HomeMy WebLinkAboutMFP25002456.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP25002456
IVR Number: 25002456
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:05/16/2025Application Date:3344500006Parcel Number: 1200 LAKE WASHINGTON BLVD N
Permit Type:06/02/2025Issue Date:Franchise
Permit Work Class:06/02/2026Expiration Date:Minor Utility
Job Number: 571021933Franchise Type:Electric
Description: Puget Sound Energy Electric
I 405 & WA 900 Installing OH Transmission wire from pole #42 to pole #40. This is a WSDOT Driven Public
Improvement project.
Contacts
Name Address PhoneTypeBilling
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
PUBLIC WORKS DEPARTMENT
Page 1 of 6 | Published: 2/25/2025
Transportation Systems Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 2/25/2025
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL
WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORE THE DATE OF WORK.
FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING
CITY HOLIDAYS.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic
Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be
conducted within the City's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
4. Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as
described in the guidelines. Additional review time may be needed.
By signing, I certify that the information on this application and within the submittal documents are accurate to the
best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip: ___________
Description of Work:
24 Hour Emergency
Contact Name & Phone:
Approval By: ______________________________________________ Date:____________________
PW/Transportation or CED/Development Engineering Division
Potelco, Inc
6905 S 228th St Kent, WA 98466
Please See Attached
5/16/2025
Katie Zimmerman
571021933-NE PARK DR Transmission PH2
1200 Lake Washington Blvd N (I-405 & WA-900)
Brian Parker 253-243-4165
Monday Friday 8:00am 3:00pm
MFP25002456
Scott Warlick CED 6/2/2025
Page 2 of 6 | Published: 2/25/2025
This Page Intentionally Left Blank
Page 3 of 6 | Published: 2/25/2025
APPLICANT AGREES TO ALL THE FOLLOWING REQUIREMENTS:
GENERAL
• Applicant is responsible for compliance with all traffic regulations of the City of Renton (City) and the State
of Washington, including codes and regulations not described in this application.
• Work Zone Traffic Control shall be in accordance with Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to Washington State Department of Transportation
(WSDOT) traffic control plans.
• Any lane or street closures not in conformance with the approved Traffic Control Plan (TCP) and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs
or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable
State and City codes.
• Indemnify and hold harmless the City from any and all claims, actions, and judgments, including all costs of
defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved TCPs including claims arising from towing of private vehicles and the acts
of Applicant’s agents and employees.
• Applicant must comply with all conditions of the application.
• The City shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such
event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this application, Applicant is
responsible to pay for legal counsel chosen by the City to defend against same.
• No more than one TCP shall be in use at any given time for a single project. If multiple TCPs are submitted
for review and approval at the same time, the TCPs shall be clearly labeled as separate plans and include
construction phasing and sequencing.
• Previously approved TCPs cannot be combined into a new TCP without review and approval by the City.
• Expired TCP is not valid and shall not be used. Applicant shall resubmit the expired TCP for approval with
the updated date and time and/or any changes to TCP.
• Applicant must have the approved TCP prior to commencing the work.
• Approved TCP must be at the work site during work hours.
• Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number
at a conspicuous place on the vehicle or equipment.
• At signalized intersections, vehicle detection shall always remain operational, unless approved in this TCP
and notified Transportation Signal Maintenance prior to commencing work. If damage occurs to existing
vehicle detection that is to remain, it is Applicant’s responsibility to replace with video vehicle detection
equipment that meets current City’s standards at Applicant’s expense.
• When not in use, temporary traffic control devices shall be removed or covered immediately. It is the
Applicant’s responsible to cover any temporary traffic control devices when not applicable for the
construction activities. Similarly, when work is suspended for short periods of time, traffic control devices
that are no longer necessary shall be removed or covered. If deemed abandoned, City crews will remove
and may store them at the City’s maintenance shop (3555 NE 2nd Street) for up to sixty (60) days. The City
is not responsible for any private property from City assets and identifying the property owner.
• Applicant is responsible to maintain existing pedestrian accessible routes during work and non-work hours.
At intersections, the work on pedestrian facilities shall be limited to one (1) corner at a time, with the least
possible inconvenience or delay to pedestrians. Pedestrian pushbuttons shall remain accessible at all times,
unless approved pedestrian accessible detour(s) are provided. Accessibility to existing or temporary
Page 4 of 6 | Published: 2/25/2025
pedestrian pushbuttons shall not be impaired. Deficiencies caused by Applicant’s operations shall be
repaired at Applicant’s expense.
• Applicant shall provide complete assistance and accommodation from a dedicated pedestrian escort to all
kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a
work zone.
• Driveway and alley access shall be maintained at all times, also see RMC Chapters 9 and 10 for Street
Closure and Street Excavation for details. Applicant is responsible for coordinating with the property
owners and/or residents prior to commencement of the work.
