HomeMy WebLinkAbout10Se cy- 0LR Group 20646'6049; 05f02/01 5-'9-M;,JetrM 0373;Raae 3/3
Enviromnental Checklist - pace 11
W((1 Ve "7b8 -PqIWuNcT s--ALL5 Ek.rum^T- -o
she. -
d. W=11 the proposal rem.:ire any new roads or streets, or
improvements to existing roads or streets, not includ-ng
driveways? if so, generally describe (indicate whether
public or private:.
The project will require that a left -turn lane be added
at the traffic lights on the co_.er of Garden Avenne and
Park Drive.
e. i:__, _ tie project use (or occur in the imme .late vicinity
of;wa_er, rail, or air transportaticn? if so,
generally ce_cribe.
The project occurs in the +maAec+ate vicinity of the
Pacific Railroad Co any.
f. How many venicular trips per day woild be generated by
the completed nrcject? Zf known, indicate when peak
vo-umes woc_c occur.
The proposed Hof JEcr roult generate 1 5.7 new
trips per day to the site.
g. Proposed measures to -educe cr ccntro- transportaticn
impacts, if anv-
None
1�. Pucl Serv-ices
ac the project result in an increased need for public
services fcr exam<nle: fire protection, police
.ealth care, schoo, other)? if so,
generally _escribe.
The pro--ect will zecpa re and increased need for fl.re
protection and police protection. The site currently
does not have a building on it_ The proposed building
has a high security need, due to the natire of the
operations within the building.
e. Proposed measures to re^ -ice cz control direct-r-pacts on
public services, .'- any.
None
;y. _--c_e --�_e� --e.^.t_l' ava_-a--e at tale
Electricity, natural gas, water, refuse service,
telephone, sanitary sever, septic system, --ble T.V.,