Loading...
HomeMy WebLinkAboutR-400308c� 0 CU LLI r� O O I 0 U) I— Ld Lv U) 0 0 a U i Lv U Q ry ry Ld I- Lv V)n z �LO n V) Fy ion o",ry %moo 0-0)D- �.i LLi w :2 �:2Q QFz z Ld LLJ J 0 Cn LL_ D_ D Y m' 2:1 MAX. SLOPE Y K -III z LEVEL BOTTOM III — _ --III-III-III-1 � 1111�1��11�1-III-�ii=IIII�� 2' MIN. SWALE SPACING DEPENDS ON SLOPE GRADIENT NOTES 1. CONDITION OF USE 1.1. REQUIRED AT: 1.1.1. THE TOP OF ALL SLOPES IN EXCESS OF 3HAV AND WITH MORE THAN 20 FEET OF VERTICAL RELIEF. 1.1.2. AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE DIMENSIONS SPECIFIED BELLOW. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. FOR SLOPES STEEPER THAN 2H:1 V WITH MORE THAN 10 FEET OF VERTICAL RELIEF, BENCHES MAY BE CONSTRUCTED OR CLOSER SPACED INTERCEPTOR SWALES MAY BE USED. THE DESIRE MEASURE MOST BE DESIGNED BY AN ENGINEER TO EFFECTIVELY INTERCEPT THE HIGH VELOCITY RUNOFF TO A SEDIMENT POND OR TRAP. 2.2. CONSTRUCTION TRAFFIC OVER TEMPORARY SWALES SHALL BE MINIMIZED. 3. MAINTENANCE STANDARDS 3.1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED IMMEDIATELY. 3.2. IF THE FACILITY DO NOT REGULARLY RETAIN STORM RUNOFF, THE CAPACITY AND/OR FREQUENCY OF THE SWALES SHALL BE INCREASED. STD. PLAN - 217.10 '•r�+ PUBLIC WORKS INTERCEPTOR SWALE A N - DEPARTMENT MARCH 2O08 IT AVERAGE SLOPE SLOPE PERCENT FLOWPATH LENGTH CONSTRUCTION RECORD DRAWING THIS CONSTRUCTION RECORD DRAWING IS A COPY OF THE APPROVED CONSTRUCTION DRAWING PREPARED BY OSBORN CONSULTING INC. AND HAS BEEN EDITED USING INFORMATION PROVIDED BY OAK HILLS CONSTRUCTION, LLC TO REFLECT ASBUILT CONDITIONS SEC. 09 , T 23 N. , R. 05 E. , Y ROCK MUST COMPLETELY COVER THE m BOTTOM AND SIDES OF THE DITCH 6MIN. " � � D 24" MIN. 2:1 SLOPES Q� 2"-4" ROCK v L = THE DISTANCE SUCH THAT POINTS op�a a�ODb A AND B ARE OF EQUAL ELEVATION 1=1 11=1 11=1 I- — L aao NOTES 1. CONDITION OF USE 1.1. WERE CONCENTRATED RUNOFF FROM DISTURBED AREAS TO AND FROM PONDS OR TRAPS. 1.2. TO CONVEY RUNOFF INTERCEPTED FROM UNDISTURBED AREAS AROUND THE SITE TO A NON -EROSIVE DISCHARGE POINT. 2. MAINTENANCE STANDARDS 2.1. ANY SEDIMENT DEPOSITION OF MORE THAN 0.5 FEET SHALL BE REMOVED SO THAT THE CHANNEL IS RESTORED TO ITS ORIGINAL DESIGN CAPACITY. 2.2. THE CHECK DAMS SHALL BE EXAMINED FOR SIGNS OF SCOURING AND EROSION OF THE BED AND BANKS. IF SCOURING AND EROSION HAS OCCURRED, AFFECTED AREAS SHALL BE PROTECTED BY RIPRAP OR AN EROSION CONTROL BLANKET. 6ti�Y 0„�, PUBLIC WORKS CHECK DAMS SPACING AND STD. PLAN - 217.40 AeR ,f,N�o$ DEPARTMENT CROSS SECTIONS MARCH 2O08 55—GALLON DRUM LID 1/2—IN WITH HOLES CONTRACTOR TO FIELD LOCATE FORCE MAIN TO SEDIMENT TRAMP/BAKER TANK 55—GALLON DRUM WITH HOLES OR 3/4" WASHED ROCK (TYP.) EQUIVALENT L O O O C y'/y'\ 000 vo yy\� PUMP PER CONTRACTOR 0 0 0 O O GEOTEXTILE FABRIC MIRAFI ° 140N OR EQUIVALENT PUMP TO BE SUPPORTED BY BRICKS OR APPROVED EQUAL. PUMP SHALL BE MIN. 2" OFF OF BOTTOM. DEWATERING PUMP N.T.S. APPROVED BY: APPROVED BY: APPROVED BY: APPROVED BY: DATE: DATE: DATE: DATE: R-400308 Know what's below. Cali before you dig.