polywrap HDPE 24-Inch Diameter Casing Pipe and Stainless Steel Casing Spacers Additional Restrained-Joint Ductile Iron Fittings 8-inch Gate Valve Assembly 12-inch Gate Valve Assembly Fire Hydrant Assembly 1-inch Air and Vacuum Release Valve Assembly Resolution of Utility Conflicts Customer Side Water Service over 5 feet Concrete for Thrust Blocking and Dead-Man Anchors Connection to Existing Water Main Abandon Existing Water Main including Cutting and Capping Side Sewer Replacement Remove and Replace Concrete Curb and Gutter Remove and Replace Cement Concrete Sidewalk Remove and Replace Cement Concrete Driveway Remove and Replace Pavement Markings Landscape and Private Property Restoration Replacement of Survey Monument Catch Basin - Type 1 Minor Changes Site Specific Utility Potholing Trench Excavation Safety Systems Removal and Replacement of Unsuitable Foundation Material Gravel Borrow for Trench Backfill Crushed Surfacing Top Course Controlled Density Fill HMA Cl. 1/2-Inch PG 58H-22 for Final Trench Patch HMA Cl. 1/2-Inch PG 58H-22 for Overlay Removal of Existing Storm Drain Pipes, Structures and Obstructions 12-Inch Class 50 Ductile Iron Storm Pipe Remove and Replace Cement Concrete Sidewalk Side Sewer Replacement Resolution of Utility Conflicts Total of Schedules A, B, & C Catch Basin - Type 2 Round Solid Locking Frame and Lid Testing Storm Sewer Pipe CCTV Inspection Connection to Drainage Structure Remove and Replace Concrete Curb and Gutter AG E N D A I T E M # 7 . e ) CITY OF RENTON BID TABULATION SHEET Project:NE 12th St AC Water MAin Stormwater Replacement Project -CAG-25-075 Due Date:4/15/2025 -Bids due by2:00 pm -Opening at 3:00 pm (Via ZOOM) Jonathan Chavez Abdoul Gafour Bid Total from Bidder Schedule of Prices *Includes Sales Tax Bayshore Construction Company 16821 Smokey Point Blvd.#808 Arlington $2,695,542.30 WA 98223 CR Construction 2 45127 SE 140th St North Bend $2,408,230.28 WA 98045 Fury Site Works,Inc. 3 P.O.Box 2118 North Bend $2,374,081.79 WA 98045 Johansen Construction Co. 4 P.O.Box674 Buckley $2,593,843.98 WA 98321 Engineer’s Estimate 2,464,565.90 AGENDA ITEM #7. e) CITY OF RENTON BID TABULATION SHEET Project:NE 12th St AC Water MAin Stormwater Replacement Project -CAG-25-075 Due Date:4/15/2025 -Bids due by2:00 pm -Opening at 3:00 pm (Via ZOOM) Jonathan Chavez Abdoul Gafour Bid Total from Bidder Schedule of Prices *lncludes Sales Tax Laser Underground and Earthworks,Inc. 5 20417 87th Ave SE Snohomish $2,807,333.27 WA 98296 Marshbank Construction,Inc. 6 P.O.Box 97 Lake Stevens $2,382,751.66 WA 98258 Northwest Cascade,Inc. 7 P.O.Box 73399 $2,489,002.82 P uya IIup WA 98373 R.W.Scott Construction 8 4005 West Valley Hwy.Suite A Auburn $2,249,365.60 WA 98001 Engineer’s Estimate 2,464,565.90 AGENDA ITEM #7. e) CITY OF RENTON BID TABULATION SHEET Project:NE 12th St AC Water MAin Stormwater Replacement Project -CAG-25-075 Due Date:4/15/2025 -Bids due by2:00 pm -Opening at 3:00 pm (Via ZOOM) Jonathan Chavez Abdoul Gafour Bid Total from Bidder Raudenbush Earthworks 9 13108 155th LN SE Rainier $2,071,559.32 WA 98576 Engineer’s Estimate 2,464,565.90 AGENDA ITEM #7. e) Item Description Determination 1. A Proposal will be considered irregular and will be rejected if: Criteria Met (Per Below) 1.a. The bidder is not prequalified when so required;Not required for this project. 1.b. The authorized proposal form furnished by the Contracting Agency is not used or is altered.Authorized proposal form used. 1.c. The complete proposal form contains any unauthorized additions, deletions, alternate bids, or conditions;No edits to proposal conditions. 1.d. The bidder adds provisions reserving the right to reject or accept the award, or enter into the Contract;No edits to proposal conditions. 1.e. A price per unit cannot be determined from the bid proposal;Price per unit clearly identified. 1.f. The proposal form is not properly executed; Proposal form submitted with bid. Signed by Jacob Raudenbush, Owner. 