Loading...
HomeMy WebLinkAboutCAG-20-065 - Duvall - A49-Concrete Inlet • • e' •;^' ,O, o " g' O' O' O' O 2 6. 11, ,,d• O 4,,,-,4, 2i O' G• V' �j- O- O- V J 9 v- ;20,:' O- ,' p� = 11111111i111rilI oil 11IrIrI11-I111riii,iiiijiiI11lft1i1irf M i111I11111tillitlili1ill11111111I1u.L. Jl�iiLtjtltiii III tli1lltllitlllieIii1littl1111ii1 i ri its 11111111rritr_ Cam; o) = ICI U N ITEC Corporation • _ Cv :o' = 358 Upland Drive •• Seattle,Washington 98188 Cam" 1 1 _ _ Chu : �. (!Irrti1kafr ilt nqnrtii t 4 = This is to certify that L r7 e.\jr-z-cA.G.12.. scale(s) = C.; I Located at: , 6�ff31(' /� 1h parr} �144-ria / ram/w 1A = Co,, T w� EC. ., 4 � was (were) serviced on this 2e day of 7/fivasdrut 20 2-7, by an authorized representative of = Co„ ' the UNITEC CORPORATION. Certified Test Weights traceable to U.S. Government Standards were used. E Co . , C. -• . = A record of said inspection is on file at the above address and in the offices of UNITEC CORPORATION. = Co• o' _ (206) 575-1100 _ C .4 =iiiii1t111IIllliltlllrlrllllrrlrtlillll 1111r111rtr11 a 1111.11111111111111111111111Ir1r1111•11r1111.11'1111.11111111111111tr11►11111111111111111111111Ir1111111111111111111111= CP ra\/`/Orld\r`0Arer0\IOr /�r/r����r`/` �� �\/�r/t .s�ti�G�I0�eo\�g�/��►/76/0 /J� G\/� /3\/ /�R (�J 0 AINIFEST Am Test Inc. LABOR AT OR IES Professional 13600 NE 126TH PL Analytical Suite C Services Kirkland, WA 98034 (425) 885-1664 Mar 2 2022 SQUAK MOUNTAIN MATERIALS 10430 RENTON ISSAQUAH RD Attention: DMARYE DEDRICK Dear DMARYE DEDRICK: Enclosed please find the analytical data for your SQUAK project. The following is a cross correlation of client and laboratory identifications for your convenience. CLIENT ID MATRIX AMTEST ID TEST (1)5/8 Soil 22-A002567 MET (2)5/8 Soil 22-A002568 MET (3)5/8 Soil 22-A002569 MET (4)5/8 Soil 22-A002570 MET (5)5/8 Soil 22-A002571 MET (1)1 1/4 Soil 22-A002572 MET (2)1 1/4 Soil 22-A002573 MET (3)1 1/4 Soil 22-A002574 MET (4)1 1/4 Soil 22-A002575 MET (5)1 1/4 Soil 22-A002576 MET Your samples were received on Thursday, February 24, 2022. At the time of receipt,the samples were logged in and properly maintained prior to the subsequent analysis. The analytical procedures used at AmTest are well documented and are typically derived from the protocols of the EPA, USDA, FDA or the Army Corps of Engineers. Following the analytical data you will find the Quality Control (QC) results. Please note that the detection limits that are listed in the body of the report refer to the Practical Quantitation Limits(PQL's), as opposed to the Method Detection Limits(MDL's). If you should have any questions pertaining to the data package, please feel free to contact me. Sincerely, Aaron W. Young Vice President PO Number: NWA12756 BACT = Bacteriological MET = Metals NUT=Nutrients MIN=Minerals CONV= Conventionals ORG = Organics DEM=Demand P.1 Am Test Inc. Professional 13600 NE 126TH PL Analytical Suite C EST Services Kirkland, WA 98034 (425) 885-1664 LABOR A TO R IES www.amtestlab.com ANALYSIS REPORT SQUAK MOUNTAIN MATERIALS Date Received: 02/24/22 10430 RENTON ISSAQUAH RD Date Reported: 3/2/22 , WA 98027 Attention: DMARYE DEDRICK Project Name: SQUAK PO Number: NWA12756 All results reported on an as received basis. AMTEST Identification Number 22-A002567 Client Identification (1) 5/8 Sampling Date Total Metals PARAMETER RESULT UNITS Q D.L. METHOD ANALYST DATE Acid Digestion Y SW-846 3050E KF 02/27/22 Lead 9.01 ug/g 1.1 EPA 6010D KF 03/01/22 P.2 SQUAK MOUNTAIN MATERIALS Project Name: SQUAK AmTest ID: 22-A002568 AMT EST Identification Number 22-A002568 Client Identification (2)5/8 Sampling Date Total Metals PARAMETER RESULT UNITS Q. D.L. : METHOD ANALYST DATE Acid Digestion Y SW-846 3050B KF 02/27/22 Lead 8.87 ug/g 1.0 EPA 6010D KF 03/01/22 AMT EST Identification Number 22-A002569 Client Identification (3)5/8 Sampling Date Total Metals PARAMETER RESULT UNITS Q D.L. METHOD ANALYST DATE . Acid Digestion Y SW-846 3050B KF 02/27/22 Lead 8.70 ug/g 0.84 EPA 6010D KF 03/01/22 P.3 SQUAK MOUNTAIN MATERIALS Project Name: SQUAK AmTest ID: 22-A002570 AMTEST Identification Number 22-A002570 Client Identification (4)5/8 Sampling Date Total Metals PARAMETER. RESULT UNITS Q D.L. METHOD ANALYST DATE Acid Digestion Y SW-846 3050B KF 02/27/22 Lead 8.89 ug/g 0.80 EPA 6010D KF 03/01/22 AMTEST Identification Number 22-A002571 Client Identification (5) 5/8 Sampling Date Total Metals PARAMETER RESULT UNITS Q D.L. METHOD ANALYST DATE' Acid Digestion Y SW-846 3050E KF 02/27/22 Lead 10.1 ug/g 1.0 EPA 6010D KF 03/01/22 P.4 SQUAK MOUNTAIN MATERIALS Project Name: SQUAK AmTest ID: 22-A002572 AMTEST Identification Number 22-A002572 Client Identification (1) 1 1/4 Sampling Date Total Metals PARAMETER RESULT UNITS Q. D.L. METHOD ANALYST DATE Acid Digestion Y SW-846 3050E KF 02/27/22 Lead 13.6 ug/g 0.55 EPA 6010D KF 03/01/22 AMTEST Identification Number 22-A002573 Client Identification (2) 1 1/4 Sampling Date Total Metals PARAMETER - RESULT UNITS Q D.L. METHOD , ANALYST DATE Acid Digestion Y SW-846 3050B KF 02/27/22 Lead 13.9 ug/g 0.85 EPA 6010D KF 03/01/22 • • P.5 SQUAK MOUNTAIN MATERIALS Project Name: SQUAK AmTest ID: 22-A002574 AMTEST Identification Number 22-A002574 Client Identification (3) 1 1/4 Sampling Date Total Metals PARAMETER RESULT UNITS -, Q . Di: METHOD ANALYST DATE Acid Digestion Y SW-846 3050B KF 02/27/22, Lead 15.4 ug/g 1.1 EPA 6010D KF 03/01/22 AMTEST Identification Number 22-A002575 - Client Identification (4) 1 1/4 Sampling Date Total Metals PARAMETER RESULT UNITS Q D.L. :: .' METHOD ANALYST.::DATE , Acid Digestion Y SW-846 3050E KF 02/27/22 Lead 15.9 ug/g 0.84 EPA 6010D KF 03/01/22 P.6 SQUAK MOUNTAIN MATERIALS Project Name: SQUAK • AmTest ID: 22-A002576 AMTEST Identification Number 22-A002576 Client Identification (5) 1 1/4 Sampling Date Total Metals PARAMETER: RESULT UNITS Q D.L. METHOD• ANALYST DATE Acid Digestion Y SW-846 3050B KF 02/27/22 • Lead 11.5. ug/g 0.66 EPA 6010D KF 03/01/22 Aar n . Young Vice President P.7 SQUAK MOUNTAIN MATERIALS Project Name: SQUAK AmTest ID: 22-A002576 AMTEST Identification Number 22-A002576 Client Identification (5) 1 1/4 Sampling Date Total Metals PARAMETER RESULT UNITS Q D.L. METHOD ANALYST DATE Acid Digestion Y SW-846 3050B KF 02/27/22 Lead 11.5 ug/g 0.66 EPA 6010D KF 03/01/22 Aardn W. Young J Vice President + fj P.7 Am Test Inc. Professional 13600 NE 126th PL Analytical Suite C EST Services Kirkland, WA, 98034 (425) 885-1664 LABOR ATORIES www.amtestlab.com QC Summary for sample numbers: 22-A002567 to 22-A002576 DUPLICATES SAMPLE# ANALYTE UNITS SAMPLE VALUE DUP VALUE RPD 22-A002337 Lead ug/g 4.52 4.29 5.2 22-A002576 Lead ug/g 11.5 13.9 19. MATRIX SPIKES SAMPLE# ANALYTE UNITS SAMPLE VALUE SMPL+ SPK SPK AMT RECOVERY 22-A002337 Lead ug/g 4.52 21.2 20.0 83.40 % 22-A002576 Lead ug/g 11.5 37.0 35.0 72.86 % STANDARD REFERENCE MATERIALS ANALYTE UNITS TRUE VALUE MEASURED VALUE RECOVERY Lead ug/g 0.80 0.79 98.8 % BLANKS ANALYTE UNITS RESULT Lead ug/g < 0.02 P.8 . . A •= .. A.:''':75.i 1:1 EST AmTest Chain of Custody Record 13600 NE 126th PL,Suite C, Kirkland,WA 98034. LABOR ATORIES - Ph(425)885-1664 Fx(425)820-0245 • www.amtestlab.com • r • - Chain of Custody No. '- - Client Name &Address: „ • . . , ,,, Invoice To: ‹... .•• ;,...-- ,,,,,,-.0 4. 7'-'I 1 i'.; 7.',•4'il.-f-,, 1,•-•')F'' ' ‘•1 •••-••) ,....• .y ... .- 1 1 PI, jt,••i , i ,••• i ' I .• 1 a '•;, ,•• 2 .''-i k',:t. i fr'i',-,4•••it I v-• ''' 1 ' ,- (4"I- 7., I ,.) L, 1 C.4..if'-e•-•,-. . 7 ,•'••y.', i', :•••• r•;'1 R6 r'''•'/ . -,. •• -•'.-i's".. ;,-. . ..,... `• rj.a 6')vri./..) I oe...;••(' 7 4..,••E• <:-.,•/ r •, r -e...i 6,..:,--14.-1 ON t 1 .;‘..i i • - .-- . • . • Contact Person: 0.,„, . ,,. _,/, ;-),,,) , . /ie. Invoice Contact: .1, .1-/•i, •p 104 f Y t 1,/c..,}U L IA ii,',1,4/.;v- v(' 1 eAfil . : Phone No: '-'2,z '"lc'41. ,,i7 z" ''':7 PO Number: t.1 j• :1i•--1 -7/...., : z::--t ?-- -7 FT.- 4•4•':::'(:;sy' :,,,'/i i - / i ti . Fax No: Invoice Ph/Fax: • . . E-mail: C,:„.. ,/,-., [-in ) . .,..(41 ii fl i /i i•:"i. Invoice E-mail: I)1),,),,,,,.., ).1.1 0 if,_,.,•(A,I.:.,../.." u.i\L- / Z 1 ilw:I.1•I I'"'14•' kit je/CCI I ecl:::_.'es'1 sj v"-1'(''''`i- , i t•-• • .. . : . Report Delivery: (Choose)lLthatpply) Data posted to online accotint: YES / NO • Mail / Fax /( Email-' / Posted Online Web Login ID: Special Instructions: • . • . Requested.TAT_:.,.(Rush must be pre-approved by lab) Temperature upon Receipt: 14-5 C'ttandard,-; RUSH ( 5 Day / 3 Day / 48 HR / 24 HR• ) ProjeCfNane: _., • ,: -(//,,i.lc u) Analysis Requested -0 - 7 o a)" Project Number: o 0 c 5_ "Ei. '6 E E x I. CO LTS 11Z3 g cn (r) ° u a) a) E 4_ • Client M +J o E 0 u I AmTest ID 0 = , co (35 characters max) 2. • . a . • _ Zfid7 1 - 51(a (.R 7, • . . . 71 5 . . . 71 1 7g .7, i • , _ 7.-i S . • . , To So \,:if . . _ CpilectecyRelinquished By: Date Time Received By: Date Time ,••_,• c., f. ,:::--1*-- /i.i,1,4ive 42-Liz.„ MS ,‘:1• 57:'- '''.e-i- -. Relinquished By: Date Time Received By: • • Date Time Relinquished By: Date Time Received By: Date Time COMMENTS: • • . • P.9 Truck Scale Report &Certification 'Date Tested: January 14,2022 CO ', . s NG Company Icon Materials E-mailr Name and Asphalt Scale raysscalederek@yahoo.com PO Box 8282 Address: 4040 Kersey Way SE Bonney Lake,WA 98391 Balance on 0 Min Grad: 20 lbs Size 120'x 10' Arrival: Platform: Capacity: 60 ton CLC: 35 ton Scale: Unibridge Make: Rice Lake Serial#: 1514200059 County: King Number of Scale Serial Reg Sections: 12 #: N/A Element: 820i Loaded Test Scale Load Test Scale Postion Weights Indication ERROR Position Weights Indications ERROR As Found Section 10 Test Truck 32,840 0 Section 1 Test Truck 32,880 0 Section 11 Test Truck 32,860 0 Section 2 Test Truck 32,860 0 Section 12 Test Truck 32,880 0 Section 3 Test Truck 32,880 0 Section 4 Test Truck 32,840 0 Section 5 Test Truck 32,880 0 Section 6 Test Truck 32,860 0 Section 7 Test Truck 32,880 0 Section 8 Test Truck 32,840 0 Section 9 Test Truck 32,860 0 Strain Load Test Empty Truck Weight Test Weights Total Error 20,880 12,000 32,880 0 Condition upon Inspection Stands Good Deck Good Indicator Good Cables Good Cell Good Bolts Good Printer N/A J-Boxes Poor Links Fair Guide Rails Good Scoreboard N/A Coping Good Remarks and/or Instructions Scale Technician na ? id Agent#): Owner/Operator: Derek Larsen 16705 Truck Scale Report & Certification e Date Tested: January 14, 2022 ,CO :alb* 4 NO Company Icon Materials E-mailw Name and Inbound Scale raysscalederek@yahoo.com PO Box 8282 Address: 4040 Kersey Way SE Bonney Lake,WA 98391 Balance on 0 Min Grad: 20 lbs Size 80'x 10' Arrival: Platform: Capacity: 60 ton CLC: 50 ton Scale: Murphy Make: Rice Lake Serial#: B34429 County: King Number of 6 Scale Serial N/A Reg IQ 710 Sections: #: Element: Loaded Test Scale Load Test Scale Postion Weights Indication ERROR Position Weights Indications ERROR As Found As Left Section 1 Test Truck 33,000 100 Section 1 Test Truck 32,900 0 Section 2 Test Truck 32,880 0 Section 2 Test Truck 32,880 0 Section 3 Test Truck 32,900 0 Section 3 Test Truck 32,920 0 Section 4 Test Truck 32,880 0 Section 4 Test Truck 32,880 0 Section 5 Test Truck 32,900 0 Section 5 Test Truck 32,880 0 Section 6 Test Truck 32,980 80 Section 6 Test Truck 32,900 0 Section 1 Section 1 12,000 12,000 0 Strain Load Test Empty Truck Weight Test Weights Total Error 20,880 12,000 32,880 0 Condition upon Inspection Stands Good Deck Good Indicator Good Cables Good Cell Good Bolts Good Printer N/A 1-Boxes Good Levers Fair Guide Rails Good Scoreboard Good Coping Good Remarks and/or Instructions Scale Technician.