March 25, 2025
City of Renton
1055 South Grady Way
Renton, WA 98055-3232
Project: Walker’s Renton Subaru, AHBL No. 2240819.10
Subject: Overhead to Underground Conversion Modification Request
To Whom It May Concern:
I am the Civil Engineer for this project, located at 505 and 519 SW 12th Street, Renton, WA
98059, on Tax Parcels 3340404148 and H3340404265. We respectfully request approval
of this modification to grant an exemption, as noted in Renton Municipal Code (RMC)
4-6-090.D.1, to allow a portion of the site’s existing overhead facilities to remain above
ground due to diminished public benefit and prohibitively high costs.
Background
Our project proposes to perform undergrounding work to overhead utilities on the south side of
the subject property (South Lines) only, while leaving the overhead power and communications
of SW 12th Street and Seneca Avenue (12th/Seneca Lines) as-is. The South Lines can be
undergrounded entirely, which will provide the greatest public benefit due to visibility along
Highway 405. On the other hand, the 12th/Seneca Lines (and poles) must remain partially intact
due to engineering restrictions and high transmission lines. The frontages of SW 12th Street
and Seneca Avenue meet the current City of Renton standard and would otherwise remain
largely unaffected by our work. On these frontages, there is negligible benefit achieved by
undergrounding a small portion of overhead lines and eliminating a marginal number of poles
when compared to the high cost of construction and the impacts to neighboring properties.
RMC 4-6-090 C. Applicability
2. Existing overhead power and utility facilities abutting a development or redevelopment site
triggering street frontage improvements under RMC 4-6-060 shall be required to be relocated
underground, pursuant to the standards of this Section.
RMC 4-6-090 D. Exemptions
1.a. Overhead power and utility facilities adjacent to a redevelopment site where a street
modification under RMC 4-9-250D is granted to keep the existing overhead power and/or utility
facilities above ground.
1.i. Installations where the Administrator determines:
ii. The cost of undergrounding such a facility outweighs the general welfare consideration
implicit in underground installation.
City of Renton
March 25, 2025
2240819.10
Page 2 of 3
Work Summary
Below is a summary of the impacts associated with the City’s underground request. Refer to
Exhibit A for limits of the overhead to underground conversion impacts based on our initial
coordination efforts with Puget Sound Energy (PSE).
1. The existing overhead power along SW 12th Street supports high transmission power
lines and cannot be underground. Removing the low voltage lines under the high
transmission power lines will require setting additional infrastructure on neighboring
private properties to maintain or restore service. We are swapping a few overhead lines
for different infrastructure, and many overhead poles and lines must remain; therefore, it
will not provide a noticeable benefit to the surrounding businesses or community.
2. Work that is required at the major ground vault at the corner of SW 12th Street and
Seneca Avenue will require two or three major outages that affect 45+ service
connections for businesses in this area.
3. Work on SW 12th Street and Seneca Avenue will require long-term disruption to at least
seven businesses directly adjacent to the road and utility work.
4. The underground conversion work triggers relocating services and adding transformers
and/or utility poles to adjacent businesses. New easements and occupancy of their
property is required to establish these new underground services. Requiring the subject
property owner to obtain offsite utility easements and take neighbors usable property is
not a legal requirement that the City can make.
5. Based on our preliminary and feasibility efforts, which have expended over $30,000 in
preliminary engineering with PSE, we have determined that a net benefit of two utility
poles will be removed for a direct total cost of nearly $2 million and 18 months of
planning/engineering/permitting, along with real tangible impacts to the local business
district and impacts to our environment with unnecessary removal and replacement of
functioning infrastructure.
Modification Request Justification
Justification No. 1 – Undergrounding 12th/Seneca Lines destroys mature frontages in
compliance with City standards that are not proposed to be improved in any other manner.
We have reviewed RMC 4-6-060 to determine if this project requires frontage improvements.
This section of code specifies minimum design standards, including pavement widths, travel
lanes, curbs, sidewalks, planter strips, and street lighting.
In our pre-application notes (PRE24-00382), SW 12th Street and Seneca Avenue SW are
noted as being within the Auto Mall Improvement Plan. The pre-application notes clarify that
the existing curb and sidewalk may remain, provided they comply with the minimum sections
above and meet current City and ADA standards. In general, the existing frontage of Seneca
Avenue SW and SW 12th Street are following City standards for the Auto Mall improvement
plan; therefore, frontage improvements are not technically triggered. Refer to attached Exhibit
B showing existing curb, planter, and mature street trees along the project frontage.
Because the existing frontages are built to City standards, we believe we are substantially
compliant with the City’s policies and the project does not warrant removal of existing frontage
improvements, including mature street trees, to accommodate the existing overhead power
and communications utilities underground. We believe this will create an undue burden on this
development by creating unneeded environmental impacts related to the removal of mature
street trees, degrading the quality of the existing mature streetscape, and increasing disruption
to Subaru and neighboring businesses.
City of Renton
March 25, 2025
2240819.10
Page 3 of 3
Justification No. 2 – The cost of the undergrounding work is not only high, but it is so high
that it will likely make the project impractical and may require relocation of the Walker Subaru
Service Center to an alternative site outside of the City of Renton. Refer to attached Exhibit C
summarizing costs.
The existing overhead power along Seneca Avenue SW supports power that runs along
connecting streets and alleys. Because these offsite lines are not within our frontages, the
poles, guy wires, and anchors must remain. Nowhere in the code does it state a property
should be responsible for providing frontage improvements beyond their frontage. Requiring
undergrounding beyond our frontage does not meet proportionality requirements, and it is not
feasible to limit undergrounding to our frontage due to the location of existing utility poles and
neighboring services.
Justification No. 3 – Undergrounding 12th/Seneca Lines provides little benefit to surrounding
properties and/or the general public.
The existing overhead power and utility facilities serve several neighboring businesses. Based
on our coordination with PSE, these adjacent businesses will be directly impacted by this
request to underground our frontage utilities. The addition of more utility poles and
infrastructure on adjoining businesses’ properties will offset any benefit of removing the limited
overhead lines.
After careful review with PSE and the contractor, we do not believe it is practical to implement
the provisions of this Title. Many overhead lines and cables will remain to support offsite power
infrastructure, and many new poles will be set on adjoining properties or public right-of-way to
offset the removal of a few overhead lines. The cost of this work will be substantial, and I do
not believe any businesses in this corridor with see a benefit.
We believe the frontages that currently exist are safe, functional, and maintainable. Adding
more infrastructure not only adds costs during construction, but increases costs for future
maintenance and increases the likelihood for conflicts with future business operations.
Undergrounding utilities will provide more impact to adjoining businesses during and after
construction than leaving the overhead utilities in place.
Please grant this modification request because the frontages are substantially in conformance
with City standards for paving, curbs, sidewalks, street trees, and lighting. Removing
established frontages and mature street trees to underground these utilities will have an
immediate negative impact on our environment.
Thank you for considering and reviewing my request. If you have any questions, please call me
at (253) 383-2422.
Sincerely,
Scott T. Kaul, PE, LEED AP
Associate Principal
STK/lsk
Q:\2024\2240819\WORDPROC\Letters\20250325 Ltr (Subaru Mod Req) 2240819.10.docx
Renton, WA
March 25, 2025
Task Onsite ROM
$ 97,397
$ 33,116
$ 52,086
$ 4,559
Subtotal 187,158$
Sales Tax - 10.3%19,277$
PSE Rough Order of Magnitude 500,000$
Nightwork Add - (5-8 Shutdowns) $40,000 per shutdown per PSE conversations
80,000$
Communication/Low Volt
Xfinity Allowance - Assumes 25% of PSE costs. No Engineering available -
Zayo Allowance - Assumes 25% of PSE costs. No Engineering available -
Sales Tax - 10.3%59,740$
High Low
Estimate
Total Costs 1,015,411$ 676,941$ 846,176$
Task Offsite ROM (Seneca & 12th St)
169,141$
66,375$
$ 292,067
$ 41,033
Subtotal 568,616$
Sales Tax - 10.3%58,567$
PSE Rough Order of Magnitude 512,000$
Nightwork Add - (5-8 Shutdowns) $40,000 per shutdown per PSE conversations 200,000$
Communication/Low Volt
Xfinity Allowance - Assumes 25% of PSE costs. No Engineering available 250,000$
Zayo Allowance - Assumes 25% of PSE costs. No Engineering available 250,000$
Sales Tax - 10.3%124,836$
High Low Estimate
Total Costs 2,356,823$ 1,571,215$ 1,964,019$
Detail
Infastructure Conduit/Vault Placement, Equipment
Restoration Concrete, Asphalt, Landscape, Fencing, Striping,
Meter Repair
Detail
PSE Preliminary ROM
Civil, Survey, Landscape, Record Drawings,
Management
Walkers Subaru - PSE
Rough Order of Magnitude
A&E Services
HHJ Inc. is pleased to submit a Rough Order of Magnitude (ROM) budget for the undergrounding of Puget Sound Energy (PSE)
electrical wire and associated communications work. The pricing below is broken down between on-site and off-site work as
described in documents previous. The pricing is based upon preliminary drawings by PSE dated 2/28/25 and are subject to
change. This is not a bid and should be used for planning purposes only, with a 20% +/- applied.
