Loading...
HomeMy WebLinkAbout524.0 DESIGN RECOWMENDATIONS 4.1 GENERAL. M KL El NFELDER The following paragraphs present our design recommendations for use by your consultants on this project- For satisfactory and successful construction of this project, these recommendations must be applied in their entiret} and in conjunction with the construction recommendations provided in Section 5.0. 4.2 SITE PREPARATION .AND EARTHWORK 4.2.1 Demolition The existing asphaltic concrete pavement at the site should I•' demolished. The resulting debris should be removed from the site and disposed of properly. The asphaltic concrete pavement, however, can be crushed and used in on -site planter areas. 4.2.2 F—rcavation Eccavation. The fill material beneath the proposed asphaltic concrete and Portland cement concrete parking and drive area subgrade should be overexcavated by 1 foot and replaced with structural fill. Proofrolling and Overexcavation: After general site excavation has been completed the exposed soil should be either proofrolled or hand probed to identify soft or unstable areas. Soft soils encountered during proofrolling or probing should be overexcavated. O erexcavation depth may be limited to 2 feet below the general excavation and should extend beyond the footing a distance equal to the depth of the excavation below planned subgrace elevation. ` Structural Fill: Soil materials used to establish grade beneath structural elements such as floor slabs should consist of on -site soil or imported select material. Import select fill material is defined in Section 5.0. Structural fill should be compacted to the following minimum relative compaction (compaction as determined by ASTVI D1557): 60213601. 6011 R05' Pof 36 •� Cop.-ish: 2000 Kk.nfcldc Inc ag