Loading...
HomeMy WebLinkAbout54-oject Narrative - Fry's Electronics Store Page 3 s 4/52001 pother issue involves the condition of the soil on the site. in the Geotechnicai Report. is recommended that 75-feet deep augercast piles be used as the foundation system rr the building. This is going to acid significantly to the total construction cost and the mount of construction equipment on the site during construction. All efforts will be lade to not let any of the construction disrupt normal functions in the area. Augercast piles are the preferred foundation system in this particular case due to the fact that they are not 'drven" piles that cause unusual vibrations in the immediate area during their placement Construction Mitigation Construction on the site is expected to begin in June of 2001 and end in November 2001 all during normal working hours Due to the location and size of the site, it is not expected that any alternate route will need to be provided for the existing traffic in the area. All necessary measures will be taken to reduce dust and other construction debris through the use of filter fabric in the storm drains and removal of waste on the site during construction.