AND ECONOMIC DEVELOPMENT ---------~en ton®
A. REPORT TO THE HEARING EXAMINER
DATE:
Project Nome
Owner:
Address:
Contact:
File Number:
Project Manager:
Project Summary:
Project Location:
Site Area:
II 8. EXHIBITS:
Exhibit 1:
Exhibit 2:
Exhibit 3:
Exhibit 4:
Exhibit 5:
Exhibit 6:
Exhibit 7:
Exhibit 8:
April 11, 2017
Chelan Creek Final Plat
Chelan Creek LLC.
PO Box 188, Puyallup, WA 98372
Cara Visintainer, C.E.S NW INC.
LUA16-000527, FP, PUD
Jan Illian
A 14-lot residential subdivision with 5 Tracts on a 4.21 acre site, located within the (R-8)
zoning classification. Preliminary Plat, PUD LUA 08-067. The Hearing Examiner approved
the subdivision, subject to 20 conditions on February 5, 2009. On February 17, 2009, the
applicant submitted a request to the Hearing Examiner for reconsideration of conditions
#7, #9, #12 and #18. On March 3, 2009, the Hearing Examiner modified conditions #7,
#9, #12, #18 and added a new condition #21. The Final PUD received approval on
September 27th, 2016.
928 -Chelan Ave NE, Section 10, Township 23, Range OS
183,4809 SF (4.21 acres)
Staff Report dated April 11, 2017
HEX Preliminary Plat and PUD Approval Report and Exhibits (LUA08-067)
Request for Reconsideration of HEX Conditions on February 17, 2009
Reconsideration modified by the HEX March 3, 2009
Conditions of Compliance Letter
Final PUD Approval
Final Plat Map
Vicinity Map
II C. FINDINGS OF FACT (FOF):
1. The applicant, Chelan Creek LLC., filed a request for approval of a 14 -lot final plat.
2. The Environmental Review Committee (ERC), the City's responsible official, issued a Determination of
Non-Significance -Mitigated on November 10, 2008 for the subject proposal.
HEX Report Che/on Creek Fino/ Plat LUA 16-000527, FP
City of Renton Department of Comm.y & Economic De~e/opment
Chelan Creek Final Plat 9
earing Examiner Recommendation
LUA16-000527, FP
April 11, 2017 Page 2 of 10
3. Representatives from various city departments are reviewing the application materials to identify
compliance with all conditions of project approval.
4. The subject site is located at 928 -Chelan Ave NE. The plat is located in Section 10 Twp.23 Rng.05.
5. The subject site (183,489 square feet) is a 4.21 acre parcel.
6. The Preliminary Plat and PUD (LUA08 -043) received approval from the City of Renton on February 5th,
2009.
7. On February 17, 2009, the applicant submitted a request to the Hearing Examiner for reconsideration
of conditions #7, #9, #12 and #18.
8. On March 3, 2009, the Hearing Examiner modified conditions #7, #9, #12, #18 and added a new
condition #21 and reads as follows:
A. Condition #7 -The applicant shall be required to extend the pedestrian pathway from where it is
proposed to begin, near Chelan Place NE, east along the NGPE bordering the hammerhead turn-
around and Lots 3 and 4 eventually connecting to Duvall Ave NE in the southern portion of the site.
A pedestrian easement shall be recorded, for the benefit of the public, for the length of the
pathway. The easement shall be recorded as directed by the Public Works Department.
B. Condition# 9 -The applicant shall provide a split rail fence on the residential side of the pedestrian
pathway identical to the other side pathway. The split rail fence will be required to include an
entrance gate from each lot to the path. The gates shall open into each respective lot and not into
the path.
C. Condition #12 -The gazebo and tot lot may be located as proposed by the applicant. In order to
assure safety from turning or backing vehicles, the applicant shall install bollards in a position to
protect these feature but in a manner where wheel stops or curbs also prevent backing vehicles
from easily hitting the bollards. The bollards may be the type that can be locked in place but
removed if necessary. In addition the plan shall note the adequate square footage to comply with
the open space requirement.
D. Condition #18 -The applicant shall record access easements for each tract. The easements shall be
recorded with the Public Works Department; the existing access easement shall be revised to
restrict access to Lot 16 only; and the residence located on Lot 16 shall include a fire sprinkler
system to the satisfaction of the City of Renton Fire Department.
E. Condition #21 New -If Council agrees to the Plat and PUD and determines not to limit the Plat's
duration; the PUD should run concurrent with the Plat.
