Short -term noise would be associated with
construction of the proposed parking lot during
daylight hours, weekdays. Long term noise would be
those associated with a retail parking lot during
operational hours.
-
3) Proposed measures to reduce or control noise
_
impacts, if any:
=
None
8. Land and Shoreline Use
a.
What is the current use of the site and adjacent
properties?
The site is currently a parking lot, undeveloped and
adjacent
to a railroad and manufacturing warehouses.
b.
Has the site been used for agriculture? If
describe. so,
No
C.
Describe any structures on the site.
None
d.
Will any structures be demolished? If so, what?
No
e.
What is the current zoning classification of the site?
IS
f.
What is the current comprehensive plan designation
the site? of
Industrial Seavy (IS)
g-
If applicable, what is the current shoreline master
program designation of the site?
N/A
"as any part of the site been classified as
an
environmentally sensitive area? If so, specify.
None known
I.
Approximately how many people would reside or work in
the
completed project?
400 employees at peak operational times (holidays)
j-
Approximately how many people would the completed
_
project displace?
None
k.
Proposed measures to avoid or reduce displacement
impacts,
if any: