HomeMy WebLinkAbout2KL Et N F E L D ER
7.0 LIMIITATIONS
Recorrt_mendations contained in this report are based on the field explorations and our
understanding of the proposed project. The investigation was performed using a mutually agreed
upon scope of work. It is our opinion that this study was a cost-effective method to explore the
subject site and evaluate the potential geotechrucal concerns.
The soils data used in the preparation of this report were obtained from borings completed for
this studv and our review of subsurface information developed by others. It is possible that
variations in soil and groundwater conditions exist between the points explored. The nature and
extent of these variations may not be evident until construction occurs. If soil or groundwater
conditions are encountered at this site which are different from those described in this report, our
firm should be immediately notified so that we may make any necessary revisions to our
recommendations. In addition, if the scope of the proposed project, locations of facilities, or
design building loads change from the descriptions given in this report, our firm should be
notified.
r' The scope of our work does not include services related to construction safety precautions and
our recommendations are not intended to direct the contractor's methods, techniques, sequences
or procedures, except as specifically described in our report for consideration in design.
wh
This report has been prepared for use in evaluating the feasibility of development of the subject
property by Fry's Electronics Inc. in accordance with the generally accepted standards of
practice at the time the report was written. No warranty, express or implied, is made.
This report may be used only by Fry's Electronics Inc. and for the purposes stated, within a
W reasonable time from its issuance. Land use, site conditions (both on- and off -site), or other
factors including advances in man's understanding of applied science may change over time and
could materially affect our findings. Therefore, this report should not be relied upon after 12
months from its issue. Kleinfelder should be notified if the project is delayed by more than 12
months from the date of this report so that a review of site conditions can be made, and
recommendations revised if appropriate.
60113601. 601 1 ROS' Page 35 of 36
�r Cop+,ght 2000 K!nnfetd-. !nc