9. The property is located within the R-8 zone and RSF Comp Plan designation.
10. The Final Plat complies with both the Zoning Code and the Comprehensive Plan.
11. The applicant has complied with the following conditions imposed by the ERC on November 10, 2008:
Mitigation Measure #1.-The applicant will be required to submit a Temporary Erosion
and Sedimentation Control Plan (TESCP) designed pursuant to the State Department
of Ecology's Erosion and Sediment Control Requirements, outlined in Volume II of the
HEX Report Che/on Creek Fino! Plat LUA 16-000527, FP
City of Renton Department of co,
Chelan Creek Final Plat
nity & Economic Development Hearing Examiner Recommendation
LUA16-000527, FP
April 11, 2017 Page 3 of 10
2001 Stormwater Management Manual. The plan must be submitted to and approved
by the Development Services Division Plan Review staff prior to issuance of the utility
construction and building permits and during utility and road construction.
Staff Comment: A Temporary Erosion and Sediment Control Plan was prepared,
approved by the City, and implemented in the field during construction.
Mitigation Measure #2 -A Native Growth Protection Easement (NGPE) shall be placed
over that part of the site encompassing the stream/wetland and buffer area.
Restrictive covenants shall also be placed on the site to this effect. The easement and ,,, restrictive covenants shall be recorded prior to the recording of the final plat.
Staff Comment: A Native Growth Protection Easement has been placed over the
stream, wetland, and wetland buffer areas as shown on the final plat. Covenants have
also been placed on the face of the final plat.
Mitigation Measure #3 -The detention system for this project shall be required to
comply with the requirements found in the 2005 King County Surface Water Design
Manual to meet both detention (Conservation Flow control -a.k.a. Level 2) and water ,,,
quality improvements.
Staff. Comment: A detention and water quality system was design, approved, and
constructed in accordance with the 2005 King County Surface Water Design Manual.
Mitigation Measure #4 -The applicant shall pay a Parks Mitigation Fee based on
$530.76 per each new single family lot. The fee is estimated at $7,430.64 (14 new lots ,,, x $530.76 = $7,430.64) and is payable prior to the recording of the final plat.
Staff Comment: The Parks Mitigation Fee shall be paid prior to issuance of each
building permit.
Mitigation Measure #5 -The applicant shall pay a Traffic Mitigation Fee in the amount
of $75 for each new net daily trip prior to the recording of the final plat. It is
,,, anticipated that the proposed project would result in the payment of $10,048.50
($75.00 x 9.57 trips x 14 new lots = $10,048.50).
Staff Comment: The Traffic Mitigation Fee shall be paid prior to issuance of each
building permit.
Mitigation Measure #6 -The applicant shall pay a Fire Mitigation Fee based on
$488.00 per new single family lot prior to the recording of the final plat. The fee is ,,, estimated at $6,832.00 ($488 x 14 = $6,832.00).
Staff Comment: The Transportation Mitigation Fee shall be paid prior to issuance of
each building permit.
12. The applicant has complied with the following conditions as a result of the preliminary plat approval
Hearing Examiner's Decision dated February 5, 2009.
Condition #1 -The applicant shall comply with the attached Chelan Creek Design
Guidelines (Exhibit 6} for all residences constructed on the proposed lots. The
applicant will be required to, as part of the FPUD application, provide elevations and
floor plans for the proposed structures.
HEX Report Chelan Creek Final Plat LUA 16-000527, FP
City of Renton Deportment of Comm ·· , & Economic Development
Chelan Creek Final Plat
aring Examiner Recommendation
LUA16-000527, FP
April 11, 2017 Page 4 of 10
Staff Comment: The applicant will comply with the Chelan Creek Design Guidelines.
All building permits will comply at the time of building permit submittal.
Condition #2 -The applicant shall submit a revised landscaping and street
improvement plan depicting the following: a meandering sidewalk; ornamental
landscaping and modulated fencing, for those portions of the frontage not abutting
the proposed NGPE, to the satisfaction of the Current Planning Project Manager.
Modulation of the fence shall be used to transition from the proposed fence, not
abutting the NGPE, to the split rail fence abutting the NGPE. In the depression of the
fence, where it connects to the split rail fence, an ornamental tree shall be planted in
,r order to conceal the transition of the fence. The revised plan must be submitted to
and approved by the Current Planning Project Manager prior to utility construction
permit, Final PUD, or Final Plat approval; whichever comes first.