• Pavement excavation shall be limited to a maximum of one travel lane at a time unless otherwise
approved.
• Accessibility for emergency vehicles shall be maintained at all times.
PUBLIC OUTREACH
• Applicant must notify Transportation Signal Maintenance (425-430-7423) and City inspector (425-430-
7203) at least twenty-four (24) hours before commencing work (lane shift/closure or near a signal)
affecting the vehicle detection.
• Applicant shall notify emergency services (253-852-2121) twenty-four (24) hours before any street closures
or lane closures.
• Applicant shall call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five (5) working days (excluding
weekends and holidays) prior to starting any work.
• Applicant shall coordinate with King County Metro Transit Construction Information Center (206-477-1140
or construction.coord@kingcounty.gov) for any construction or installation activities affecting transit
operations or facilities. Notification information and guidelines can be found at:
https://kingcounty.gov/en/dept/metro/about/contractor-resources/transit-system-impacts.
WORKING DAYS AND TIMES
• Normal working days are Monday through Friday. Work on holidays, weekends or at night shall not occur
without City’s approval. For work times between 10:00 p.m. and 7:00 a.m., see Night Work section below
for details.
• Work time begins when any street or travel lane is fully or partially closed. This includes set up and removal
within the traveled way.
• If the City determines the closure hours adversely affect traffic during the work, the City may require to
adjust or reduce the working hours accordingly. Reduced work hours may be required by the City to
minimize traffic impacts for any work located near a school during pick-up and drop-off times or on an
arterial street. (See WSDOT Functional Classification Map:
https://www.wsdot.wa.gov/data/tools/geoportal/?config=FunctionalClass)
• Applicant may request the City for consideration of extended or modified working hours. Such request
must be approved by the City before changing hours of work.
CLOSURES
• All closure hours and days are subject to local permit and ordinance conditions (such as noise ordinances).
More information can be found on https://www.rentonwa.gov/City-Services/Permit-Center. Total street
closure lasting more than twenty-four (24) hours is subject to City Council authorization per Section 9-9 of
the Renton Municipal Code (RMC).
• Road closure notice – Applicant must install Portable Changeable Message Sign (PCMS) boards no less than
five (5) working days in advance of effective date and time, not including holidays, at location(s) as
identified in the TCP. Other methods of displaying the messages shall be approved by the City.
Page 5 of 6 | Published: 2/25/2025
• Road closure notice messages must include at least the following:
ROAD WILL BE CLOSED
MONTH/DAY – MONTH/DAY
_AM - _PM
• Road and/or sidewalk closure must be evaluated by the City with respect to both the necessity as well as
the impact of the closure to the public. Applicant shall submit detour plans for road closures to
accommodate both motorized and non-motorized users, including accessible pedestrian route(s). Road
closures shall require additional temporary traffic control including advance notification, approach and
detour signage.
• Applicant is responsible to temporarily remove the flags and install bags over the flag holders for any work
requiring the temporary closure of a crosswalk equipped with pedestrian flags. Applicant shall ensure the
bags remain intact and shall replace damaged bags as needed or determined necessary by the City of
Renton inspector. For any misplaced or lost flags, Applicant is responsible to replace at Applicant’s own
expense. Upon restoration of the crosswalk, Applicant shall remove the bags and return all flags to the
holders. Inventory of pedestrian flags must be submitted to the City inspector and reported to City of
Renton Transportation Signal Maintenance (425-430-7423) prior to removal.
UNIFORMED POLICE OFFICERS (UPO) / FLAGGERS
• Any construction activities within one hundred and fifty (150) feet of a signalized intersection shall require
Uniformed Police Officer(s) (UPO) at the traffic signal, unless otherwise approved in this TCP and evaluated
by City Transportation for the impacts of traffic signal operations and safety.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic
or pedestrian safety or travel.
• For TCPs that require the presence of UPO to manage vehicular traffic and pedestrians at signalized
intersections, Applicant shall coordinate with Transportation Signal Maintenance (425-430-7423) at least
twenty-four (24) hours in advance for any signal that will be placed in red flashing mode. Applicant shall
notify Transportation Signal Maintenance when the intersection is back to the normal traffic signal
operations.
TEMPORARY TRAFFIC SIGNALS OR TRAFFIC SIGNAL MODIFICATION
• Temporary traffic signal programming or modification requires a minimum fifteen (15) working days for
each traffic signal controller to be programmed and tested by City Transportation staff before starting the
work. The Start Date on this TCP shall reflect the time for temporary traffic signal programming or
modification.
TEMPORARY NO-PARKING
• Applicant must post notice of date(s) and time(s) of Temporary No Parking Zone with signs at every
hundred (100) feet at least seventy-two (72) hours in advance of effective date and time.
