Planning/Building/Public Works Department
Jesse Tanner, Mayor Gregg Zimmerman P.E., Administrator
June -2, 2001
Kevin Robins, Director of Constructior
Fry's Electronics
600 East Brokaw Road
San Jose. CA 95112
Subject: Fry's Electronics
File No. LUA-01-052, ECF
Dear Mr. Robins:
The purpose of this letter is to provide you with a final breakdown of the fees associated
with the development proposal referenced above. After discussion among Department
Administrators, the following list represents the development fees thai will be applied to
this project:
• Fire Mitigation Fee:
• Traffic Mitigation Fee
• Water and Sewer
System Development Charges:
Remaining Building
Permit Fees:
$78,624.00
(based on $0.52 per sf of building area)
$90,633.75
(based on $75.00 per new daily trip
attributed to the project)
$70,111.38
(based on 12.66-acre portion of parcel plus
$750 fee segregation charge w/ credit given
for 68,000 sf previously paid)
$23,424.90
(includes permit fee and building code fee)
In response to your request to further analyze the method used for calculating the
Traffic Mitigation Fee, staff has determined it would be most appropriate to distinguish
the amount of trips generated by the warehouse portion of the building m the area
dedicated to retail use. Based on this distinction, a total of 1,208.45 daay trips would be
generated by the development (178.56 trips for warehouse / 1,029.89 for retail). The
revised calculation, which is reflected above, is also based on the daily trips generated
by the project as opposed to peak hour trips to the site.
As we discussed last week, the City's Transportation Division has provided a plan that
establishes the improvements anticipated to be necessary for the creation of the left -
turn at the Park Avenue and Lake Washington Boulevard intersection. These
channelization improvements to be installed by the applicant are estimated at a,cost of
approximately $18,000 - $25,000.