HomeMy WebLinkAbout10City of Renton F/R�PW Department Enviror, .htal Review Committee Staff Report
FRY'S ELECTRONICS LUA-01-052 ECF
REPORT OF MAY 8. 2001 Page 4 of 6
1 8. The applicant has shown a 12-inch main to be extended along the east and north side of the building and looped
to Garden and North 8' Street. A pressure -reducing valve may be required.
9. A separate utility permit and separate plans wi:1 be required for the installation of all double detector check valve
assemblies for fire sprinkler systems. All devices installed shall be per the latest Department of Health "Approved
List- of Backflow Prevention Devices. Location of device shall be shown on the civil plans and shall show the
following note: "Separate plans and utility permit for DDCVA installation for Fire Sprinkler System will be
required". DCVA installations outside the building shall be in accordance with the City of Renton Standards.
10. For DDCVA insta0ations proposed to be installed inside the building, applicant shall submit a copy of the
mechanical plan sntwing the location and installation of the backflow assembly inside the mechanical room.
Installation shall be in accordance with the City of Renton's requirements. DDCVA shall be installed immediately
after the pipe has passed through the building floor slab. Installation of devices shall be in the horizontal position
one. A separate utility permit and separate plans will be required for the installation of the double detector check
valve assembly for the fire sprinkler system, if backflow device is to be installed inside the building.
11. If the building exceeds 30 feet in height, a backflow device will be required to be installed on the domestic water
meter.
Plan Review — Sanitary Sewer
1. There is an existing 8-inch sewer main on Garden Avenue North. There is also an existing 20-inch sewer main on
North 8°1 Street.
2. A Sewer System Development Charge (SDC) of $95,145.07 is owed on this site. The rate is based on 897,595
square feet x SO.160 (credit has been given for the 68,000 square feet previously assessed). This fee is payable
at the time the utility permit is issued.
3. If food preparation facilities are proposed, a grease trap or grease interceptor will be required.
Plan Review — Surface Water
1. There are existing stomi facilities on Garden Avenue North and North 8' Street.
2. No new impervious surface area has been created at this site, therefore no Surface Water System Development
Charges are owed. Detention and water quality are not required.
Plan Review ::_Iran sportation
1. There is curb and gutter fronting the property_
2. If not already in place, full street improvements including 5-foot sidewalks, and streetlights are required to be
installed along North 8`b Street and Garden Avenue North. Separate street lighting plans shall be included with
civil utility plans.
3. It is anticipated that the existing sidewalk on the north side of North 8tb Street abutting the site would be removed
and not replaced in order to accommodate the South Transit project. The existing combined pedestrian/bicycle
facility on the south side would be maintained to provide east -west pedestrian access along this section of North
8' Street.
4. The driveway on North 8" has been located to match Paccar's driveway across the street.
5. Channelization will be required on Park Avenue Notch in order to provide a left turn lane onto Garden Avenue
North.
6. All wire utilities shall be installed underground per the City of Renton Undergrounding Ordinance. If three or more
poles are required to be moved by the development design, all existing overhead utilities shall be placed
underground. Existing transmission lines along Garden are exempt from the undergrounding requirement.
Plan Review —General Comments
1. All construction utility permits for utilities, drainage and street improvements will require separate plan submittals.
All utility plans shall conform to the Renton Drafting Standards, which are attached for reference. Plans shall be
prepared by a licensed Civil Engineer.
2. When the utility plans are complete, please submit three (3) copies of the drawings, two (2) copies of the drainage
report; permit application and an itemized cost of construction estimate and application fee at the counter on the
sixth floor. A fee worksheet is attached for your use, but prior to preparing a check, it is recommended to call 425-
430-7266 for a fee estimate as generated by the permit system
3. The fee for review and inspection of these improvements is 5% of the first $100,000 of the estimated construction i
costs; 4% of anything over $100,000 but less than $200,000 and 3% of anything over S200,000. Half the fee
must be paid upon application. I