HomeMy WebLinkAbout23y
S= =Y: 0_R Group 20646'6049; 05/02/01 5:32-W; -
Environmental Checklis= - page 11
khIf 8E % 6e, Di4?K-tmVf STALL5 EL. M"MA-V� FIV-0- Tt}e-
5 LSE.
d_ sail: the propasai recruire any new roads or streets, or
improvements to ex_sL_ng roads or streets, net includ_rg
driveways2 if se, generally describe (indicate whether
pt�__c or Private;.
The project will requ,_re that a left -turn lane be added
at the traffic lights on the ccr x of Garden Avenue and
Park Drive.
e. Will the project use (or ccc�_ -.. - -7_-te
of) water, rail, cr a .�..�>
generally cescr_ne-
he project occurs in the .immediate vicinity of the
Pacific Railroad coany.
-- How many ver._c::_:,r trips per day would he generated by
the cccmpleteZ _ _ect' volumes If known, :: dicate whey. peak
wou---
The proposed woid ex ate
trips per day to the site. g 'j- new
g- Propesed ;easures to redtce or con_rc' transpertaticn
impacts, if any. -
Done
15- ?ubl=c Services
a. Would the project result in an _..creased need for pabl_c
Services (_or exa=ple: fire=-^tecticn, Police
pr_�_ ectcn, health care, schcols,other;?
so,
g='�=ra.ly describe.
�-
The protect will regaire and increased need for fire
protection and police pro -,.action. The site currently
does not have a building on it. The proposed building
has a high security need, due to the nature of the
operations vz1thi_-3 the building.
7ropcsec measures to recl:ce - -- rest acts on
c services, if ar. _ .._ -trc_ .., =mF
?lore -
_6. ==ES
:ne 51:6'
Electricity, natural gas, water, refuse service,
telephone, sanitary sewer, septic system, cable T.v.,
Y
Y -