1.g. The Bidder fails to submit or properly complete a Subcontractor list, if applicable, as required in Section 1-02.6.Subcontractor list submitted with bid. 1.h.The bidder fails to submit or properly complete a Disadvantaged, Minority or Women’s Business Enterprise Certification, if applicable, as required in Section 1-02.6; or Not applicable 1.i. The bid proposal does not constitute a definite and unqualified offer to meet the material terms of the bid invitation.Definite and unqualified offer. 1.j. More than one proposal is submitted for the same project from a Bidder under the same or different names.One proposal submitted. Item Description Determination 2. A Proposal may be considered irregular and may be rejected if: Criteria Met (Per Below) 2.a. The Proposal does not include a unit price for every Bid item.Unit price included for every bid item. 2.b.Any of the unit prices are excessively unbalanced (either above or below the amount of a reasonable Bid) to the potential detriment of the Contracting Agency; All unit prices considered reasonable and balanced. 2.c. The authorized Proposal Form furnished by the Contracting Agency is not used or is altered; Proposal form submitted with bid. Signed by Jacob Raudenbush, Owner. 2.d. The completed Proposal form contains any unauthorized additions, deletions, alternate Bids, or conditions;No edits to proposal conditions. 2.e. Receipt of Addenda is not acknowledged;Receipt of Addenda acknowledged. 2.f.A member of a joint venture or partnership and the joint venture or partnership submit Proposals for the same project (in such an instance, both Bids may be rejected); or No evidence that members of a joint venture or partnership submitted multiple proposals. 2.g. If the Proposal form entried are not made in ink.Proposal form entries made in ink. NE 12TH ST AC WATER MAIN AND STORMWATER REPLACEMENT PROJECT 2025 WSDOT Standard Specifications 1-02.13 Irregular Proposals L&I Doing Business As (DBA): Raudenbush Earthworks, LLC City Special Provisions 1-02.13 Irregular Proposals WA UBI No.: 604 878 848 License No.: RAUDEEL789J8 Entity Type: WA Profit Corporation Bidder Assessment CAG-25-075 Bid Opening: April 15, 2025 Bidder: Raudenbush Earthworks, LLC CAG-24-060 Bidder Assessment (May 2024) Page 1 of 3 AGENDA ITEM #7. e) NE 12TH ST AC WATER MAIN AND STORMWATER REPLACEMENT PROJECT L&I Doing Business As (DBA): Raudenbush Earthworks, LLC WA UBI No.: 604 878 848 License No.: RAUDEEL789J8 Entity Type: WA Profit Corporation Bidder Assessment CAG-25-075 Bid Opening: April 15, 2025 Bidder: Raudenbush Earthworks, LLC Item DESCRIPTION Determination 1.A Bidder will be deemed not responsible and the proposal rejected if the bidder does not meet the responsibility criteria in RCW 39.04.350. Criteria Met (Per Below) (1)Before award of a public works contract, a bidder must meet the following responsibility criteria to be considered a responsible bidder and qualified to be awarded a public works project. The bidder must: Criteria Met (Per Below) YES L&I Acct ID: 370,602-01 Account is CURRENT (1)(b) Have a current state unified business identifier number; WA UBI: 604 878 848 (1)(c)If applicable, have industrial insurance coverage for the bidder's employees working in Washington as required in Title 51 RCW; Meets current requirements per L&I (1)(d) Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3); No debarments have been issued against this contractor per L&I. (1)(e) If bidding on a public works project subject to the apprenticeship utilization requirements in RCW 39.04.320, not have been found out of compliance by the Washington state apprenticeship and training council for working apprentices out of ratio, without appropriate supervision, or outside their approved work processes as outlined in their standards of apprenticeship under chapter 49.04 RCW for the one-year period immediately preceding the date of the bid solicitation; Registered training agent