Minor Franchise Permit: MFP25002382
IVR Number: 25002382
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:05/13/2025Application Date:0007200168Parcel Number: 117 WELLS AVE S
Permit Type:05/28/2025Issue Date:Franchise
Permit Work Class:05/28/2026Expiration Date:Minor Utility
Job Number: 105107263Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO TRENCH IN ROW AT EXISTING V01 (317884 166089) TO HH TO INSTALL
NEW RUN OF UG WIRE IN CUSTOMER PROVIDED CONDUIT. RESTORATION PER CITY OF RENTON
STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
PUBLIC WORKS DEPARTMENT
Page 1 of 6 | Published: 2/25/2025
Transportation Systems Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 2/25/2025
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL
WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORE THE DATE OF WORK.
FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING
CITY HOLIDAYS.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic
Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be
conducted within the City's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
4. Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as
described in the guidelines. Additional review time may be needed.
By signing, I certify that the information on this application and within the submittal documents are accurate to the
best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip: ___________
Description of Work:
24 Hour Emergency
Contact Name & Phone:
Approval By: ______________________________________________ Date:____________________
PW/Transportation or CED/Development Engineering Division
Potelco, Inc
6905 S 228th St Kent, WA 98466
Please See Attached
105107263
117 WELLS AVE S
DAVE FLORES 425-449-6019
CORRIE RYDBERG
5/13/25
8:00am 3:00pm
Scott Warlick CED
Monday Friday
MFP25002382
5/28/2025
Page 2 of 6 | Published: 2/25/2025
This Page Intentionally Left Blank
Page 3 of 6 | Published: 2/25/2025
APPLICANT AGREES TO ALL THE FOLLOWING REQUIREMENTS:
GENERAL
• Applicant is responsible for compliance with all traffic regulations of the City of Renton (City) and the State
of Washington, including codes and regulations not described in this application.
• Work Zone Traffic Control shall be in accordance with Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to Washington State Department of Transportation
(WSDOT) traffic control plans.
• Any lane or street closures not in conformance with the approved Traffic Control Plan (TCP) and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs
or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable
State and City codes.
• Indemnify and hold harmless the City from any and all claims, actions, and judgments, including all costs of
defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved TCPs including claims arising from towing of private vehicles and the acts
of Applicant’s agents and employees.
• Applicant must comply with all conditions of the application.
• The City shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such
event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this application, Applicant is
responsible to pay for legal counsel chosen by the City to defend against same.
• No more than one TCP shall be in use at any given time for a single project. If multiple TCPs are submitted
for review and approval at the same time, the TCPs shall be clearly labeled as separate plans and include
construction phasing and sequencing.
• Previously approved TCPs cannot be combined into a new TCP without review and approval by the City.
• Expired TCP is not valid and shall not be used. Applicant shall resubmit the expired TCP for approval with
the updated date and time and/or any changes to TCP.
• Applicant must have the approved TCP prior to commencing the work.
• Approved TCP must be at the work site during work hours.
• Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number
at a conspicuous place on the vehicle or equipment.
• At signalized intersections, vehicle detection shall always remain operational, unless approved in this TCP
and notified Transportation Signal Maintenance prior to commencing work. If damage occurs to existing
vehicle detection that is to remain, it is Applicant’s responsibility to replace with video vehicle detection
equipment that meets current City’s standards at Applicant’s expense.
• When not in use, temporary traffic control devices shall be removed or covered immediately. It is the
Applicant’s responsible to cover any temporary traffic control devices when not applicable for the
construction activities. Similarly, when work is suspended for short periods of time, traffic control devices
that are no longer necessary shall be removed or covered. If deemed abandoned, City crews will remove
and may store them at the City’s maintenance shop (3555 NE 2nd Street) for up to sixty (60) days. The City
is not responsible for any private property from City assets and identifying the property owner.
• Applicant is responsible to maintain existing pedestrian accessible routes during work and non-work hours.
At intersections, the work on pedestrian facilities shall be limited to one (1) corner at a time, with the least
possible inconvenience or delay to pedestrians. Pedestrian pushbuttons shall remain accessible at all times,
unless approved pedestrian accessible detour(s) are provided. Accessibility to existing or temporary
Page 4 of 6 | Published: 2/25/2025
pedestrian pushbuttons shall not be impaired. Deficiencies caused by Applicant’s operations shall be
repaired at Applicant’s expense.