• Applicant is responsible to show on the TCP the limits of Temporary No Parking Zone, identifying barricade
locations for vacate parking or curb lane usage. The cover sheet of this approved TCP form must be
attached to each Temporary No Parking Sign on the project site.
• Two travel lanes (one for each approach) must be open at all times on arterial streets unless approved in
this TCP.
NIGHT WORK
• Between the hours of 10 p.m. and 7 a.m., approved Noise Variance shall be required (See Section RMC 8-7-
8) for night work. Process may take up to twelve (12) weeks. More information can be found at
https://www.rentonwa.gov/City-Services/Permit-Center/Land-Use-Development/Noise-Variance.
• City may require night work for TCPs that have severe traffic impacts on arterial streets.
Page 6 of 6 | Published: 2/25/2025
• Night work shall always be required if two lanes of traffic (One for each approach) cannot be maintained
on an arterial street.
• Night work shall be required if an evaluation of existing traffic volumes and patterns finds that any TCP will
functionally reduce an arterial or high-volume collector street to only one lane of traffic.
• The following configurations may require night work:
Work at traffic signals that requires shifting one direction of traffic into a left turn pocket where a high
volume of left turns occur.
Work at traffic signals that requires shifting two directions of traffic into left turn pockets.
Work at traffic signals that requires shifting high-volume left-turn movement into a through lane on a
single approach to the intersection.
Work at signals that requires shifting left-turning traffic into a through lane on multiple approaches to
the intersection.
• If City’s initial TCP review finds that night work is required, a pre-construction meeting is mandatory to
confirm the extents of the work required, the duration of work, anticipated noise levels, and any potential
alternatives to mitigate the impact of night work to adjacent residents prior to review and approval of the
TCP.
TRAFFIC CONTROL PLAN (TCP) FORMAT
• TCP must be site and project specific. The TCP shall clearly indicate all existing transportation facilities
impacted by work including roads, bike lanes, sidewalks, transit stops, and driveways. Typical drawings,
taper tables and MUTCD illustrations, by themselves, are insufficient.
• Each construction phase shall be provided with appropriate work zone traffic control. The impacts of utility
relocation, traffic delays, detours and capacity restrictions must be considered and addressed. A suitable
sequence of construction activities must be discussed with City Staff prior to fully developing TCPs based on
the complexity of a project.
• TCPs shall be clearly labeled as separate plans to identify the construction sequencing during each phase
when more than one TCP layout is submitted.
• TCP must be submitted with an electronic copy of TCP layout(s), on 11” X 17” paper size PDF format, which
consist of:
Map(s) showing the location of the project and work area.
All fonts shall be legible and a minimum 10-point font size.
All symbols of viewing or printing shall be clear and contrasting.
All streets shall be labeled, and layout must include a north arrow and scale.
Must show channelizing devices, signing, flagger locations, barricades, PCMS boards, etc.
Show locations where the standard traffic control plans are applied.
111112121212121412 12 13 12 12131
4
151212121220NB I-405SB I-405NB
I-405SB
I-405TMATMATMAPOLICEK9 UNITCLEAR AREA(SEE NOTES)TMAWSP
RAMP CLOSES
TMAWSP
RAMP CLOSES
TMATMATMAPOLICE
K9 UNIT CLEAR AREA(SEE NOTES)2.0 SEC 2.0. SEC
ROLLING
SLOW
DOWN
BE
PREPARED
TO STOP
FIELD LOCATE 1 MILE (+/-) IN
ADVANCE OF LANE CLOSURE
PCMS BOARD
GAP = 10 Min (20/60) = 3.33 Miles
CLEARANCE = 3.33 Miles (60-20/60) = 5.0 Min
DISTANCE = 5 Min (60/60) = 5.0 Miles
"CHASER" VEHICLE, LAST
VEHICLE IN QUE TO INSURE
SAFETY(WSP)
ALL VEHICLES REQUIRED TO HAVE
WARNING BEACONS & ARROW
BOARDS IN CAUTION MODE
(TMA'S RECOMMENDED)
2.0 SEC 2.0. SEC
ROLLING
SLOW
DOWN
BE
PREPARED
TO STOP
FIELD LOCATE 1 MILE (+/-) IN
ADVANCE OF LANE CLOSURE
PCMS BOARD
"CHASER" VEHICLE, LAST
VEHICLE IN QUE TO INSURE
SAFETY(WSP)
NE SU
N
S
E
T
B
L
V
D
N
E
S
U
N
S
E
T
B
L
V
D
SRMP 5.47 P40P42
OPERATION NOTES
1. ALL WORK VEHICLES SHALL USE WARNING BEACONS
2. THE NUMBER OF VEHICLES SHOWN IS A MINIMUM.
IF POSSIBLE, USE ONE VEHICLE PER LANE CLOSURE.