per L&I. (1)(f) Have received training on the requirements related to public works and prevailing wage under this chapter and chapter 39.12 RCW. The bidder must designate a person or persons to be trained on these requirements. The training must be provided by the department of labor and industries or by a training provider whose curriculum is approved by the department. The department, in consultation with the prevailing wage advisory committee, must determine the length of the training. Bidders that have completed three or more public works projects and have had a valid business license in Washington for three or more years are exempt from this subsection. The department of labor and industries must keep records of entities that have satisfied the training requirement or are exempt and make the records available on its web site. Responsible parties may rely on the records made available by the department regarding satisfaction of the training requirement or exemption; and Exempt from this requirement per L&I. (1)(g) Within the three-year period immediately preceding the date of the bid solicitation, not have been determined by a final and binding citation and notice of assessment issued by the department of labor and industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of chapter 49.46, 49.48, or 49.52 RCW. No lawsuits against the bond or savings accounts during the previous 6 year period per L&I. (2) Before award of a public works contract, a bidder shall submit to the contracting agency a signed statement in accordance with chapter 5.50 RCW verifying under penalty of perjury that the bidder is in compliance with the responsible bidder criteria requirement of subsection (1)(g) of this section. A contracting agency may award a contract in reasonable reliance upon such a sworn statement. Form submitted with bid. Signed by Signed by Jacob Raudenbush, Owner. 2. A bidder may be deemed not responsible and the proposal rejected if: Criteria Met (Per Below) 2.a. More than one proposal is submitted for the same project from a bidder under the same or different names;One proposal submitted. 2.b.Evidence of collusion exists with any other bidder or potential bidder. Participants in collusion will be restricted from submitting further bids; No evidence of collusion. 2.c. The bidder, in the opinion of the Contracting Agency, is not qualified for the Work or to the full extent of the bid, or to the extent that the bid exceeds the authorized prequalification amount as may have been determined by a prequalification of the bidder; Bidder considered to be qualified. (1)(a) At the time of bid submittal, have a certificate of registration in compliance with chapter 18.27 RCW; City Special Provisions 1-02.14 Disqualification of Bidder RCW 39.04.350 CAG-24-060 Bidder Assessment (May 2024) Page 2 of 3 AGENDA ITEM #7. e) NE 12TH ST AC WATER MAIN AND STORMWATER REPLACEMENT PROJECT L&I Doing Business As (DBA): Raudenbush Earthworks, LLC WA UBI No.: 604 878 848 License No.: RAUDEEL789J8 Entity Type: WA Profit Corporation Bidder Assessment CAG-25-075 Bid Opening: April 15, 2025 Bidder: Raudenbush Earthworks, LLC 2.d. An unsatisfactory performance record exists based on past or current Contracting Agency Work or for Work done for others, as judged from the standpoint of conduct of the Work; workmanship; progress; affirmative action; equal employment opportunity practices; or Disadvantaged Enterprise, Minority Enterprise, or Women’s Business Enterprise utilization; No evidence of unsatisfactory performance. 2.e.There is uncompleted Work (Contracting Agency or otherwise) which might hinder or prevent the prompt completion of the Work bid upon; No evidence of uncompleted work. 2.f. The bidder failed to settle bills for labor or materials on past or current contracts; No evidence of unsettled bills. 2.g.The bidder has failed to complete a written public contract or has been convicted of a crime arising from a previous public contract; No evidence of failure to complete a public contract. 