HomeMy WebLinkAbout7STAFF City of Renton
REPORT Department of Planning / Building / Public Works
ENVIRONMENTAL REVIEW COMMITTEE
A. BACKGROUND
ERC MEETING DATE May 8, 2001
Project Name: Fry's Electronics
Applicant DLR Group
File Number: LUA-01-052, ECF
Project Manager Lesley Nishihira
Project Description: The applicant is requesting Environmental (SEPA) Review for the construction of a
151 200 s uar foot in t t I t t t l b -t � f -
Project Locat;on.
Exist. Bldg. Area gst
Site Area:
RECOMMENDATION:
Project location Map
e s
q g e s ory, s ng a enan re ai ut d ng or use as a Fry s
Electronics store. The site is located within the Heavy Industrial (IH) zoning
designation and is currently developed as an asphalt parking lot (formerly Boeing Lot
6). The property is bordered by the Burlington Northern and Santa Fe Railroad right-
of-way to the east, Garden Avenue North to the west, and North 8' Street to the south.
(Continued on page 2)
800 Garden Avenue North
NIA I-- Proposed New Bldg. Area: 151,200 square feet
551,282 square feet (24�5 acres) Total Building Area gst 151,200 square feet
Staff recommends that the Environmental Review Committee issue a Determination of
A aft
ercrpt