HomeMy WebLinkAboutNOA_Mailer_20250513DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253800080
BNSF RAILWAY CO
PROPERTY TAX DEPT
PO BOX 961089
FORT WORTH TX 76161
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253800040
CORR-PRO ASSOCIATES LLC
301 SW 27TH STREET
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253800230
LEVINE LIND LLC+3215 LIND A
13110 NE 177TH PL #315
WOODINVILLE WA 98072
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253800120
PIETROMONACO/MODERN LLC
PO BOX 776
MERCER ISLAND WA 98040
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253800050
CURRENT RESIDENT
200 SW 29th St
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253800090
CURRENT RESIDENT
200 SW 34th St
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253790010
CURRENT RESIDENT
225 SW 29th St
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253810090
CURRENT RESIDENT
2700 Lind Ave SW
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253800110
CURRENT RESIDENT
2700 Lind Ave SW UNIT 100
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253790020
CURRENT RESIDENT
2700 Lind Ave SW UNIT 200
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253800040
CURRENT RESIDENT
2900 Lind Ave SW
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253800040
CURRENT RESIDENT
2900 Lind Ave SW UNIT A
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253800120
CURRENT RESIDENT
2900 Lind Ave SW UNIT B
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253800120
CURRENT RESIDENT
2900 Lind Ave SW UNIT C
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253800120
CURRENT RESIDENT
299 SW 27th St
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253810110
CURRENT RESIDENT
3000 Lind Ave SW Suite 100
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253800050
CURRENT RESIDENT
3002 Lind Ave SW
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253800090
CURRENT RESIDENT
301 SW 27th St
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253790010
CURRENT RESIDENT
3215 Lind Ave SW
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253790020
CURRENT RESIDENT
400 SW 34th St
RENTON WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253790020
CURRENT RESIDENT
400 SW 34th St
RENTON WA 98057
Puget Sound Energy
Wendy Weiker, Community Svs. Mgr.355 110th Ave NE
Mailstop EST 11WBellevue, WA 98004
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
NOTICE OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic
Development (CED) – Planning Division of the City of Renton. The following briefly describes the application
and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: May 13, 2025
PROJECT NAME/NUMBER: 3 Plus Empire, LUA25-000142 /PR25-000001
PROJECT LOCATION: 2900 Lind Ave SW UNIT B (APN 1253790010)
APPLICANT/PROJECT CONTACT
PERSON:
Julie Templeton, 138 Dover Circle Norfolk, VA 23505 /
jul.templeton@gmail.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://rb.gy/mqcypp
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the change
of use of an existing 33,150 square foot tenant space, currently classified as vacant warehouse space, to an I-502
Tier 3 marijuana production and processing facility. All proposed improvements would be interior to the tenant
space, no exterior site improvements are proposed. The project site totals 188,882 square feet in area and is
located within the Heavy Industrial (IH) zoning designation and the Employment Area Valley (EAV) overlay. Existing
driveway access curb cuts off of Lind Avenue SW and SW 29th Street would be maintained. A seismic hazard area
is mapped on the project site.
DATE OF APPLICATION: May 6, 2025
NOTICE OF COMPLETE
APPLICATION:
May 13, 2025
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a
DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single
comment period. There will be no comment period following the issuance of the Threshold Determination of Non-
Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal.
A 14-day appeal period will follow the issuance of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review
1253790020
CURRENT RESIDENT
400 SW 34th St
RENTON WA 98057
King County Department of Permitting &
Environmental ReviewAttn: SEPA Section
919 SW Grady Way STE 300Renton, WA 98057
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal
must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this
form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: 3 Plus Empire, LUA25-000142 /PR25-000001
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Parking Analysis, Traffic Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Employment Area (EA) on the City of
Renton Comprehensive Land Use Map and Heavy Industrial (IH) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2, 4-4 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on May 27, 2025. Please submit
comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may
physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton,
WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent
threshold determination is available upon request.
CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7328,
mkerrihard@rentonwa.gov