Staff Comment: Landscaping and street improvement plans have been submitted and
approved by the Current Planning Project Manager. The meandering sidewalk has
been constructed on Duvall Avenue NE along the site frontage with ornamental
landscaping and modulated fencing. Split rail fencing has been installed abutting the
NGPE.
Condition #3 -The Pillo LLA (LUAOS-066) shall be recorded prior to Final Plat recording
,r or Final PUD approval; whichever comes first.
Staff Comment: The Pillo LLA was recorded on January 30, 2009 under King County
Recording number 20090130900003.
Condition #4 -The applicant shall be required to construct, to the satisfaction ofthe
Development Services and Current Planning Divisions, street improvements along
Duvall Ave NE. Street improvements include, but are not limited to: paving, sidewalks,
,r curb, gutter, storm drain, landscape, streetlights, and street signs.
Staff Comment: Street improvements along Duvall Ave NE include paving, curb/gutter,
storm drainage, landscaping, streetlights, and street signs were constructed to the
satisfaction of the Development Engineering Section and Current Planning.
Condition #5 -The applicant shall be required to locate the meandering sidewalk
,r closest to the street where the NGPE abuts the right-of-way.
Staff Comment: The meandering sidewalk is located where the NGPE abuts the right of
way along Duvall Avenue NE.
Condition #6 -The applicant shall submit a lighting plan for review and approval by the
Current Planning Project Manager prior to utility construction, Final PUD, or Final Plat
,r approval; whichever comes first. The lighting plan shall contain pedestrian lighting on
both sides of the pathway in a staggered configuration.
Staff Comment: A lighting plan was submitted, reviewed, and approved on January 11,
2016. Street lighting is installed per the approved plan.
Condition #7 -The applicant shall be required to extend the pedestrian pathway from
where it is proposed to begin, near Chelan Place NE, east along the NGPE bordering
,r the hammerhead turn-around and Lots 3 and 4 eventually connecting to Duvall Ave
NE in the southern portion of the site. A pedestrian easement shall be recorded, for
the benefit of the public, for the length of the pathway prior to utility construction,
Final PUD, or Final Plat approval; whichever comes first.
HEX Report Chelan Creek Fino/ Plat LUA 16-000527, FP
City of Renton Department of Co
Chelan Creek Final Plat
nity & Economic Development Hearing Examiner Recommendation
LUA16-000527, FP
April 11, 2017 Page 5 of 10
Staff Comment: This condition was revised as a result of the reconsideration by HEX
on March 3, 2009. See Findings of Fact (FOF) 13. Revised Condition #7.
Condition #8 -The applicant shall be required to enhance the buffer area adjacent to
where the pathway is located. Where enhancement of the buffer, adjacent to the
pathway, due to existing high quality vegetation, additional buffer area or other
,,, mitigation may be required. A revised wetland/stream mitigation plan shall be
submitted to and approved by the Current Planning Project Manager prior to utility
construction or Final Plat approval; whichever comes first.
Staff Comment: A revised wetland/stream mitigation plan was submitted and
approved by the Current Planning Project Manager.
Condition #9 -The applicant shall provide a split rail fence on the residential side of
the pedestrian pathway identical to the other side pathway. The split rail fence will be
,,, required to include an entrance gate that opens out onto the pedestrian pathway for
each lot.
Staff Comment: This condition wos revised as o result of the reconsideration by the
HEX on March 3, 2009. See Findings of Fact (FOF) 13. Revised Condition #9.
Condition #10 -The applicant shall be required to orient each residence as noted on
page 14 of the report; under Preliminary Plat review criteria. Lots 1 and 2 shall be
oriented towards Chelan Pl NE; Lots 3 and 4 towards the NGPE (west); Lots 5 through
12 towards the NGPE (east); Lot 13 towards the NGPE (south); Lots 14 and 15 towards
,,, Tract A (south); and Lot 16 towards the abutting property to the west.
Staff Comment: Each residence will be oriented as noted on Page 14 of the staff report.
Mare specifically, Lats 1 and 2 toward Chelan Place NE, Lots 3 and 4 toward the NGPE,
Lots 5-10 toward the NGPE, Lot 11 (previously Lot 13) toward the NGPE, Lot 12 and 13
(previously Lots 14 and 15) toward the NGPE, and Lot 14 (previously Lot 16) toward the
abutting property to the west.