Demo Demoltion, Trenching, Digging, Bedding, Survey,
Lighting
Infastructure Conduit/Vault Placement, Equipment
Demoltion, Trenching, Digging, Bedding, Survey,
Lighting
ROM Budget
Demo
Restoration Concrete, Asphalt, Landscape, Fencing, Striping,
Meter Repair
A&E Services Civil, Survey, Landscape, Record Drawings,
Management
PSE Preliminary ROM
317389-165630
X8719 (40T)
900kVAR
SLAP0375
#2ACS
R
C
B
A
555
600
317401-165615
X3318 (100T)
519
39
7
.
5
M
C
M
A
A
C
ABCN
A
B
C
#2ACSR
397.5 MC
M
A
A
C
C
B
A
EAR
13
397.5 M
C
M
A
A
C
C
B
A
DWY
SW 13TH
S
T
EAR
13
317391-165641
47.5 kVA 120/240V (AC)
OPEN-WYE/OPEN-DELTA
SLAP0376
317382-165598
25 kVA 120/240V (A)
317394-165654
608
511
505
501
603
611
LI
N
D
A
V
E
S
W
SW 13TH
S
T
317398-165673
317385-165613
317383-165613
317408-165624
112.5 kVA 120/208V (ABC)
317415-165599
15 kVA 120/240V (B)
317412-165608 T144/14
317420-165614
317422-165655
SLAG7004
317415-165626
50 kVA 120/240V (B)
317418-165637 T144/15
45 kVA 120/240V (ABC)
WYE/DELTA
SE
N
E
C
A
A
V
E
S
W
SW 12TH
S
T
60'
ROW 35'
EOP
MA
P
L
E
A
V
E
S
W
317405-165708
ERROR - SET SWITCH ID
SITE PLAN - REMOVALS
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
N/A
N/A
N/A
N/A N/A
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Svc/MSA
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:N/A
N/A
N/A
SCALE: 1" = 50'
N/
A
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A
WALKER'S RENTON SUBARU
519 SW 12TH ST, RENTON, WA 98057
N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A N/A N/A
N/A N/A N/A
N/A N/A N/A N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Service Stubs
N/A
N/A
N/A
N/A
N/A
BR
E
A
K
L
I
N
E
±
2
5
0
'
555
600
519
A
B
C
#2ACSR
EAR
13
DWY
SW 13TH
S
T
EAR
13
317382-165598
25 kVA 120/240V (A)
317398-165673
X1819
XXX (100T)
XXX (100T)
XXX
317382-165602
317383-165598
XXX (100T)
608
511
505
501
603
611
LI
N
D
A
V
E
S
W
SW 13TH
S
T
317385-165613
317383-165613
317408-165624
112.5 kVA 120/208V (ABC)
317415-165599
15 kVA 120/240V (B)
317412-165608 T144/14
317420-165614
SE
N
E
C
A
A
V
E
S
W
SW 12TH
S
T
60'
ROW 35'
EOP
MA
P
L
E
A
V
E
S
W
317405-165708
ERROR - SET SWITCH ID
SITE PLAN - INSTALLS
SCALE: 1" = 50'
N/
A
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A
WALKER'S RENTON SUBARU
519 SW 12TH ST, RENTON, WA 98057
N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A N/A N/A
N/A N/A N/A
N/A N/A N/A N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
BR
E
A
K
L
I
N
E
±
2
5
0
'
SD
SD
SD
SD
SD
SD
L15
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OH
U
OH
U
OH
U
OH
U
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
O
H
U
O
H
U
GP
GP
SD
P
C
SS
GP
GPGP
GP
GP
GP
GP
RD
IRR
SS
RD
RD
IRR IRR
GP
GP
SS
SS
GP
GP
P
IRR
GP
GP
BOL BOL
IRR
HVACHVAC
RD
RD
BOL
IRR
IRR
GP GP
GP
G
P
GPG
P
GP
GP
GP
RD
RD BOL
BOL
RD
RD
RD
RD
RD
BOL
FDC
SSSS
COCOBOL
BOLBOL
SS
BOLBOL
BOL
GP
SD SD
RDBOLBOL
BOL
BOL
BOLBOL
GP
GP
CORD
GP
BOL
BOL
CO
RDGP GP
GP
GP
P
BOLCOBOL
GP
GP
BOL
BOLGP
GP
HVACHVAC
P
GP
GP
GP
GP
SS
\
\\\\\\\\\\\\\\\\\\\\\\\\\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\\\\\\\\
\
\
\
\\\
\\\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\
\
\
\
\
\
TOPTOPTOP
TO
P
TOP TOP TOP
T
O
P
TOETOETOE
TOE TOE TOE TO
E
TOP TOP
TO
P
TO
P
T
O
P
TOP
TO
P
TO
P
TO
P
TOE
TO
E
TO
E
T
O
E
TO
E
TO
E
TO
E
\
\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\
\
\
\
\
\
\
\
\
\
\\\\\\
\
\
\
\
\
\
\
\\\\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\\\\\\\
\
\
\
\
\
\
\\\\\\\\\\\\\\\\\\\
\
\\\
\
\
\\\\\\
\\
\
\
\
\
\
\
\\\\\\\\\
\
\
\
\
\
\
\
\
\
\\\
G
G
G
G
T
T
T
T
T
T
T
T
T
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
W
F
O
FO
FO
FO
FO
P
P
G
G
G
G
G
G
G
G
G
G
G
W
W
W
T
T
T
PW
W
W
W
W
W
W
W
W
W
W
W
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
P P
P P
P
P
P P P P P
W
W
T
T
T
T
T
T
T
T
T
T
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
W
W
W
W
W
W
W
W
W
W
W W
W
P
P
P
P
P
P
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
T
T
T
P
T
T
PPP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
W
N77°27'44
"
E
9
8
8
.
6
6
'
(
C
)
S0
1
°
2
7
'
1
4
"
W
3
0
0
.
8
4
'
S0
1
°
2
3
'
1
0
"
W
2
7
8
.
3
5
'
(
M
)
S0
1
°
2
1
'
0
3
"
W
1
0
7
6
.
5
8
'
(
M
)
SD
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
D
S
D
G
G
G
G
G
G
G
G
G
G
G
O
H
U
O
H
U
O
H
U
O
H
U
OH
U
OH
U
OH
U
OH
U
OH
U
OHU
SD
SD
SD
S
S
(
R
E
C
)
SD
SD
SD
SD
SD
S
D
S
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SD
SD
SD
SD
SD
S
D
SD
SD
SD
SD
SD
SD
S
D
SD
SD
SD
SD
S
D
525.46'(C
)
N0
1
°
2
6
'
1
4
"
E
10
9
.
1
8
'
237.36'
117.44'
S0
1
°
2
2
'
4
2
"
W
11
6
.
4
3
'
N77°26'10
"
E
119.92'
N0
1
°
2
2
'
4
3
"
E
11
6
.
3
8
'
L1
8
L17
S
0
9
°
3
9
'
1
5
"
E
1
0
5
.
0
4
'
L16
L2
0
L
2
1
N77°24'38
"
E
123.29'
11
4
.
3
4
'
S86°20'10"W
391.52'
25
4
.
