HomeMy WebLinkAbout70Environmental Checklis` - _aye 4
cons :r use? if so, generally describe.
The potential for erosion to occur as a result of
clearing or construction will be minimized through the
use of a Temporary Erosion and Sediment Control Plan and
Best Management Practices.
g. About what_ percent of the site will be covered with
impervious surfaces after pro ect construction (for
example, asphalt or building)?
92%
h. Proposed measures to reduce or control erosion, or other
impacts to the earth, if any:
Erosion will be controlled through the use of a
Temporary Erosion and Sediment Control Plan and Best
Management Practices including silt fences, inlet
protection, stabilized construction entrances, and
appropriate cover measures in accordance with the City
of Renton Standards.
2. Air
a. What types of=-.=ssions to the air would result from the
proposal (i.e_, dust, automobile, odors, industrial wood
smoke) during construction and when the project is
completed? If any, generally describe and give
approximate quantities if known.
Construction equipment exhaust. No Burning will be
Permitted.
b. Are there any off -site sources of emissions or odor that
may affect your proposal? If so, generally describe.
no
C. Proposed measures to reduce or control emissions or
other impacts to air, if anv:
Dust control by watering during construction.
3_ Water
a. Surface:
1) Is the any surface water --cay on or in the
immediate vicinity of the site (including year-
round and seasonal streams, saltwater, lakes,
ponds, wetlands)? If yes, describe type and
provide names. If appropriate, state what stream
or river it flows into.
No surface water body on site. Lake Washington is
approximately 1/2 mile downstream of the site.
2) Wili the projec= req:__= any work over, in, or
adjacent to (witn_n 20C __et) the described waters?
If yes, please describe and attach available plans.