2.h. The bidder is unable, financially or otherwise, to perform the Work; No evidence of inability to perform the Work. 2.i. A bidder is not authorized to do business in the State of Washington (not registered in accordance with RCW 18.27); Meets current requirements per L&I. 2.j.The Bidder owes delinquent taxes to the Washington State Department of Revenue without a payment plan approved by the Department of Revenue;No evidence of delinquent taxes. 2.k. The Bidder is currently debarred or suspended by the Federal government; No debarments have been issued against this contractor per SAM.gov. 2.l. There are any other reasons deemed proper by the Contracting Agency. No other reasons for rejection. Valid Contractor's License? Yes Any Tax Debts during previous 6 year period? No Any License Violations during previous 6 year period? No (however, did have violations due to fall protection, but violation being appealed) Valid Worker's Comp Account? Yes CAG-24-060 Bidder Assessment (May 2024) Page 3 of 3 AGENDA ITEM #7. e) Client City of Renton City of Enumclaw City of Auburn Project Renton Downtown Utility Improvement Project SR 410 Sewermain Replacement Auburn 16 Project Amount $10,555,986.64 $2,050,200.60 $9,132,070.22 Year 2021 2022 2021 Contact Michael Benoit 425-430-7206 Lance Talmadge 360-615-5740 Jamie Roberts 253-266-2143 Location Renton, WA Enumclaw, WA Auburn, WA Type of Work Water, sewer, and storm main replacement Sewer main replacement Water, sewer, and storm main replacement Satisfied with their performance?YES YES YES Uncompleted work or unsettled bills?NO NO NO Other concerns?NO NO NO Date of Call 04/17/2025 04/18/2025 04/18/2025 Bond Company Name The Ohio Casualty Insurance Company Bond Company Contact Christopher Fix Bid Amount $2,071,559.32 Minimum Bond Amount Required $103,577.97 Verification Bid bond valid, verified via phone call on 4/17/2025 at 2:35PM. I called 206-361- 9693. Also obtained email verification. BID BOND VERIFICATION FOR RAUDENBUSH EARTHWORKS Bidder Assessment REFERENCE CHECK FOR RAUDENBUSH EARTHWORKS Windsor Hills Utility Improvements CAG-24-060 Bid Opening: April 30, 2024 AGENDA ITEM #7. e) 1 CITY OF RENTON, WASHINGTON ORDINANCE NO. ________ AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING THE CITY’S 2024 ZONING MAP OF A CERTAIN PROPERTY WITHIN THE CITY OF RENTON (101 SW 41ST ST; KING COUNTY PARCEL NO. 3926800040) FROM COMMERCIAL OFFICE (CO) TO COMMERCIAL ARTERIAL (CA), AUTHORIZING CORRECTIONS, PROVIDING FOR SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, the Council has heretofore adopted and filed Development Regulations and the Council has implemented and amended the Development Regulations from time to time, together with the adoption of various codes, reports and records; and WHEREAS, on January 15, 2025, the City accepted an application from William Millhollin, Northwest Permit, to amend the City of Renton zoning map to change the zoning classification of King County Parcel No. 3926800040 (“Subject Property”) from Commercial Office (CO) to Commercial Arterial (CA); and WHEREAS, the Subject Property is 59,417 square feet (1.36 acres) in size and is located at 101 SW 41st Street, Renton, WA 98057; and WHEREAS, pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21C, 1971 as amended), on February 10, 2025 the Environmental Review Committee issued a Determination of Non-Significance (DNS) for the zoning map amendment for the subject property; and WHEREAS, the subject property is located within the Employment Area (EA) Comprehensive Plan Land Use Designation, which includes the Commercial Office (CO) and Commercial Arterial (CA) zoning classifications; and AGENDA ITEM # 9. a) ORDINANCE NO. ________ 2 WHEREAS, this matter was duly referred to the Hearing Examiner for investigation and study, and the matter was considered by the Hearing Examiner; and WHEREAS, the Hearing