8
8
'
L1
2
L9
L1
0
L11
L4
L3
L2
L1
9
GP
GP
P IRR
IRRIRR
C C
C
T
O
E
TO
P
T
O
P
PP
TT
T
T
T
T
T
G
P
P
P
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
P
P
P
P
T
G
SD
S
D
SD
SD
SD
OHU
OHU
OHU
OHU
OHU
S
D
10
9
.
2
0
'
75
.
2
0
'
03
/
1
8
/
2
0
2
5
49
9
2
1
D
E
R
E
TSIGER
NOTGNIHSAW
F
O
ETATS P R O F ESSIONAL
L
A
N
D
S
U
R
VEYOR
L
A
R
R
Y
O.
WALK E R
LINE TABLE
LINE NO.
L15
L16
L17
L18
L19
L20
L21
DISTANCE
29.98'
63.89'
84.61'
108.12'
108.12'
216.24'
60.12'
BEARING
N77° 27' 44"E
N77° 27' 44"E
S77° 26' 10"W
N01° 22' 43"E
S01° 22' 43"W
S01° 22' 43"W
S08° 57' 15"E
LEGEND
EXISTING 1 FOOT MAJOR CONTOUR INTERVALXXX
EXISTING 1 FOOT MINOR CONTOUR INTERVALXXX
\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\EDGE EXISTING ASPHALT PAVING
EXISTING CHAINLINK FENCE AS NOTED
EXISTING WOOD FENCE AS NOTED
EXISTING STORMDRAIN LINE
EXISTING CONCRETE SURFACE
\
\
\
\
\
\
\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\
\
\
\
\
\
\
\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\
EXISTING ASPHALT SURFACE
SD SD
EXISTING GRAVEL SURFACE
XX.X'EXISTING GROUND SPOT ELEVATION
ALL GRADES ALONG CURB ARE AT FLOWLINE
EXISTING 6" IN DIAMETER OR BIGGER DECIDUOUS TREE
AS NOTED
EXISTING 6" IN DIAMETER OR BIGGER CONIFEROUS TREE
AS NOTED
EXISTING ECOBLOCK RETAINING WALL
(GRADE POINT ARROW IS AT TOE FACE WALL)
BOL
GP
SS
SD
RD
HVAC
P
P
C
FDC
FOUND MONUMENT AS NOTED
FOUND REBAR AND CAP AS NOTED
FOUND TACK IN LEAD AS NOTED
EXISTING STORMDRAIN MANHOLE
EXISTING STORMDRAIN CATCHBASIN
EXISTING STORMDRAIN YARD DRAIN
EXISTING STORMDRAIN CULVERT END
EXISTING STORMDRAIN ROOF DRAIN
EXISTING SANITARY SEWER MANHOLE
EXISTING POWER VAULT
EXISTING PAD MOUNTED TRANSFORMER
EXISTING POWER METER
EXISTING LUMINAIRE
EXISTING TELECOMMUNICATIONS MANHOLE
EXISTING TELECOMMUNICATIONS RISER
EXISTING NATURAL GAS VALVE
EXISTING NATURAL GAS METER
EXISTING WATER METER
EXISTING WATER VALVE
EXISTING FIRE HYDRANT
EXISTING FIRE DEPARTMENT CONNECTION
EXISTING POST INDICATOR VALVE
EXISTING WATER HOSE BIB
EXISTING UTILITY POLE
EXISTING GUY ANCHOR
EXISTING UTILITY JUNCTION BOX
EXISTING HVAC UNIT
CO EXISTING UNKNOWN USE CLEANOUT
EXISTING GATE POST
EXISTING BOLLARD
EXISTING SIGN AS NOTED
CONCRETECONC.
TOP WALL GRADE AT TOP BACK WALLTW
BOTTOM WALL GRADE AT TOE FACE WALLBW
EXISTING SANITARY SEWER LINESSSS
RECORD POSITION EXISTING SANITARY SEWER LINE
(SEE SURVEYORS NOTE 8, SHEET SV-01)
SS(REC)SS(REC)
EXISTING WATER LINEWW
EXISTING SUBTERRANEAN POWER LINEPP
EXISTING SUBTERRANEAN TELECOMMUNICATIONS LINETT
EXISTING SUBTERRANEAN FIBER OPTICS LINEFOFO
EXISTING OVERHEAD UTILITY LINEOHUOHU
TOP TOP EXISTING TOP OF SLOPE
TOE TOE EXISTING TOE OF SLOPE
EXISTING NATURAL GAS LINEGG
CONCRETE CURB AND GUTTERC/G
EXTRUDED CURBE/C
RAISED CONCRETE WALKWAYRA/W
CURB CUTC/C
ASPHALT WEDGE CURBA/W
CALCULATED SUBJECT PARCELS DEED LINE
MEASURED/OR CALCULATED RIGHT OF WAY CENTERLINE
CALCULATED RIGHT OF WAY MARGIN
MEASURED/OR CALCULATED VACATED RIGHT OF WAY CENTERLINE
CALCULATED VACATED RIGHT OF WAY MARGIN
CALCULATED PLATTED LOT LINE PER LAT OF C.D. HILLMAN'S
EARLINGTON GARDENS ADD'N TO THE CITY OF SEATTLE DIVISION NO.1
CHAINLINK FENCECLF
CALCULATED EASEMENT MARGIN AS NOTED
CALCULATED EASEMENT AREA
5
SV-05
TAX PARCELS 3340404265 AND 3340404148
OVERALL BOUNDARY AND TOPOGRAPHIC SURVEY DIAGRAM
LINE IS 1" AT
FULL SCALE
FOR 22" X 34" SHEET
SCALE: 1" = 30'
30150 60
SHEET
DESIGNED
N/A
DRAWN
SCALE
CHECKED
DATE APPROVED
L. WALKER
11/21/2024
NU
M
DA
T
E
DE
S
C
R
I
P
T
I
O
N
OF 11
HH
J
A
R
C
H
I
T
E
C
T
S
AT
T
N
:
M
R
.
J
O
H
N
M
A
N
U
E
L
60
1
S
t
.
H
E
L
E
N
S
A
V
E
.
TA
C
O
M
A
,
W
A
9
8
4
0
2
WA
L
K
E
R
'
S
R
E
N
T
O
N
SU
B
A
R
U
WALKER'S RENTON SUBARU
A PORTION OF THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER OF
SECTION 19, TOWNSHIP 23 NORTH, RANGE 05 EAST, WILLAMETTE MERIDIAN
CITY OF RENTON, COUNTY OF KING, STATE OF WASHINGTON
L. WALKER
L. WALKER
JOB NO.
24-165
CL
I
E
N
T
:
Z:\Shared\McInnis Engineering Files\2024 Proposals-Projects\24-165 - HHJ - Walker's Renton Subaru Survey\Survey\Signed Documents\20250318-Final Draft-Boundary and Topographic Survey\24-165 Survey Base.dwg 3/18/2025 1:42 PMPlotted:File:Plotted By: Larry
AS NOTED
1
02
/
0
7
/
2
0
2
5
SU
P
P
L
E
M
E
N
T
E
D
O
R
I
G
I
N
A
L
TO
P
O
G
R
A
P
H
I
C
S
U
R
V
E
Y
W
I
T
H
NO
R
T
H
E
R
L
Y
H
A
L
F
O
F
S
W
1
2
T
H
S
T
RE
C
E
I
V
E
D
T
I
T
L
E
R
E
P
O
R
T
S
F
O
R
AL
L
P
A
R
C
E
L
S
S
H
O
W
N
H
E
R
E
O
N
AN
D
A
D
D
E
D
E
A
S
E
M
E
N
T
S
CO
N
T
A
I
N
E
D
T
H
E
R
E
I
N
2
03
/
1
8
/
2
0
2
5
(V
A
L
E
N
T
I
N
E
A
V
E
N
U
E
)
SE
N
E
C
A
A
V
E
N
U
E
S
W
(SECOND
A
V
E
N
U
E
)
SW 12TH S
T
R
E
E
T
LI
N
D
A
V
E
N
U
E
S
W
(THIRD A
V
E
N
U
E
)
SW 13TH S
T
R
E
E
T
I-405
TAX
PARCEL
3340404265
TAX
PARCEL
3340404148
NOT PART OF
SURVEY
TAX PARCEL
3340404150
BOUNDARY AND TOPOGRAPHIC
SURVEY DETAIL SHEET MATCHLINE
(SHEETS SV-06 THROUGH SV-11)
(TYPICAL)
SV-06
(SHEET 6 OF 11)
SV-07
(SHEET 7 OF 11)
SV-08
(SHEET 8 OF 11)
SV-09
(SHEET 9 OF 11)
SV-10
(SHEET 10 OF 11)
SV-11
(SHEET 11 OF 11)
ALLEY (VA
C
A
T
E
D
-
C
.
O
.
R
.
O
R
D
I
N
A
N
C
E
4
9
1
4
)
1
6
'
90'
1
6
'
8
'
8
'
8
'
8
'
1
6
'
3
0
'
3
0
'
3
0
'
3
0
'
(THIRD A
V
E
N
U
E
)
SW 13TH S
T
R
E
E
T
-
(VACATED
-
C
.
O
.
R
.
O
R
D
I
N
A
N
C
E
4
9
4
2
)
90'
80'
80'
3
0
'
3
0
'
3
0
'
3
0
'
3
0
'
3
0
'
30'
30'
30'
30'
30'
30'
30'30'
30'
30'
30'
UTILITIES EASEMENT
TO THE CITY OF RENTON
PER AFN 20010906002177, CITY OF RENTON ORDINANCE 4914
(ENCOMPASSES WHOLE VACATED ALLEY)
UTILITIES EASEMENT
TO THE CITY OF RENTON
PER AFN 20020207002539, CITY OF RENTON ORDINANCE 4942
(ENCOMPASSES WHOLE VACATED STREET)
PRIVATE INGRESS/EGRESS EASEMENT
PER EASEMENT AGREEMENT WITH RIGHT AND RESPONSIBILITIES
AFN 20020612000622
PSE ELECTRICAL EASEMENT
PER AFN 20030128002591
QWEST
TELECOMMUNICATIONS
EASEMENT
PER AFN 20030327000928
OH
U
OH
U
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU OHU OHU
SD
P
C
GP
IRR
G
G
G
G
G
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
G
G
P
P
P
P
T
P
P
P
P
P
P
P
P
P
P
W
W
W
W
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
W
W
W
W
W
W
P
P
P
P
P
P
P
P
P
P
P
P
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T T
T
T
T
T
T
T
T
T
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T T T T
T
T
T
T
T
T
P
P
P
P
P
T T T
T
T
T
T
P P PPPP
P P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
W
W
W
W
W
21
21
2
1
2
1
21
21
2
2
22
2
2
2
2
21 22
21
21
21
21
21
2
1
21
21
2
2
22
2
2
21
2
1
21.5'
21.4'
21.4'
21.3'
21.2'
21.1'
20.8'
20.7'
20.9'
21.2'
21.3'
21.4'
21.5'
21.6'
21.7'
21.7'
21.
8
'
21.8'
21
.
3
'
21
.
3
'
21
.
4
'
21
.
0
'
20
.
7
'
20
.
6
'
20
.
4
'
20
.
5
'
21.0'
21
.
0
'
21.
2
'
21.4'
2
1
.
6
'
2
1
.
3
'
21.6'
2
1
.
6
'
21.
8
'
21.7'
2
1
.
8
'
21.
6
'
21
.
9
'
22
.
0
'
2
2
.
0
'
21
.
8
'
2
1
.
7
'
2
1
.
6
'
21.6'
21.6'
21.5'
21.3'
2
1
.
4
'
21.4'
21.
6
'
21.7'
20
.
2
'
2
0
.
4
'
20.
3
'
20.1'
20.7'20.9'
21.0'
2
0
.
7
'
2
0
.
7
'
20.5
'
20.9
'
20.8
'
20
.
9
'
20.5
'
20.6
'
21.0'
20.6'21.2'
20.7'21.4'
22.3'
22.3'
22.4'
22
.
4
'
22.7'
21
.
3
'
21.3'
21.2'
20.5'
21.3'
2
2
.
0
'
2
1
C/GC/G
C/G
C/G
E/C
E/C
E/C
C/C
C/C
RAMP
RAMP
C/C
C/C
C/C
C/C
RAMP
2
0
.
3
'
12"
MAPLE
12"
MAPLE
14"
MAPLE
8"
UNKNOWN
DECIDUOUS
C/C
C/C
31.3'
DRIVEWAY
C/G
C/G
C/G
C/G
E/C
E/C
E/C
E/C
E/C
E/C
C/G
C/C
6' CLF
6' CLF
6' CLF
0.6'
0.5'
NOT PART OF SURVEY
(TAX PARCEL NO. 3340404150)
21.8'
21
.
5
'
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
E/C
22.2'
2
2
.
1
'
NOT PART OF SURVEY
(TAX PARCEL NO. 3340404150)
(V
A
L
E
N
T
I
N
E
A
V
E
N
U
E
)
SE
N
E
C
A
A
V
E
N
U
E
S
W
(SECOND
A
V
E
N
U
E
)
SW 12TH S
T
R
E
E
T
6' CLF ANGLE POINT
BEARS S84°11'E, 0.6'
FROM CALCULATED
LOT CORNER
"STOP"
STOP BAR
21.3'20.8'
O
H
U
O
H
U
SD
SD
SD
SD
SD
SD
SD
SD
STORMDRAIN CATCHBASIN
TYPE I
RIM=20.39'
IE=17.67' 12" PVC E
IE=17.68' 12" PVC SW
IE=17.65' 12" PVC NW
S
D
S
D
S
D
SD
SD
STORMDRAIN CATCHBASIN
TYPE I
RIM=20.61'
IE=17.45' 12" PVC N
IE=17.48' 12" PVC S
SD
SD
SD
SD
SD
SD
SD
STORMDRAIN CATCHBASIN
TYPE I
RIM=20.95'
IE=17.24' 12" PVC NE
IE=17.26' 12" PVC S
IE=17.07' 12" PVC W
SD
SD
STORMDRAIN CATCHBASIN
TYPE I
RIM=20.14'
IE=17.10' 12" PVC W
SD
S
D
(
R
E
C
)
STORMDRAIN CATCHBASIN
DID NOT OPEN
RIM=22.04'
12"
MAPLE
17"
MAPLE
S
D
(
R
E
C
)
SD(REC)
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
D
S
D
S
D
STORMDRAIN CATCHBASIN
TYPE I
RIM=21.20'
IE=18.13' 12" PVC NE
IE=18.41' 12" PVC SE
IE=18.17' 12" PVC SW
STORMDRAIN CATCHBASIN
TYPE I
RIM=21.80'
IE=19.04' 8" SW
IE=18.97' 12" PVC NW
SD
SD
SD
SD
SD
STORMDRAIN CATCHBASIN
TYPE I
RIM=21.15'
IE=18.22' 12" PVC NE
IE=18.27' 12" PVC SW
SD
SD
SD
STORMDRAIN CATCHBASIN
IE=18.55' 8" PVC NE
IE=18.42' 12" PVC SW
STORMDRAIN CATCHBASIN
TYPE I
RIM=20.70'
IE=17.88' 12" PVC NE
IE=17.81' 12" PVC NW
237.36'
117.44'
L3
GP
GP
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
P
P
P
P
P
P
P
P
P
P
P
P
P
PT
T
T
T
G
G
G
G
GP
P
T
C/G
C/G
22
22
23
23
22
22
23
22
23
22
23
22
21.8'
21
.
0
'
21
.
5
'
21
.
1
'
2
1
.
6
'
21.5'
23.5'
23.6'
2
1
.
1
'
21
.
7
'
2
1
.
2
'
21.8'
21.8'
21.8'
23.2'
23.1'
23.5'
23.4'
23.6'
2
1
.
2
'
2
1
.
8
'
C/C
C/C
14.9'
DRIVEWAY
2
1
.
5
'
2
1
.
4
'
22
.
0
'
2
2
.
1
'
22.1'
22.0
'
GATE
E/C
E/C
2
2
22 2
2
22
2
1
.
9
'
15"
UNKNOWN
DECIDUOUS
13"
UNKNOWN
DECIDUOUS
15"
UNKNOWN
DECIDUOUS
CONC. STEPS
W/HANDRAIL AT CENTER
6' CLF
10
9
.
2
0
'
PSE ELECTRICAL
EASEMENT PER AFN
20030128002591
03
/
1
8
/
2
0
2
5
49
9
2
1
D
E
R
E
TSIGER
NOTGNIHSAW
F
O
ETATS P R O F ESSIONAL
L
A
N
D
S
U
R
VEYOR
L
A
R
R
Y
O.
WALK E R
6
SV-06
TAX PARCELS 3340404265 AND 3340404148
BOUNDARY AND TOPOGRAPHIC SURVEY DETAIL
LINE IS 1" AT
FULL SCALE
FOR 22" X 34" SHEET
SCALE: 1" = 10'
10050 20
SHEET
DESIGNED
N/A
DRAWN
SCALE
CHECKED
DATE APPROVED
L. WALKER
11/21/2024
NU
M
DA
T
E
DE
S
C
R
I
P
T
I
O
N
OF 11
HH
J
A
R
C
H
I
T
E
C
T
S
AT
T
N
:
M
R
.
J
O
H
N
M
A
N
U
E
L
60
1
S
t
.
H
E
L
E
N
S
A
V
E
.
TA
C
O
M
A
,
W
A
9
8
4
0
2
WA
L
K
E
R
'
S
R
E
N
T
O
N
SU
B
A
R
U
WALKER'S RENTON SUBARU
A PORTION OF THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER OF
SECTION 19, TOWNSHIP 23 NORTH, RANGE 05 EAST, WILLAMETTE MERIDIAN
CITY OF RENTON, COUNTY OF KING, STATE OF WASHINGTON
L. WALKER
L. WALKER
JOB NO.
24-165
CL
I
E
N
T
:
Z:\Shared\McInnis Engineering Files\2024 Proposals-Projects\24-165 - HHJ - Walker's Renton Subaru Survey\Survey\Signed Documents\20250318-Final Draft-Boundary and Topographic Survey\24-165 Survey Base.dwg 3/18/2025 1:42 PMPlotted:File:Plotted By: Larry
AS NOTED
1
02
/
0
7
/
2
0
2
5
SU
P
P
L
E
M
E
N
T
E
D
O
R
I
G
I
N
A
L
TO
P
O
G
R
A
P
H
I
C
S
U
R
V
E
Y
W
I
T
H
NO
R
T
H
E
R
L
Y
H
A
L
F
O
F
S
W
1
2
T
H
S
T
RE
C
E
I
V
E
D
T
I
T
L
E
R
E
P
O
R
T
S
F
O
R
AL
L
P
A
R
C
E
L
S
S
H
O
W
N
H
E
R
E
O
N
AN
D
A
D
D
E
D
E
A
S
E
M
E
N
T
S
CO
N
T
A
I
N
E
D
T
H
E
R
E
I
N
2
03
/
1
8
/
2
0
2
5
SH
E
E
T
M
A
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
S
V
-
0
7
F
O
R
C
O
N
T
I
N
U
A
T
I
O
N
SHEET MATCHLINE
SEE SHEET SV-09 FOR CONTINUATION
L15
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
O
H
U
O
H
U
O
H
U
O
H
U
O
H
U
O
H
U
CO
RD GP GP
GP
GP
P
BOL
CO
BOL
GP
GP
BOL
BOL
GP
GP
\\\\\\\\\\\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\\\\\\\\\\\\\\\\\\\\\\\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\\\\\\\\\\\\\\\\\\\\\\\\\\\
\
\\\\\\\\\\\\\\\\\\\\\\\\\\\
\
\
\
\
\\\\\\\
\
\
\
\
\
\
\
\
\
\\\\\\\\\\\\\\\\\\
\\\\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\\\\\\\\\\\\\\\\\\\\\\\\\
\\\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
T
T
W
F
O
F
O
F
O
F
O
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
P
P
P
P
P
P
P
P
T
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T T
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W
W
W
W
W
W
W
W
W
W
W
N77°27'44
"
E
9
8
8
.
6
6
'
(
C
)
S0
1
°
2
1
'
0
3
"
W
1
0
7
6
.
5
8
'
(
M
)
\\
2
2
C/C
2
2
22
22
22
22 2
2
2
2
2
2
22
22
21.8'
21.7'
21.7'
21.6'
21.6'
21
.
6
'
21.5'
21.6'
20
.
9
'
21.1'21
.
3
'
2
1
.
3
'
21
.
3
'
21
.
8
'
21.3'
21
.
4
'
21
.
5
'
22
.
0
'
22.0'
2
2
.
2
'
22.
1
'
22.1'
22.2
'
22
.
2
'
22
.
2
'
2
2
.
1
'
22.2'
22.7'
22.4'
21.6'
21.7'
22.0'
22.1'
22.1'
22.1'
22.1'
21.9'
21.7'
21.7'
21.6
'
21
.
7
'
21.
3
'
21.
4
'
21
.
3
'
21.
5
'
2
1
.
5
'
21.
6
'
21.9'
21
.
8
'
21.
8
'
23.9'
DRIVEWAYG
G
G
G
G
G
G
20.6'
DRIVEWAY
24.2'
DRIVEWAY
C/C ASPHALT
RAMP
C/G
C/G
C/G
E/C
E/C
A/W
A/W
22.2'
2
2
.
1
'
21
.
9
'
22.1'
21
NOT PART OF SURVEY
(TAX PARCEL NO. 3340404150)
GATE
GATE
GATE
C/C
C/C
2
1
.
0
'
GATE
0.5'
0.4'
0.3'
0.1'
4.9'
8.0'
22
.
2
'
6' CLF 7' CLF
7' CLF
0.2'
0.3'
0.2'
7' CLF
6' CLF
6' CLF
6' CLF
2
1
.
9
'
6' CLF
22.4'
LI
N
D
A
V
E
N
U
E
S
W
(SECOND
A
V
E
N
U
E
)
SW 12TH S
T
R
E
E
T
6'/7' CLF ANGLE POINT
BEARS N89°50'E, 0.6'
FROM CALCULATED
LOT CORNER
14.4'
0.1'
3X8"
UNKNOWN
SD
SD
SD
STORMDRAIN CATCHBASIN
TYPE I
RIM=21.46'
IE=19.69 8" PVC S
UNKNOWN USE
CLEANOUT
RIM=21.96'
SD
SD
STORMDRAIN CATCHBASIN
TYPE I
RIM=21.07'
IE=18.55' 8" PVC NE
IE=18.42' 12" PVC SW
SD
SD
SD
SD
SD
SD
SD
S
D
S
D
S
D
S
D
STORMDRAIN CATCHBASIN
TYPE I
RIM=20.76'
FULL OF DIRT
N0
1
°
2
2
'
4
3
"
E
11
6
.
3
8
'
L1
8
S
0
9
°
3
9
'
1
5
"
E
1
0
5
.
0
4
'
L16
P IRR
IRRIRR
C C
C
TO
E
T
O
E
T
O
E
TO
E
TO
P
TO
P
TO
P
T
O
P
T
O
P
T
O
P
W
W
W
W
W
W
W
P
P
P
P
P
P
P
P
P
P
P
P
P P P P
P
P
P
T
T
T
T
T
T
T T
T
FO
FO
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
FO
G
G
G
G
G
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
T
T
T
T
T T T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
FO
P
T
T
SD
SD
SD
SD
S
D
S
D
S
D
S
D
SD
SD
SD
SD
SD
SD
SD
SD
22
22
22
23
22
22
22
23
22
22
22
23
23
2
2
23
24
24
24
23
23
2
3
23
23
23 24
24
24
24
25
25
25
25
25 26
26
24232221
21
2
0
21
2
2
2
3
24
2
3
24
24
23
2
2
22
21
21
2
1
.
1
'
2
1
.
7
'
22.3'
23
.
1
'
23.
0
'
2
1
.
2
'
21
.
8
'
22.2'
22
.
7
'
2
1
.
3
'
2
2
.
0
'
23.0'
23
.
5
'
21
.
2
'
2
1
.
9
'
22.6'
22.7'
2
1
.
5
'
22
.
0
'
23.8'2
2
.
1
'
2
2
.
8
'
24.2'
21.5'
21.1'20.2'25.1'
26.0'25.4'
23.9
'
23
.
7
'
23.1'
22.
0
'
20
.
8
'
21.
6
'
20
.
7
'
21.4
'
21
.
4
'
21
.
2
'
2
2
.
2
'
22.2'
21.9'
24.7'
25.4'
24.7'
24.3'
23.
7
'
2
2
.
6
'
21.8'
22.1'
22.4'
22.7'
22.9'
23.2'
23.4'24.0'24.3'24.5'24.5'
25.0'
25.3'
25.
5
'
25.4'
23.8'
22.9'23.6'24.1'24.1'
23.1'
22.5'
2
2
.
5
'
23.0'
22.3'
22.9'
22.8'
24
.
4
'
C/C
C/C
RAMP
6' CLF
6' CLF
1X7", 5X4", 4X3"
UNKNOWN
DECIDUOUS
6' CLF
6' WDF
6' WDF
6' WDF
1X7" AND 14X3"
UNKNOWN
DECIDUOUS
1X7" AND 14X3"
UNKNOWN
DECIDUOUS
RAMP
C/C
C/C
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
6' CLF
6' CLF
6' CLF
STORMDRAIN CULVERT END
IE=19.03' 16" CMP
S
D
S
D
S
D
SD
SD
UTILITY
LOCATE
PAINTED
STUB MARK
C/G
C/G
C/G
1X9",2X7",1X4"
UNKNOWN
DECIDUOUS
STORMDRAIN CATCHBASIN
2.1' X 1.7'
RIM=23.56'
IE=20.43' 6" DI NE
IE=20.53' 6" DI SW
IE=22.81' 4" PVC NW
STORMDRAIN CATCHBASIN
TYPE I W/SOLID LID
RIM=23.34'
IE=20.10' 6" DI SE
IE=20.25' 6" DI SW
STORMDRAIN CATCHBASIN
TYPE I
RIM=21.08'
IE=19.65' 6" PVC NE
IE=19.58' 8" CMP SE
IE=19.74' 6" DI NW
STORMDRAIN CATCHBASIN
TYPE I
RIM=21.91'
IE=19.84' 8" DI SE
STORMDRAIN CATCHBASIN
TYPE II W/GRATED LID
RIM=21.88'
IE=19.46' 12" DI NE
IE=19.39' 16" CMP SE
IE=19.74' 8" SW
IE=19.07' 8" DI NW
FULL OF WATER
TOP WATER=20.25'
21
.
5
'
"STOP"
STORMDRAIN CATCHBASIN
TYPE I
RIM=20.87'
IE=19.58' 12" DI NE
C/G
C/G
C/G
C/G
C/G
QWEST TELECOMMUNICATIONS EASEMENT
PER AFN 20030327000925
PRIVATE INGRESS/EGRESS EASEMENT
PER EASEMENT AGREEMENT WITH RIGHTS AND RESPONSIBILITIES
AFN 20020612000622
03
/
1
8
/
2
0
2
5
49
9
2
1
D
E
R
E
TSIGER
NOTGNIHSAW
F
O
ETATS P R O F ESSIONAL
L
A
N
D
S
U
R
VEYOR
L
A
R
R
Y
O.
WALK E R
7
SV-07
TAX PARCELS 3340404265 AND 3340404148
BOUNDARY AND TOPOGRAPHIC SURVEY DETAIL
SHEET
DESIGNED
N/A
DRAWN
SCALE
CHECKED
DATE APPROVED
L. WALKER
11/21/2024
NU
M
DA
T
E
DE
S
C
R
I
P
T
I
O
N
OF 11
HH
J
A
R
C
H
I
T
E
C
T
S
AT
T
N
:
M
R
.
J
O
H
N
M
A
N
U
E
L
60
1
S
t
.
H
E
L
E
N
S
A
V
E
.
TA
C
O
M
A
,
W
A
9
8
4
0
2
WA
L
K
E
R
'
S
R
E
N
T
O
N
SU
B
A
R
U
WALKER'S RENTON SUBARU
A PORTION OF THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER OF
SECTION 19, TOWNSHIP 23 NORTH, RANGE 05 EAST, WILLAMETTE MERIDIAN
CITY OF RENTON, COUNTY OF KING, STATE OF WASHINGTON
L. WALKER
L. WALKER
JOB NO.
24-165
CL
I
E
N
T
:
Z:\Shared\McInnis Engineering Files\2024 Proposals-Projects\24-165 - HHJ - Walker's Renton Subaru Survey\Survey\Signed Documents\20250318-Final Draft-Boundary and Topographic Survey\24-165 Survey Base.dwg 3/18/2025 1:42 PMPlotted:File:Plotted By: Larry
AS NOTED
1
02
/
0
7
/
2
0
2
5
SU
P
P
L
E
M
E
N
T
E
D
O
R
I
G
I
N
A
L
TO
P
O
G
R
A
P
H
I
C
S
U
R
V
E
Y
W
I
T
H
NO
R
T
H
E
R
L
Y
H
A
L
F
O
F
S
W
1
2
T
H
S
T
RE
C
E
I
V
E
D
T
I
T
L
E
R
E
P
O
R
T
S
F
O
R
AL
L
P
A
R
C
E
L
S
S
H
O
W
N
H
E
R
E
O
N
AN
D
A
D
D
E
D
E
A
S
E
M
E
N
T
S
CO
N
T
A
I
N
E
D
T
H
E
R
E
I
N
2
03
/
1
8
/
2
0
2
5
SH
E
E
T
M
A
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
S
V
-
0
6
F
O
R
C
O
N
T
I
N
U
A
T
I
O
N
SHEET MATCHLINE
SEE SHEET SV-08 FOR CONTINUATION
LINE IS 1" AT
FULL SCALE
FOR 22" X 34" SHEET
SCALE: 1" = 10'
10050 20
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
SS
GP
GP
GP
GP
GP
GP
RD
SS
RD
RD
IRR IRRGP
GP
RD
RD
BOL
BOL
RD
RD
RD
RD
RD SS
COCOBOL
BOL
BOL BOL
HVACHVAC
P
GP
GP
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\\\\\\\\\\
G
G
G
G
G
G
G
G
G
G
T
T
T
T
T
T
T
T
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
W
W
W
P
P
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W
W W W W
P
P
P
P
P
P
P
P
P
P
P
T
T
T
T
T
T
T
T
T
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
S0
1
°
2
3
'
1
0
"
W
2
7
8
.
3
5
'
(
M
)
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
21
21.5'
21.3'
2
1
.
4
'
21.4'
20
.
2
'
20.1'
20.7'20.9'
21.3'
C/C
RAMP
C/G
E/C
E/C
6' CLF
NOT PART
OF SURVEY
PARCEL NO.
3340404150)
(V
A
L
E
N
T
I
N
E
A
V
E
N
U
E
)
SE
N
E
C
A
A
V
E
N
U
E
S
W
ALLEY (VA
C
A
T
E
D
-
C
.
O
.
R
.
ORDINAN
C
E
4
9
1
4
)
21.
4
'
22.0'
22.0'
3.1'
7.9' TALL CMU WALL
W/CANOPY
E/C
E/C
E/C
E/C
6' CLF
6' CLF
6' CLF
21
21
21
21
21
21
2
1
21
STOP BAR
C/G
C/G
C/G
C/G
C/G
C/C
C/C
30.0'
DRIVEWAY
E/C
21.7'
21
.
7
'
2
1
.
5
'
21.5
'
21.5
'
21.4'
21.4'
21.3'
21.5'
21.5'
21.5'
21.6'
21.5'
21.4'
21.4'
21.3'
21.3'
21.3'
21.3'
21.4'
21.3'
21.2'
21.3'21
.
3
'
21.3'
2
1
.
4
'
21
.
4
'
21.9'
21.9'
21.4'
21.4
'
2
1
.
4
'
21.4
'
21.4'
22.0'
22.0'
22.0'
22.0'
22
.
0
'
2
2
.
0
'
2
1
.
9
'
2
2
.
0
'
2
1
.
4
'
21
.
4
'
21.
4
'
21.
5
'
22.0'
21.9'
21.9'
21.8'
21.7'
21.8'
21.7'
21
.
8
'
21.9'
21.7'
21.8'
22.0'
21.6'
21.5'
21.5'
21.4'
20.1'
20.1'
20.2'
20.3'
20.3'
20.2'20.8'
20.9'
20.8'
2
0
.
7
'
21.4'
21.5'20
.
7
'
20.8'
20.8'
20.7'
20.7'
20
.
7
'
20.6'
20.3'
20.6'
20.5'
20.4'20.5'
20.5'
21.5'
21.5'
21.5'
21.5'
21.5'
21.4'21.9'
21.4'
21.3'
21.4'21.9'
21.4'21.5'
22.0'
21.9'
21.4'21.4'
21.9'
21.4'
20.7'
20.7'21.0'
20
.
7
'
2
0
.
7
'
RA/W
RA/W
RA/W
RA/W
RA/W
RA/W
2
2
22
21.5'
21.5'21.6'
21.8'
21.6'
21.6'
21.6'
21.6
'
21.
8
'
2
1
.
8
'
21.9'
21.8'
21.8'
2
1
.
8
'
21.3'
21.5'
21.
8
'
21.9'21.9'
DUMPSTER
CONC. PAD
AREA
ECO
BLOCKS
BUILDING FINISH FLOOR AT
CENTER OF PED. DOOR
LABELED "SPRINKLER ROOM"
ELEV=21.95' NAVD 88
BUILDING FINISH FLOOR AT
CENTER OF DOUBLE PED. DOOR
ELEV=22.03' NAVD 88
E/C
E/C
E/C
E/C
E/C
CONC.
CANOPY
COLUMN
21.3'
CONC.
CANOPY
COLUMN
CONC.
CANOPY
COLUMN
CONC.
CANOPY
COLUMN
GATE
GATE
GATE
4' CLF4' CLF
4' CLF
4' CLF
4' CLF
4' CLF
EDGE
CANOPY
(TYPICAL)
EDGE
CANOPY
(TYPICAL)
12"
MAPLE
13"
MAPLE
12"
MAPLE
13"
MAPLE
17"
MAPLE
GATE 6' CLF
O
H
U
O
H
U
O
H
U
O
H
U
O
H
U
O
H
U
O
H
U
O
H
U
O
H
U
O
H
U
O
H
U
O
H
U
O
H
U
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
OHU
OHU
OHU
OHU
"STOP"
STEEL POST FOR
AERIAL
WALKER'S RENTON
SUBARU PARTS AND
SERVICE CENTER SIGN
SERVICE CENTER
DIRECTIONS SIGN
C/C
C/C
RAMP
E/C
C/C
C/C
RAMP
21.7'
20.6'
21.6'
STORMDRAIN CATCHBASIN
TYPE I
S
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
RIM=21.61'
UNKNOWN USE
CLEANOUT
RIM=21.65'
SANITARY SEWER
MANHOLE
W/ CONC. CHANNEL
RIM=20.52'
IE=12.41' 8" CONC. NE
IE=12.52' 8" CONC. S
IE=12.22 8" CONC. SW
LADDER=S
SANITARY SEWER MANHOLE
NO CHANNELIZATION - PIPE PASSES
THROUGH IN AIR WITH
CLEANOUT/REDUCER IN MIDDLE - NO
ACCESS TO IE'S - STRUCTURE FILLED WITH
WATER
RIM=21.34'
TOP PIPE=16.94' 6" PVC NE
TOP PIPE=17.01' 8" PVC SW
TOP WATER=16.75'
LADDER=NW
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SS(REC)
SD
SD
SD
SD
SD
SD
STORMDRAIN CATCHBASIN
TYPE I
RIM=21.20'
IE=19.10' 12" PVC SW
STORMDRAIN CATCHBASIN
TYPE I
RIM=20.70'
IE=17.92' 12" PVC NE
IE=18.01' 12" PVC S
SD
SD
S0
1
°
2
2
'
4
2
"
W
11
6
.
4
3
'
N77°26'10
"
E
119.92'
25
4
.
8
8
'
L1
0
L11
FND 1/2" REBAR AND CAP STAMPED
"LS 19635"
REBAR BEARS S88°24'33"E, 0.23'
FROM THE CALCULATED LOT CORNER
VISITED 11/18/2024
UTILITIES EASEMENT TO THE CITY OF RENTON
PER AFN 20010906002177, CITY OF RENTON ORDINANCE 4914
(ENCOMPASSES WHOLE VACATED ALLEY)
PSE ELECTRICAL
EASEMENT PER AFN
20030128002591
STORMDRAIN CATCHBASIN
TYPE I
RIM=21.20'
IE=18.88' 12" PVC NE
IE=18.77' 6" PVC SE
IE=18.75' 12" PVC S
PSE ELECTRICAL
EASEMENT PER AFN
20030128002591
UTILITIES EASEMENT TO THE CITY OF RENTON
PER AFN 20020207002539, CITY OF RENTON ORDINANCE 4942
(ENCOMPASSES WHOLE VACATED STREET)
03
/
1
8
/
2
0
2
5
49
9
2
1
D
E
R
E
TSIGER
NOTGNIHSAW
F
O
ETATS P R O F ESSIONAL
L
A
N
D
S
U
R
VEYOR
L
A
R
R
Y
O.
WALK E R
9
SV-09
TAX PARCELS 3340404265 AND 3340404148
BOUNDARY AND TOPOGRAPHIC SURVEY DETAIL
SHEET
DESIGNED
N/A
DRAWN
SCALE
CHECKED
DATE APPROVED
L. WALKER
11/21/2024
NU
M
DA
T
E
DE
S
C
R
I
P
T
I
O
N
OF 11
HH
J
A
R
C
H
I
T
E
C
T
S
AT
T
N
:
M
R
.
J
O
H
N
M
A
N
U
E
L
60
1
S
t
.
H
E
L
E
N
S
A
V
E
.
TA
C
O
M
A
,
W
A
9
8
4
0
2
WA
L
K
E
R
'
S
R
E
N
T
O
N
SU
B
A
R
U
WALKER'S RENTON SUBARU
A PORTION OF THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER OF
SECTION 19, TOWNSHIP 23 NORTH, RANGE 05 EAST, WILLAMETTE MERIDIAN
CITY OF RENTON, COUNTY OF KING, STATE OF WASHINGTON
L. WALKER
L. WALKER
JOB NO.
24-165
CL
I
E
N
T
:
Z:\Shared\McInnis Engineering Files\2024 Proposals-Projects\24-165 - HHJ - Walker's Renton Subaru Survey\Survey\Signed Documents\20250318-Final Draft-Boundary and Topographic Survey\24-165 Survey Base.dwg 3/18/2025 1:42 PMPlotted:File:Plotted By: Larry
AS NOTED
1
02
/
0
7
/
2
0
2
5
SU
P
P
L
E
M
E
N
T
E
D
O
R
I
G
I
N
A
L
TO
P
O
G
R
A
P
H
I
C
S
U
R
V
E
Y
W
I
T
H
NO
R
T
H
E
R
L
Y
H
A
L
F
O
F
S
W
1
2
T
H
S
T
RE
C
E
I
V
E
D
T
I
T
L
E
R
E
P
O
R
T
S
F
O
R
AL
L
P
A
R
C
E
L
S
S
H
O
W
N
H
E
R
E
O
N
AN
D
A
D
D
E
D
E
A
S
E
M
E
N
T
S
CO
N
T
A
I
N
E
D
T
H
E
R
E
I
N
2
03
/
1
8
/
2
0
2
5
SH
E
E
T
M
A
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
S
V
-
0
8
F
O
R
C
O
N
T
I
N
U
A
T
I
O
N
SHEET MATCHLINE
SEE SHEET SV-06 FOR CONTINUATION
SHEET MATCHLINE
SEE SHEET SV-10 FOR CONTINUATION
LINE IS 1" AT
FULL SCALE
FOR 22" X 34" SHEET
SCALE: 1" = 10'
10050 20
SD
SD
SD
SD
SD
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
GP
GP
SS GP
GP
P
IRR
BOL
BOL
IRR
HVAC HVAC
RD
RD
BOL
RD
RD
BOL
BOL
BOL
FDC
\
\
\
\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\\\\\\\\\\\\\\\\\\\\\\\\\\\
\\\\\\\\\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
TO
P
TO
P
T
O
E
\
\
\
\
\
\\\\\\\\\\
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P P P
P
P
P
P
P
P
P
P P P P P P P P P P P P P P P P P
W
W
W
W
W
W W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
W
W
W
W
W
W
W
\
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
D
S
D
S
D
S
D
S
D
S
D
(THIRD A
V
E
N
U
E
)
SW 13TH S
T
R
E
E
T
(
V
A
C
A
T
E
D
-
C
.
