Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutSolera walkthroughINSPECTION WORKSHEET - Solera Master Plan
C21001020Case Number:
Inspection Date:
Inspector:Joel McCann- Primary Inspector
Inspection Status:Scheduled
Inspection Type:ENG - Punchlist
Case Module:Permit Management
Job Address:2806 Ne Sunset Blvd, B
Renton, WA 98056-3180
Parcel Number:7227801205
Checklist Item Passed Comments
Maintenance Punch List Item No Blue marker for Hydrant on Page 82 at 16+59. Fire hydrant 70.
Maintenance Punch List Item No Page 79 SSCO All side sewer clean outs need mechanical plugs
removed. Not required by standard.
Punch List Item No Blue marker for hydrant at 11+80
Punch List Item No CB 37 Needs mud work around ring and lid.
Punch List Item No MH 21 mud around pipe to east, mud around ring and lid.
Punch List Item No MH 23 needs pick holes mudded.
Created By Created OnNote
May 21, 2025 Page 1 of 1