Loading...
HomeMy WebLinkAbout21CITY t�� RENTON Ptanning/Building/Public Works Department Gregg Timmerman P.E., Administrator Jesse Ta—, May - May 20, 2002 Mr. Matt Alexander STAUBACH 301 Howard Street, Suite 920 San Francisco, CA 94105 Subject: Mitigation Fees S Utility System Development Charges Boo & goo Garden Avenue North Dear Mr. Alexander. The purpose of this letter is to provide a breakdown of the appixabie fees for the development of the property(s) referenced above. Please note that previous estimates given for the site were based on the completion of a `fee segregation' for the property. The City has assumed that the new development proposals contemplated for the site would include the subdivision., or short plat, of the site into two individual parcels. The following development fees would apply to each parcel/project indnridualty. • Traffic Mitigation Fee - This fee would be calculated at a rate of $75.00 per each new average daily trip ittrbutable to the specrfic project. For these particular uses, the City would implement trip calculations based on big box retaiF* uses as established by the Institute of Transportation Engineers (ITE) Manual. • Fire Mitigation Fee - This fee would be based ar a rate of $0.52 per square foot of new building area for each at the proposed buildings. • Water Svstem Development Charges - Charges would be based on $0.154 per square foot of prop•'-y area, with credit given for previous payment of 68,000 square feet of area. • Wastewater System Development Charges - Charges would be calculated at $0.106 per square foot of property area, with credit given for previous payment of 68,000 square feet of area. Should you have any further questions or concerns, please do not hesitate to contact me at (425) 430-7270. Sincerely, A ' Lesley Nishif� /*_D Project Manager cc: Gregg Zimmerman Sue Carlson Alex Pietsch Neil Watts Jennifer Henning 1055 South Grady Way - Renton, Washington 98055 R E iV T O N eT1a-rursa.a50'4- - ___ AHEAD - THE C4a