• Applicant shall provide complete assistance and accommodation from a dedicated pedestrian escort to all
kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a
work zone.
• Driveway and alley access shall be maintained at all times, also see RMC Chapters 9 and 10 for Street
Closure and Street Excavation for details. Applicant is responsible for coordinating with the property
owners and/or residents prior to commencement of the work.
• Pavement excavation shall be limited to a maximum of one travel lane at a time unless otherwise
approved.
• Accessibility for emergency vehicles shall be maintained at all times.
PUBLIC OUTREACH
• Applicant must notify Transportation Signal Maintenance (425-430-7423) and City inspector (425-430-
7203) at least twenty-four (24) hours before commencing work (lane shift/closure or near a signal)
affecting the vehicle detection.
• Applicant shall notify emergency services (253-852-2121) twenty-four (24) hours before any street closures
or lane closures.
• Applicant shall call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five (5) working days (excluding
weekends and holidays) prior to starting any work.
• Applicant shall coordinate with King County Metro Transit Construction Information Center (206-477-1140
or construction.coord@kingcounty.gov) for any construction or installation activities affecting transit
operations or facilities. Notification information and guidelines can be found at:
https://kingcounty.gov/en/dept/metro/about/contractor-resources/transit-system-impacts.
WORKING DAYS AND TIMES
• Normal working days are Monday through Friday. Work on holidays, weekends or at night shall not occur
without City’s approval. For work times between 10:00 p.m. and 7:00 a.m., see Night Work section below
for details.
• Work time begins when any street or travel lane is fully or partially closed. This includes set up and removal
within the traveled way.
• If the City determines the closure hours adversely affect traffic during the work, the City may require to
adjust or reduce the working hours accordingly. Reduced work hours may be required by the City to
minimize traffic impacts for any work located near a school during pick-up and drop-off times or on an
arterial street. (See WSDOT Functional Classification Map:
https://www.wsdot.wa.gov/data/tools/geoportal/?config=FunctionalClass)
• Applicant may request the City for consideration of extended or modified working hours. Such request
must be approved by the City before changing hours of work.
CLOSURES
• All closure hours and days are subject to local permit and ordinance conditions (such as noise ordinances).
More information can be found on https://www.rentonwa.gov/City-Services/Permit-Center. Total street
closure lasting more than twenty-four (24) hours is subject to City Council authorization per Section 9-9 of
the Renton Municipal Code (RMC).
• Road closure notice – Applicant must install Portable Changeable Message Sign (PCMS) boards no less than
five (5) working days in advance of effective date and time, not including holidays, at location(s) as
identified in the TCP. Other methods of displaying the messages shall be approved by the City.
Page 5 of 6 | Published: 2/25/2025
• Road closure notice messages must include at least the following:
ROAD WILL BE CLOSED
MONTH/DAY – MONTH/DAY
_AM - _PM
• Road and/or sidewalk closure must be evaluated by the City with respect to both the necessity as well as
the impact of the closure to the public. Applicant shall submit detour plans for road closures to
accommodate both motorized and non-motorized users, including accessible pedestrian route(s). Road
closures shall require additional temporary traffic control including advance notification, approach and
detour signage.
• Applicant is responsible to temporarily remove the flags and install bags over the flag holders for any work
requiring the temporary closure of a crosswalk equipped with pedestrian flags. Applicant shall ensure the
bags remain intact and shall replace damaged bags as needed or determined necessary by the City of
Renton inspector. For any misplaced or lost flags, Applicant is responsible to replace at Applicant’s own
expense. Upon restoration of the crosswalk, Applicant shall remove the bags and return all flags to the
holders. Inventory of pedestrian flags must be submitted to the City inspector and reported to City of
Renton Transportation Signal Maintenance (425-430-7423) prior to removal.
UNIFORMED POLICE OFFICERS (UPO) / FLAGGERS
• Any construction activities within one hundred and fifty (150) feet of a signalized intersection shall require
Uniformed Police Officer(s) (UPO) at the traffic signal, unless otherwise approved in this TCP and evaluated
by City Transportation for the impacts of traffic signal operations and safety.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic
or pedestrian safety or travel.
• For TCPs that require the presence of UPO to manage vehicular traffic and pedestrians at signalized
intersections, Applicant shall coordinate with Transportation Signal Maintenance (425-430-7423) at least
twenty-four (24) hours in advance for any signal that will be placed in red flashing mode. Applicant shall
notify Transportation Signal Maintenance when the intersection is back to the normal traffic signal
operations.