Examiner held a public hearing on March 18, 2025, duly considered all relevant matters, and heard all parties in support or opposition, who issued Findings of Fact, Conclusions of Law, and a Recommendation on April 9, 2025, and subsequently forwarded a recommendation to the City Council; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION I. The City Council hereby affirms and adopts the Hearing Examiner Findings of Fact, Conclusions of Law, and Recommendation, attached hereto as Attachment A. SECTION II. The official City of Renton Zoning Map is hereby amended as set forth in page 4 of Attachment B, attached hereto. SECTION III. If any section, subsection, sentence, clause, phrase, or word of this ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section, subsection, sentence, clause, phrase, or word of this ordinance. SECTION IV. This ordinance shall be in full force and effect five (5) days after publication of a summary of this ordinance in the City’s official newspaper. The summary shall consist of this ordinance’s title. AGENDA ITEM # 9. a) ORDINANCE NO. ________ 3 PASSED BY THE CITY COUNCIL the day of , 2025. Jason A. Seth, City Clerk APPROVED BY THE MAYOR this day of , 2025. Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney Date of Publication: CED:25ORD008:04.24.2025 AGENDA ITEM # 9. a) A ATTACHMENT A FINDINGS OF FACT, CONCLUSIONS OF LAW AND RECOMMENDATION HEARING EXAMINER FILE NO. PR24-000002 AGENDA ITEM # 9. a) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 REZONE - 1 CAO VARIANCE - 1 BEFORE THE HEARING EXAMINER FOR THE CITY OF RENTON SW 41st St. Rezone Rezone File No. PR24-000002 FINDINGS OF FACT, CONCLUSIONS OF LAW AND RECOMMENDATION Summary Kana Properties LLC seeks approval of rezone from Commercial Office (CO) to Commercial Arterial CA) for 1.36 acres located at the southwest corner of the intersection of SW 41st St. and East Valley Road. It is recommended that the City Council approve the rezone. The project site is currently developed with an existing 15,104 square foot multi-tenant retail building. The proposed rezone is not associated with proposed development. Properties to the north and east are also zoned CA. The Applicant requests the rezone because demand for office space has substantially decreased since the pandemic. A rezone to CA would broaden the range of retail uses allowed at the rezone site. AGENDA ITEM # 9. a) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 REZONE - 2 CAO VARIANCE - 2 Testimony Jill Ding, senior planner, summarized the staff report. William Millhollin, Applicant representative, noted that the purpose of the rezone was to expand the range of authorized retail uses. Exhibits Twelve exhibits as identified in the City staff exhibit list presented during the March 18, 2025 hearing were admitted into evidence. FINDINGS OF FACT Procedural: 1. Applicant. William Millhollin, Northwest Permit, 1026 SW 151st St, Burien, WA 98166. 2. Hearing. A virtual hearing was held on the application at 11:00 am on March 18, 2025 in the City of Renton Council Chambers. 3. Project Description. Kana Properties LLC seeks approval of rezone from Commercial Office CO) to Commercial Arterial (CA) for 1.36 acres located at the southwest corner of the intersection of SW 41st St. and East Valley Road. The requested rezone is intended to accommodate expanded retail use types to align with the current use demand of the neighborhood. The proposed rezone is not associated with a proposed development at this time. The project site is currently developed with an existing 15,104 square foot multi-tenant retail building. 