Loading...
HomeMy WebLinkAbout49TO: FROM: SUBJECT: Id CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS MEMORANDUM April 4. 2002 Lesley Nishihira Dave Christensel Partial for System DeN APRO9 RFCEt V ED I have reviewed the proposed Interpretation/Policy decision regarding the segregation of SDC fees. Let me start by stating that the Utility Systems Division administers this section of the code and, as such. any interpretation of this section of code needs to be done through this division. Therefore. we do not feel that it is appropriate for Development Services to render a decision through the format proposed. As far as the information contained within the proposal. Utilities does feel that it was the intent of the code at the time it was developed to require partially developed sites to be responsible for greater than their direct area of the site. That is why the formula is in place. If, at this time. Administration does not feel that this should still be the methodology used. then we need to change the code. Currently, the Utility Systems Division has proposed revisions to this section that would allow for a property in [his situation to segregate at straight fee as long as it is a minimum of two acres and leaves a minimum of two acres. It should also be noted that the Surface Water section of the SDC Code does allow for this methodology with 5-acre requirements. It would, therefore, be Utility System Division's recommendation that this instance be handled one of two ways. The preferred way would be for us to process our code revisions, thus eliminating the concern directl%- If timing does not allow for this, then I would prefer that Utilities make a determination that although the five -acre allowance is not in the water or sewer section. that its exclusion was accidental due to the reformatting that occurred during the move of sections from Title 8 to Title 4. Thus it was the intent to continue to have this option available for all SDC fees. This will allow the other method to stay in place where it is applicable. while allowing the Frye development the option it needs to proceed with its plans. If you have any questions regarding this proposal. please contact me at x-7212. Ntil M a t',CETrrRAL`SY52%DEP S\PBPVY1Diy1StON.SNLMLME.S\DOCS1.�-213 doc1DMC:If