TEMPORARY TRAFFIC SIGNALS OR TRAFFIC SIGNAL MODIFICATION
• Temporary traffic signal programming or modification requires a minimum fifteen (15) working days for
each traffic signal controller to be programmed and tested by City Transportation staff before starting the
work. The Start Date on this TCP shall reflect the time for temporary traffic signal programming or
modification.
TEMPORARY NO-PARKING
• Applicant must post notice of date(s) and time(s) of Temporary No Parking Zone with signs at every
hundred (100) feet at least seventy-two (72) hours in advance of effective date and time.
• Applicant is responsible to show on the TCP the limits of Temporary No Parking Zone, identifying barricade
locations for vacate parking or curb lane usage. The cover sheet of this approved TCP form must be
attached to each Temporary No Parking Sign on the project site.
• Two travel lanes (one for each approach) must be open at all times on arterial streets unless approved in
this TCP.
NIGHT WORK
• Between the hours of 10 p.m. and 7 a.m., approved Noise Variance shall be required (See Section RMC 8-7-
8) for night work. Process may take up to twelve (12) weeks. More information can be found at
https://www.rentonwa.gov/City-Services/Permit-Center/Land-Use-Development/Noise-Variance.
• City may require night work for TCPs that have severe traffic impacts on arterial streets.
Page 6 of 6 | Published: 2/25/2025
• Night work shall always be required if two lanes of traffic (One for each approach) cannot be maintained
on an arterial street.
• Night work shall be required if an evaluation of existing traffic volumes and patterns finds that any TCP will
functionally reduce an arterial or high-volume collector street to only one lane of traffic.
• The following configurations may require night work:
Work at traffic signals that requires shifting one direction of traffic into a left turn pocket where a high
volume of left turns occur.
Work at traffic signals that requires shifting two directions of traffic into left turn pockets.
Work at traffic signals that requires shifting high-volume left-turn movement into a through lane on a
single approach to the intersection.
Work at signals that requires shifting left-turning traffic into a through lane on multiple approaches to
the intersection.
• If City’s initial TCP review finds that night work is required, a pre-construction meeting is mandatory to
confirm the extents of the work required, the duration of work, anticipated noise levels, and any potential
alternatives to mitigate the impact of night work to adjacent residents prior to review and approval of the
TCP.
TRAFFIC CONTROL PLAN (TCP) FORMAT
• TCP must be site and project specific. The TCP shall clearly indicate all existing transportation facilities
impacted by work including roads, bike lanes, sidewalks, transit stops, and driveways. Typical drawings,
taper tables and MUTCD illustrations, by themselves, are insufficient.
• Each construction phase shall be provided with appropriate work zone traffic control. The impacts of utility
relocation, traffic delays, detours and capacity restrictions must be considered and addressed. A suitable
sequence of construction activities must be discussed with City Staff prior to fully developing TCPs based on
the complexity of a project.
• TCPs shall be clearly labeled as separate plans to identify the construction sequencing during each phase
when more than one TCP layout is submitted.
• TCP must be submitted with an electronic copy of TCP layout(s), on 11” X 17” paper size PDF format, which
consist of:
Map(s) showing the location of the project and work area.
All fonts shall be legible and a minimum 10-point font size.
All symbols of viewing or printing shall be clear and contrasting.
All streets shall be labeled, and layout must include a north arrow and scale.
Must show channelizing devices, signing, flagger locations, barricades, PCMS boards, etc.
Show locations where the standard traffic control plans are applied.
DRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAY
DRIVEWAYDRIVEWAY
V01HH1
ROADWORKAHEADWELLS AVE SWELLS AVE SROADWORKAHEAD
SHOULDERWORKAHEAD X
NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
Pedestrian Escort: Stop work, securepassable ADA compliant pedestrian accesson existing sidewalk (4' min.). Clear zonemust be free of overhead hazards whenpedestrians are moving through the work zone.MANDATORY
OFFICE: 800-343-4049DIRECT: 425-923-9086WATCP@KNDSERVICES.NET
CUSTOMER:CONTACT:LOCATION:DATE:JOB #DAVE FLORES425-449-601904/23/25 105107263...117 WELLS AVE SRENTON, WA 98057 WSTCS#7243BEXP:02/01/2029DESIGNED BY: WHITNEY BARBARINONOTIF #514831480
PLACE SPOTTER AT ANY OPEN DRIVEWAY ORENTRANCE LOCATED WITHIN THE WORK ZONE TOASSIST TRAFFIC OUT OF WORK ZONE.MAINTAIN DRIVEWAY ACCESS, IF UNABLE TO NOTIFYHOMEOWNERS OF TEMPORARY CLOSURE.PLACE NO PARKS 72 HOURS IN ADVANCE OF WORKBEING PERFORMED. SPOTTER TO ASSIST PEDESTRIANS AROUND WORKZONE.
