Loading...
HomeMy WebLinkAbout70Environmental Checklis` - _aye 4 cons :r use? if so, generally describe. The potential for erosion to occur as a result of clearing or construction will be minimized through the use of a Temporary Erosion and Sediment Control Plan and Best Management Practices. g. About what_ percent of the site will be covered with impervious surfaces after pro ect construction (for example, asphalt or building)? 92% h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Erosion will be controlled through the use of a Temporary Erosion and Sediment Control Plan and Best Management Practices including silt fences, inlet protection, stabilized construction entrances, and appropriate cover measures in accordance with the City of Renton Standards. 2. Air a. What types of=-.=ssions to the air would result from the proposal (i.e_, dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. Construction equipment exhaust. No Burning will be Permitted. b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally describe. no C. Proposed measures to reduce or control emissions or other impacts to air, if anv: Dust control by watering during construction. 3_ Water a. Surface: 1) Is the any surface water --cay on or in the immediate vicinity of the site (including year- round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. No surface water body on site. Lake Washington is approximately 1/2 mile downstream of the site. 2) Wili the projec= req:__= any work over, in, or adjacent to (witn_n 20C __et) the described waters? If yes, please describe and attach available plans.