HomeMy WebLinkAboutP_Plans_KingCo_Tabor_Crowall&Brodell_250519_v12025_0507_rev02_projectnarrativecedarriverrightbankrevrepair.docx 6
Attachment 1. Tabor-Crowall Revetment Repair Plans and Brodell
Revetment Repair Plans
Attachment 1
Cultural resources hand-dug test holes in this area (of proposed Cedar River Trail temporary detour)
between SR169 and Golf Course Fence
hand-dug test holes to be at 30 meter spacing (or greater) between Maplewood Ave SE and 131st Ave SE
(where the proposed CRT detour will end and connect back in with the CRT).