PLEASE SCHEDULEWITH DISPATCH@ 800-343-4049 OPT.1AND PROVIDE ACOPY OF THE APPROVEDTRAFFIC CONTROL PLANK&D Services, as the preparer of this trafficcontrol plan makes no representation as to its'general adequacy or being approved for implementation.Approval must result from the Traffic Engineer orother Public Official having statutory enforcement authorityin the jurisdiction. Utilization and implementation of thisplan shall be a result of that approval.Ref. MUTCD 2009 6A-01 (10)
LegendConeNOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 R7-T39 R7-T39SpotterROADWORKAHEADW20-1 Road Work AheadSHOULDERWORKAHEADW21-5c Shoulder workWork Area
Notes:1. Maintain ped. access to and through crosswalks2. Maintain Min. 10' lanes3. Maintain local access4. Notify Transit Authority at least 48 hrs. in advance of bus stop closure5. Traffic control plan and all devices shall comply with MUTCD, PROWAG & WSDOT6. DEVICE SPACING Flag Taper 20' Signs per WSDOT Tapers per WSDOT7. 28" Cones 36" Barrels 48" Signs 24" Paddle8. Adjust to field conditions
www.invarion.com
516023747
MFP25002382
10398104114112118105108115121122126110116124858206S 2ND STWELLS AVE S ROW60'SL1023289SL1023313SL1023348GRA1772315020057231501095D/W117317884-166089100 kVA 120/240V (B)167 kVA 120/240V (B)EOP40'BØUNKBØACI681CØACI683 AØ16753BØ16754AØ16749CØ16751317857-166075317857-166085317857-166089SL1023186SL10232667231501940201SL1023184SL1023223SL1023224UNKSL1023226SL1023187AØEHE113BØEHE114CØEHE115EOP32'ROW60'JPOWER GENERAL NOTES - MULTIFAMILY PROJECTNVicinity Map47.482,-122.2054Owner / Developer Contact InfoofficeATTN:SATARA LLC13985 NE 3RD STBELLEVUE, WA 98005AJAY SIKKA425-442-4850OVERHEAD CIRCUIT MAPSCALE: 6" = 1 MILE11.7.6.5.4.3.2.1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation fromthis work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.All switching arrangements and/or outage arrangements are to be made with the Project Manager at leastthree (3) working days in advance.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencingwork to get the underground facilities located.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or constructionmaterials which would restrict construction and/or equipment access, before work can begin.Roads shall be paved or have a compacted , crushed rock base in place.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet fromcombustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guardposts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.All work is to be done in accordance with local municipal and county permit requirements as applicable.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduitsand crossings from the individual unit's meter base to the designated connection point.Inclement weather conditions may cause delays in construction times and dates.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction andrestoration per this sketch and per PSE standards. A minimum protective cover of 36" is required overPSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customerwill provide any and all shoring or they will side slope the trench to 1:1.8.ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.CIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASEGRA-1712/16/202424122823505.410241233.41235GASPHONECABLE TV1081633665941644315160238461043679505160238473002980606N/AN/AN/APROJECT PHASEPWRNOTIF#ORDER#SuperiorRetire HH/TUT FargosUpgd FargosConnect & Set SVCMeterDistributionHP Svc/MSAUNDERGROUND CIRCUIT MAPNOT TO SCALE9.10.E-Mail:Cell Phone:Project Manager Contact Information:Manager:DAVID FLORES(425) 449-6019DAVID.FLORES@PSE.COMPSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"105107263THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPDAVID FLORES(425) 449-601901/14/25A. WIKEGARDN/A01/15/25JAMES WORKMANN/A04/16/25A. WIKEGARDN/A02/11/25RW-136943RENTONSATARA APARTMENTSUPGD TUT SEC CONN BARS, 1-PH UG-UG SEC L/E, UPGD B/O HH117 WELLS AVE S RENTON, WA 98057N/AN/AN/A105107263AS NOTED1 OF 2KINGN/AN/ACSPSKEPM23-05E-S17N/AN/A2305E0662305E0882305E066SWGRA-17N/AN/AN/AN/AN/ANAN/AN/AN/APSEDAVID FLORES(425) 449-6019N/AN/AN/AN/AN/AN/AN/AN/AN/AService Stubs105107263N/AN/A514831480N/ACIRCUIT FEET ADDED: 0'001"2"0050'100'JOB SITEJOB SITECUSTOMER DEVELOPMENT NOTES:A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK.CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PERPUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:VAULTS & WORK PITS.-PROVIDE A 4' X 4' WORK PIT AT V01.-PROVIDE A 7' X 6' WORK PIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT HH1.TRENCHING & CONDUIT.-TRENCH & INSTALL ± 100' OF 1-3" SCH'L 80 GREY PVC CONDUIT FROM V01 TO HH1.-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.JOB SITE READINESS.-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE.-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY.-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESSDAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES.-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING.-IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETINGWITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS.SECONDARY HH/PEDESTAL TABLEWorkLocationPedestalorHandholeNumber ofPositionsRequiredRemarksHH1HANDHOLE:HH18500AS8SECONDARY CABLE & CONDUIT TABLEWorkLocationCableConduitVoltageDropVoltageFlickerAs Built InformationSizeLengthDesign(ft)SizeLengthDesign(ft)BendsForeman - CompleteFROMTO(1/0,4/0,350)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable)V01HH1SEC 350 UGTPX120'3"100'22.1%0.9%V01HH1SEC 350 UGTPX120'CABLE ONLYTOTAL SEC 350 UG TPX: 240'TOTAL 3" SCH'L 80 CONDUIT: 100'FAULT CURRENT TABLE1Ø PM TRANSFORMERS (240/120V)120V WINDINGS240V WINDINGSLOCATIONSIZER/XMIN.%ZFAULTCURRENTMIN.%ZFAULTCURRENTV01167kVA0.52.43%57,3001.9%36,600CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLEBLDG.# OFMETERSSOURCE# OF RUNSWIRE SIZEREMARKSM011HH12350KCMIL-ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLEJOB SITESITE SPECIFIC NOTESAT V01: 317884-166089 (EXISTING)-EXISTING COMBO VAULT TO REMAIN-REMOVE EXISTING 100kVA 120/240V TUT XFMR & RETURN TO PSE YARD-REMOVE EXISTING (3) B/O SECONDARY CONNECTOR BARS-INSTALL (1) NEW 15kV 1-PH 167kVA 120/240V TUT XFMR (BØ) PER STD 6045.7000 (TUT1LL)-INSTALL (3) #2-750 8-POS SECONDARY CONNECTOR BARS (MID: 7651202)-RECONNECT EXISTING SVCSAT HH1: (EXISTING)-EXISTING B/O CONCRETE HH & LID TO BE REMOVED & RETURNED TO PSE YARD-INSTALL (1) CONC HH 233 #10-500 8-POS ANTI-SKID PER STD 6050.2020 (HH18500AS)-INSTALL (3) #10-500 8-POS CONNECTOR BARS (MID: 7651102)-RECONNECT EXISTING SVCSM01: NEW MULTI-METER BASE-POTELCO TO INSTALL NEW 200A METER-PSE METER DEPT TO INSTALL 600A METER AT LATER DATEM02: TEMP SVC-EXISTING UG-UG TEMP SVC TO BE REMOVEDSPAN SPECIFIC NOTES-PULL OUT APPROX. 120' OF EXISTING SEC 4/0 UG TPX V01-HH1.-REUSE EXISTING 3" SCH'L 80 CONTINUOUS PVC CONDUIT V01-HH1.