Loading...
HomeMy WebLinkAboutC_KCWTD Comments_250513.pdf Department of Natural Resources and Parks King Street Center, KSC-NR-0500 201 South Jackson Street Seattle, WA 98104-3854 May 13, 2025 sent via email: amorganroth@rentonwa.gov KC OAP Ref No.: 2316 Alex Morganroth City of Renton 1055 South Grady Way Renton, WA 98057 Dear Alex Morganroth: The King County Wastewater Treatment Division (WTD) has received the Notice of Application and SEPA Proposed Determination of Non-Significance (DNS) for the Boeing Crew Shelters - 737 Logan Ave N project (LUA25-000124 ECF,SSDP/PR25-000030) that the applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of thirteen (13) new crew shelters and tool cabana structures on Apron R at the Boeing plant site. The subject properties (APN 0723059001 and 0723059046) are located to the east of the Cedar River along the southern shore of Lake Washington. The site, developed with the Boeing 737 plant and associated support buildings, is located in the Urban Center - 2 (UC- 2) zone and has a Comprehensive Plan designation of Commercial Mixed-Use (CMU). The project would involve the installation of six (6) new crew shelters, two (2) of which will replace existing shelters, and seven (7) new tool cabanas. The structure sizes range between 80 sq. ft. and 671 sq. ft. The site is located with the Lake Washington Reach I Shoreline and is designated High Intensity Overlay. High Seismic Hazard is mapped on the project site. No change in access to the site is proposed and no new impervious surface would be added. According to the applicant, no tree or vegetation removal would occur a part of the project. The applicant submitted a Technical Information Report, Photometric Report, and Lake Study Report. King County facilities, the Eastside Interceptor 2 and the Bryn Mawr Trunk are located within 100 feet of the highlighted project area. (See enclosed record drawing showing the location of the facility in the project vicinity). In order to protect this wastewater facility during construction, WTD requires that City of Renton submit preliminary design drawings for the project, so that WTD can assess its potential impacts. Please send drawings to: Local Public Agency Program King County WTD, Engineering and Technical Resources 201 South Jackson Street, KSC-NR-0503 Seattle, WA 98104-3855 (206) 477-5414 | lpa.team@kingcounty.gov May 13, 2025 Page 2 of 2 King County has a permanent easement for a sewer line on the proposed development site, and must be assured the right to maintain and repair the sewer line. In the event that the line must be relocated, a new permanent easement must be provided. Please contact King County regarding this easement, at: Claire Christian Property Asset Management Supervisor King County Wastewater Treatment Division 201 South Jackson Street, KSC-NR-5505 Seattle, WA 98104-3855 (206) 477-5452 | claire.christian@kingcounty.gov Thank you for the opportunity to review and comment on this proposal. Sincerely, Emmeline Aquino Emmeline Aquino Environmental Planner cc: Scott Vandenburgh, Local Public Agency Coordinator Kimberly Foreman, Property Asset Management Enclosure