Loading...
HomeMy WebLinkAboutConstruction Observation Report 6-5-17 Construction ProgressCLIENT: City of Renton PROJECT: Highlands Generator Replacement and Radio Equipment Relocation ENGINEER: RH2 Engineering CONTRACTOR: Colvico FOREMAN: Ethan Giles   CREW SIZE EQUIPMENT ON SITE     (3) Contractors Excavator     WORK IN PROGRESS: Installing conductors inside generator Preparing to install fuel line in carrier pipe. WORK COMPLETED: Generator shelter light fixtures and conduit in ceiling installed. Radio room furring and drywall installed. Sidewalk from generator shelter to radio room installed. HH-3 installed. Fuel tank staged on fuel tank pad. Load bank pad completed with load bank staged on pad. DISCREPIENCES NOTED: None DISCUSSIONS WITH CONTRACTOR: Colvico has been unable to located a supplier that has 8’ arborvitae in stock and plans to install the largest available (6’-6”) that they are able to purchase. RH2 asked Colvico to submit an RFI to formally confirm that the change was acceptable. The area between the new sidewalk and the booster pump stations driveway has a strip that needs to be restored now that the sidewalk is installed. Colvico has discussed with Hector Olvera and agreed that the strip should be filled with gravel instead of dirt and hydro seed. ITEMS FOR OFFICE ACTION: CAUSE FOR DISPUTE, CHANGE ORDERS, OR DELAYS: EXTRA WORK IN PROGRESS, EQUIPMENT, AND MATERIALS: Radio room tables and other equipment in radio room awaiting assembly. Conduits that will be installed on the elevated reservoir access ladder are staged on the ground near the elevated reservoir. OBSERVATIONS BY: Isaac Oquist TIME AT SITE: 9:00 AM – 10:00 AM  WEATHER: Sunny TEMPERATURE: 60 deg F