(Si tur and Agent#): Owner/Operator: Derek Larsen%_ 16705 Truck Scale Report & Certification Date Tested: January 14,2022 op ;Lip . NC Company Icon Materials E-mailve rays sca le dere k@ya hoo.com Name and Outbound Scale Po Box 8282 Address: 4040 Kersey Way SE Bonney Lake,WA 98391 Balance on Size 0 Min Grad: 20 lbs 80'x 11' Arrival: Platform: Capacity: 60 ton CLC: 50 ton Scale: Suvivor Make: Rice Lake Serial#: 834435 County: King Number of 5 Scale Serial 8QEH Reg 10 710 Sections: #: Element: Loaded Test Scale Load Test Scale Postion Weights Indication ERROR Position Weights Indications ERROR As Found As Left Section 1 Test Truck 32,860 0 Section 1 Test Truck 32,860 0 Section 2 Test Truck 32,880 0 Section 2 Test Truck 32,880 0 Section 3 Test Truck 32,760 -100 Section 3 Test Truck 32,880 0 Section 4 Test Truck 32,880 0 Section 4 Test Truck 32,860 0 Section 5 Test Truck 32,860 0 Section 5 Test Truck 32,880 0 Section 1 Section 1 12,000 12,000 0 Strain Load Test Empty Truck Weight Test Weights Total Error 20,880 12,000 32,880 0 Condition upon Inspection Stands Excellent Deck Excellent Indicator Fair Cables Excellent Cell Excellent Bolts Excellent Printer N/A 1-Boxes Excellent Levers N/A Guide Rails Excellent Scoreboard N/A Coping Excellent Remarks and/or Instructions Scale Technician (Signature and Agent#): Owner/Operator Derek Larsen # 16705 0VVV�%\ \%VVVVV�1/Va/VVVVVV��%V�.VV\al•\a•\,,VVV,%V, o -1 I _,)11 11 1 1 1 1 1J j_i I I I I I I L.L11 1 1 111L l l l l l t111!l t l l l ll_I_I_l lJJJ .!1 11 1 1 11111t 1 1 1 LL1 1 1 1 1 1 1 1 1 1 1 11 A I I I t i 11 L111J u l I T1 1 1 ll.11 1 111l!'111........Ll ii I I I 1 1 1115 1 1 1-t 111 1111 l l I t i y UNITEC Corporation niec Upland 358 U land Drive • Seattle,Washington 98188 = C Q. rrtffirati of ,Jrn prrtiout E cc- :1 i .1 = = Cc_ _ nn�! o' _ This is to certify that �t� �� �U /G���'�JCLt scale(s) ems., I Located at: S�iT.j�of ...4 J bz v2/ - L=iy'vn of E. 45 o - was (were) serviced on this ) dayof UC r� 20� , by an authorized representative of _ C�" ,- .>7 the UNITEC CORPORATION. Certified Test Weights traceable to U.S. Government Standards were used. Co; 4 _ A record of said inspection is on file at the above address and in the offices of UNITEC CORPORATION. _ Co;, • " E.' BY: S� 'o .C4- - '0 = Co.. c. o' E (206) 575-1100 Cam. - -- ----- - Il l IIILlltlltlli-rIIIITll1111111111111111111111111TTI i1111JIL1TTff1111riT-11 atiniTll1i11 -I ,�' -1LILIIIIIIIIITTl I11111�Tillll_ T7 TrrT _ _.. _ _ O O O Washington State T/ Department of Transportation Request for A roval of Material Contract Number FA Number N/A SR Duvall Ave NE Date CAG 20-065 01.28.202Z Section/Title ofProject Duvall Ave NE County King Contractor Reed Trucking & Excavating, Inc. Subcontractor This form shall be completed prior to submittal. If this form is not compete at time of submittal it may For WSDOT Use Only be returned for information that was omitted. RAM# 80 PE Use Bid Item Material or Name and Location of Fabricator, Specification PEIQPL Hdgtr./QPL HQ Use No. Product/Type Manufacturer or Pit Number Reference Code Code A44-A52 CSTC 5'8'Natural Sumner Pit B-231 7 " 1 , 2 86-89 A44-A52 rcnr 1 ra•r.,„ ,136-B9 s�rw e.rtit oa Bank e ncha Gravel for A43-A52 Run Sumner Pit B-231 9-03.19 1, 2 A43-A52 Bank Run Gravel for Trench Backfill Sumner Pit B-231 9-03.19 1, 2 A43-A48,Gravel Backfill for B6-B9 Pipe Zone Bedding Sumner Pit B-231 9-03.12(3) 1, 2 A43-A48 Gravel Backfill to B6-B9 Pip.Zone Bedding Sumner Pit B-231 9-03.12(3) 1, 2 Project Ergireer/Reoresentative Date State Materials Engineer/Representative Date 1/31/2022 Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. Acceptance Criteria: Acceptance based upon"Satisfactory'Test Report for samples of materials to be incorporated into project. 2. Acceptance Criteria: Mfg.Cert.of Compliance for'Acceptance'prior to use of material. See Remarks 3. Acceptance Criteria: Catalog Cuts for'Acceptance'prior to use of material. Catalog Cut Approved ❑Yes ❑No 4. Acceptance Criteria: Submit Shop Drawings for'Approval'prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment', 'WSDOT Inspected'or'Fabrication Approved Decal'material shall be used. 6, Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks (PE): Provide Scale Cert. Delivery Ticket shall show bid item number and description Remarks (HO): DOT Form 350-071 Project Engineer Distribution Revised 03/2021 ❑K Contractor ❑Region Operations Engineer ❑Faoncatlon Inspection ❑Region Materials ❑State Materals Lah-MS 47365 Stoneway Concrete Technical Services Aggregate Sieve Analysis PROJECT: Internal Testing DATE: 1/26/2022 LOCATION: Sumner Sand & Gravel SAMPLE SOURCE: B-231 SAMPLE DESCRIPTION: 5/8" Crushed Surfacing Top Course Type 1G AGGREGATE SIZE: 5/8" TESTER: Sean SIEVE WEIGHT PERCENT PERCENT SPECIFICATION SIZE RETAINED RETAINED PASSING 9-03.9(3) 3/4" 0.0 0 100 , 99 - 100 5/8" 0.0 0 100 \I 1/2" 0.9 8 92 80 - 100 3/8" 2.7 27 73 1/4rr 4.7 46 54 #4 5.5 54 46 J 46 - 66 #40 9.0 89 11 q 8 - 24 #200 9.7 96 4 J 0 - 10 PAN 10.1 100 0 WET SAMPLE: 10.6 TOTAL MOISTURE 5.0% DRY SAMPLE 1: 10.1 SE: 64% t FRACTURE: 100% %Passing No.200 Dust Ratio: %Passing No.40 •The minimum percent passing the No.50 and No.100 sieves may be reduced to 5 and 0,respectively,if the aggregate is to be used in air-entrained concrete containing more than 400 lb of cement per cubic yard or in nonair-entrained concrete containing more than 500 lb of cement per cubic yard(C 33 6.2) 9-03.12(3) Gravel Backfill for Pipe Zone Bedding Sieve Size Percent Passing 1 i' 99-100 1" 75-100 %" 50-100 9-03.9(3) Crushed Surfacing No_4 20-80 i 4 Base Course Top Course nd Keystone No.40 3-24 Sieve Size Percent Passing No.200 10.0 max. — Sand Equivalent 35 min. NT 1%" 99-100 1" 80-100 %" 99-100 J -_ _ %„ __ 80 9-03.19 Bank Run Gravel for 50- w' so-too 1 Trench Backfill No.4 25-45 46-66 4Sieve Size Percent Psing No.40 3-18 8-24 221/2" 75O No.200 7.5 max. 10.0 max.li No.4 22-100 %Fracture 75 min. 75 min. i ___ No.200 0-10 Sand Equivalent 40 min. 40 min. 4 Dust Ratio: %max. If Sand Equivalent 30 min. J ASTM C 136 ASTM C 33 r . PROJECT: Internal Testing DATE: 1/26/2022 LOCATION: Sumner Sand & Gravel SAMPLE SOURCE: B-231 SAMPLE DESCRIPTION: 1-1/4r' CSBC /Type 2G AGGREGATE SIZE: 1-1/4" TESTER: Sean SPECIFICATION SIEVE WEIGHT PERCENT PERCENT C0s9-03.9 SIZE RETAINED RETAINED PASSING Type 2G 1-1/4" 0.0 0 100 ; 99 - 100 1" 0.3 3 _ 97 80 - 100 3/4" 1 .8 18 82 5/8" 2.7 27 73 \/ 50 - 80 1/2" 3.8 38 62 3/8" 4.5 45 55 I #4 6.1 61 _ 39 V 25 - 45 #40 9.4 95 5 J 3 - 18 #200 9.7 98 _ _ 2 q 0 - 7.5 PAN 9.9 100 0 WET SAMPLE: 10.3 TOTAL MOISTURE: — 3.9% DRY SAMPLE: 9.9 S.E.: 64% FRACTURE: 98% %Passing No,200 Dust Ratio: %Passing No.40 'the minimum percent passing the No.50 and No '00 sieves may be reduced to 5 and O.respectively if the aggregate is to be used in sir-entrained concrete renrairir y nacre ban 416 b of,enwr t per cubic yard or in n ona r-..ntrarnerl concrete(..mare rig'nc e,harr,5CO lb of cement per r:ulrr:yard C..:33 6.di 9-03.12(3) Gravel Backfill for Pipe Zone Bedding Sieve Size Percent Passim 1 Yz" 99.100 4 1" 75-100 4 9-03.9(3) Crushed Surfacing x" so-100 4 (Base Course)) ]Top Course and Keystone No.4 20-80 i Sieve Size Percent Passing No.40 3-24 iv — 99-100 4No.200 10.0 max, 1" 80-100 Sand Equivalent 35 min.J Y." 99-100 %" 50-80 K" 80-100 No.4 25 as 46-66 9-03.19 Bank Run Gravel for No 40 3 I8 , a za Trench Backfill No.200 7.5 max.'r 10.0 max. See,aitig PerceitileNj %Fracture 75 min.l 75 min. 2" 75.100 Sand Equivalent 40 min. 1 40 min. No.4 L - 22-1004 No.200 0-10 Dust Ratio. %max.4 Sand Equivalent 30min. Page ad a by eng►, WSDOT MATERIALS LAB 01/28/2022 Aggregate Source Approval Report Owner: Cava Materials Aggregate Source: PS-B-231 Lessee: Known as: Cava Materials Pit Located in: S 1/2 NW 1/4 Section 18 T2ON R5E County: Pierce Remarks: Mineral Agg.and Surfacing: Test Date: 04/15/2021 Expiration Date: 04/15/2026 Absorption:1.01 Apparent Sp.G.:2.745 Bulk Sp.G.(SSD):2.697 Bulk Sp.G.:2.67 Deg:66 LA:14 Remarks: Currently approved as a source of aggregate for: ATB Ballast BST Crushed Cover Stone BST Crushed Screenings Crushed Surfacing Base Course Crushed Surfacing Key Stone Crushed Surfacing Top Course Gravel Backfill for Foundation Class A HMA Other Courses HMA Weanng Course Maintenance Rock Permeable Ballast Acceptance tests need to be performed as necessary. Aggregates for Concrete: Test Date: 02/01/2018 Expiration Date: 02/01/2023 ASR-14 Day:0.56 ASR-One Year:0.04 CCAAbsorption:1.18 CCA Sp.G:2.681 Deg:70 FCA Absorption:2.04 FCA Organics:1 FCA Sp.G:2.627 LA:12 Remarks: 1-Year ASR Results expire 12/19/2023 Currently approved for: Coarse Concrete Aggregates Fine Concrete Aggregates Acceptance tests need to be performed as necessary Acceptance tests need to be performed as necessary Riprap,Quarry Spalls,Rock for Rock Wall, Erosion and Scour Protection: Test Date: Expiration Date: Absorption: Apparent Sp.G.: Bulk Sp.G.(SSD): Bulk Sp.G.: Deg: LA: • •-� Page added.by,engineer Remarks: NOT Approved for: - Quarry Spells Riprap Rock for Erosion arid Scour Protection • Rock for Rock Walls Stone 9-27:3(6) Streambed Aggregates: Test Date: 02/01/2018 Expiration Date: 02/01/2023 Absorption:1.18 Apparent Sp.G.:2.735 Bulk Sp.G.(SSD):2.681 Bulk.Sp.G.:2:65 Deg:70 . LA:12 Remarks: Currently Approved for: Streambed Aggregate Gravel.Borrow for Structural.Earth Walls:- Test Date: 02/01/2018 Expiration Date:,02/01/2023 Bulk Sp.G.