Condition #11 -Driveway widths shall be restricted to no more the 9 feet for a single
,,, car garage and no more than 16 feet for double car garage.
Stoff Comment: Driveway widths for a single car garage will not exceed 9 feet and a
double car garage will not exceed 16 feet.
Condition #12 -The applicant shall submit a revised landscape plan depicting the
relocation of the tot lot and the relocation of the gazebo to where the proposed
pedestrian pathway either starts or terminates. The revised plan shall be submitted to
,,, and approved by the Current Planning Project Manager prior to Final PUD, Final Plat,
or utility construction approval. In addition the plan shall note adequate square
footage to comply with the open space requirement.
Staff Comment: This condition was revised as a result of the reconsideration by the
HEX on March 3, 2009. See Findings of Fact (FOF) 13. Revised Condition #12.
Condition #13 -The applicant shall be required to depict adequate area on each lot for
private open space on the Parking, Lot Coverage, and Landscaping Analysis to be ,,, submitted as part of the Final PUD application.
Staff Comment: Parking, Lot Coverage, Private Open Space, and Landscaping areas are
shown on the dimensioning plan as a part of the civil construction drawings. This plan
was reviewed and approved by the City. Please refer to sheet C9 of the construction
HEX Report Chelan Creek Final Plat LUA 16-000527, FP
City of Renton Deportment of Comm 'ty & Economic Development
Chelan Creek Final Plat
earing Examiner Recommendation
LUA16-000527, FP
April 11, 2017 Page 6 of 10
drawings.
Condition #14 -The applicant shall be required to establish a homeowners' association
for the development, which would be responsible for any common improvements
and/or tracts within the PUD prior to Final Plat or Final PUD approval; whichever
comes first. In addition, those standards included in the Chelan Creek Design
,/ Guidelines that are applicable to the maintaining the design of the PUD shall be
incorporated into the homeowners' association bylaws.
Staff Comment: A Homeowners Association {HOA} has been established for the
development. The Chelan Creek Design Guidelines hove been incorporated into the
CC&Rs.
Condition #15 -The applicant shall obtain a demolition permit and complete all
required inspections for all buildings located on the property prior to the recording of
,/ the final plat.
Stoff Comment: The developer obtained the permit and all required inspections were
completed.
#16 -Omitted in error.
Condition #17 -The applicant shall submit a revised detailed landscape plan prepared
by a certified landscape architect or other landscape professional to the Current
Planning Project Manager prior to utility construction permit, Final Plat, or Final PUD
approval; whichever comes first. The revised landscape plan should include: a 5-foot
landscape strip along the frontage of Lots 1 through 4; and ornamental 10-foot
landscape strip along Duvall Ave NE street frontage for Lots 1 through 4 and Lot 13;
,/ and ornamental landscaping to mirror the existing frontage improvements along
Duvall Ave NE, just south of the site. The revised landscape plan should also include
fence detail for the entire site.
Staff Comment: A landscape plan was submitted to the City for review and approval.
The Landscape pion included o 5-foot landscape strip along the frontage of Lots 1 and
2, o 10-foot wide landscape strip along Duvall abutting Lots 1-4 and Lot 11 (previously
Lot 13). Fencing details were specified on the pion.
Condition #18 -The applicant shall record access easements for each tract prior to
utility construction, Final Plat, or Final PUD approval, whichever comes first; the
existing access easement shall be revised to restrict access to Lot 16 only; and the
,/ residence located on Lot 16 shall include a fire sprinkler system to the satisfaction of
the City of Renton Fire Department.
Staff Comment: This condition was revised as a result af the reconsideration by the
HEX on March 3, 2009. See Findings of Fact {FOF) 13. Revised Condition #18.
Condition #19 -The applicant shall be required to submit a revised plat plan depicting
a 15-foot radius on the northeast corner of Lot 12. The revised plan would be
,/
required to be submitted prior to construction permit, Final Plat, Final PUD approval;
whichever comes first.
Staff Comment: A 15-foot radius is shown on Lot 10 (previously Lot 12/. Please refer to
the Fino/ Plat Map.
HEX Report Che/on Creek Final Plat LUA 16-000527, FP
City of Renton Department of Co
Chelan Creek Final Plat
nity & Economic Development Hearing Examiner Recommendation
LUA16-000527, FP
April 11, 2017 Page 7 of 10
Condition #20 -The applicant shall be required to extend the existing 8-inch water
main within the access easement (extended from NE 10th St) to the south boundary of
Lot 16 prior to Final Plat approval. Water main extensions shall also be installed for
the full frontage of Lot 3.
