HomeMy WebLinkAboutMFP25002497.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP25002497
IVR Number: 25002497
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:05/19/2025Application Date:3342700461Parcel Number: 3607 PARK AVE N
Permit Type:05/29/2025Issue Date:Franchise
Permit Work Class:05/29/2026Expiration Date:Minor Utility
Job Number: 101183037Franchise Type:Electric
Description: Puget Sound Energy Electric Crew to park at pole P01 (319428 166220) to upgrade transformer.
Contacts
Name Address PhoneTypeBilling
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
PUBLIC WORKS DEPARTMENT
Page 1 of 6 | Published: 2/25/2025
Transportation Systems Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 2/25/2025
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL
WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORE THE DATE OF WORK.
FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING
CITY HOLIDAYS.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic
Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be
conducted within the City's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
4. Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as
described in the guidelines. Additional review time may be needed.
By signing, I certify that the information on this application and within the submittal documents are accurate to the
best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip: ___________
Description of Work:
24 Hour Emergency
Contact Name & Phone:
Approval By: ______________________________________________ Date:____________________
PW/Transportation or CED/Development Engineering Division
Potelco, Inc
6905 S 228th St Kent, WA 98466
Please See Attached
Katie Zimmerman
5/19/2025
3607 Parl Ave N
Jenny Chau (253) 208-9480
101183037- Robinson Residence XFMR Upgrade MFP25002497
Monday Friday 8:00am 3:00pm
Scott Warlick CED 5/29/2025
Page 2 of 6 | Published: 2/25/2025
This Page Intentionally Left Blank
Page 3 of 6 | Published: 2/25/2025
APPLICANT AGREES TO ALL THE FOLLOWING REQUIREMENTS:
GENERAL
• Applicant is responsible for compliance with all traffic regulations of the City of Renton (City) and the State
of Washington, including codes and regulations not described in this application.
• Work Zone Traffic Control shall be in accordance with Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to Washington State Department of Transportation
(WSDOT) traffic control plans.
• Any lane or street closures not in conformance with the approved Traffic Control Plan (TCP) and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs
or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable
State and City codes.
• Indemnify and hold harmless the City from any and all claims, actions, and judgments, including all costs of
defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved TCPs including claims arising from towing of private vehicles and the acts
of Applicant’s agents and employees.
• Applicant must comply with all conditions of the application.
• The City shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such
event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this application, Applicant is
responsible to pay for legal counsel chosen by the City to defend against same.
• No more than one TCP shall be in use at any given time for a single project. If multiple TCPs are submitted
for review and approval at the same time, the TCPs shall be clearly labeled as separate plans and include
construction phasing and sequencing.
• Previously approved TCPs cannot be combined into a new TCP without review and approval by the City.
• Expired TCP is not valid and shall not be used. Applicant shall resubmit the expired TCP for approval with
the updated date and time and/or any changes to TCP.
• Applicant must have the approved TCP prior to commencing the work.
• Approved TCP must be at the work site during work hours.
• Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number
at a conspicuous place on the vehicle or equipment.
• At signalized intersections, vehicle detection shall always remain operational, unless approved in this TCP
and notified Transportation Signal Maintenance prior to commencing work. If damage occurs to existing
vehicle detection that is to remain, it is Applicant’s responsibility to replace with video vehicle detection
equipment that meets current City’s standards at Applicant’s expense.
• When not in use, temporary traffic control devices shall be removed or covered immediately. It is the
Applicant’s responsible to cover any temporary traffic control devices when not applicable for the
construction activities. Similarly, when work is suspended for short periods of time, traffic control devices
that are no longer necessary shall be removed or covered. If deemed abandoned, City crews will remove
and may store them at the City’s maintenance shop (3555 NE 2nd Street) for up to sixty (60) days. The City
is not responsible for any private property from City assets and identifying the property owner.
• Applicant is responsible to maintain existing pedestrian accessible routes during work and non-work hours.