(SSD):2.681 Deg:70 LA:12 . Remarks: For.geosynthetic reinforcement,the gravel borrow shall be tested for pH.prior•to placement.For metallic reinforcement,the;gravel borrow-shalt be tested for pH,resistivity,chlorides,and sulfates prior to:placement:If the resistivity of .the backfill material equals;or exceeds.5,000 ohm-cm,the specified chloride and sulfate limits may be waived.If the aggregate source has variable quality,additional testing rmay be required.Contact the Regional Materials Engineer'or the State Geotechnical Engineer for direction. Currently Approved for: . Gravel Borrow for Str Earth Walls • • • • ALL OTHER PIT RUN MATERIALS: Project Engineer may request preliminary samples but Aggregate Source Approval is not required. AGGREGATE MATERIALS NOT REQUIRING ASA APPROVAL: Aggregate for Gravel Base 9-03.10 Gravel Backfill for Foundation Class B 9-03.12(1)B Gravel Backfill for Walls 9-03.12(2) Gravel Backfill for Pipe Zone Bedding 9-03.12(3) Gravel Backfill for Drains 9-03.12(4) Gravel Backfill for Drywells 9-03.12(5) Backfill for Sand Drains 9-03.13 Sand Drainage Blanket 9-03.13(1) Gravel Borrow 9-03.14(1) • Select Borrow 9-03.14(2) Page.added,by engineer Common Borrow 9-03.14(3) Native Material for Trench Backfill 9-03.15 Foundation Material Class A and B 9-03.17 Foundation Material Class C 9-03.18 Bank Run Gravel for Trench Backfill 9-03.19 Commercial Concrete Aggregate 6-02.3(2)8 r► WWashington State ATF Department of Transportation Request for Approval of Material Contract Number FA Number N/A SR Duvall Ave NE Date CAG 20-065 01/28/2022 Section/Title of Project Duvall Ave NE County King Contractor Reed Trucking & Excavating, Inc. Subcontractor This form shall be completed prior to submittal. If this form is not compete at time of submittal it may For WSDOT Use Only be returned for Information that was omitted. RAM 0 081 PE Use Bid Item Material or Name and Location of Fabricator, Specification PE/QPL Hdgtr./QPL HQ Use No. Product/Type Manufacturer or Pit Number Reference Code Code A27 A44-A52 Gravel Borrow Icon Materials-Auburn A-464 7-04 1, 2 , B6-B9 A44-A52, B6-69 CSTC Icon Materials-Auburn A-464 7-04 1, 2 A44-A52 CSBC Icon Materials-Auburn A-464 7-04 1, 2 B6-89 Project Engineer/Representative Date State Materials Engineer/Representative Date _ki. __ 1 1/31/2022 Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 21. Acceptance Criteria: Acceptance based upon"Satisfactory'Test Report for samples of materials to be incorporated into project. 2. Acceptance Criteria: Mfg.Cert.of Compliance for'Acceptance prior to use of material. See Remarks 3. Acceptance Criteria: Catalog Cuts for'Acceptance'prior to use of material.Catalog Cut Approved ❑Yes ❑No 4. Acceptance Criteria: Submit Shop Drawings for'Approval'prior to fabrication of material. 5 Acceptance Criteria: Only'Approved for Shipment', 'WSDOT Inspected'or'Fabrication Approved Decal'material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks (PE): Provide Scale Cert. Delivery Ticket shall show bid item number and description Gravel Borrow may be used for Gravel Borrow and Bank Run Gravel for Trench Backfill Remarks (HQ): CSTC may be used for CSTC, Bank Run Gravel for Trench Backfill and Gravel Backfill for Pipe Zone Bedding CSBC may be used for Bank Run Gravel for Trench Backfill and Gravel Backfill for Pipe Zone Bedding DOT Form 350-071 Project Engineer Distribution Revised 03/2021 ®Contractor DRegion Operations Engineer El Fabncalion Inspection El Region Matenals ID State Materals Lab-MS 47365 --9. ICON Summary Report Sample Information Sample No 1264637438 rc•- . . Product Id 2380 .7., Product Name Gravel Borrow x. Specification WSDOT 9-03.14.1 Gravel Borrow as- Date Sampled 01/07/2022 09:00 / Sampled By Skye Southward so- Sample Type Investigative '_ / / Sample Method Surge Pile t' ,:- Notes 2°. 2022 Submittal (B) °,.. I . . 1. ..... i . .r....r i r i• . i ..r.i , s . S 4.la 4.' �. . smoO.n"wr..i 1:1w0(ES)0IS WC 056 DSO 1 42 D60:210 015016'.OOO Cu II.s,CC 0.79 Gradation Results Quality Results Date Tested Tested By Skye Southward Sieve %Passing Tolerances Test Result Unit Tolerances 4"(100mm) 100 99-100 FM 3.88 AASHTO T27/T11 3"(75mm) 100 SE 62 % _>50 AASHTO T176 2"(50mm) 100 75-100 -#200(75um) 6.7 % 1"(25mm) 98 Grad Loss 0.0 % 3/4"(19mm) 94 Wash Loss(#200/75um) 4.5 1/2"(12.5mm) 88 3/8"(9.5mm) 82 #4(4.75mm) 71 50-80 9-03.12(3) Gravel Backfill for #to(2mm) 57 Pipe Zone Bedding #40(.425mm) 25 0-30 Sieve Size P e rcent Passing 1W5" l 99100 #100(.15mm) 9 %Passing No.200 1" 75-100 #200(75pm) 6.7 0-7 Dust Ratio: %Passing No.40 %" t=50-100) No.4 20-80 No.40 3-24 X No.200 10.0 max. Sand Equivalent 35 min. 9-03.14(1) Gravel Borrow SieveSiae PercentPassi 9-03.19 Bank Run Gravel for 4" 99-100 � Trench Backfill 2" 75-100 Sie eep Perce�t_P-atsiri No.4 50-80 1 2" 75-100 N0.40 30 max.t/J No.4 22.100 No.200 0-10 No.200 7.0 max. Dust Ratio: is max. J Sand Equivalent 50 min. / Sand Equivalent 30 min. StonemontOC 01/10/2022 CRH Americas Materials(AMAT) 4 ICON Summary Report Sample Information Sample No 303028092 too- . Product Id 2350 Product Name 5/8"CS TC 80: Specification 9-03.9(3)Crushed Surfacing TC 10- Date Sampled 01/08/2022 10:00 ro- Sampled By Randy Mattson „_ Sample Type Investigative r„ Sample Method Surge Pile e .0- Notes p Submittal 2022 . o- oT T . r ,i . i.,.. i .t , ri•'riiri • I '� 4 6 s. 3 " S.. * a 4.4, Sf"rtOO"""10 Mc 010E51.023 0317 100 050 112 OW 413 015055.00.Cu 2123 Cc 100 Gradation Results Quality Results Date Tested Tested By Randy Mattson Sieve %Passing Tolerances Test Result Unit Tolerances 1 1/2"(37.5mm) 100 SE 66 % 240 AASHTO T176 1"(25mm) 100 Fractured Faces(>1) 95.0 % 275 AASHTO T-335 3/4"(19mm) 100 99-100 Unfractured Faces(>1) 5.0 % AASHTO T-335 5/8"(16mm) 99 -#200(75um) 4.2 % 1/2"(12.5mm) 94 80-100 Grad Loss 0.0 % 3/8"(9.5mm) 82 Wash Loss(#200/75um) 3.6 % 1/4"(6.3mm) 67 #200/#40 0.25 #4(4.75mm) so 46-66 9-03.12(3) Gravel Backfill for #8(2.36mm) 44 Pipe Zone Bedding sirm sin #16(1.18mm) 32 Percent Pants #30(.6mm) 21 1Y," 99.100r %Passing No.200 1" 75-100 #40(.425mm) 17 8-24 Dust Ratio: %Passing No.40 %" 50-100 #50(.3mm) 12 No.4 20430/ #100(.15mm) 6 No.40 3-24 #200(75pm) 4.2 0-10 No.200 lO.Omax.✓ 9-03.9(3) Crushed Surfacing Sand Equivalent 35 min.✓ Bees Course i[7bn C0�e�nd Keystone Steve She Percent Paeans 1/" 99-100 1" 80-100 9-03.19 Bank Run Gravel for %" 99-100✓ Trench Backfill %" 50-80 STat %" 80.100✓ 2" Perci7.#0711 / No.4 25-45 46 66 No.4 22 100 No.40 3-18 8-24 No.200 0-10I/j JDustNo.200 7.5 max. 10.0 max. Ratio: %�",/ �/ Sand Equivalent 30 min. ✓ %Fracture 75 min. 75 min. Sand Equivalent 40 min. 40 min. J .._...._..._..__,_ .........._..__ ......................Materials(AMAT) ICON Summary Report Sample Information Sample No 655576787 Product Id 2379 Product Name 1 1/4"CS BC B6- Specification 9-03.9(3)Crushed Surfacing BC Bo- Date Sampled 01/04/2022 11:05 rD- Sampled By James Begley so. Sample Type Process Control e, Sample Method Surge Pile 4- Notes z- 2022 Submittal 2a- 10- u ►.. 1 . . 9. ..... 1 . . r".T i ►r 1 'I ' t9 . 4 5 , 4.s.';sh' s, • a s«.00."molmm 0101ES1 0#0 C70 2.84 050 750 049 low 0161090 00.Cu 21 54 CC 1 57 Gradation Results Quality Results Date Tested Tested By James Begley Sieve %Passing Tolerances Test Result Unit Tolerances 2 1/2"(63mm) 100 SE 73 % 240 AASHTO T176 2"(50mm) 100 Fractured Faces(>1) 98.0 % 275 AASHTO T-335 1 1/4"(31.5mm) 100 99-100 Questionable Faces(>1) 4.1 % AASHTO T-335 1"(25mm) 96 80-100 -#200(75um) 2.0 % 3/4"(19mm) 86 Grad Loss 0.0 % 5/8"(16mm) 77 50-80 Wash Loss(#200/75um) 1.3 % 1/2"(12.5mm) 66 #200/#40 0.23 3/8"(9.5mm) 56 9-03.12(3) Gravel Backfill for #4(4.75mm) 37 25-45 Pipe Zone Bedding Shwa Shea im #10(2mm) 25 Percent Pass #40(.425mm) 9 3-18 1h" 99-100� %Passing No.200 1" 75-100 / #100(.15mm) 3 Dust Rath: %Passing No.40 %" 50-100 #200(75pm) 2.0 0-7.5 No.4 20.80i No.40 3-24 J No.200 10.0 max. 9-03.9(3) Crushed Surfacing Sand Equivalent 35 min. Coupe Ibis Course and Keystone Sieve Size Passing 1%" 99-100 1" 80-100 V 9-03.19 Bank Run Gravel for y." 99-100 Trench Backfill %" 50-80 i %" t 80-100 2" 75-100 No.4 25-45 t// 46-66 No.4 22-100 No.40 3-18 T f 8-24 No.200 0-10 i No.200 7.5 max. V 10.0 max. Dust Ratio: '4 max. %Fracture 75 min.1! 75 min. Sand Equivalent 30 min. Sand Equivalent 40 min. J 40 min. StonemontQC 01/08/2022 CRH Americas Materials(AMAT) Aggregate Source Approval Report. https://www.wsdot.wa.gov/biz/mats/ASA/ASAReport.cfm?prefix=A&pi... WSDOT MATERIALS LAB 01/31/2022 Aggregate Source Approval Report Owner: La Pianta Limited Partnership Aggregate Source: PS-A-464" Lessee: Icon Materials,Inc. Known as: Auburn Pit Located in: SW1/4 SW 1/4 SEC 28&29 Section 28,29,T211U R5E County: King Remarks: Mineral Agg.and Surfacing: Test Date: 10/17/2018 Expiration Date: 10/17/2023 Absorption:1.26 Apparent Sp.G.:2.744 Bulk Sp.G.(SSD):2.686 Bulk Sp.G.:2.652 Deg:57 LA 14 Remarks: Currently approved as a source of aggregate for: ATB Ballast BST Crushed Cover Stone BST Crushed Screenings Crushed Surfacing Base Course Crushed Surfacing Key Stone Crushed Surfacing Top Course Gravel Backfill for Foundation Class A HMA Other Courses HMA Wearing Course Maintenance Rock Permeable Ballast • Acceptance tests need to be performed as necessary. Aggregates for Concrete: Test Date: 10/24/2018 Expiration Date: 10/24/2023 ASR-14 Day: ASR-One Year..0.037 CCA Absorption:1.24 CCASp.G:2.68 Deg:72 FCAAbsorption:2.18 FCAOrganics:3 FCASp.G:2.624 LA 11 Remarks: Current:1 Year ASR(ASTM C1293)results: 0.037%.Results expire on 12/9/2025 Currently approved for: Coarse Concrete Aggregates Fine Concrete Aggregates Acceptance tests need to be performed as necessary Acceptance tests need to be performed as necessary Riprap,Quarry'Spalls,Rodcfor Rock Wall,Erosion and Scour Protection: Test Date: Expiration Date: Absorption Apparent Sp.G.: Bulk Sp.G.(SSD): Bulk Sp.G.: Deg: LA Remarks: 1 of 2 1/31/2022,9:43 AM Aggregate Source Approval Report. https://www.wsdot.wa.gov/biz/mats/ASA/ASAReport.cfm?prefix=A&pi... NOT Approved for: Quarry Spans Riprap Rock for Erosion and Scour Protection Rock for Rock Walls Stone 9-27.3(6) Streambed Aggregates: Test Date: 10/24/2018 Expiration Date: 10/24/2023 Absorption:1.24 Apparent Sp.G.:2.736 Bulk Sp.G.(SSD):2.68 Bulk Sp.G.:2.647 Deg:72 LA 11 Remarks: Currently Approved for: Streambed Aggregate Gravel Borrow for Structural Earth Walls: Test Date: 10/24/2018 Expiration Date: 10/24/2023 Bulk Sp.G.