Loading...
HomeMy WebLinkAbout23y S= =Y: 0_R Group 20646'6049; 05/02/01 5:32-W; - Environmental Checklis= - page 11 khIf 8E % 6e, Di4?K-tmVf STALL5 EL. M"MA-V� FIV-0- Tt}e- 5 LSE. d_ sail: the propasai recruire any new roads or streets, or improvements to ex_sL_ng roads or streets, net includ_rg driveways2 if se, generally describe (indicate whether pt�__c or Private;. The project will requ,_re that a left -turn lane be added at the traffic lights on the ccr x of Garden Avenue and Park Drive. e. Will the project use (or ccc�_ -.. - -7_-te of) water, rail, cr a .�..�> generally cescr_ne- he project occurs in the .immediate vicinity of the Pacific Railroad coany. -- How many ver._c::_:,r trips per day would he generated by the cccmpleteZ _ _ect' volumes If known, :: dicate whey. peak wou--- The proposed woid ex ate trips per day to the site. g 'j- new g- Propesed ;easures to redtce or con_rc' transpertaticn impacts, if any. - Done 15- ?ubl=c Services a. Would the project result in an _..creased need for pabl_c Services (_or exa=ple: fire=-^tecticn, Police pr_�_ ectcn, health care, schcols,other;? so, g='�=ra.ly describe. �- The protect will regaire and increased need for fire protection and police pro -,.action. The site currently does not have a building on it. The proposed building has a high security need, due to the nature of the operations vz1thi_-3 the building. 7ropcsec measures to recl:ce - -- rest acts on c services, if ar. _ .._ -trc_ .., =mF ?lore - _6. ==ES :ne 51:6' Electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, cable T.v., Y Y -