Loading...
HomeMy WebLinkAbout66Fry's Electronics L UP,-01-052, EC F Adv sory Notes (continued) Page 3of3 11 . `f the building exceeds 30 feet in height_ a backflow device will be required to be installed on the domestic water peter. Plan Review - Sanitary Sewer 1. 'mere is ar' existing 8-inch sewer main on Garden Avenue North- There is also an existing 20-inch sewer main on North 8 Street. 2. A Sewer System Development Charge (SDC) of S95,145.07 is owed on this site. The rate is based on 897,595 <quare feet x $0 160 (credit has been given for the 68,000 square feet previousiy assessed). This fee is sayable at the time the utility permit is issued. 3. If food preparation facilities are proposed. a grease trap or grease interceptor will be required. Plan Review - Surface Water 1. There are existing storm facilities on Garden Avenue North and North 8f° Street, 2. No new impervious surface area has been created at this site, therefore no Surface Water System Development Charges are owed. Detention and water ouality are not required. Plan Review - Transpor-anon 1. There is cur`. and gutter fronting the property. 2. If not already in place full street improvements including 5-foot sidewalks, and streetlights are required to be installed along North 81" Street and Garden Avenue North. Separate street lighting plans shall be included with civil utility plans. 3. It is anticipated that the existing sidewalk on the north side of North 8°i Street abutting the site would be removed and not replaced in order to accommodate the South Transit project. The existing combined pedesMan/bicycle fagity on the south side would be maintained to provide east -west pedestrian access along this section of North 8 Street. 4. The driveway on North 8' has been located to ,natch Paccar s driveway across the street 5. Channelization will be required on Park Avenue North in Order to provide a left turn lane onto Garden Avenue North. 6 All wire utilities shall be installed underground per the City of Renton Undergrounding Ordinance. If three or more poles are required to be moved by the development design. all existing overhead utilities shall be placed underground- Existing transmission lines along Garden are exempt from the undergrounoing requirement. Plan Review - General Comments 1 Ali construction utility permits for utilities, drainage and street improvements will require separate plan submittals. All utility plans shall conform to the Renton Drafting Standards, which are attached for reference. Plans shall be prepared by a licensed Civil Engineer 2 When the utility plans are complete, „lease submit three (3) copies of the drawings, two (2) copies of the drainage report, permit application and an rtemLzed cost of construction estimate and application fee at the counter on the sixth floor_ A fee worksheet is attached for your use, but prior to prepanng a check, it is recommended to call 425-430-7266 for a fee estimate as generated by the permit system 3. The fee for review and inspection of these improvements is 5% of the first $100,000 of the estimated cons ln:ction costs, 4% of an; ping over $100, 000 but less than $200,000. and 3% of anything ver $200.000- Half the fee must be paid upon application_ t