(SSD):2.68 Deg:72 LA 11 Remarks: For geosynthetic'reinforcement,the gravel borrow shall be tested for pH prior to placement.For metallic reinforcement,the gravel borrow shall be tested for pH,resistivity,chlorides,and sulfates prior to placement.ff.the resistivity of the backfill material.equals or exceeds 5,000.ohm-cm,the-specified chloride and sulfate limits may be waived.If the aggregate source has variable quality,additional testing may.be required.Contact the-Regional Materials Engineer or the State.Geotechnical Engineer for direction. Currently Approved for: Gravel Borrow for Str Earth Walls ALL OTHER PIT RUN MATERIALS: Project Engineer may request preliminary samples but Aggregate Source Approval is not required. AGGREGATE MATERIALS NOT REQUIRING ASA APPROVAL: Aggregate for Gravel Base 9-03.10 Gravel Backfill for Foundation Class B 9-03.12(1)B Gravel Backfill for Walls 9-03.12(2) Gravel Backfill for Pipe Zone Bedding 9-03.12(3) Gravel Backfill for Drains 9-03.12(4) Gravel Backfill for Drywells 9-03.12(5) Backfill for Sand Drains 9-03.13 Sand Drainage Blanket 9-03.13(1) Gravel Borrow 9-03.14(1) Select Borrow 9-03.14(2) Common Borrow 9-03.14(3) Native Material for Trench Backfill 9-03.15 Foundation Material Class A and B 9-03.17 Foundation Material Class C 9-03.18 Bank Run Gravel for Trench Backfill 9-03.19 Commercial Concrete Aggregate 6-02.3(2)B 2 of 2 1/31/2022,9:43 AM � Washington State Department of Transportation Request for A roval of Material Contract Number FA Number N/A SR Duvall Ave NE Date CAG 20-065 1/26/2022 Section/Title of Project Duvall Ave NE County King Contractor Reed Trucking & Excavating, Inc. Subcontractor This form shall be completed prior to submittal. If this form is not compete at time of submittal it may For WSDOT Use Only be returned for information that was omitted. RAM# 029C PE Use Bid Item Material or Name and Location of Fabricator, Specification PEJQPL Hdgtr./QPL HQ Use No. Product/Type Manufacturer or Pit Number Reference Code Code Mortar Speedcrete 3 A49-A53 1 Project Engineer/Representative ),. Date State Materials Engineer/Representative Date 1/26/2022 Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. Acceptance Criteria: Acceptance based upon"Satisfactory"Test Report for samples of materials to be incorporated into project. 2. Acceptance Criteria: Mfg.Cert.of Compliance for'Acceptance'prior to use of material. 3°Acceptance Criteria: Catalog Cuts for'Acceptance'prior to use of material.Catalog Cut Approved ®Yes ❑No 4. Acceptance Criteria: Submit Shop Drawings for'Approval'prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment', 'WSDOT Inspected'or'Fabrication Approved Decal'material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks (PE): Remarks (HQ): DOT Form 350-071 Project Engineer Distribution Revised 03/2021 ❑X Contractor ❑Region Operations Engineer ❑Fabncation Inspection ❑Region Llatenals ❑State Materais Lab-MS 47365 The Euclid Chemical Company SPEED CRETE PM ED SINGLE COMPONENT, VERTICAL/OVERHEAD MORTAR EUCLID CHEMICAL WITH CORROSION INHIBITOR DESCRIPTION r1 SPEED CRETE PM is a single-component,polymer-modified,ready-to-use,cement based concrete and masonry repair mortar that requires only potable water for mixing. SPEED CRETE PM is a proprietary formulation of O portland cement, finely graded aggregates and special polymer modifiers used to increase adhesion,strength, m and aid in curing. PRIMARY APPLICATIONS D • Repair of numerous interior/exterior,above/below grade,vertical/overhead structural surfaces without forming m FEATURES/BENEFITS • Compatible with galvanic anodes • Repairs from featheredge to 3" (7.6 cm) • Excellent workability • Develops high strength and tenacious bond • Contains an integral corrosion inhibitor • Excellent resistance to freeze-thaw conditions • After initial set. may be shaved to conform to contours of the surrounding surface TECHNICAL INFORMATION The following are typical values obtained under laboratory conditions. Expect reasonable variation under field conditions. Set Time,ASTM C266,Gilmore Initial Set approx 15 min Flexural Strength psi(MPa)ASTM C78 Final Set approx 40 min 7 Day 650 (4.5) Working Time 10 to 15 min 28 Days 1,300 (9.0) Compressive Strength psi(MPa)ASTM C109 Shear Bond Strength psi (MPa)ASTM C 882 1 day 2,500(17.2) 28 Day 2,650 (18.3) 7 days 6,500(44.8) Splitting Tensile Strength psi(MPa)ASTM C496 c 28 days 7,000(48.3) 7 day 450 (3.1) 28 day 550 (3.8) Volumetric Resistivity 7,980 ohm-cm Freeze Thaw Resistance ASTM C666 r^ 320 cycles 99.0%RDF 3 PACKAGING SPEED CRETE PM is packaged in 50 lb (22.7 kg) poly-lined bags. SHELF LIFE 1 year in unopened package COVERAGE/YIELD One 50 lb (22.7 kg) bag yields approximately 0.5 ft3(0.014 m3). DIRECTIONS FOR USE Surface Preparation: Concrete surfaces must be structurally sound,free of loose or deteriorated concrete and o m free of dust,dirt,paint,efflorescence,oil and all other contaminants. Mechanically abrade the surface to achieve o a surface profile equal to CSP 6-8 in accordance with ICRI Guideline 310.2. Properly clean profiled area. o o Priming&Bonding (Saw Cut&Chipped Out Repairs): Thoroughly clean any exposed reinforcing steel, and i D apply DURALPREP A.C.to the concrete and the reinforcing steel within the repair area.Refer to the DURALPREP -r A.C.technical data sheet for full instructions.Alternatively,application of EUCOWELD 2.0 to a dry substrate or a scrub coat of SPEED CRETE PM to the saturated surface dry(SSD)concrete surface may be used for bonding. The repair material must be placed on the scrub coat before the scrub coat dries out. Priming & Bonding (Vertical & Overhead Skim Coats/Toppings): Apply EUCOWELD 2.0 to a dry substrate or a scrub coat of SPEED CRETE PM to the saturated surface dry (SSD) concrete surface. The repair material must be placed on the scrub coat before the scrub coat dries out. 19215 Redwood Road • Cleveland, OH 44110 www.euclidchemical.com 800-321-7628 t • 216-531-9596 f • Mixing: SPEED CRETE PM will require approximately 4.0 to 4.25 qt (3.8 to 4.0L) of potable water per 50 lb bag (22.7 kg) to achieve the proper mix consistency. Pour the measured amount of water into a clean mixing container,slowly add the SPEED CRETE PM,and thoroughly mix for 2 to 3 minutes to a stiff,no slump,putty-like consistency. Use a rotary mixer with rubber tip blades for mixing quantities up to 100 lb (45.4 kg). Application: Apply a scrub coat of neat mortar to the prepared SSD substrate. Before the scrub coat dries, apply SPEED CRETE PM. To ensure complete bond with the entire surface,force the SPEED CRETE PM firmly into the repair area by hand or with a trowel. Place the SPEED CRETE PM so that the material conforms to the contours of the surrounding surface. Always finish the SPEED CRETE PM toward the common bonding edge between the repair material and the existing surface. For repairs deeper than 3" (7.6cm) apply in multiple lifts. Score surface between lifts. Cure material using standard curing practices. Curing: Follow standard ACI guidelines for curing. In case of high temperature, high wind, or low humidity causing rapid surface drying, use wet burlap/plastic or a water-based curing compound. CLEAN-UP Clean application tools and mixing equipment with water immediately following use. PRECAUTIONS/LIMITATIONS • Use only potable water with SPEED CRETE PM. • Do not re-temper or add sand to SPEED CRETE PM. • Do not over-work or over-trowel the repair material. • Do not apply at temperatures below 45°F(7°C). • When necessary,follow the recommendations in ACI 305R "Guide to Hot Weather Concreting" or ACI 306R "Guide to Cold Weather Concreting". • In all cases,consult the Safety Data Sheet before use. Rev.07.20 WARRANTY:The Euclid Chemical Company("Euclid')solely and expressly warrants that its aroducts shall be free from defects in materials and work'nanship for one(11 year from the date of purchase.Unless authorized r writing by an officer of Euclid no other representations or statements made by Euclid or Its representatives,in Noting or orally.shall alter!his warranty.EUCLID MAKES NO WARRANTIES IMPLIED OR OTHERWISE. AS TO THE MERCHANTABILITY OR FITNESS FOR ORDINARY OR PARTICULAR PURPOSES OF ITS PRODUCTS AND EXCLUDES THE SAME.If any Euclid product fails to conform with this warranty.Euclid wig replace the product at'to cost to Buyer.Replacement of any product shall be the sole and exclusive rerneay available and buyer shall have no clam for incidental or consequential damages.Any warranty claim must se made MN-) one It)year from the date of the cleaned breach.Euclid does not authorize anyone on its behalf to make any written or oral statements which in any way alter Euclid's installation information or instructions in its product :derature or on its packaging labels.Any installation of Euclid products whirl fads to conform with such.rstallation information or instructions shall void this warranty.Product demonstrations,f any are done for illustrative purposes only and do sot constitute a warranty or warranty alteration of any kind.Buyer shall be solely responsible for determining the suitability of Euclid s products for the Buyers intended purposes Qualified Product List https://wsdot.wa.gov/biz/mats/QPLiQPLPrint.cfm?Product_no-201700... Washington State y January 26,2022 Qualified Product List Contractor Product Information Contractor: Contract No: Sub Contractor: Date: Bid Item: I � Manufacturer: Euclid Chemical Co. - Cleveland, OH Product Name: Speed Crete PM Standard Spec : 9-20.4(3), Mortar Type 2 for Masonry Applications Product Description : Mortar for Masonry Applications Product Restriction : Acceptance Code : 3113 Code Description : Visually verify the product delivered to the job site is the product that was originally submitted by the Contractor and approved from the QPL and conforms to the Standard Specification blending ratio. Last Updated : Mar 25, 2017 To be completed by the field inspector: Quantity: Verified By: Date: 1 of 1 1/26/2022,2:24 PM * - AIIIW WIWashington State Department of Transportation Request for Approval of Material Contract Number FA Number SR Date CAG 20-065 N/A DUVALL AVE NE 01/06/2022 Section!Title of Project County DUVALL AVE NE KING Contractor Subcontractor REED TRUCKING&EXCAVATING.INC This form shall be completed prior to submittal. If this form is not compete at time of submittal it may For WSDOT Use Only be returned for information that was omitted. RAM# 029B PE Use Bid Item Material or Name and Location of Fabricator, Specification PE/QPL Hdqtr./QPL HQ Use No. Product/Type Manufacturer or Pit Number Reference Code Code B17 ALL THRD ROD STS INDUSTRIAL Std. Plan - 10 106 A49-A53 SPEEDCRETE/REDLINE EUCLID CHEMICAL Std. Plan - 10 310.1 A43-A48, B6-B8, • ETHAFOAM SHEETS ULINE S.P.7-04.2 3 B17 and B18 Project Engineer/Representative Date State Materials Engineer/Representative Date — 1/20/2022 Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. Acceptance Criteria: Acceptance based upon"Satisfactory"Test Report for samples of materials to be incorporated into project. 