Staff Comment: The developer has extended the existing 8-inch water main as
approved under the construction plans.
13. The applicant has complied with the following revised conditions as a result of the reconsideration by
the HEX March 3, 2009:
tornfiJia~~ < tie~~stW.~~c~n§i~er~ti~h~t~~~·~°:~diti~hs_. · .·. · t ·· ··i".;;J_)"'iii\ i ij·· ..... ·. <\•· .· .... .
Revised Condition #7 -The applicant shall be required to extend the pedestrian
pathway from where it is proposed to begin, near Chelan Place NE, east along the
NGPE bordering the hammerhead turn-around and Lots 3 and 4 eventually connecting
to Duvall Ave NE in the southern portion of the site. A pedestrian easement shall be ., recorded, for the benefit of the public, for the length of the pathway. The easement
shall be recorded as directed by the Public Works Department.
Staff Comment: The pedestrian pathway has been extended around the entire
circumference of the NGPE, internal to the plot, connecting to Duvall Avenue NE in two
locations. A public pedestrian easement is shown on the face of the Final Plat.
Revised Condition# 9 -The applicant shall provide a split rail fence on the residential
side of the pedestrian pathway identical to the other side pathway. The split rail
fence will be required to include an entrance gate from each lot to the path. The gates
., shall open into each respective lot and not into the path .
Staff Comment: A split rail fence is installed adjacent to the NGPE as shown on the
approved landscaping, wetland buffer mitigation and civil plans. A 4-foot board fence
is installed along the residential side of the pedestrian pathway as shown on the
approved plans. The gates open into each lot and not into the path.
Revised Condition #12 -The gazebo and tot lot may be located as proposed by the
applicant. In order to assure safety from turning or backing vehicles, the applicant
shall install bollards in a position to protect these feature but in a manner where
wheel stops or curbs also prevent backing vehicles from easily hitting the bollards. The
bollards may be the type that can be locked in place but removed if necessary. In ., addition the plan shall note the adequate square footage to comply with the open
space requirement.
Staff Comment: A landscape plan depicting the gathering space was review and
approved by City Planning. The gathering space, including bollard, will be bonded for
and installed prior to final of the first constructed home. A note has been added on the
plan showing the square footage of the open space.
Revised Condition #18 -The applicant shall record access easements for each tract.
The easements shall be recorded with the Public Works Department; the existing ., access easement shall be revised to restrict access to Lot 16 only; and the residence
located on Lot 16 shall include a fire sprinkler system to the satisfaction of the City of
Renton Fire Department.
HEX Report Chelan Creek Final Plat LUA 16-000527, FP
City of Renton Department of Comm 'ty & Economic Development
Chelan Creek Final Plat
earing Examiner Recommendation
LUA16-000527, FP
April 11, 2017 Page 8 of 10
Staff Comment: Access easements are shown on the face af the Fino/ Plot Map. The
existing access easement hos been revised ta restrict access ta Lat 14 (previously Lot
16). Lot 14 (previously Lot 16) will include a residential fire sprinkler0
Condition #21 New -If Council agrees to the Plat and PUD and determines not to limit
the Plat's duration; the PUD should run concurrent with the Plat. ,,,.
Staff Comment: Renton Municipal Code RMC 4-1-045F5. PU Os are approved as a
companion to a preliminary plat application shall remain valid for the duration of the
preliminary and final plat.
14. The applicant has complied with the following conditions as a result of the Final PUD approval and
decision dated September 27, 2016. The project is subject to all Preliminary PUD, Preliminary Plat, and
SEPA conditions unless otherwise modified via this decision, and also subject to the following Final
PUD conditions:
. Compliance Final Pl.lb Conilitions ;. ..
Condition #1 -The applicant shall comply with the attached Chelan Creek Design
Guidelines for all residences constructed on the proposed lots and shall be
demonstrated prior to building permit approval for each home. The applicant should
note that based on the renderings, the homes may not comply with (but not limited
to) the following: on-site garages shall be set back a minimum of 5 feet from the
building facade on which the garage is located; a minimum of at least one side
articulation shall occur for side or rear elevations facing streets or public spaces; each
home shall have a covered porch or main entry oriented toward the public realm in
the respective front yard; primary roof pitches shall be a minimum of 6:12.
Staff Comment: The Chelan Creek Design Guidelines will be followed and demonstrated
prior to building permit approval.