4. Surrounding Uses. The project site is surrounded by office and retail use. Properties to the north and east are zoned CA and to the south and west are zoned CO. 5. Adverse Impacts. There are no significant adverse impacts associated with the proposal. On February 10, 2025 the Environmental Review Committee issued a Determination of Non- Significance (DNS) for the rezone (Exhibit 5). The proposed rezone will enable a wider range of retail uses, which in turn could increase trip generation. The proposal fronts two collector arterials -- SW 41st St along the north property line and East Valley Road along the east property line. As such, it is will located for enhanced retail use. As outlined in the staff report, the project site is fully served by all necessary utilities, including water, sewer and stormwater. The project site is mapped within a seismic hazard area. The City’s critical area regulations will mitigate against any impacts arising from the hazard area for any proposed redevelopment. The property is also surrounded on two sides by properties zoned with the requested CA zoning designation and so is compatible with surrounding development. 6. Changed Circumstances. Conditions have substantially changed since the property was zoned CO. The applicant notes that there has been a dramatic reduction in demand for office space since the pandemic, especially office space in retail strip mall. The project site is currently developed with a AGENDA ITEM # 9. a) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 REZONE - 3 CAO VARIANCE - 3 multi-tenant retail building. The CA zoning designation would allow for a broader range of retail uses within the existing retail building than the current CO zoning designation would allow. Conclusions of Law 1. Authority. The hearing examiner is required to hold a hearing and issue a recommendation to the City Council on site specific rezones. RMC 4-8-080(G) classifies site specific rezones not necessitating a comprehensive plan amendments as a Type IV application. Type IV applications require a hearing and recommendation from the hearing examiner with final approval by the City Council. 2. Zoning/Comprehensive Plan. The site is designated Employment Area (EA) on the City’s Comprehensive Plan Map. It’s zoning is CO. 3. Review Criteria. Rezone criteria are set by RMC 4-9-180F.2. Those criteria are quoted below in italics and applied via corresponding conclusions of law. RMC 4-9-180F.2a. The rezone has merit and value for the community, and will not adversely affect public health, safety, and welfare; 4. Criterion met. The rezone will serve to expand the range of retail uses authorized at a location that is suited for the proposal. In this regard it adds value to the community. As determined in Finding of Fact No. 5 it also creates no significant adverse impacts and so will not adversely affect public health, safety and welfare. RMC 4-9-180F.2b. The rezone will not be materially detrimental to the uses or properties located in the immediate vicinity thereof; 5. Criterion met. As determined in Finding of Fact No. 5 the proposal creates no significant adverse impacts and so will not be materially detrimental to the uses and properties located in the immediate vicinity. RMC 4-9-180F.2c. Since the original zoning or most recent rezone of the subject property, conditions affecting the subject property have substantially changed as a result of, but not limited to, public improvements or permitted private development; 6. Criterion met. The criterion is met for the reasons identified in Finding of Fact 6. RMC 4-9-180F.2d. The property subject to rezone was not specifically considered for a rezone at the time of the last area land use analysis and area zoning; AGENDA ITEM # 9. a) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 REZONE - 4 CAO VARIANCE - 4 7. Criterion met. The criterion is met. The subject property was not considered for a rezone at the time of the last area land use analysis and area rezoning, and specifically was not considered with its neighboring parcels in Ordinance 5832. RMC 4-9-180F.2e. The characteristics of development upon the land subject to the rezone application are compatible with the purpose and intent of the proposed zone as well as the zone- specific policy of the proposed