2. Acceptance Criteria: Mfg. Cert.of Compliance for'Acceptance'prior to use of material. (7Acceptance Criteria: Catalog Cuts for'Acceptance'prior to use of material.Catalog Cut Approved ❑X Yes ❑No Acceptance Criteria: Submit Shop Drawings for'Approval'prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment','WSDOT Inspected'or'Fabrication Approved Decal'material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. 0.pproval Withheld: See Remarks 11. Miscellaneous Acceptance Criteria. Remarks (PE): COR-TEN Steel Tie Rods per COR Std. Plan-310.1 Remarks Mortar for pipe joints and grade rings and casting for CB (HQ): Type 1 shall meet requirements of AASHTO M 85, Type I or Type II, per Std. Plan -200.00&WSDOT 9-04.3 Mortar for Manhole Risers shall meet requirements of ASTM C270 Type S, per COR Std Plan -106 DOT Form 350-071 Project Engineer Distribution Revised 03/2021 ©Contractor ❑Region Operations Engineer ❑Fabrication Inspection ❑Region Materials ❑State Materials Lab-MS 47365 f A307 All Thread Rod.Galvanized BID ITEM B17 FOR HYDRANT RUNS The AS A301 specification covers carbon steel Potts and studs ranging from 1;A-through 1 diameter A307:s an economical low carbon material oiler manufactured using A36 round bar.Dimensional specifications 011°111111°111111 are governed by ASME B18.31 3.A307 ail thread rod is available in hot dip galvanized finish.which ptovldes a corrosion resistant zinc coating.The all thread rod dated on this page is domestic,mailed and manufactured in the USA A A N. PRODUCTS GOVERNING STANDARDS MECHANICAL PROPERTIES CHEMICAL PROPERTIES GOVERNING STANDARDS SUBMITTAL REVEW No Esupmrs Than Meta Car mrw Noted w1.nd a%nub e Covers A 30' e s Me mechanical and materialrequirements RN inch Swint Wieners in tamales from Rgeoea-Sine feenus l 1)a'truagn it made of Carbon steel having a reireinum tensile saengn of 60 000 tMr nanontAN!NOTICE llesrmerw dove not relieve tma Contract.torn responrwtry si catpy a randor Friona. AWE 91a H.31.1 Covers one genes old data tb al lelsgnel data 9faY threaded d[d rl1dP COR-TEN M T Man Rode oar COR Sid Plan-71 RI,ne SAeo►o o s and 1.1 Cowart Uwrneols 1136 ASME 81 1:MC a Slsxfies the thread lawn series cuss aboanee roN.ance.ant aese rwbn ter limbed screw (b "" IMF Class 2A treads. eY DM ban»1,1101a2 Diameter + Tread Pitch t A307 All Thread Rod,Galvanized of I The Euclid Chemical Company SPEED CRETE RED LINE ED RAPID SETTING REPAIR MATERIAL EUCLID CHEMICAL m 7c DESCRIPTION r SPEED CRETE RED LINE is a rapid-setting,cement-based concrete and masonry repair mortar.SPEED CRETE O RED LINE is a proprietary formulation of blended portland cements,finely processed selected aggregates, and m specific chemical additives that undergo a chemical"hyper hydration"and produces a stable, low permeability, cementitious matrix. SPEED CRETE RED LINE can be"shaved"for detailed repairs. D PRIMARY APPLICATIONS rn v • Interior and exterior • Vertical and overhead repairs • Used at no slump consistency • Outstanding repair material for concrete pipe,formed and precast concrete FEATURES/BENEFITS • Initial set in 8 to 20 minutes • High strength • Final set within 30 minutes • Excellent durability • Can be"shaved"to desired shape • Compatible with galvanic anodes TECHNICAL INFORMATION -v m m The following are typical values obtained under laboratory conditions. Expect reasonable variation under field conditions. m Compressive Strength, psi (MPa)ASTM Clog Freeze Thaw Durability Factor ASTM C666 'i m 24 Hour 2,550(17.6) 300 Cycles 96.75% v 7 Day 4,000 (27.6) rn 28 Day 5,700(39.3) Shrinkage 50%RH ASTM C157(3"x3"x11"specimens r Set Time,ASTM C266 were removed from molds @ 24 hours) Initial 8 20 Min 28 Day -0.069% m Final 15-30 Min Expansion 100% RH ASTM C157(3"x3"x11"specimens Split Tensile Strength,psi (MPa) ASTM C496 were removed from molds @ 24 hours) 7 Day 240(1.7) 28 Day 0.142% 28 Day 290(2.0) Flexural Strength, psi (MPa) ASTM C348 Scaling Resistance ASTM C672 7 Day 700 (4.8) 50 Cycles 0%loss 28 Day 918 (6.3) Volumetric Resistivity 5,250 ohm-cm Appearance: Available in 6 shades of gray o -^ PACKAGING T o ,3 SPEED CRETE RED LINE is packaged in 50 lb(22.7 kg) poly-lined bags,and 50 lb (22.7 kg) pails Wo a 3 SHELF LIFE 18 months in original, unopened packaging COVERAGE One 50 lb (22.7 kg) bag yields approximately 0.47 ft3(0.013 m3)when mixed with 5.5 qt(5.2 L) water 19215 Redwood Road • Cleveland, OH 44110 www.euclidchemical.com 800-321-7628 t • 216-531-9596 f DIRECTIONS FOR USE Surface Preparation:Concrete surfaces must be structurally sound,free of loose or deteriorated concrete and free of dust,dirt,paint,efflorescence,oil and all other contaminants. Mechanically abrade the surface to achieve a surface profile equal to CSP 6-8 in accordance with ICRI Guideline 310.2. Properly clean profiled area. Priming & Bonding (Saw Cut&Chipped Out Repairs): Thoroughly clean any exposed reinforcing steel,and apply DURALPREP A.C.to the concrete and the reinforcing steel within the repair area.Refer to the DURALPREP A.C. technical data sheet for full instructions. Alternatively, application of a scrub coat of SPEED CRETE RED LINE to the saturated surface dry(SSD) concrete surface may be used for bonding.The repair material must be placed on the scrub coat before the scrub coat dries out. Mixing: SPEED CRETE RED LINE will require approximately 5 to 5.5 qt(4.7 to 5.2 L) of potable water per 50 lb (22.7 kg) bag to achieve the proper mix consistency. Pour the measured amount of water into a clean mixing container, then add the SPEED CRETE RED LINE, and thoroughly mix for no more than 60 seconds to a stiff, no slump, putty-like consistency. Mix small quantities of SPEED CRETE RED LINE in a clean pail with a hand trowel. Use a rotary mixer with rubber tip blades for mixing quantities up to 100 lbs. (45.4 kg). To fill patches 2" (5.1 cm) deep or greater, add clean, pre-dampened, 3/8" (0.96 cm) size pea gravel. DO NOT USE LIMESTONE AGGREGATE.The mix ratio must not exceed 40 lbs. (18 kg) of pea gravel to each 50 lb (22.7 kg) bag or pail of SPEED CRETE RED LINE. Mixing procedure:Start mixer,load water,load pea gravel,and then load the SPEED CRETE RED LINE. MIX FOR NO MORE THAN 60 SECONDS. Application: For vertical repairs, place SPEED CRETE RED LINE in 1/8"-2" (3.2mm-50.0 mm) lifts.To ensure a complete bond with the entire surface,force the SPEED CRETE RED LINE firmly into the SSD area by hand or with a trowel. Slightly overfill the repair,and following initial set, shave the material to conform to the contour of the surrounding surface. Always shave SPEED CRETE RED LINE toward the common bonding edge between the repair mortar and the existing surface. Cure material using standard curing practices. Cold Weather Installation: Application at temperatures below 40°F (4°C) extends the set time. Heating the repair area until warm, using warm water for mixing, and tenting/insulating the repair area after application will increase strength development. Do not use direct heat on the repair after it is installed. C LEAN-U P Clean application tools and mixing equipment with water immediately following use. PRECAUTIONS/LIMITATIONS • Keep in covered storage away from all moisture. • Mix no more than 60 seconds. • Use only potable water with SPEED CRETE RED LINE. • Mix to a stiff, putty-like, no slump consistency. Do not add more water than recommended. • Do not apply SPEED CRETE RED LINE as a horizontal topping or as a tile setting mortar. • When necessary, follow the recommendations in ACI 305R "Guide tosIti }(� Conan X r kv ACI 306R "Guide to Cold Weather Concreting". ,u�sMAL KCVICYv • Do not re-temper or add sand to SPEED CRETE RED LINE. No Exceptions Taken • In all cases, consult the Safety Data Sheet before use. Make Corrections Noted Amend & Resubmit X Rejected-See Remarks Mortar for pipe joints and grade rings and casting for CB Type 1 shall meet requirements of AASHTO M 85,Type I IMPORTANT NOTICE:This review or Type II, per Std. Plan -200.00&WSDOT 9-04.3 does not relieve the Contractor from responsibility to comply&conform Mortar for Manhole Risers shall meet requirements of with the Plans, Specifications,and ASTM C270 Type S, per COR Std Plan-106 Contract Documents. Gay&Osborne, Iz CONSULTING ENGINEERS Rev.03.19 By. DRS Date•1/11/2022 WARRANTY The Euclid Chemical Company("Euclid I solely and expressly warrants that its products shall be free from defects in rratenats and wo'k narship,or one It;year'turn the date of purchase Unless authorized 'F writing by ar officer of Euclid no other representations or statements made by Euclid or its representatives.in writing or orally steal:ate(the warranty EUCUC MAKES NO WARRANTIES IMPLIED OR OTHERWISE. AS TO THE MERCHANTABILITY OR FITNESS FOR ORDINARY OR PARTICULAR PURPOSES OF ITS PRODUCTS AND EXCLUDES THE SAME.lf any Euclid product tads to conform wltn this warranty.Euclid will replace tre product at no cost to Buyer.Replacement of any product shall be the sole and exclusive remecy available and buyer shall have no clam for incidental or conseguential carnages.Any warranty claim must oe made within one f t I year from the Date of the gamed breach.Euclid does not authorize anyone on its behalf to make airy written or oral statements which in any way alter Euclid-s mstailation information or instructions in its product literature or on its packaging labels.Any installation of Euclid products chic','ails to conform wrtn such rstallabon informatics or instructions shall void this warranty.Product demonstrations,1 any are done for illustrative purposes only and do not constitute a warranty or warranty alteration of any kind.Buyer shall be solely responsible for determining the statab lity of Euclid s products for the Buyers intended purposes- ULINE 700 Uline Way Allentown, PA 18106 • PHONE (800)295-5510 • WEB uline.com • FAX(800)295-5571 January 4, 2022 Ferguson Waterworks 2042 112th St S Tacoma, WA 98444 Hello Mark, This is the Specification Sheet for S-12856 - Plank Foam without Adhesive- Non- Perfed, White, 48 x 96 x 2". • Flexible low-density polyethylene foam is highly resilient, shatter proof and tear resistant. • Water, fungi and mold-resistant closed cell foam. • FDA compliant for indirect food contact. • Non-perfed sheets, no adhesive. • Temp Range --78° a +101°C (-110° to +215°F) Please contact our Customer Service Department at 1-800-295-5510 if you have any additional questions. Sincerely, Andrea N. Customer Service Pennsylvania SUBMITTAL REVIEW X No Exceptions Taken Make Corrections Noted Amend & Resubmit Rejected-See Remarks IMPORTANT NOTICE: This review does not relieve the Contractor from responsibility to comply&conform with the Plans, Specifications, and Contract Documents. Gray 8L Osborne,Imo. CONSULTING ENGINEERS By: DRS Date: 1/20122 CHICAGO •ATLANTA • DALLAS • LOS ANGELES • MINNEAPOLIS • NYC/PHILA • RENO SEATTLE MEXICO • CANADA i IVWashington State Department of Transportation Request for Approval of Material Contract Number FA Number N/A SR Date CAG 20-065 Duvall Ave NE 12/16/2021 Section/Title of Project Duvall Ave NE County King Contractor Reed Trucking & Excavating, Inc. Subcontractor This form shall be completed prior to submittal.If this form is not compete at time of submittal it may For WSDOT Use Only be returned for information that was omitted. RAM# 059&061 PE Use Bld Item Material or Name and Location of Fabricator, Specification PEIQPL Hdgtr/QPL HQ Use No. Product/Type Manufacturer or Pit Number Reference Code Code A35, A44-52, CSTC Black River Quarry 4-04 10 B6-B9 - 1 Project Engineer/Representative ---- �—� Date State Materials Engineer/Representative Date . `�.