Loading...
HomeMy WebLinkAbout14TESTING PROGRAM LABORATORY FIELD U-S.C-S. ir ip SOIL DESCRIPTION [EZ > W CONSTRUCTION E ar C, ed S-42 2 23 SI-12 Drillcri-Irport5graveil soils- Sampler 27 o ,— returned . small amountfdy ��el, 35 3 any, ex, 'en dense, fine-grained.Driller3 165 [ GP blackwet, dense, fine-grained, b=gw-. (POST-GLACIALALLUVIAL SANTD) Si-13 22 W5 Boring completed to a depth of 66.5 feet BGS. Ciround-ater was encountered during drilling at a depth of 14 feet BGS. Holevans grouted and backfilled to 15 feet BGS with ber,.-Ie chips. A 15' piezo-et- with 10 feet of screen/sand backfill was installed in the bortrip, and the ­-t of the hole was biickfilled with bentortite chips. The surface of the hole w as completed with a monitoring well monument. anchored with cement_ A -at- le, el of 7.67 BGS was Ine-urld In the pi ezometcr on 14 01. sA-%Uq-ER H C.L (3-OV) SPT q;.��D) C-11 Sbdb Grab S.-P Tube TYPE spkit sp— spra 30011- --HAAVW[FR 'WEIGHT (30--1) 1401bs (30 Dro)) Fry's Superstore #30 FIGURE Renton, 'Washington KLELNIFELDER A -2d GEOTF -M 13ORING LOG A TESTING PAGE 4 oft PROJECT NLMBER- 60-211"1