Loading...
HomeMy WebLinkAbout69page _ the point of tangency; Thence north 18101'40" west along said westerly margin 1, 995.11 feet to an intersection with the southerly margin of the Washington State Highway (PSH-1) north Renton interchange A -Line right-of-way; Thence south 49'05'06" west along said southerly margin 406.82- feet; Thence south 31'53155" west along said southerly margin 62.78 feet; Thence south 08'39'15" east. 47.07 feet: Thence south 18'00'30" east along said easterly margin 1,289.97 feet to the point of curvature of a curve to the right of radius 910.00 feet; thence along said margin curving to the right, an arc length of 293.83 feet to the point of tangency: Thence south 00'29'31" west along said easterly margin 253.42 feet to the tr-.e point of beginning; Situate in the City of Renton, County of King, State of Washington B. ENVIRONMENTAL---_'!ENTS 1. Earth a. General descric-_- _.._ __-e __._le one): Flat, it rollinq, hilly, seep slopes, mountainous, other b. What is the steepest slope on the ____ (approximate percent slope)? Less than 1.5% C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Fill, post Glacial Floodplain Deposits, Alluvial Sand, and Glacial Silt. d. Are the surface indications or c_5- ry of unstable soils in the immediate vicinity? If so, describe. No e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source f fill_ Minimal grading will be required for the proposed project. The existing site is currently a flat asphalt parking lot. Grading will be limited to excavation for the new building foundations.