�-:?.it f_ 12116/2021 Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. Acceptance Criteria: Acceptance based upon"Satisfactory"Test Report'for samples of materials to be incorporated into project. 2. Acceptance Criteria: Mfg.Cert.of Compliance for'Acceptance'prior to use of material. 3. Acceptance Criteria: Catalog Cuts for'Acceptance'prior to use of material.Catalog Cut Approved ❑Yes ❑No 4. Acceptance Criteria: Submit Shop Drawings for'Approval'prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment','WSDOT Inspected'or'Fabrication Approved Decal'material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. c). miscellaneousApproval Withheld: Per ASAReport, source not approved for CSTC Acceptance Criteria. Remarks (PE): Remarks (HQ): DOT Form 350-071 Project Engineer Distribution Revised 03/2021 a Contractor El Region Operations Engineer ❑Fabrication Inspection El Region Materials El Slate Materials Lab-MS 47365 WSDOT MATERIALS LAB 12/16/2021 Aggregate Source Approval Report Owner: Kangley Rock&Recycling, Black River Aggregate Source. RSA 516 Lessee: Known as: Kangley Rock&Recycling, Black River Located in: T23N, RANGE4E, SECTIQN14 Section 14 T23N R4E County: King Remarks: Tier 1 & 2 Recycled Concrete Aggregates (RCA). Acceptance is based on Toxicity Test Report & Certification of Toxicity Characteristics per 9-03.21(1) & Field Testing for Grading, Sand Equivalency and/or Dust Ratio per 3-04 &9-03.See QPL for further info. Mineral Agg.and Surfacing: Test Date: Expiration Date: Absorption: Apparent Sp.G.: Bulk Sp.G.(SSD): Bulk Sp.G.: Deg: LA: Remarks: NOT approved as an aggregate source for: act BST Crushed Cover Stone BST Crushed Screenings Crushed Surfacing Base Course Crushed Surfaoing:Key Stone Crushed Surfacing Top Course Gravel Backfill for Foundation Class A HMA Other Courses HMA Wearing Course Maintenance Rock Permeable Ballast Aggregates for Concrete: Test Date: Expiration Date: ASR.14 Day: ASR-One Year: CCA Absorption: CCA Sp.G: Deg: FCA Absorption: FCA Organics: FCA Sp.G: LA: Remarks: • NOT approved for: Coarse Concrete Aggregates Fine Concrete Aggregates Riprap,Quarry Spalls,Rock for Rock Wall,Erosion and Scour Protection: Test Date: Expiration Date: Absorption: Apparent Sp.G.: Bulk Sp.G.(SSD): Bulk Sp.G.: Deg: LA: Remarks: NOT Approved for: Quarry Spalls Riprap Rock for Erosion and Scour Protection Rock for Rock Walls Stone 9-27.3(6) Streambed Aggregates: Test Date: Expiration Date: Absorption: Apparent Sp.G.: Bulk Sp.G.(SSD): Bulk Sp.G.; Deg: LA: Remarks: NOT Approved for: Streambed Aggregate Streambed Aggregate Gravel Borrow for Structural Earth Walls: Test Date: 'Expiration Date: Bulk Sp.G.(SSD): Deg: LA: NOT Approved for: Gravel Borrow for Str Earth Walls ALL OTHER PIT RUN MATERIALS: Project Engineer may request preliminary samples but Aggregate Source Approval is not required. AGGREGATE MATERIALS NOT REQUIRING ASA APPROVAL: Aggregate for Gravel Base 9-03.10 Gravel Backfill for Foundation Class B 9-03.12(1)B Gravel Backfill for Walls 9-03.12(2) Gravel Backfill for Pipe Zone Bedding 9-03.12(3) Gravel Backfill for Drains 9-03.12(4) Gravel Backfill for Drywalls 9-03.12(5) Backfill for Sand Drains 9-03.13 Sand Drainage Blanket 9-03.13(1) Gravel Borrow 9-03.14(1) Select Borrow.9-03.14(2) Common Borrow 9-03.14(3) Native Material for Trench Backfill 9-03.15 Foundation Material Class A and B 9-03.17 Foundation Material Class C 9-03.18 Bank Run Gravel for Trench Backfill 9-03.19 Commercial Concrete Aggregate 6-02.3(2)B PROJECT: Internal Testing DATE: 12/9/2021 LOCATION:--Black River-Quarry SAMPLE SOURCE:A-516 SAMPLE DESCRIPTION: RCA 5/8"Crushed Surfacing Top Course (Type 1G) AGGREGATE SIZE: 5/8" TESTER: Sean SIEVE WEIGHT PERCENT PERCENT SPECIFICATION SIZE RETAINED RETAINED PASSING COS 9-03.9 3/4" 0.0 0 100 ' 100 1/2" 0.3 3 98 80 - 100 3/8" 1.1 11 89 #4 3.5 35 65 46 - 66 #40 8.5 85 15 8 - 24 #200 9.9 99 2 0 - 10 PAN 10.0 100 0 WET SAMPLE: 10.4 TOTAL MOISTURE: 3.8% DRY SAMPLE: 10.0 S.E.: 62% FM: 1.20 FRACTURE % 95% DUST RATIO: 10% 'The minimum percent peering the No.60 and No.100 sieves may be reduced to 5 and 0,respectively,if the aggrogato is to be used in air-entrained concrete containing more than 400 lb of cement per cubic yard or in nonair-entrained concrete containing more than 500 lb of cement per cubic yard(C 336.2) r„ Y IVWashington State Department of'Transpot,tation Request for Approval of Material Contract Number FA Number N/A SR Duvall Ave NE Date CAG 20-065 Section/Title of Project Duvall Ave NE County King Contractor Reed Trucking & Excavating , Inc. Subcontractor g 9 This form shall be completed prior to submittal. If this form is not compete at time of submittal it may For WSDOT Use Only be returned for Information that was omitted. RAM# 060 PE Use Bid Item Material or Name and Location of Fabricator, Specification PFJQPL HdgtrJQPL HQ Use No. Product/Type Manufacturer or Pit Number Reference Code Code A35 CSTC Kangley Rock & Recycling 4-04 1, 2 A44-52, 1175, B6-B9 ASA { Project Engineer/Representative Date State Materials Engineer/Representative Date -�\ ice 12/20/2021 Acceptance Action Codes for use by Project Engineer and State Materials Laboratory ��1 0 Acceptance Criteria: Acceptance based upon"Satisfactory"Test Report for samples of materials to be incorporated into project. Acceptance Criteria: Mfg.Cert.of Compliance for'Acceptance'prior to use of material. See Remarks. 2.. Acceptance Criteria: Catalog Cuts for'Acceptance'prior to use of material.Catalog Cut Approved ❑Yes ❑No 4. Acceptance Criteria: Submit Shop Drawings for'Approval'prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment','WSDOT Inspected'or'Fabrication Approved Decal'material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. 10, Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks (PE): Prior to use, provide toxicity testing and certification of toxicity characteristics in accordance with Section 9-03.21(1). Rema(HQ}rks Provide Scale Cert. and Daily Scalernan's Reports. Delivery Ticket shall show bid item number and description. DOT Form 350-071 Project Engineer Distribution Revised 03/2021 )ti Contractor ❑Region Operations Engineer ❑Fabrication Inspection ❑Region Materials 0 State Materials Lab-MS 47365 w PROJECT: Internal Testing DATE: 12/9/2021 LOCATION: Black River Quarry SAMPLE SOURCE: A-516. SAMPLE DESCRIPTION: RCA 5/8" Crushed Surfacing Top Course (Type 1G) AGGREGATE SIZE: 5/8" TESTER: Sean SIEVE WEIGHT PERCENT PERCENT SPECIFICATION SIZE RETAINED RETAINED PASSING COS 9-03.9 3/4" 0.0 0 100 J 100 1/2" 0.3 3 98 J 80 - 100 3/8" 1.1 11 _ 89 #4 3.5 35 65 4 46 - 66 ' #40 8.5 85 15 4 8 - 24 #200 9.9 99 2 J 0 10 PAN 10.0 100 0 WET SAMPLE: 10.4-_.-TOTALMoISTURE.__..__..__3.8°/0--------_._..-.---..__.._.........-.-.---. _..___._ ...... DRY SAMPLE: 10.0 S.E.: 62% 4 FM: 1.20 FRACTURE %. 95%° DUST RATIO: 10% "The minimum percent passing the No.50 and No 100 sieves may be reduced to 5 and 0,respectively,if the aggregate is to be used in air-entrained concrete containing more than 400 lb of cement per cubic yard or in nbnair-entrained concrete containing more than 500 lb of cement per cubic yard(C 33 6.2) 0© WSDOT MATERIALS LAB 12/16/2021 Aggregate Source Approval Report Owner: Kangley Rock&Recycling, Black River Aggregate Source(S-A-516) Lessee: Known as: Kangley Rock&Recycling,Black River Located in: T23N,RANGE4E,SECTION1.4 Section 14 T23N R4E County: King Remarks: Tier 1 & 2 Recycled Concrete Aggregates (RCA). Acceptance is based on Toxicity Test Report & Certification of Toxicity Characteristics per 9-03.21(1) & Field Testing for Grading, Sand Equivalency and/or Dust Ratio per 3-04 &9-03.See QPL for-further info. Mineral Agg.and Surfacing: Test Date: Expiration Date: Absorption: Apparent Sp.G.: Bulk Sp.G:(SSD): Bulk Sp.G.: Deg: LA: Remarks: - • NOT approved as an aggregate-source for: ATB Ballast BST Crushed Cover Stone BST Crushed Screenings Crushed Surfacing Base Course Crushed Surfacing Key Stone Crushed Surfacing Top Course Gravel Backfill for Foundation Class A HMA Other Courses HMA Wearing Course Maintenance Rock Permeable Ballast • Aggregates for Concrete: Test Date: Expiration Date: • ASR-14 Day: ASR-One Year: CCA Absorption: CCA Sp.G: Deg: FCA Absorption: FCA Organics: FCA Sp.G: LA: Remarks: NOT approved for: Coarse Concrete Aggregates Fine Concrete Aggregates Riprap,Quarry Spalls,Rock for Rock Wall, Erosion and Scour Protection: Test Date: Expiration Date: Absorption: Apparent Sp.G.: Bulk Sp.G.(SSD): Bulk Sp.G.: Deg: LA: Remarks: • NOT Approved for: Quarry Spans Riprap Rock for Erosion and Scour Protection Rock for Rock Walls Stone 9-27.3(6) Streambed Aggregates: Test Date: Expiration Date: Absorption: Apparent Sp.G.: Bulk Sp.G.(SSD): Bulk Sp,G.: Deg: LA Remarks: NOT Approved for: Streambed Aggregate Streambed Aggregate Gravel Borrow for Structural Earth Walls: Test Date: Expiration Date: Bulk Sp.G.