Loading...
HomeMy WebLinkAboutEx13_King_County_Metro_Comments,_dated_April_25,_20251 Nichole D. Perry From:Markwell, Thi <tmarkwell@kingcounty.gov> Sent:Friday, April 25, 2025 2:44 PM To:Nichole D. Perry Subject:Fw: City of Renton LUA Acceptance: Oakesdale Ave SW Stormwater System Project, LUA25-000099, ECF Attachments:CONSTRUCTION INFORMATION REQUEST PDF.pdf; CONSTRUCTION INFORMATION REQUEST.docx Good afternoon, King County Metro received the notice identified in the subject line and forwarded it for internal review. The Construction Coordination team responded with: To All Contractors and Agencies performing construction work in Metro Transit Bus Stops and Roadways: Contractors or Agencies doing work that impact transit routes or bus stops, must reach out to this office directly by sending an email to construction.coord@kingcounty.gov, with the following information: · Construction Request Form (Attached) · All Approved TCPs and permits, (Required) · Please send all pertinent TCPs for this work along with a completed copy of the attached construction request form. Notification Guidelines: · Please note that King County Metro requires all contractors and agencies to follow notification guidelines. · Visit KC Metro System Impacts web site for more details at: Transit System Impacts - King County, Washington · Your project is not approved until you are notified by the KC Metro Construction Impacts office. · We will contact you if we require additional information or T-39 No Parking Signs. The contractor is responsible for providing permitted no-park signage for the placement of temporary bus stop placement or for the safe movement of coaches on a planned reroute. No- Parks must be placed 72 hours prior to the start of work to be enforceable. · Once we receive all required information, your request will be reviewed and final written approval will be sent via email. · Once approval is received, the contractor may contact the permitting agency as necessary. · KCM Construction Coordinators will arrange for the coordination of all bus stops closures and the placement of temporary bus stops if necessary. · More notification lead time will be needed when impacting a KC Metro Layover and access to Comfort Stations. Station.comfort@kingcounty.gov 206-477-9959 · TCPs need to accurately dipict your traffic control and work site set up. This includes noting the location of impacted bus stops. Precon, Construction and Site Meetings: · KCM Construction Coordinators are available to attend meetings. CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. EXHIBIT 13 Docusign Envelope ID: FC390598-2A08-49AE-A3C9-DD1A9376DC08 2 o Please send all meeting invites to construction.coord@kingcounty.gov o Site meetings can be coordinated with Construction Coordinators and Metro Service Quality Field Supervisors. Bus Stop Construction and Long-Term Bus Stop Impacts: · If the contractor needs to remove/reinstall bus stop equipment/structures, such as zone flags, bus stop shelters, benches, and KC garbage cans, our Transit Route Facilities group will work with you to coordinate this work.They can be reached at: RFDOTTransitRouteFacilities@kingcounty.gov · If the contractor needs to find information on bus stop specifications, please contact our Bus Stop Projects group at: busstopprojects@kingcounty.gov · NOTE: All work that will require the construction, removal or installation of bus stop amenities requires 30 business days notification lead time. Timely notification allows us to plan, mitigate, and most importantly, notify our riders and operators of your work. · Single Bus Stop Closures: 5 business days (Not including holidays) · Projects that require multiple bus stop closures: 10 business days (Not including holidays) · Street Closures that impact transit: 10 business days (Not including holidays) · Long-term Bus Stop moves that require the closure and relocation of a layover or access to Metro facilities: 30 business days (Not including holidays) See our website for details. Please download, complete, and return the attached Bus Stop/Route Impact Request form. If your project has multiple phases, please complete one form for each phase. Be sure to include all approved TCPs and permits for this impact with your request form. Please be sure to reach out to the permitting agency (if applicable) for prior approval of your project. We appreciate you working with us so we can help you safely complete your project. Thank you. ==== If you have any questions or concerns, please reach out. Thanks! Thi Markwell (She/Her) Transit Environmental Planner II Transit Real Estate and Environmental (TREE) P 206-263-2659 tmarkwell@kingcounty.gov From: Chung, Lawrence <lachung@kingcounty.gov> Sent: Thursday, April 24, 2025 4:48 PM To: Markwell, Thi <tmarkwell@kingcounty.gov> Subject: OAP: City of Renton LUA Acceptance: Oakesdale Ave SW Stormwater System Project, LUA25-000099, ECF Docusign Envelope ID: FC390598-2A08-49AE-A3C9-DD1A9376DC08 3 From: Jennifer Cisneros <JCisneros@Rentonwa.gov> Sent: Thursday, April 24, 2025 4:05 PM To: ktsang@muckleshoot.nsn.us; Laura Murphy <Laura.murphy@muckleshoot.nsn.us>; sepacenter@dnr.wa.gov; Planning@TukwilaWA.gov; Mark Hofman <markh@newcastlewa.gov>; sepa@pscleanair.org; Ishimaru, Jim <Jim.Ishimaru@kingcounty.gov>; McColloch, Duffy <McCollD@wsdot.wa.gov>; NSchildmeyer <NSchildmeyer@kentwa.gov>; Madura, Jalaine <Jalaine.Madura@seattle.gov>; Fischer, Katherine <katherine.fischer@kingcounty.gov>; SEPA@dahp.wa.gov; R4Splanning@dfw.wa.gov; NWS.Compliance@usace.army.mil; culturalpreservation@duwamishtribe.org; KCWTD Other Agency Planning <KCWTD_otheragencyplanning@kingcounty.gov>; sandy.leek@pse.com; ktsang@muckleshoot.nsn.us; Chung, Lawrence <lachung@kingcounty.gov> Cc: Nichole D. Perry <NPerry@rentonwa.gov>; Muang Saelee <MSaelee@rentonwa.gov> Subject: City of Renton LUA Acceptance: Oakesdale Ave SW Stormwater System Project, LUA25-000099, ECF [EXTERNAL Email Notice! ] External communication is important to us. Be cautious of phishing attempts. Do not click or open suspicious links or attachments. Hello, Please see linked documents below for City of Renton LUA acceptance for the following project: Oakesdale Ave SW Stormwater System Project LUA25-000099, ECF Please see related documents linked below: Notice of Application Site Plan Environmental Checklist As the project progresses, more information will be available by request and through our online Public Notice of Land Use Applications Map. Regards, JENNY CISNEROS, Planning Technician City of Renton // Community and Economic Development Virtual Permit Center // Online Applications and Inspections office 425-430-6583 NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56 Docusign Envelope ID: FC390598-2A08-49AE-A3C9-DD1A9376DC08