Loading...
HomeMy WebLinkAboutR-431506Q J n rr O ��2 VJ O w 2 n O A PORTION OF THE SE 1/4 OF SECTION 19, TWP, 23 REG, 5 E, WM rr\ I SO r rJJ I _R L 1S_RV O 1_R Pr\_Rf< J J w — —� — 208 �✓� w v — � S 21 ST ST 2og w w w w �— CATCH BASIN INSET PER (NEIGHBORHOOD COLLECTOR ARTERIAL) (OP cTn PI ANI ') 1 F ' (O nf\l .............................. ........... — _ .................... - LJ .... ................. .. .......... .. ............................. ... ...... ...... ...... -�� ,.......... �� ... ..................... r. ti 0..... - 209 ° �— \/ — _ _ _ > ..>..:.: I. FBI I I 1 ! EXISTING CONCRETE - ------ ----- — — — — I.. ___ _________� — , RETAINING WALL TO � �! -------------------- 0 --b----- — — — ; a f --- - �- - ---,$- ;=T O — — — — — — REMAIN. TO BE FILLED INSTALL TEMPORARY . ' IN ON WEST SIDE. \ ----- i� ---- --------------------- 12"0 CULVERT UNDER CONSTRUCTION o ENTRANCE SEE COR 0 ��00 00 00 00 00 00 00 O� Q 9e88200010 \ STD PLAN 215.10 ON o fo0� o°000 �O f �Ooo �Oo �Oc'0�( I I I ,tog 2101 BURNETT PL S I Oo O Oo OHO 0 Oo°O�Oo°CSC ..... a o O� O �, SHEET GR-03 0 ,o0a0 Oa0 o0a0 o0a0 o0a0 00�0 o0a0 oO�OC� (� 0 C�°O�� °00�0°00�0° ��0° ��0° �00° �00° � o f o O o O Oo00 Oo00 Oo00 000 OOC� PAD=21 1.7 I O o�/ O 0 0o Oo O O O o MOO Q ti�O�oOo°OD o00oo a O O O0 =0 0 0a0Co I I PAD-211.7 0 CONSTRUCTION ENTRANCE PAD=211.5 PER COR STD PLAN 215.10 A ON SHEET GR-03 Y o � 212--��----}-------------------J _ _ - - W.:::..... `L / 9888200020 1 I SILT FENCE PER COR 2107 BURNETT PL S f ( / EXISTING CONCRETE 212 � f ....E ....... STD PLAN 214.00 ON \ c�..... RETAINING WALL TO TYP SHEET GR-03 REMAIN. �- -� 2� ( ) -P r\ r 0 _ / _E r r E R=) Fir 1 L.... C?........ M \ N N +. (o 7222000106 214 / — _ ...L.... i I 7222000141 �... �... / � N N 2114 SMITHERS ` 7222000105 2109 SMITHERS 1 `: : :.... ) 1 AVE S-ti f \ 2120 SMITHERS AVE S / �`� AVE S 216 I CONSTRUCTION SEQUENCE NOTE: REFER TO WET SEASON PROVISIONS ON SHEET GR-02 FOR 10. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES ADDITIONAL EROSION CONTROL MEASURES THAT ARE REQUIRED SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT FOR WET WEATHER CONSTRUCTION (BETWEEN OCTOBER 1 AND CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY OF RENTON APRIL 30). EROSION AND SEDIMENT CONTROL STANDARDS. 1. SCHEDULE A PRE -CONSTRUCTION MEETING WITH THE CITY OF RENTON. 11. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET 2. POST SIGN WITH NAME AND PHONE NUMBER OF T.E.S.C. SUPERVISOR SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC (MAY BE CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION SHEETING OR EQUIVALENT. SIGN). 12. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. 3. FLAG OR FENCE CLEARING LIMITS. 13. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 4. INSTALL CATCH BASIN PROTECTION ON EXISTING STRUCTURES AS DAYS. SHOWN. 14. INSTALL STORM DRAINAGE SYSTEM WITH TEMPORARY CATCH BASIN 5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). PROTECTION. 6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). 15. EXCAVATE AND CONSTRUCT STORMWATER VAULT. 7. GRADE AND STABILIZE CONSTRUCTION ROADS. 16. INSTALL ALL OTHER UTILITIES, CURB, GUTTER, SIDEWALK AND PAVING. 8. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE 17. CLEAN DETENTION SYSTEM AS NECESSARY. SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING 18. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE FOR PROJECT DEVELOPMENT. CONSTRUCT SWPPS CONTROLS IN STABILIZED AND SEDIMENT CONTROL BMPS REMOVED IF APPROPRIATE. ANTICIPATION OD SCHEDULED CONSTRUCTION ACTIVITY (E.G., CONCRETE -RELATED PH MEASURES FOR UTILITY, VAULT OR 19. COR INSPECTORS MAY REQUIRE ADDITIONAL TESC MEASURES/BMPS IN ROADWAY CONSTRUCTION.) ORDER TO PREVENT OR LIMIT RUNOFF OFFSITE. 9. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY OF RENTON STANDARDS AND MANUFACTURER'S RECOMMENDATIONS. Call 2 Working Days Before You Dig 811 Utilities Underground Location Center (ID,MT,ND,OR,WA) ®CONSULTING 2001 32nd Avenue South ENGINEERS L�// L C Suite 200 1 ® Federal Way, WA 98001 FEDERAL WAY (253) 838-6113 www.esmcivil.com LYNNWOOD (425) 297-9900 Civil Engineering Land Surveying Land Planning Public Works I Project Management I Landscape Architecture ESM JOB #41 1-004-023 01 CHA�c� OF WASy�Nco(�G� W50085 N �FG/STERF� G♦��v SS�CNAL RECORD DRAWINGS 1211111111 I0a1IE.9[S A SURVEYED: DESIGNED: WL DRAWN: CJR CHECKED BY I DATE I APPR I APPROVED: SCALE: 1 "=409 ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATUM CL z m CITY OF 1051 5R RENTON Planning/Building/Public Works Dept. n SCALE: 1' = 20' 20 10 0 20 40 CONTOUR INTERVAL = 1 APPROXIMATE EARTHWORK QUANTITIES STRIPPING (ASSUMED 12") 1185 CY CUT 0 CY FILL 3,815 CY NET 3,815 CY FILL FOR PERMIT PURPOSES ONLY. QUANTITIES ARE "NEAT LINE" YARDAGE'S WITHOUT ALLOWANCE FOR SHRINK OR SWELL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CALCULATE ALL YARDAGE'S FOR BID PURPOSES. R-431506 IN COMPLIANCE WITH CITY OF RENTON STANDARDS SOPHIE JO SHORT PLAT GRADING & T.E.S.C. PLAN UTILITY PERMIT # DATE: 02/18/25 PAGE DRAWING NO: GR-01 SHEET: OF:23