zone, as provided by the Comprehensive Plan; and 8. Criterion met. The criterion is met. The proposed CA zone, like the current CO zone, is an implementing zone of the underlying Employment Area comprehensive plan land use map designation per pages 12 and 13 of the Comprehensive Plan. One of the purposes of the CA zone is to provide for “a wide variety of retail sales, services, and other commercial activities along high- volume traffic corridors” per RMC 4-2-020N. The existing multi-tenant building at the rezone site, bordered by two primary arterials, is well suited to accommodate this type of use. RMC 4-9-180F.2f. The rezone does not conflict with the governing Community Plan, if one was adopted for the Community Planning Area in which the property subject to the rezone is located. 9. Criterion met. The subject property is located in the Valley Community Plan area and no governing Community Plan has been adopted. Therefore, the rezone does not conflict with any governing Community Plan. RECOMMENDATION It is recommended that the City Council approve Rezone File No. PR24-000002 for the reasons identified in the conclusions of law above. DATED this 9th day of April 2025. City of Renton Hearing Examiner AGENDA ITEM # 9. a) CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT HEARING EXAMINER DECISION EXHIBITS Project Name: SW 41st St Rezone Land Use File Number: LUA24-000281, ECF, R Date of Hearing March 18, 2025 Staff Contact Jill Ding Senior Planner Project Contact/Applicant William Millhollin Northwest Permit 1026 SW 151st St, Burien, WA 98166 Project Location 101 SW 41st St, Renton, WA 98057 (APN 3926800040) The following exhibits are included with the Hearing Examiner Decision: Exhibits 1-3: As shown in the Environmental Review Committee (ERC) Report Exhibit 4-9: As shown in the Staff Report to the Hearing Examiner Exhibit 10: Staff PowerPoint Exhibit 11: COR Maps, http://rp.rentonwa.gov/Html5Public/Index.html?viewer=CORMaps Exhibit 12: Google Earth, https://www.google.com/earth/ AGENDA ITEM # 9. a) ORDINANCE NO. ________ B ATTACHMENT B MAP OF REZONED PROPERTY AGENDA ITEM # 9. a) Dav i s A v e S E V a l l e y H w y Valley Medical CenterAccessRd SR 1 6 7 S 43rd StSW 43rd St SW 41st St 88 t h A v e S SW 39th St Lind Ave SW Access Rd S R 1 6 7 R a m p Ea s t V a l l e y R d Site Parcels City Limits °0 225 450 Feet Exhibit 1 Vicinity SW 41st St Rezone Kent 167 AG E N D A I T E M # 9 . a ) Dav i s A v e S E V a l l e y H w y V a l l e y M edical Center AccessRd S 43rd StSW43rdSt SW 41st St 88 t h A v e S SW 39th St Lind Ave SW Ac c e s s R d Ea s t V a l l e y R d Site Parcels City Limits °0 225 450 Feet Exhibit 2 Aerial SW 41st St Rezone Kent 167 AG E N D A I T E M # 9 . a ) Dav i s A v e S E V a l l e y H w y Valley Medical CenterAccessRd SR 1 6 7 S 43rd StSW 43rd St SW 41st St 88 t h A v e S SW 39th St Lind Ave SW Ac c e s s R d S R 1 6 7 R a m p Ea s t V a l l e y R d CA COCO CA CO IM IM IL CO IL R-6 CA R-1 IM CO CA Site City Limits Zoning R-1: Residential 1 DU/ Acre R-6: Residential 6 DU/ Acre CA: Commercial Arterial CO: Commercial Office IL: Industrial Light IM: Industrial Medium °0 225 450 Feet Exhibit 3 Current Zoning SW 41st St Rezone Kent 167 AG E N D A I T E M # 9 . a ) Dav i s A v e S E V a l l e y H w y Valley Medical CenterAccessRd SR 1 6 7 S 43rd StSW 43rd St SW 41st St 88 t h A v e S SW 39th St Lind Ave SW Ac c e s s R d S R 1 6 7 R a m p Ea s t V a l l e y R d CA COCO CA CO IM IM IL CO IL R-6 CA R-1 IM CO CA Site City Limits Zoning R-1: Residential 1 DU/ Acre R-6: Residential 6 DU/ Acre CA: Commercial Arterial CO: Commercial Office IL: Industrial Light IM: Industrial Medium °0 225 450 Feet Exhibit 4 Proposed Zoning SW 41st St Rezone Kent CAChange from CO to CA 167 AG E N D A I T E M # 9 . a ) Legal Description: LOT 4, KOLL BUSINESS CENTER/RENTON, ACCORDING TO THE PLAT THEROF, RECORDED IN VOLUME 114 OF PLATS, PAGE(S) 15 AND 16, IN KING COUNTY, WASHINGTON. AGENDA ITEM # 9. a)