(SSD): Deg: LA: NOT Approved for: Gravel Borrow for Str Earth Walls ALL OTHER-PIT-RUN-MATERIALS: Project Engineer may request preliminary samples but Aggregate Source Approval is not required. AGGREGATE MATERIALS NOT REQUIRING ASA APPROVAL: Aggregate for Gravel Base 9-03.10 Gravel Backfill for Foundation Class B 9-03.12(1)B Gravel Backfill for Walls 9-03.12(2) Gravel Backfill for Pipe Zone Bedding 9-03.12(3) Gravel Backfill for Drains 9-03.12(4) Gravel Backfill for Drywalls 9-03.12(5) Backfill for Sand Drains 9-03.13 Sand Drainage Blanket 9-03.13(1) Gravel Borrow 9-03.14(1) Select Borrow 9-03.14(2) Common Borrow 9-03.14(3) Native Material for Trench Backfill 9-03.15 Foundation Material Class A and B 9-03.17 Foundation Material Class C 9-03.18 Bank Run Gravel for Trench Backfill 9-03.19 Commercial Concrete Aggregate 6-02.3(2)B WSDOT-Materials Laboratory https://www.wsdot.wa.gov/biz/mats/QPL/QPLProdinfo.cfm?Product n... Waaf�inston Stato thpnrtrn nt of Traaaportation Qualified Product List Product Information Manufacturer : Kangley Rock & Recycling, Black River, Renton -. WA Product Name : Tier 1 and Tier 2 - Recycled Concrete Aggregate (RS- A-516) Standard Spec : 9-03.21(1)C, Recycled Concrete Aggregate Product Description : Tier 1 and Tier 2 - Recycled Concrete Aggregate is approved for the following aggregate materials; 9-03.1(4) Coarse Aggregate for Commercial Concrete (Class 3000), 9-03.10 Aggregate for Gravel Base, 9-03.12(1)B Gravel Backfill for Foundations Class B, 9-03.12(2) Gravel Backfill for Walls, 9-03.12(3) Gravel Backfill for Pipe Zone Bedding, 9-03.14(1) Gravel Borrow, 9-03.14(2) Select Borrow, 9-03.14(2) Select Borrow (greater than 3 feet below subgrade and side slope), 9-03.14(3) Common Borrow, 9-03.14(3) Common Borrow (greater than 3 feet below subgrade and side slope), 9-03.17 Foundation Material Class A and Class B, 9-03.18 Foundation Materials Class C, and 9-03.19 Bank Run Gravel for Trench Backfill. ********** For Tier 2 only - 9-03.9 B.aIlast and Crushed Surfacing; 9-03.12(1)A Gravel Backfill for Foundations Class A. See ASA for additional information. Product Restriction.: Need to provide toxicity testing and certification of toxicity characteristics in accordance with Section 9-03.21(1). Acceptance Code : 1175 Code Description : Acceptance is based on Toxicity Test Report and Certification of Toxicity Characteristics in accordance with Section 9-03.21(1) and Field Testing for Grading, Sand Equivalency and/or Dust Ratio in accordance with Sections 3-04 and 9-03. Last Updated : Sep 25, 2018 Contractors with WSDOT Click here for Contractor Product Info Page Copyright WSDOT©2016 1 oft 12/20/2021,8:53 AM - allbr VWashington State • Department of Transportation Request for Approval of Material Contract Number FA Number N/A SR Duvall Ave NE Date • CAG 20-065 Section I Title of Project Duval I Ave NE County King Contractor •Reed Trucking & Excavating, Inc. Subcontractor This form shall be completed prior to submittal.If this form is not compete at time of submittal it may For WSDOT Use Only be returned for information that was omitted. RAM# 065 • PE Use Bid Item Material or Name and Location of Fabricator, Specification PE/QPL Hdqtr./QPL HQ Use No. Product/Type Manufacturer or Pit Number Reference Code Code Ag 89 AS2CSTC Tier 2 squak Mountain 9-03.21(1)C 10 A43.03.02 Bank Run Gravel for Trench Backfill 9-03.19 -A52.03.02 Tier 1 Squak Mountain-Issaquah 9=03.21(1)C. 1,2 Gravel Backfill for Pipe Zone Bedding. 9-03.12(3) { B6-B9 Tier 1 Squak'Mountain-Issaquah' 9-03.21(1)C 1,2 i - Project Engineer/Representative -\ Date State Materials Engineer/Representative • .bate 1/3/2022 Acceptance Action Codes for use by Project Engineer and:State Materials Laboratory OAcceptance Criteria: Acceptance based upon"Satisfactory"Test Report for samples of materials to be incorporated into project. ' 0 Acceptance Criteria: Mfg.Cert.of Compliance for'Acceptance'prior to use of material. 3. Acceptance Criteria:.CatalogCuts for'Acceptance'prior to use of material.CatalogCutApproved P P ['Yes ❑No 4. Acceptance Criteria: Submit Shop Drawings for'Approval'prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment','WSDOT Inspected'or'Fabrication Approved Decal'material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved:. 9. Approval Withheld: Submit samples for preliminary evaluation. 0 pproval Withheld: Reclamation facility must be on the QPL as a Tier 2 facility, per WSDOT 9-03.21(1)C. 11. Miscellaneous Acceptance Criteria. See below QPL pages,Squak Mnt out of Issaquah is not Remarks currently an approved facility. (PE): Remarks Remarks: . (HQ): Prior to use, provide toxicity testing and certification of toxicity characteristics in accordance with Section 9-03.21(1). Provide Scale Cert. and Daily Scaleman's Reports. Delivery Ticket shall show bid item number and description. DOT Form 350-071 Project Engineer Distribution Revised 03/2021 El Contractor ❑Region Operations Engineer ❑Fabrication Inspection ❑Region Materials ❑State Materlals Lab-MS 47365 WSDOT-Materials Laboratory Qualified Products List(QPL) https://wsdot.wa.gov/biz/mats/QPL/QPLProductsGrid.ctrn • •TW sIdngtoa Sta to i oopirt no t o1 Transportation Qualified Products List Standard Specification: 9-03.21(1)C Product Name 1__ spec_Title IL__ Manufacturer _ _ —_ _ Tier 1 and Tier 2 - Recycled i Recycled Concrete 1 Central Pre-Mix (An Oldcastle Infrastructure Concrete Aggregate (RS-C-343)___I Aggregate !Company), Spokane Valley-WA Tier 1 and Tier 3 - Recycled Recycled Concrete Tucci and Sons, Lakewood-WA • Concrete Aggregate (RS-B-352) Aggregate _ Tier 1 and Tier 2 - Recycled Recycled Concrete i Kangley Rock &Recycling, Black River, Concrete Aggregate (RS-A-516) j Aggregate 1 Renton-WA Tier 1 - Recycled Concrete I Recycled Concrete I Aggregate (RS-F-211) Aggregate Cowden Gravel & Ready Mix, Bellingham-WAI Tier 1 - Recycled Concrete ! Recycled Concrete 1 American Rock Products, Richland-WA Aggregate (RS-R-189) ;Aggregate j �-- — ----- -------------------------- Tier 1 - Recycled Concrete Recycled Concrete 1American Rock Products, Pasco-WA 1 Aggregate (RS-FN-121) I Aggregate Tier 1 - Recycled Concrete I Recycled Concrete IAmerican Rock Products, Walla Walla-WA 1 Aggregate (RS-O-146) —I Aggregate _j Tier 1 and Tier 3 - Recycled Recycled Concrete iFro-Recycle, LLC, Spokane Valley-WA 'Concrete Aggregate (RS-C-345) Aggregate __ 1 _ - i Tier 1 - Recycled Concrete I Recycled Concrete Holroyd Green Products Plant, Tacoma-WA Aggregate (RS-B-351) I Aggregate 'Tier 1 - Recycled Concrete 1 Recycled Concrete f Renton Concrete Recyclers, Renton-WA ;Aggregate (RS-A-519) j Aggregate i 'Tier 1 - Recycled Concrete Recycled Concrete Blake Sand &Gravel, Sequim-WA 1 Aggregate (RS-Q-241) Aggregate Tier 1 - Recycled Concrete I Recycled Concrete Dickson Company, Tacoma-WA Aggregate (RS-B-350)) i Aggregate , Tier 1 - Recycled Concrete I Recycled Concrete Aggregate (RS-D-359) I Aggregate Lenz Enterprises, Inc., Stanwood-WA 1 'Tier 1 - Recycled Concrete Recycled Concrete 1 :Aggregate (RS-B-349) I Aggregate Corliss Resources, Inc., Puyallup-WA Tier 1 - Recycled Concrete Recycled Concrete Corliss Resources, Inc., Enumclaw-WA Aggregate (RS-A-518) .Aggregate Tier 1 - Recycled Concrete ; Recycled Concrete 1 Action Materials, Inc., Spokane-WA Aggregate (RS-C-344) i Aggregate , Tier 1 and Tier 3 - Recycled ; Recycled Concrete 1 i Fruhling Sand &Topsoil, Bothell-WA Concrete Aggregate (RS-D-360)_;Aggregate _ _ _ _ ___.______.___----I Tier 1 - Recycled Concrete I Recycled Concrete II I Aggregate (RS-OR-90) Aggregate I.V. Rlley, Bingden-WA ,Tier 1 and Tier 2 - Recycled I Recycled Concrete Stampede Sand &Gravel LLC, Easton-WA 1 Concrete Aggregate (RS-S-312) I Aggregate J 1,Tier 1 and Tier 3 - Recycled Recycled Concrete Miles Resources - Lakeview, Lakewood-WA l'Concrete Aggregate (RS-B-353) ;Aggregate i Tier 1 and Tier 3 - Recycled Recycled Concrete ' Concrete Aggregate RS-D-361 Aggregate Reece Construction Company, Arlington-WA (RS-D-361) iA99 9 - --- - _I 1 of 2 12/29/2021,8:45 AN. WSDOT Materials Laboratory Qualified Products List(QPL) https://wsdot.wa.gov/biz/mats/QPL/QPLProductsGrid.cfm Tier 1 and Tier 3 - Recycled Recycled Concrete Girard Resources & Recycling LLC, Concrete Aggregate (RS-A-517) Aggregate Covington-WA Tier 1 and Tier 3 - Recycled Recycled Concrete Girard Resources & Recycling LLC, Concrete Aggregate (RS-D-358) Aggregate Snohomish-WA 'Tier 1 and Tier 2 - Recycled Recycled Concrete Interstate Concrete &Asphalt, Elk-WA Concrete Aggregate (RS-C-346) Aggregate Tier 1 - Recycled Concrete Recycled Concrete Black Lake Resources, Littlerock-WA Aggregate (RS-J-217) Aggregate Tier 1 - Recycled Concrete Recycled Concrete Black Lake Resources, Grand Mound WA 'Aggregate (RS-J-216) Aggregate Tier 1 - Recycled Concrete Recycled Concrete Kitsap Reclamation & Materials, Bremerton- Aggregate (RS-I-118) Aggregate ;WA copyright WSDOT 0 2016 2 of 2 12/29/2021,8:45 AM ALLIANCE Alliance Testing Services PO Box 2377 (tist TESTING Renton,WA 98056 425-757-0762 .„, „7;,.- SERVICES Plant 1-Alliance Testing Services Product 68-Squak Mountain CSTC Name/Title Mike Costello/Manager Period: 01/01/2019-04/09/2019 Report Date 04/09/2019 Procedure Sieve/Test Result Unit 9-03.9.3 Crushed Surfacing TC AASHTO Ti 1/27 3/4"(19mm) 100.0 % 100-100 1/2"(12.5mm) 89.4 % 80-100 #4(4.75mm) 49.7 % 46-66 #40(0.425mm) 13.3 % 8-24 #200(75um) 7.60 % 0-10 AASHTO T176 SE 53 >40 AASHTO T335 Fractured Faces(>1) 86 >75 9-03.12(3)Gravel Backfill for Pipe Zone Bedding 9-03.19 Bank Run Gravel for Trench Backfill Sieve Size Percent Passing 17 " 99-100 VOW Size pow 1" 75-100 t/ MlIllrgadllIllMIIEtaM %" 50-100 1/ No.4 22-100 No.4 20 80 i I No.200 0-10 No.40 ' 3-24 i Dust Ratio: %max.1 No.200 10.0 max.1/ 1 Sand Equivalent 30 min. Sand Equivalent I 35 min. StonemontQC Washington State v1. Department of Transportation Request for Approval of Material Contract Number FA Number N/A SR Duvall Ave NE Date CAG 20-065 8/31/21 Section/Title of Project Duvall Ave NE County King Contractor Reed Trucking & Excavating, Inc. Subcontractor This form shall be completed prior to submittal. If this form Is not compete at time of submittal it may For WSDOT Use Only be returned for Information that was omitted. RAM# 025 PE Use Bid Item Material or Name and Location of Fabricator, Specification PEIQPL Hdgtr.IQPL HQ Use No. Product/Type Manufacturer or Pit Number Reference Code Code A49 20x24 Locking Olympic Foundry Inc 7-05 3 Frame P ject En ineer/Riffiesentative Date State Materials Engineer/Representative Date A ptance AA t on Codes for use y roject Engineer and State Materials Laboratory 1. A ep n Criteria: A ptance based upon"Satisfactory"Test Report for samples of materials to be incorporated into project. 2. Acceptance Criteria: Mfg.Cert.of Compliance for'Acceptance'prior to use of material. Acceptance Criteria: Catalog Cuts for'Acceptance'prior to use of material.Catalog Cut Approved ®Yes ❑No 4. Acceptance Criteria: Submit Shop Drawings for'Approval'prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment','WSDOT Inspected'or'Fabrication Approved Decal'material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks (PE): Remarks (HQ): DOT Form 350-071 Project Engineer Distribution Revised 03/2021 ®Contractor ❑Region Operations Engineer ❑Fabrication Inspection ❑Region Materials1:3 State Materials Lab-MS 47365 w i BID ITEM A49, A50. A51 Frame and Grate shall have rust protection coating W --7/8' 15/8' la 1/2' L 41/T �.rl/8' I 5/8. 