HomeMy WebLinkAbout71Environmental Checklist - page 5
No
3) Estimate the amount of fill and dredge material
that would be placed in or removed from surface
water or wetlands and indicate the area of the site
that would be affected. Indicate the source of fill
material.
N/A
4) Will the proposal require surface water withdrawals
or diversions? Give general description, purpose,
and approximate quantities if known.
No
5) Coes the proposal lie within a 100-year floodplain?
If so, note location on the site plan.
No
5) Does the proposal involve any discharges of waste
materials to surface waters? If so, describe the
type of waste and anticipated volume of discharge.
No
b. Ground:
1) Will ground water be withdrawr, or will water be
discharged to ground water? Give genera:
description, purpose, and approximate quantities :_
known.
No
2) Describe waste material that will be discharged
into the ground from septic tanks or other sources,
if any (for example: Domestic sewage; industrial,
containing the following chemicals...;
agricultural; etc.). Describe the general size of
the system, the number of such systems, the number
of houses to be served (if applicable), or the
number of animals or humans the system(s) are
expected to serve.
None
C. Water Runoff (including storm water):
Describe the source of runoff (including storm
water) and method of collection and disposal, If
any (include quantities, if known). Where w:._:-
this water flow? Will this water flow into otcs--=
waters? If so, describe.
Stormwater runoff from new parking and roof areas
will be collected by tzghtlined system and
discharged to the public storm system in Garden.
Ave. N.
M