Condition #2 -A pedestrian easement shall be recorded, for the benefit of the public,
for the length of the pedestrian pathway (from near Chelan Pl NE east along the NGPE
to Duvall Ave NE) prior to/or concurrent with Final Plat recording.
Staff Comment: A public pedestrian easement is shown an the face of the Final Plat
and will be recorded concurrently.
Condition #3 -The applicant shall submit a revised plat/landscape plan depicting at
least a 3-foot separation from proposed pathway and the existing fence on southern
property line. The 3-foot area is required to include vegetation and groundcover. The
revised site/landscape plan shall be submitted to, and approved by, the Current
Planning Project Manager prior to Final Plat approval.
Staff Comment: The area of the path relocation was proposed as wetland buffer
enhancement and shown an the wetland mitigation plans. A revised wetland buffer
mitigation plan will be provided to the Current Planning Project Manager prior to final
plat approval.
Condition #4 -The applicant shall be required to orient the front yard and entrances
for each residence shall be demonstrated prior to building permit approval for each
HEX Report Chelan Creek Final Plat LUA 16-000527, FP
City of Renton Department of Co1
Chelan Creek Final Plat
1ity & Economic Development Hearing Examiner Recommendation
LUA16-000527, FP
April 11, 2017 Page 9 of 10
home. Lots 1 and 2 required to orient toward Chelan Place NE, Lots 3 and 4 would
orient toward the NGPE (west); Lots 5 through 10 would orient towards the NGPE
(east); Lot 11 (previously Lot 13) toward the NGPE (south); Lots 12 and 13 (previously
Lots 14 and 15) toward the NGPE (south); and Lot 14 (previously Lot 16) toward the
abutting property to the west.
Staff Comment: The building and front yard will be oriented as required and shown on
the site plan prior to building permit issuance.
Condition #5 -Driveway widths shall be restricted to no more the 9 feet for a single
lane and no more than 16 feet for double lane driveways and shall be demonstrated
,/ prior to building permit approval for each home.
Staff Comment: Driveway widths for a single car garage will not exceed 9 feet and a
double car garage will not exceed 16 feet.
Condition #6 -The gazebo (and tot lot) may be located as proposed by the applicant.
In order to assure safety from turning or backing vehicles, the applicant shall install
,/
bollards in a position to protect these features but in a manner where wheels stops or
curbs also prevent backing vehicles from easily hitting bollards. The bollards may be
the type that can be locked in place but removed if necessary.
Staff Comment: Bollards will be installed within Tract A at the gathering space.
Condition #7 -The applicant shall be required to establish a homeowners' association
for the development, which would be responsible for any common improvements
and/or tracts within the PUD prior to or concurrent with Final recording. In addition,
,/
those standards included in the Chelan Creek Design Guidelines that are applicable to
the maintaining the design of the PUD shall be incorporated into the homeowners'
association bylaws.
Staff Comment: A homeowner's association has been created and the PUD design
guidelines have been added to the CCRs.
Condition #8 -A Native Growth Protection Easement shall be placed over that part of
the site encompassing the stream/wetland and buffer area. Restrictive covenants
,/
shall also be placed on the site to this effect. The easement and restrictive covenants
shall be recorded prior to or concurrent with the recording of the Final Plat.
Staff Comment: An easement and restrictive covenant will be recorded concurrently
with recording of the final plat.
I D. CONCLUSIONS:
1. The subject site is located in the R-8 Zone and RSF Comp Plan designation and complies with the
zoning and development standards established with this designation. See FOF 10.
2. The Final Plat satisfies the conditions imposed by the preliminary plat, PUD and the SEPA process.
See FOF 11-14.
I £. RECOMMENDATION:
Staff recommends approval of Chelan Creek Final Plat, File No. LUA16-000527, FP as depicted in Exhibit 7,
subject to the following conditions:
HEX Report Chelan Creek Final Plat LUA 16-000527, FP
City of Renton Department of Comm "ty & Economic Development
Chelan Creek Final Plat
April 11, 2017
earing Examiner Recommendation
LUA16-000527, FP
Page 10 of 10
1. All plat improvements shall be either constructed or deferred to the satisfaction of City staff prior
to the recording of the plat.
SUBMITIED THIS 11th DAY OF APRIL, 2017
HEX Report Che/on Creek Fino/ Plat LUA 16-00052 7, FP
.PiiNNING DIVISION