Loading...
HomeMy WebLinkAbout4,Y k - _ tonne `=1 r_hec - - page B basis (for example: traffic, .construction, A operation, other)? Indicate what hours noise would come from the site - - i Short -term noise would be associated with construction of the proposed parking lot during daylight hours, weekdays. Long term noise would be those associated with a retail parking lot during operational hours. - 3) Proposed measures to reduce or control noise _ impacts, if any: = None 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? The site is currently a parking lot, undeveloped and adjacent to a railroad and manufacturing warehouses. b. Has the site been used for agriculture? If describe. so, No C. Describe any structures on the site. None d. Will any structures be demolished? If so, what? No e. What is the current zoning classification of the site? IS f. What is the current comprehensive plan designation the site? of Industrial Seavy (IS) g- If applicable, what is the current shoreline master program designation of the site? N/A "as any part of the site been classified as an environmentally sensitive area? If so, specify. None known I. Approximately how many people would reside or work in the completed project? 400 employees at peak operational times (holidays) j- Approximately how many people would the completed _ project displace? None k. Proposed measures to avoid or reduce displacement impacts, if any: None