HomeMy WebLinkAbout05/13/2025 - 051325 Director's Report - OtherRenton Airport Advisory
Committee
Director’s Report
Tuesday, May 13, 2025
Services Provided to the Public
Renton Airport is a general aviation airport serving Renton and other nearby communities. It serves as a reliever airport for SeaTac International Airport under the jurisdiction of the Federal Aviation Administration – Northwest Mountain Region. Located at the south shore of Lake Washington, the Airport
Has a land-based and sea-based airstrip. The Boeing 737 series are built at the Renton Boeing Plant across the Cedar River.
Is the site of all initial test flights of Boeing 737 aircraft produced at the nearby Boeing-Renton facility, making it the maiden flight headquarters for one of the world’s most popular and frequently flown airplanes.
Provides regional airport services for air charter, air taxi, corporate flights, business, and recreational flyers.
Provides light instruction and pilot services through the airport's FBOs. US Customs and Border Patrol services are available with a 24-hour notice.
Is a strategic airport for regular and emergency services into and out of the region.
Is used for life flight services, military operations, Boeing manufacturing, law enforcement, and various other essential services.
Is a key transfer and distribution point for emergency equipment and supplies.
Regulatory Overlay
What affects work that we do and how we do it
The Renton Airport serves nearly
140,000 operations a year, accounting
for about 20% of all aviation activity in
Washington state.
FAA 139 requirements between safety
and operating standards.
NFPA 407 Standards for Aircraft Fueling
Department of Ecology
The airport's focus for the year remains on preventative maintenance, particularly through
improved pavement management and leveraging our online Airport Management System
(Veoci) for:
•Efficient work order & maintenance handling
•Digital lease management of tie-down & hangars
•Storage of important documents
•Automating contract management
•Streamlining how the airport communicates with tenants
2024 AIRPORT OPERATING REVENUE AND EXPENSES
Sourse of Revenue Actual
Beginning Balance (from 2023)$5,432,714.97
Airport Fuel Charges $ 116,464.00
All Airport Leases (short-term/long -term)$4,174,125.90
Total Revenue $9,723,304.87
Expenses Actual
Airport Operations ( $2,285,218.72)
Grand Excess of Revenues over
Expenditures
$7,438,086.15
2024 Airport Capital Fund Revenue
Source Actual
Airport Lease/Long Term $ 564,349.30
Taxiway A Rehab $ 948,921.27
Total Capital Fund Revenue $1,513,270.57
2025
Anticipated Revenue = $17M
From the FAA Grant for Taxiway A Project
Grant Funding
The Renton Airport is part of the National Plan of Integrated Airport Systems (NPIAS) under the Federal
Aviation Administration. This allows the airport eligibility for Federal funding under the Airport
Improvement Program (AIP) over the next 5 years.
Washington Department of Transportation
FEMA
Congressional Direct Spending
State and local sources
2025 PROJECTED PROFIT AND LOSS OF REVENUE
FROM VACATED LEASES
Source of Revenue Projected Loss
RFS (800 Parcel)$ 88,112.00
LGW (295 Parcel)$ 67,589.00
Total Projected Loss $ 155,701.00
Source of Revenue Projected Revenue
Bosair LLC (800 parcel, self -serve)$ 34,320.00
Transient Parking (800 parcel ramp)$ 4,000.00
Total Projected Revenue $ 38,320.00
Projected Revenue $ 38,320.00
Projected Loss $ 155,701.00
Total Projected Loss $ 117,381.00
EEffective June 1, 2025
12-Month Revenue Projection
from Fee Schedule Increase
From June 1, 2025
Airport Charges Amount $
T-Hangars ($580 x 41)$ 23,780.00
Tie-Downs ($185.60 x 38)$ 7,052.80
Monthly Projected Revenue
Annual Projected Revenue
$ 30,832.80
X12
$369,984.00
Secured siting study grant for new control tower $600,000
FAA Taxiway Alpha Construction Phase 1 and Phase 2 $17M
Runway Fog Seal & Restripe Grant $1.5M
Secured Windsock Tie-down & 243 Apron Repave
Construction $1.5M
Security Upgrade Project Construction $1.7M
Seaplane Base Dredging Construction $3M
Seaplane Base Dock and Ramp Construction $3M
Looking Ahead
Airport Improvement Budget
Secured siting study grant for new control tower $600,000
FAA Taxiway Alpha Construction Phase 1 and Phase 2 $17M
Runway Fog Seal & Restripe Grant $1.5M
Secured Windsock Tie-down & 243 Apron Repave
Construction $1.5M
Security Upgrade Project Construction $1.7M
Seaplane Base Dredging Construction $3M
Seaplane Base Dock and Ramp Construction $3M
Looking Ahead
Airport Improvement Budget
Security Upgrade Project
SUSTAINABILITY PLAN
STAKEHOLDER PRIORITY SUSTAINABILITY INITIATIVES
(Initiated in 2010)
Track monthly utility charges
Partner with energy firms to consider renewable energy projects on residual lands that
offset airport costs or generate revenue
Initiate a total cost of ownership system for making decisions
Airport Financial
Initiatives
Description Primary Benefits Barriers/Effects
to be Avoided/
Minimized
Update Cash Flow Model
Monthly
Tracking of monthly cash flow
to highlight potential areas
for improvement/
opportunities.
Financial Time intensive
Track monthly utility charges Focus on airport-owned
facilities' consumption of
energy, water, etc.
Financial
Energy Conservation/ GHG
Time intensive
Partner with energy firms to
consider renewable energy
projects on residual lands
that offset airport costs or
generate revenue
Examine potential of
installing solar panels,
geothermal, wind turbines,
etc. to help offset airport
costs, reduce energy
consumption/ GHG
emissions, and potentially
increase revenue.
Financial
Airport/ Local Economic Value
Community Outreach-Energy
Conservation/ GHG Reduction
Potential initial costs,
but ROI could be high;
partnership may be
able to offset initial
costs (lease
agreements)
Initiate a total cost of
ownership system for making
decisions
Examine
financial/operational
decisions within a framework
of cost of implementation,
maintenance, and operation
within the life cycle.
Financial
Airport/ Local Economic Value
Energy Conservation/ GHG
Reduce Operation and
Maintenance Impacts
Initial cost to develop,
but return over the
long-term
SUSTAINABILITY PLAN
STAKEHOLDER PRIORITY SUSTAINABILITY INITIATIVES
(Initiated in 2010)
Airport and Local
Economic Values
Description Primary Benefits Barriers/Effects
to be Avoided/ Minimized
Prepare for greater lease area
needs associated with Boeing
737 Max program
Examine the needs of Boeing
under the expansion of lease
area resulting from an increase
in 737 production.
Financial
Airport/ Local Economic Value
Noise (additional aircraft
operations)
Water Quality
Precision Approach - Develop
RNP approaches/departure
procedures
Develop a Required Navigation
Procedure for approach/
departure for aircraft with the
necessary navigation
equipment.
Financial
Airport/ Local Economic Value
Community Outreach
Energy Conservation/ GHG
Reduce Noise
Not all aircraft are equipped
with the necessary avionics
equipment to fly precision
approach procedures
Attract an avionics repair shop
as an airport tenant
Attract an avionics shop to help
diversify economic base and
expand amenities for local
users.
Financial
Airport/ Local Economic Value
Community Outreach
-Noise (additional aircraft
operations)
Partner with energy firms to
consider renewable energy
projects that offset airport costs
or generate revenue
Examine potential of installing
solar panels, geothermal, wind
turbines, etc. to help offset
airport costs, reduce energy
consumption/GHG emissions,
and potentially increase
revenue.
