Loading...
HomeMy WebLinkAbout59r S" KLEIN FELDER from the responsibility of performing the work in such a manner as to provide a satisfactory job that meets the requirements of the project plans and specifications, or from meeting contractual obligations to the owner. 5.1.5 Geoteehnical Report This report has been prepared for design purposes for Fry's Electronics and its design consultants for this project only. The entire report should be provided to contractors for their bidding or estimating, but not as a warranty of the subsurface conditions. We cannot be responsible for the interpretation by others of the information contained in this report. 5.1.6 Construction Site Safety Our scope of sen-ices did not include construction safety practices and this report is not intended to direct construction means, methods, techniques, sequences, or procedures, except as specifically described, and then only for consideration in design, not for construction guidance. The c,:::tractor should be made responsible for construction site safety and compliance with local, state, and federal requirements. 5.2 EARTHWORK 5.2.1 General Earthwork consists of clearing and stripping, removal of existing pavements, excavating, placing and compacting fill, utility trench backfilling, structural excavating and backfilling, and all subsidiary work necessary to complete the grading of the developed areas to conform with the lines, grades, and slopes shown on the plans. Terms used in this section are defined as follows: Percent Compaction is the required in -place dry density of the material, expressed as a percentage of the maximum dry density of the same material as determined in the laboratory by ASTM Standard D 1557-91 ('Modified Proctor). Page 22 of 36 602 ! 3601. 60I I R057 Copy,o, 2000 K:,,nfcido Inc