Loading...
HomeMy WebLinkAbout33FRY'S ELECTRONICS DEVELOPMENT FEES FEE TYPE INITIAL AMOUNT REDUCED AMOUNT DIFFERENCE Fire Mitigation Fee $78,624.00 based on bMical rate WA N/A Traffic Mitigation Fee $101,379.75 Possibly as low as —$89,000 w/ I $12,379.75 NRW's revised calculation (their numbers do not help) Channelization —$18-25,000 (amount based on in- WA WA Improvements house estimate; plan will be provided to architect; cost is far less than typical intersect,on improvements considering minimal changes to be installed' Water SDC Fee $138,229.63 (based on full 22 acre $84,897.43 (based on 12.66 acre $50,332.20 Sewer SDC Fee parcel; includes 68,000 sf credit) $95,145.07 (based on full 22 acre portion of parcel) $58,435.89 (based on 12.66 acre 536.709 18 parcel; includes 68,000 sf creditportion of arcel) Surface Water SDC N/A (no new impervious area) N/A WA � Fee TOTAL FEE $431,378.45 - VM,378.45 $328,957.32 - $335,957.32 $102,421.13 i AMOUNTS N/A rLess SDC WA (credit applied in original $17,680.00 (based on prior payment Redevelopment Credit amount) for 68,000 square feet of si.e area; amount includes both Wafer and i Sewer credit FINAL TOTALS $431,378..45 - $438,378.45 $311,277.32 - $318,277.32 $120,101.13 P] 50