Financial
Airport/ Local Economic Value
Community Outreach
Energy Conservation/ GHG
Reduction
-Potential initial costs, but ROI
could be high; partnership may
be able to offset initial costs
(lease agreements)
SUSTAINABILITY PLAN
STAKEHOLDER PRIORITY SUSTAINABILITY INITIATIVES
(Initiated in 2010)
Track monthly utility charges
Partner with energy firms to consider renewable energy projects on residual lands that
offset airport costs or generate revenue
Initiate a total cost of ownership system for making decisions
Community Outreach
and Education
Description Primary Benefits Barriers/Effects
to be Avoided/
Minimized
Continue airport tours for at
least five Renton-based
community groups annually
Conduct airport tours for
interested community groups
and members.
Airport/ Local Economic Value
Community Outreach
-Time for Airport staff
Conduct one annual airport
open house
Conduct an annual airport open
house for the community to visit
the airport facilities and learn
about airport programs and
contributions.
Community Outreach Time for Airport staff
Establish airport internships
and/or public education
programs with a sustainability
component
Create positions to help the
Airport implement and track
their sustainability projects,
while providing experience for
students.
Airport/ Local Economic Value
Community Outreach
Financial
Time for Airport staff
Conduct events such as
displays of historical info,
woman flight, aircraft, etc.
Research and develop special
events such as: historical
aircraft displays/flights, a focus
on women in aviation or other
public interest events to
promote the Airport.
Airport/ Local Economic Value
Community Outreach
Time for Airport staff
Community Outreach
and Education
(continued)
Description Primary Benefits Barriers/Effects
to be Avoided/
Minimized
Seek opportunities to use the
old Renton Chamber of
Commerce site to engage the
public in the importance of
aviation in Renton
Create an information
sharing site to share
information on potential
benefits of aviation.
Airport/ Local Economic Value
Community Outreach
Time for Airport staff
SUSTAINABILITY PLAN
STAKEHOLDER PRIORITY SUSTAINABILITY INITIATIVES
(Initiated in 2010)
SUSTAINABILITY PLAN
STAKEHOLDER PRIORITY SUSTAINABILITY INITIATIVES
(Initiated in 2010)
Track monthly utility charges
Partner with energy firms to consider renewable energy projects on residual lands that
offset airport costs or generate revenue
Initiate a total cost of ownership system for making decisions
Noise from Aircraft
OperationsEnergy
Conservation/
Greenhouse Gases
Description Primary Benefits Barriers/Effects
to be Avoided/
Minimized
Annually update brochure for
Voluntary Noise Abatement
procedures
Update the Voluntary Noise
Abatement Brochure every year
to include new procedures or
additional information
Community Outreach
Reduce Noise
Reduce Operation/ Maintenance
Time of Airport staff
Continue to encourage Renton-
based and other flight schools
in the area to train students to
"fly quiet"
Provide a more robust fly quiet
training for student pilots to
ensure that they understand the
noise sensitivities and methods
they can use to reduce their
impact.
Airport/ Local Economic Value
Community Outreach
Reduce Noise
Reduce Operation/ Maintenance
Time of Airport staff
Continue to contract with firms
such as Whispertrack to
electronically disseminate
RNT's existing noise abatement
procedures
Provide additional methods of
dissemination of fly quiet
information for pilots and
tenants of the Airport to ensure
that they understand the noise
sensitivities and methods they
can use to reduce their impact.
Airport/ Local Economic Value
Community Outreach
Reduce Noise
Reduce Operation/ Maintenance
Time of Airport staff
Evaluate berms and blast
fences for additional
attenuation
Examine the potential to
construct a berm or blast fence
for additional noise attenuation
Airport/ Local Economic Value
Community Outreach
Reduce Noise
Financial: Initial cost of
study/berms
SUSTAINABILITY PLAN
STAKEHOLDER PRIORITY SUSTAINABILITY INITIATIVES
(Initiated in 2010)
Track monthly utility charges
Partner with energy firms to consider renewable energy projects on residual lands that
offset airport costs or generate revenue
Initiate a total cost of ownership system for making decisions
Operation, Maintenance,
and Capital Improvement of Airport Facilities
Description Primary Benefits Barriers/Effects
to be Avoided/
Minimized
Replace the Seaplane launch
ramp
Replace the existing seaplane
launch ramp with updated
facilities.