At intersections, the work on pedestrian facilities shall be limited to one (1) corner at a time, with the least
possible inconvenience or delay to pedestrians. Pedestrian pushbuttons shall remain accessible at all times,
unless approved pedestrian accessible detour(s) are provided. Accessibility to existing or temporary
Page 4 of 6 | Published: 2/25/2025
pedestrian pushbuttons shall not be impaired. Deficiencies caused by Applicant’s operations shall be
repaired at Applicant’s expense.
• Applicant shall provide complete assistance and accommodation from a dedicated pedestrian escort to all
kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a
work zone.
• Driveway and alley access shall be maintained at all times, also see RMC Chapters 9 and 10 for Street
Closure and Street Excavation for details. Applicant is responsible for coordinating with the property
owners and/or residents prior to commencement of the work.
• Pavement excavation shall be limited to a maximum of one travel lane at a time unless otherwise
approved.
• Accessibility for emergency vehicles shall be maintained at all times.
PUBLIC OUTREACH
• Applicant must notify Transportation Signal Maintenance (425-430-7423) and City inspector (425-430-
7203) at least twenty-four (24) hours before commencing work (lane shift/closure or near a signal)
affecting the vehicle detection.
• Applicant shall notify emergency services (253-852-2121) twenty-four (24) hours before any street closures
or lane closures.
• Applicant shall call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five (5) working days (excluding
weekends and holidays) prior to starting any work.
• Applicant shall coordinate with King County Metro Transit Construction Information Center (206-477-1140
or construction.coord@kingcounty.gov) for any construction or installation activities affecting transit
operations or facilities. Notification information and guidelines can be found at:
https://kingcounty.gov/en/dept/metro/about/contractor-resources/transit-system-impacts.
WORKING DAYS AND TIMES
• Normal working days are Monday through Friday. Work on holidays, weekends or at night shall not occur
without City’s approval. For work times between 10:00 p.m. and 7:00 a.m., see Night Work section below
for details.
• Work time begins when any street or travel lane is fully or partially closed. This includes set up and removal
within the traveled way.
• If the City determines the closure hours adversely affect traffic during the work, the City may require to
adjust or reduce the working hours accordingly. Reduced work hours may be required by the City to
minimize traffic impacts for any work located near a school during pick-up and drop-off times or on an
arterial street. (See WSDOT Functional Classification Map:
https://www.wsdot.wa.gov/data/tools/geoportal/?config=FunctionalClass)
• Applicant may request the City for consideration of extended or modified working hours. Such request
must be approved by the City before changing hours of work.
CLOSURES
• All closure hours and days are subject to local permit and ordinance conditions (such as noise ordinances).
More information can be found on https://www.rentonwa.gov/City-Services/Permit-Center. Total street
closure lasting more than twenty-four (24) hours is subject to City Council authorization per Section 9-9 of
the Renton Municipal Code (RMC).
• Road closure notice – Applicant must install Portable Changeable Message Sign (PCMS) boards no less than
five (5) working days in advance of effective date and time, not including holidays, at location(s) as
identified in the TCP. Other methods of displaying the messages shall be approved by the City.
Page 5 of 6 | Published: 2/25/2025
• Road closure notice messages must include at least the following:
ROAD WILL BE CLOSED
MONTH/DAY – MONTH/DAY
_AM - _PM
• Road and/or sidewalk closure must be evaluated by the City with respect to both the necessity as well as
the impact of the closure to the public. Applicant shall submit detour plans for road closures to
accommodate both motorized and non-motorized users, including accessible pedestrian route(s). Road
closures shall require additional temporary traffic control including advance notification, approach and
detour signage.
• Applicant is responsible to temporarily remove the flags and install bags over the flag holders for any work
requiring the temporary closure of a crosswalk equipped with pedestrian flags. Applicant shall ensure the
bags remain intact and shall replace damaged bags as needed or determined necessary by the City of
Renton inspector. For any misplaced or lost flags, Applicant is responsible to replace at Applicant’s own
expense. Upon restoration of the crosswalk, Applicant shall remove the bags and return all flags to the
holders. Inventory of pedestrian flags must be submitted to the City inspector and reported to City of
Renton Transportation Signal Maintenance (425-430-7423) prior to removal.
UNIFORMED POLICE OFFICERS (UPO) / FLAGGERS
• Any construction activities within one hundred and fifty (150) feet of a signalized intersection shall require
Uniformed Police Officer(s) (UPO) at the traffic signal, unless otherwise approved in this TCP and evaluated
by City Transportation for the impacts of traffic signal operations and safety.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic
or pedestrian safety or travel.
• For TCPs that require the presence of UPO to manage vehicular traffic and pedestrians at signalized
intersections, Applicant shall coordinate with Transportation Signal Maintenance (425-430-7423) at least
twenty-four (24) hours in advance for any signal that will be placed in red flashing mode. Applicant shall
notify Transportation Signal Maintenance when the intersection is back to the normal traffic signal
operations.
TEMPORARY TRAFFIC SIGNALS OR TRAFFIC SIGNAL MODIFICATION
• Temporary traffic signal programming or modification requires a minimum fifteen (15) working days for
each traffic signal controller to be programmed and tested by City Transportation staff before starting the
work. The Start Date on this TCP shall reflect the time for temporary traffic signal programming or
modification.
TEMPORARY NO-PARKING
• Applicant must post notice of date(s) and time(s) of Temporary No Parking Zone with signs at every
hundred (100) feet at least seventy-two (72) hours in advance of effective date and time.
• Applicant is responsible to show on the TCP the limits of Temporary No Parking Zone, identifying barricade
locations for vacate parking or curb lane usage. The cover sheet of this approved TCP form must be
attached to each Temporary No Parking Sign on the project site.
• Two travel lanes (one for each approach) must be open at all times on arterial streets unless approved in
this TCP.
NIGHT WORK
• Between the hours of 10 p.m. and 7 a.m., approved Noise Variance shall be required (See Section RMC 8-7-
8) for night work. Process may take up to twelve (12) weeks. More information can be found at
https://www.rentonwa.gov/City-Services/Permit-Center/Land-Use-Development/Noise-Variance.
• City may require night work for TCPs that have severe traffic impacts on arterial streets.
Page 6 of 6 | Published: 2/25/2025
• Night work shall always be required if two lanes of traffic (One for each approach) cannot be maintained
on an arterial street.
• Night work shall be required if an evaluation of existing traffic volumes and patterns finds that any TCP will
functionally reduce an arterial or high-volume collector street to only one lane of traffic.
• The following configurations may require night work:
Work at traffic signals that requires shifting one direction of traffic into a left turn pocket where a high
volume of left turns occur.
Work at traffic signals that requires shifting two directions of traffic into left turn pockets.
Work at traffic signals that requires shifting high-volume left-turn movement into a through lane on a
single approach to the intersection.
Work at signals that requires shifting left-turning traffic into a through lane on multiple approaches to
the intersection.
• If City’s initial TCP review finds that night work is required, a pre-construction meeting is mandatory to
confirm the extents of the work required, the duration of work, anticipated noise levels, and any potential
alternatives to mitigate the impact of night work to adjacent residents prior to review and approval of the
TCP.
TRAFFIC CONTROL PLAN (TCP) FORMAT
• TCP must be site and project specific. The TCP shall clearly indicate all existing transportation facilities
impacted by work including roads, bike lanes, sidewalks, transit stops, and driveways. Typical drawings,
taper tables and MUTCD illustrations, by themselves, are insufficient.
• Each construction phase shall be provided with appropriate work zone traffic control. The impacts of utility
relocation, traffic delays, detours and capacity restrictions must be considered and addressed. A suitable
sequence of construction activities must be discussed with City Staff prior to fully developing TCPs based on
the complexity of a project.
• TCPs shall be clearly labeled as separate plans to identify the construction sequencing during each phase
when more than one TCP layout is submitted.
• TCP must be submitted with an electronic copy of TCP layout(s), on 11” X 17” paper size PDF format, which
consist of:
Map(s) showing the location of the project and work area.
All fonts shall be legible and a minimum 10-point font size.
All symbols of viewing or printing shall be clear and contrasting.
All streets shall be labeled, and layout must include a north arrow and scale.
Must show channelizing devices, signing, flagger locations, barricades, PCMS boards, etc.
Show locations where the standard traffic control plans are applied.
DRIVEWAYDRIVEWAYDRIVEWAYP01 N 36TH ST
N 36TH ST PARK AVE NONE LANEROADAHEAD
ONE LANEROADAHEAD
ONE LANEROADAHEAD
ROADWORKAHEAD
ROADWORKAHEAD
ROADWORKAHEAD
ROADWORKAHEAD BEPREPAREDTO STOP
BEPREPAREDTO STOPROADWORKAHEAD PARK AVE NXX
SPEEDLIMIT25
SPEEDLIMIT25
XXX
X X
X
N 37TH STPLEASE SCHEDULEWITH DISPATCH@ 800-343-4049 OPT.1AND PROVIDE ACOPY OF THE APPROVEDTRAFFIC CONTROL PLANK&D Services, as the preparer of this trafficcontrol plan makes no representation as to its'general adequacy or being approved for implementation.Approval must result from the Traffic Engineer orother Public Official having statutory enforcement authorityin the jurisdiction. Utilization and implementation of thisplan shall be a result of that approval.Ref. MUTCD 2009 6A-01 (10)
LegendConeFLAGGER STATIONPoleBEPREPAREDTO STOP W3-4 Be Prepared To StopROADWORKAHEADW20-1 Road Work AheadONE LANEROADAHEAD W20-4 One Lane Road AheadW20-7a flaggerWork Area
OFFICE: 800-343-4049DIRECT: 425-923-9086WATCP@KNDSERVICES.NET
CUSTOMER:CONTACT:LOCATION:DATE:JOB #JENNY CHAU253-208-948003/04/25 101183037...3607 PARK AVE NRENTON, WA 98056 WSTCS#7243BEXP:02/01/2029DESIGNED BY: WHITNEY BARBARINONOTIF #515359772
Notes:1. Maintain ped. access to and through crosswalks2. Maintain Min. 10' lanes3. Maintain local access4. Notify Transit Authority at least 48 hrs. in advance of bus stop closure5. Traffic control plan and all devices shall comply with MUTCD, PROWAG & WSDOT6. DEVICE SPACING Flag Taper 20' Signs per WSDOT Tapers per WSDOT7. 28" Cones 36" Barrels 48" Signs 24" Paddle8. Adjust to field conditions
Maintain DrivewayAccess
www.invarion.comMFP25002497
DWY
ROW50'12051201
3607
1204
1122
1310
1213
3613
3619
3610
1301
122212161210
35071215
1209
1305
12071203
N 36TH ST
N 37TH ST
PARK AVE NN 36TH ST ROW45'ROW
55'
ROW
50'ROW60'319428-166224
319416-166224
SLAH4807
319428-166220
25 kVA 120/240V (B)
37.5 kVA 120/240V (B)
(40T)
319451-166208
50 kVA 120/240V (B)
SLAH4822
319444-166225
SLAH4821
319418-166194
37.5 kVA 120/240V (B)
SLAH4808
319418-166205
37.5 kVA 120/240V (B)
SLAT8800
319428-166211
HAZ
15
B
#4CUB
#4CUSITE SPECIFIC NOTES
AT P01: 319428-166220
-EXISTING 1970 45FT CL-4 POLE TO REMAIN
-INSTALL INSTALL (1) HOT CLAMP #4-4/0 & TAP BØ (MID: 2153100)
-REMOVE (1) EX. 25kVA 120/240V TRF AND RETURN TO YARD
-INSTALL (1) 37kVA OH TRF 120/240v W/ LB C/O (FUSE @ 15T) PER STD 6025.1000 (TRFPXF)
AT P02: 319428-166224
-EXISTING 1956 40FT CL-UNK POLE TO REMAIN
AT P03: 319428-166211
-EXISTING 1956 30FT CL-UNK POLE TO REMAIN
-INSTALL (1) 3/8" DOWN GUY W/ AUTO GRIP PER STD 6013.0100 ( GYD3SA)
-INSTALL (1) TRIPLE HELIX ANCHOR 10FT WEST PER STD 6012.1000 (ANDH3)
M01 AT "3607": NEW METER BASE
-INSTALL 200A METER
M02 AT "3607": EXISTING METER BASE
-REMOVE EXISTING 200A METER
SPAN SPECIFIC NOTES
SEE SITE PLAN AND TABLES FOR INSTALL AND REMOVALS
P02 TO P03:
-TIGHTEN EXISTING SPAN OF 1/0 OH TPX
SITE PLAN
SCALE: 1" = 50'
JOB SITE
POWER GENERAL NOTES - RESIDENTIAL PROJECT
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or
as required by your local municipality.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
8.
9.
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
CROSSING/BORING.
-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT
REQUIREMENTS.
-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO
CONSTRUCTION.
-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION
WORK IN RIGHT OF WAY.
-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
N
Vicinity Map
47.5240, -122.2029
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
00 1"2"
00 50'100'
SERVICE LINE
(UTILITY OWNED)
SERVICE MAST
CONNECTION POINT
24'
16-1/2'
12'13'
STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS,
DRIVEWAYS, AND PARKING AREAS
RESIDENTIAL PROPERTY
OVERHEAD SERVICE CLEARANCE DETAIL
SCALE: NONE
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
319428-166220
25kVA
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (OH)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
37.5kVA 120/240v
6211300
P01
319428-166220
BØ BØ
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HAZ-15
06/2024
228.00 247.00 251.00
0.00 1.07 0.00
228.00 248.07 251.00
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CHAU 253-208-9480 01/16/25
J. CHAU 253-208-9480 01/16/25
E. SCHOTT 714-893-2405 01/16/25
N/A RENTON
ROBINSON RESIDENCE
UPGRADE OH XFMR, NEW PARALLEL OH SEC, (2) SPANS OH SVC (200A)
3607 PARK AVE N, RENTON, WA 98056
N/A N/A
N/A 101183037
AS NOTED 1 OF 1
KING N/A N/A CSPSKEPM
NW 32-24N-05E N/A N/A
2405E126 2405E136 2405E126 HAZ-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:JENNY CHAU
253-208-9480
JENNY.CHAU@PSE.COM
GAS
PHONE
CABLE TV
PROJECT PHASE
PWR
NOTIF#ORDER#101183037SCALE: 6" = 1 MILE
OVERHEAD CIRCUIT MAP 2405E136
Owner / Developer Contact Info
officeATTN:
SANDRA ROBINSON
3607 PARK AVE N
RENTON, WA 98056
PETE PAULING 206-900-3293
CIRCUIT FEET ADDED:
SQ. FOOTAGE:
PANEL SIZE:
HEAT TYPE:
EST. DEMAND:
LRC:
% V. DROP:
% FLICKER:
515359772
108161945
101183038
583078972
108161944
101183037
Retire OH SVC
OH SVC Replacement
Retire OH XFMR
Retire OH Line
Superior JOB SITE
515886267
0'
2,960 SQ FT
200A
GAS
7.3kW
65A
2.1%
3.9%
WIRE REMOVAL TABLE
SPAN REMARKS
FROM TO LENGTH WIRE
P03 M02 120'OH TPX
WIRE STRINGING PRIMARY & SECONDARY
Location
Pri Sec Wire Size & Type Quantity
Length
(Per conductor)Total ActualFromTo
P02 P03 X PARALLEL 1/0 TPX SEC 1 155 155
P03 M01 X 1/0 TPX SVC 2 120 120
6" to 12"
Under Normal
Conditions
65" Min for Triple Helix
DETAIL FOR TRIPLE
HELIX INSTALLATION
Not To Scale
ANCHOR DETAIL - TRIPLE HELIX
Not To Scale
GUYED MAST DETAIL
MFP25002497