-SEE SITE PLAN, ONE LINE DRAWING AND TABLES FOR NEW INSTALLS AND REMOVALSVault & Equipment TableWorkLocationGridNumberVault Size& CoverType & SizeEquipmentIn VaultPrimary BushingsTransformerID Numbers(Company ID)ASBUILT INFORMATIONForeman-CompleteLBDCV01317884-166089EXISTING167kVA120/240V (B) -TUT00Installed at site:Grid Number:kVA Rating:TRANSFORMER INSTALLATION (TUT)Company ID#:Primary phase connected to:Tested Secondary VoltageMaterial ID#:Foreman to redline the following information167kVA 120/240v6237250V01 317884-166089Removed at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER REMOVALCompany ID#:Primary phase connected to:Tested Secondary VoltageV01317884-166089100kVA 120/240V TUTLRC:% V. Drop:% Flicker:Sq. Footage:Panel Size:Heat Type:Est. Demand:6,762 SQ. FT.600AELECTRIC36.99KW140A2.1% @ HH10.9% @ HH13-123-221-08ASITE PLANSCALE: 1" = 50'MFP25002382RESTORATION PER CITY OF RENTON STANDARDS
CUSTOMER SUPPLIED6" BEDDING OF CRUSHED ROCKPSE SUPPLIED & INST. 1-RUN350 UG TPX ± 120'CUSTOMER SUPPLIED7' X 6' WORK PIT30'90°R=48"90°R=48"317884-166089100 kVA 120/240V (B)167 kVA 120/240V (B)30'40'CUSTOMER SUPPLIED4' X 4' WORK PITCUSTOMER SUPPLIED & INST.1-3" SCH'L 80 CONTINUOUSPVC CONDUIT ±100'PSE SUPPLIED & INST. 1-RUN350 UG TPX ± 120'REUSE EXISTING 1-RUNCONTINUOUS3" SCH'L 80 CONDUITSCALE: NONECABLE & CONDUIT ONE-LINE DIAGRAM105107263THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPDAVID FLORES(425) 449-601901/14/25A. WIKEGARDN/A01/15/25JAMES WORKMANN/A04/16/25A. WIKEGARDN/A02/11/25RW-136943RENTONSATARA APARTMENTSUPGD TUT SEC CONN BARS, 1-PH UG-UG SEC L/E, UPGD B/O HH117 WELLS AVE S RENTON, WA 98057N/AN/AN/A105107263AS NOTED2 OF 2KINGN/AN/ACSPSKEPM23-05E-S17N/AN/A2305E0662305E0882305E066SWGRA-17N/AN/AN/AN/AN/ANAN/AN/AN/APSEDAVID FLORES(425) 449-6019N/AN/AN/AN/AN/AN/AN/AN/AN/ASINGLE PHASE SECONDARY CONCRETE HANDHOLENot to scale6050.2020-2Steel DoorHandhole1900 lbsTypical customer runservice conductors in ductSeal conduitwith foamInstall PVC bell endsand grout into wallConduits and conductors shall enter fromends of handhole through knockouts providedTOP VIEWSIDE VIEW3'-4"EXCAVATION: 5-1/3 CUBIC YARDS7'-0"6'-0"6" Crashed rock 2"Customer-installed grounding wires ( the "4th" wire on the single-phase systems and the "5th" wire onthe three-phase systems) shall not be connected to PSE's ground or neutral bus. They shall beremoved by customer or cut off at the vault wall.TV & TELElectric Service Cable in Conduit3" Schedule 80 Grey PVCExcavated Dirt PileFinal Grade24" Min24" Minto36" MaxCoverSeparation12" Min20" Min JOINT TRENCH DETAILElectric Service Cable in Conduit (NTS)To Excavated Dirt Pile36" MINIMUM COVERIN RIGHT OF WAYBackfill for ConduitFree of rockslarger than 8"in diameter)Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.FLOW DIRECTIONLAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,SECURE WITH PEA GRAVEL BAGS (MID 9995692).6'3'8"TECHNIQUES FOR EROSION AND SEDIMENT CONTROLSILT FENCE DETAILNot to Scale0150.3200TOP VIEW18" MIN3' MINWORKINGSPACE18" MIN3' MIN4' MIN6' MAX5' PREFERRED6" MIN6' MAX3' MIN3' MINNe
a
r
e
s
t
S
i
d
e
W
a
l
l
o
r
O
b
s
t
r
u
c
t
i
o
n Any Obstruction Above MeterCT EnclosureWorking SpaceMeter ClearancesSCALE: NONE6" Crushed RockSet Handhole flushto final gradehole near steel door hinge providedConnect equipotential jumper toby vault manufacturerdoor openingCoil wire to allow fullCustomer's ServiceConductorsshall be folded backConductors enterfrom beneath andOPTIONAL PVC ENTRANCE SIDE VIEWNot to ScaleMFP25002382