O
.
R
.
O
R
D
I
N
A
N
C
E
4
9
4
2
)
(THIRD A
V
E
N
U
E
)
SW 13TH S
T
R
E
E
T
21
20.4'20.5'
RA/W 21.3'
21.5'
21.
8
'
21.9'21.9'E/C
11"
MAPLE
14"
MAPLE
(V
A
L
E
N
T
I
N
E
A
V
E
N
U
E
)
SE
N
E
C
A
A
V
E
N
U
E
S
W
2
1
21
21
2
1
21
21
21
2
1
2
1
21
2
1
21
22
22
22
21
21
21
22
22 22
22
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
OH
U
STEEL POST
FOR AERIAL
SUBARU SIGN
21.4'21.9'
21.4'
21.9'
21.2'
21.2'
21.3'
21.4'
21.4'
21.5'
21.5'
21.5'
21.6'
21.5'
21.5'
21.8'
22.1'
22.1'
22.0'
22.0'
22.0'
21.9'
22.0'
21.9'
2
1
.
9
'
21.7'
21.6'
21.6'
21.7'
21.6'
21.6'
21.6'21.7'
21.8'
21.8'21.8'
21.7'
21.6'
21.6'
21.6'
21.5'
21.5'
21.6'
21.6'
21.6'
21.6'
21.6'
21.6'
21.5'
21.5'
21.5'
21.5'
21.4'
21.4'
21.4'
21.3'
21.4'
21.3'
21.3'
21
.
6
'
21.5'
21.4'
21.3'
21.3'
21.3'
21.5'
2
1
.
5
'
2
1
.
8
'
2
1
.
8
'
21.8
'
21.
6
'
21.
7
'
21.
8
'
21.
8
'
21.
8
'
21.7'
21.7'
21.3'
21.5'
21.5'
21.3'
21.2'
21.3'
21.
6
'
21
.
5
'
2
1
.
7
'
21
.
5
'
2
1
.
5
'
2
1
.
4
'
21.4'
21
.
6
'
21.
6
'
21.6'
21.7'21.6
'
21.5'
22.0'
21.
9
'
21.9'
21
.
7
'
21.7'
21
.
8
'
21
.
3
'
20.9'20.9'
20.8'
21.1'
21.2'
21.7'
21.4'
2
1
.
5
'
20.7'
20.9'
20.9'
20.6'
20.5'
20.5'
20.4'
20.6'
20.8'
20.8'
20.6'
20.5'
20.5'20.4'
20.4'
20.3'
20.4'
20.4'
20.5'
20.8'
20.9'
20.7'
20.5'
20.3'
20.5'20.5'
21.2'
21.5'
21.2'
21.3'
21.2'
21.0'
20.6'
20.5'
20.5'21
21
22
22
22
22
2
2
2
2
22
22
2
2
22
22
22
21.3'
21
E/C E/C
E/C
E/C
E/C
E/C
E/C
E/C
E/C
20.2'
20.1'2
0
.
7
'
20.6'
20.7'
20.8'
C/C
26.9'
DRIVEWAY
C/G
C/G
GATE
RA/W
6' CLF
6' CLF
6' CLF
6' CLF
6' CLF
6' CLF
6' CLF
GATE
6' CLF
FENCE TRANSITION
6' CLF/6' STEEL
6' STEEL
20.8'
21.2'
21.2'
8"
UNKNOWN
DECIDUOUS
6"
UNKNOWN
DECIDUOUS
22
22
1X7" 1X6"
UNKNOWN
DECIDUOUS
21.5'
21.6'
20.3'
TW=21.6'
BW=20.8'
0.4'
STORMDRAIN CATCHBASIN
TYPE I
RIM=21.16'
IE=18.47' 8" PVC N
IE=18.37' 8" PVC NE
IE=18.18' 12" PVC SE
IE=18.25' 8" PVC NW
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D SD
SD
SD
SD
SD
SD
SD
STORMDRAIN CATCHBASIN
TYPE I
RIM=20.93'
IE=18.91' 6" PVC NW
IE=18.68' 8" PVC SE
S
D
STORMDRAIN CATCHBASIN
TYPE I
RIM=21.17'
IE=18.50' 8" PVC N
IE=18.90' 6" PVC NE
IE=18.44' 8" PVC SE
IE=18.98' 6" PVC W
SD
SD
SD
SD
SD
SD
STORMDRAIN CATCHBASIN
TYPE I
RIM=20.04'
IE=18.32' 12" PVC N
SANITARY SEWER
MANHOLE
W/ CONC. CHANNEL
RIM=20.83'
IE=12.93' 8" CONC. N
IE=13.03' 8" CONC. NE
LADDER=W
S86°20'10"W
391.52'
INTERSTATE 405
0.7'
0.9'
1.0'
0.8'
4' CLF
3-WAY 6' CLF
INTERSECTION
BEARS S15°13'E,
0.6' FROM THE
CALCULATED LOT
CORNER
75
.
2
0
'
UTILITIES EASEMENT TO THE CITY OF RENTON
PER AFN 20020207002539, CITY OF RENTON ORDINANCE 4942
(ENCOMPASSES WHOLE VACATED STREET)
03
/
1
8
/
2
0
2
5
49
9
2
1
D
E
R
E
TSIGER
NOTGNIHSAW
F
O
ETATS P R O F E
SSIONAL
L
A
N
D
S
U
R
VEYOR
L
A
R
R
Y
O.
WALK E R
10
SV-10
TAX PARCELS 3340404265 AND 3340404148
BOUNDARY AND TOPOGRAPHIC SURVEY DETAIL
SHEET
DESIGNED
N/A
DRAWN
SCALE
CHECKED
DATE APPROVED
L. WALKER
11/21/2024
NU
M
DA
T
E
DE
S
C
R
I
P
T
I
O
N
OF 11
HH
J
A
R
C
H
I
T
E
C
T
S
AT
T
N
:
M
R
.
J
O
H
N
M
A
N
U
E
L
60
1
S
t
.
H
E
L
E
N
S
A
V
E
.
TA
C
O
M
A
,
W
A
9
8
4
0
2
WA
L
K
E
R
'
S
R
E
N
T
O
N
SU
B
A
R
U
WALKER'S RENTON SUBARU
A PORTION OF THE SOUTHWEST QUARTER OF THE NORTHWEST QUARTER OF
SECTION 19, TOWNSHIP 23 NORTH, RANGE 05 EAST, WILLAMETTE MERIDIAN
CITY OF RENTON, COUNTY OF KING, STATE OF WASHINGTON
L. WALKER
L. WALKER
JOB NO.
24-165
CL
I
E
N
T
:
Z:\Shared\McInnis Engineering Files\2024 Proposals-Projects\24-165 - HHJ - Walker's Renton Subaru Survey\Survey\Signed Documents\20250318-Final Draft-Boundary and Topographic Survey\24-165 Survey Base.dwg 3/18/2025 1:42 PMPlotted:File:Plotted By: Larry
AS NOTED
1
02
/
0
7
/
2
0
2
5
SU
P
P
L
E
M
E
N
T
E
D
O
R
I
G
I
N
A
L
TO
P
O
G
R
A
P
H
I
C
S
U
R
V
E
Y
W
I
T
H
NO
R
T
H
E
R
L
Y
H
A
L
F
O
F
S
W
1
2
T
H
S
T
RE
C
E
I
V
E
D
T
I
T
L
E
R
E
P
O
R
T
S
F
O
R
AL
L
P
A
R
C
E
L
S
S
H
O
W
N
H
E
R
E
O
N
AN
D
A
D
D
E
D
E
A
S
E
M
E
N
T
S
CO
N
T
A
I
N
E
D
T
H
E
R
E
I
N
2
03
/
1
8
/
2
0
2
5
SH
E
E
T
M
A
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
S
V
-
1
1
F
O
R
C
O
N
T
I
N
U
A
T
I
O
N
SHEET MATCHLINE
SEE SHEET SV-09 FOR CONTINUATION
LINE IS 1" AT
FULL SCALE
FOR 22" X 34" SHEET
SCALE: 1" = 10'
10050 20