Airport/ Local Economic Values
Reduce Operation/ Maintenance
Cost of replacement
Potential water quality
impacts during
construction
Complete the Maintenance
Dredging and Shoreline
Mitigation project to maintain
proper water depths for
seaplanes to access the Lake
Dredge the seaplane base.Airport/ Local Economic Values
Reduce Operation/ Maintenance
Water Quality
Cost
Potential impact on
seaplane operation
during mitigation
Potential increase in
wildlife hazards
Develop a "green" landscaping
and maintenance practices plan
(i.e., limit chemical, water and
energy use, use of native
materials, etc.)
Create a landscaping and
maintenance plan with green
practices to reduce
consumption of materials and
impact on surrounding
resources.
Community Outreach
Reduce Operation/ Maintenance
Water Quality
Cost of plan
development; ROI
Perform annual facility surveys
and prioritize maintenance
items for the year
Annually perform a survey to
examine and prioritize
maintenance items for the
following year.
Financial
Reduce Operation/ Maintenance
Water Quality
Time of Airport staff
SUSTAINABILITY PLAN
STAKEHOLDER PRIORITY SUSTAINABILITY INITIATIVES
(Initiated in 2010)
Track monthly utility charges
Partner with energy firms to consider renewable energy projects on residual lands that
offset airport costs or generate revenue
Initiate a total cost of ownership system for making decisions
Operation, Maintenance,
and Capital Improvement
of Airport Facilities
(Continued)
Description Primary Benefits Barriers/Effects
to be Avoided/
Minimized
Update the Pavement
Management Plan for the Airport
to track the pavement condition
of the runway, all taxiways and
ramps, and all parking lot and
perimeter road pavements
Update the Pavement
Management Plan to ensure that
pavement on the Airport is
adequately maintained and
replaced as needed.
Reduce Operation/Maintenance
Airport/Local Economic Values
Time of Airport staff
Complete the development of
an airport maintenance
management plan by December
2013 to memorialize scheduled
maintenance activities
Provide a method to track and
ensure maintenance activities
are being completed on time
and as needed.
-Reduce Operation/Maintenance
-Airport/Local Economic Values
Time of Airport staff
SUSTAINABILITY PLAN
STAKEHOLDER PRIORITY SUSTAINABILITY INITIATIVES
(Initiated in 2010)
Track monthly utility charges
Partner with energy firms to consider renewable energy projects on residual lands that
offset airport costs or generate revenue
Initiate a total cost of ownership system for making decisions
Water Quality Description Primary Benefits Barriers/Effects
to be Avoided/
Minimized
Consider installing pervious
pavements when repaving
parking lots where
appropriate/available
Where appropriate, install
pervious pavements when
replacing pavement.
Reduce Operation/ Maintenance
Water Quality
Financial: Additional cost
Install swales or rain garden
type treatments where possible
to improve stormwater quality
Install swales or rain gardens Reduce Operation/Maintenance
Water Quality Financial: Additional cost
to install
Utilize low-toxicity herbicides -
Plant nitrogen-fixing vegetation
Use low-toxicity
pesticide/herbicides on the
airport property.
Airport/ Local Economic Value
Reduce Operation/ Maintenance
Water Quality
Additional cost
Install moisture sensors and
timers for all irrigation systems
Install moisture sensors for
irrigation to prevent
overwatering.
Financial
Water Quality
Reduce Operation/ Maintenance
Cost of implementation;
ROI
Thank you!