25 1 C 20 1/4' 3 3/4'Piiiinili/F-- =• 3/4' 22' 1-2 1/2. 1 SAC3/4' r, SLOT DETAL - 3/4' 1 221/2' [ 11/a__ - 24 1/4' J . I 2°• —1 __I28 1/4' ..-1 I-1/2" -5/8' FRAME SLOT FCRNED AND RECESSED FOR 3/8"-11 NC'2'SOCKET HEAD(ALLEN HEAD)CAP SCREW. 1 5/8'(TOLERANCE-+0',-1/18') r ALTERNATE 11 It' 3/8' SUBMITTAL REVIEW T�� Tr No Exceptions Taken ���1.....1LLL T 20• X Make Corrections Noted --___ _=� 4. ' Amend & Resubmit ^Z ..I-,r 4 Rejected-See Remarks IMPORTANT NOTICE:This review 24' 1 5/�'(ITLERANCEa+0',-1/15'} does not relieve the Contractor from j5/5r r_11/4' responsibility to comply& conform 1/8'R / I 1 5/8" with the Plans, Specifications, and /8'i I •i2, 5%18�R.R I 2�/4' j j Contract Documents. 2 3/4" / IIWO PARTING LIRE -2 3/4' Inc.�lb Oebo , nc VANE DETAIL Y CONSULTING ENGINEERS By:MB Date: 9/15/21 NOTES: WSDOT STD B2B OLYMPIC FOUNDRY INC. 20"X 24" REVERSIBLE LOCKING FRAME &VANED GRATE MATL:Frame;Cast Won ASTM A48 CL30.Grate;Ductile Iron ASTM A536 CL8055- RATING: H-20 PART NO. SM6OV D/T 06 APPROX WT:Frame 160 Lbs,Grate 104 Lbs REV:A DATE:7/3/2003 New border REV TOLERANCE A W DOCUMENT APPROVED DN:CL DATE:7/3/2003 REV: DATE: xx+-1 BY: DATE: CHKD:CL DATE:7/3/2003 xxxx DSo DWG#:SM60 VANED DT SCALE:N/A SHEET:1 OF 1 <w2 DEG FF • Enaineer Addition Washington State wa/ Department of Transportation Qualified Product List Product Information Manufacturer : Olympic Foundry, Inc., Seattle, - WA Product Name : Metal Castings for Catch Basins and Inlets Standard Spec : 9-05.15(2), Drainage Structures - Metal Frame, Grate and Solid Metal Cover for Catch Basins or Inlets Product Description : Manufacturer of frame, grate and solid metal cover for catch basins or inlets; See Std Plan B-25.20, B-30.10; B-30.20, B-30.30, B-30.40 and B- 30.50 for further details Product Restriction cceptance Code : 5 0 Co Description . Acceptance is based on field verification of the `WSDOT - A' impres into e casting. (A is an alpha fabrication inspectors' identification). Document, ' he inspectors' IDR, the fabrication stamp information identifying the inspector ett and quantity and either`F' or'D'for foreign or domestic steel and/or iron o of marke . the Contract contains a Buy America clause and the material is m ed F or not at all, e PEO is responsible for acquiring a Certificate of Material rigin from the Contractor. : The Pro' et'6ffice will need to forward a copy of the completed QPL page to the Fabric ection Office for notification as soon as this material is approved for ast Updated : Sep 13, 2010 • Contractors with WSDOT Click here for Contractor Product Info Page Copyright WSDOT© 2016 - i .;,i r,. Ink � Washington State �// Department of Transportation Request for Ap roval of Material Contract Number FA Number N/A SR Duvall Ave NE Date CAG 20-065 Section/Title of Project Duvall Ave NE County King Contractor Reed Trucking & Excavating, Inc. Subcontractor This form shall be completed prior to submittal.If this form is not compete at time of submittal it may For WSDOT Use Only be returned for Information that was omitted. RAM#014 PE Use Bid Item Material or Name and Location of Fabricator, Specification PE/QPL Hdgtr./QPL HQ Use No. Product/Type Manufacturer or Pit Number Reference Code Code A49 Type 1 Riser Shope 7-05 3 A49 Curb Inlet Shope 7-05 3 Project E gineer/Repr:s-ntativ: Date State Materials Engineer/Representative Date Ac Y c- •to ceActi�n Codes for use by Project Engineer and State Materials Laboratory 1. cceptat =Criteria: Acceptance based upon''Satisfactory"Test Report for samples of materials to be incorporated into project: 2. Acceptance Criteria: Mfg.Cert.of Compliance for'Acceptance'prior to use of material. (2Acceptance Criteria: Catalog Cuts for'Acceptance'prior to use of material.Catalog Cut Approved ®Yes ❑No Acceptance Criteria: Submit Shop Drawings for'Approval'prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment','WSDOT Inspected'or'Fabrication Approved Decal'material shall be used. B. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. B. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks (PE): Remarks (HQ): DOT Form 350-071 Project Engineer Distribution Revised 03/2021 ['Contractor 0 Region Operations Engineer ❑Fabrication Inspection ❑Region Materials ❑State Materials Lab-MS 47385 6 AlIlk lir.7Washington State 41.0 Department of Transportation Request for Approval of Material Contract Number FA Number N/A SR Duvall Ave NE Date CAG 20-065 Section/Title of Project Duvall Ave NE County King Contractor Reed Trucking & Excavating, Inc. Subcontractor This form shall be completed prior to submittal. If this form is not,compete at time of submittal it may For WSDOT Use Only be returned for Information that was omitted. RAM#014 PE Use Bid Item Material or Name and Location of Fabricator, Specification PE/QPL Hdgtr,IQPL HQ Use No. ProductiType Manufacturer or Pit Number Reference Code Code A49 Type 1 Riser Shope 7-05 3 A49 Curb Inlet Shope 7-05 3 Project Engineer/Representative Date State Materials Engineer/Representative Date Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. Acceptance Criteria: Acceptance based upon"Satisfactory"Test Report for samples of materials to be incorporated into project. 2. Acceptance Criteria: Mfg.Cert.of Compliance for'Acceptance'prior to use of material. Acceptance Criteria: Catalog Cuts for'Acceptance'prior to use of material.Catalog Cut Approved ®Yes ❑No • • Acceptance Criteria: Submit Shop Drawings for'Approval'prior to fabrication of material. 5. Acceptance Criteria: Only'Approved for Shipment','WSDOT Inspected'or'Fabrication Approved Decal'material shall be used. 6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved: 9. Approval Withheld: Submit samples for preliminary evaluation. 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks (PE): Remarks (HQ): DOT Form 350-071 Project Engineer Distribution Revised 03/2021 ❑Contractor ❑Region Operations Engineer ❑Fabrication Inspection ❑Region Materials ❑Slate Materials Lab-MS 47365 catch basin products :,'IlliMEMII WSDOT Catch Basin Risers Type 1 34"� �30" 24" 20" 1 34" 30" 24 20" 6" �\ --- v 30" \ ' 34" \ ' 24" 20" 2" \\\ I �'/ \1 t 34' ♦ 30" '\ ,- 24" 4620" \\\ v -'i' \ \ ,- i \ \z'/ 0 4,0" 12" 30" ik1 34" 24" 20" Y 4" I \ I \\ I i' \yi \ v SUBMITTAL REVIEW \ Y \\\ X No Exceptions Taken 34" ♦ 30" Make Corrections Noted ♦ za" 20^ 30" Amend & Resubmit 34" 24" 20" — Rejected-See Re - s 0�/— —\\ Il IMPORTANT NOTIC . hi i400011111!° 24" does not relieve the Con'.• • 'T1 responsibility to comply&confo i2a" with the Plans, Specificati ins, and Contract Documents. F IWO b . 1Gray£$Osborne, In,G 1 ' CONSULTING ENGINEERS 17"KNOCKOUT ALL FOUR SIDES \ I i'\yi By: TLS Date:9/7/21 \\yam-� Note::drawings not to scale Si'7^ Shope Enterprises,Inc. (253)848-1551 1-800-422-7560[FREE CALL—North America] I 1618 East Main Avenue Fax Line 1(253)845 0292 www.shopeconcrete.com concrete products Puyallup,WA 98372-3142 Fax Line 2(253)864-6172 60 Catch Basin shQDe Products Cone€ce Praduuts Curb Inlet Type 26 Reinforcing WSDOT B-25.60-02 • ASTM A-61 5 • All components ■ #3 grade 60 reinforcing bar — a51011 B 6 Inch Riser • 300 lbs 12 Inch Riser Provide Frame & rate Submittal • 600 lbs 34' 30"24" 20" Precast Base • Base unit has four-way knock outs provided for 6" RISER pipe entry • 1100lbs ■ 1' inch hole on each side for handling Conformity Standards • Washington State APWA/WSDOT Standard Specifications 30"■ WSDOT B-25.60-02 34 24' ♦ 20 , k 0 12" RISER SUBMITTAL REVIEW x No Exceptions Taken Make Corrections Noted Amend & Resubmit Rejected-See Remarks IMPORTANT NOTICE:This review does not relieve the Contractor from 34• 30' responsibility to comply&conform 26" 22• with the Plans, Specifications, and Contract Documents. 4 \ 0 17" 0 25„ Gray 8L Osborne,Inc. CONSULTING ENGINEERS 4' By: TLS Date: 9/7/21 Note:drawings not to scale Shope Concrete,LLC (253)848-1551 Sn�/,'/�G Q ,/ 1618 East Main Avenue Fax Line 1(253)845-0292 1-800-422-7560[TOLL FREE] Puyallup,WA 98372-3142 Fax Line 2(253)864-6172 www.shopeconcrete.com Engineer Addition Ask Washington State vj Department of Transportation Qualified Product List Product Information Manufacturer : Shope Concrete Products, Puyallup - WA Product Name : Precast Concrete Catch Basins Standard Spec : 9-05.50(3), Precast Concrete Catch Basins Product Description : Manufacturers of precast concrete catch basins and risers; for assistance, see Std Plan B-5.20, B-5.40, B-5.60, B-10.20, B-10.40, B-10.60 and B- 30.90 for further details. Product Restriction : cceptance Code : 5120 Co Description : Acce ance is based on field verification of`W.S.D.O.T. INSPE ' stamp. Do ment, in the field inspectors' IDR, the fabrication inspectors' initial, quanta nd ither'F' or'D'for foreign or domestic steel and/or iron or not marked. Concre 'ustment Sections less than 12 inches - Acceptance shall be Visually in a rdance ' h Section 9-1.4C. If the Contract contains a Buy America clause an he material is ked F or not at all, the PEO is responsible for acquiring a Certi ' ate of Material Origin fr the Contractor. Note 10 : The Project Office will n d to orward a copy of the completed QPL page to the Fabrication Inspection Office for n ' ation as soon as this material is approved for use. Last Updated : Sep 9, 2017 Contractors with WSDOT Click here for Contractor Product Info Page Copyright WSDOT©2016 Engineer Addition 114162 Washington State rfir Department of Transportation Qualified Product List Product Information Manufacturer : Shope Concrete Products, Puyallup - WA Product Name : Precast Concrete Inlets Standard Spec : 9-05.50(4), Precast Concrete Inlets Product Description : Manufacturers of precast concrete inlets and drop inlet Type 1 and risers; for assistance, see Std Plan B-25.60 and B-45.20 for further details. Product Restriction : Acceptance Code 5120 Code Description : ceptance is ba d on field verification of'W.S.D.O.T. INSPECTED'stamp. Do ment, in t field inspectors' IDR, the fabrication inspectors' initial, quantity and either' ' or for foreign or domestic steel and/or iron or not marked. Concrete Adjustme ections less than 12 inches - Acceptance shall be Visually in accordance with S 'on 9-1.4C. If the Contract contains a Buy America clause and the material is arke F or not at all, the PEO is responsible for acquiring a Certificate of Material rigin from he Contractor. Note 10 : The Project Office will need to rwar c of the completed QPL page to the Fabrication Inspection Office for notification a on as this material is approved for use. Last Updated : Sep 9, 2017 Contractors with WSDOT Click here for Contractor Product Info Page Copyright WSDOT©2016