3. NOTIFY WSP PRIOR TO OPERATIONS - SO THEY ARE
AWARE OF THE OPERATION.
4. ALL ON-RAMP TRAFFIC SHALL BE STOPPED DURING
SLOWDOWN.
5. USE CALCULATION CHART TO DETERMINE CLEAR
AREA.
WORKERS
ON
ROADWAY
DO
NOT
PASS
USE PCMS ON EACH
TRANSPORTABLE ATTENUATOR
TRUCK MOUNTED PCMS BOARD
2.0 SEC 2.0. SEC
2.0 SEC 2.0. SEC
ROLLING
SLOW
DOWN
SLOW
TRAFFIC
AHEAD
DRIVE DOWN SHOULDER TO
REMAIN 0.5 +/- MILE IN
ADVANCE OF TRAFFIC QUEUE.
(OPTIONAL IS SHOULDER IS
LESS THAN 8 FEET.)
TRUCK MOUNTED PCMS BOARD
TMAWORKERS
ON
ROADWAY
DO
NOT
PASS
USE PCMS ON EACH
TRANSPORTABLE ATTENUATOR
TRUCK MOUNTED PCMS BOARD
2.0 SEC 2.0. SEC
2.0 SEC 2.0. SEC
ROLLING
SLOW
DOWN
SLOW
TRAFFIC
AHEAD
DRIVE DOWN SHOULDER TO
REMAIN 0.5 +/- MILE IN
ADVANCE OF TRAFFIC QUEUE.
(OPTIONAL IS SHOULDER IS
LESS THAN 8 FEET.)
TRUCK MOUNTED PCMS BOARD
TMABEFORE
WORK AREA
PCMSBEFOREWORK AREAPCMS0'90'45'
N
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
Safaa Al Neema
(425) 398-6077
safaa.alneema@pse.com
1 OF 41-405 & WA-900, Renton, WA 98056
0
515934125
01/24/2025
Notes:
1. Notify WSDOT at least 5 days prior to scheduled date.
2. At time of work, call wsdot radio (per region as instructed in
permit) at the time the lane is closed (or intersection flagged);
and again when the lane/intersection is opened. leave a
contact name and cell phone number with radio.
3. All advanced warning signs and spacing to conform to the
MUTCD and WSDOT standards.
4. Channelizing devices shall be traffic drums (barrels)
with steady burning Type C lights on all State Routes
and Hwys.
5. All signs are 48" x 48", Black legend on Orange background.
Use class B signs unless otherwise specified.
6. Flaggers shall be in radio contact with each other at
all times; flagger stations shall be illuminated during
hours of darkness with minimum 150w lights
7. All lane closures shall not infringe upon adjacent
lanes.
8. Alert affected residents and businesses if existing on
WSDOT roadways. All sidewalks, driveways, exits and
egresses shall be completely clear unless otherwise
indicated.
9. Work areas will be noted as per distances between
State Route milepost markers.
10. See sheet 4 for WSDOT Notes and Tables.
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
WORK AREA
CHEVRONARROW BOARD
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
POLE
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound Energy
Traffic Control Supervisor:
Safaa Al Neema
Card No. IS 6 100072Card Exp. 10/10/2028Safaa.alneema@pse.com(425)398-6077
MFP25002456
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
Safaa Al Neema
(425) 398-6077
safaa.alneema@pse.com
2 OF 41-405 & WA-900, Renton, WA 98056
0
515934125
01/24/2025
N
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound Energy
Traffic Control Supervisor:
Safaa Al Neema
Card No. IS 6 100072Card Exp. 10/10/2028Safaa.alneema@pse.com(425)398-6077
WORK AREA
4.
5.
TEMPORARY ON-RAMP HOLDS
(CLOSURES) SB I-405
1.N 30TH ST.
2.NE 44TH ST.
3.LAKE WASHINGTON BLVD SE.
4.COAL CREEK PKWY SE.
5.I-90 (E+WB RAMP- SOUTH).
VEHICLE TO HOLD
RAMP TRAFFIC
SINGLE LANE RAMP CLOSURE
(1 HOLD VEHICLE REQUIRED)
WSP - WB HEADING SOUTH
SINGLE LANE RAMP CLOSURE
(1 HOLD VEHICLE REQUIRED)
WSP - EB HEADING SOUTH
2 LANES MERGE INTO 1
1 HOLD VEHICLE REQUIRED
CONSTRUCTION VEHICLE
SINGLE LANE RAMP CLOSURE
(1 HOLD VEHICLE REQUIRED)
CONSTRUCTION VEHICLE
2 LANES MERGE INTO 1
1 HOLD VEHICLE REQUIRED
CONSTRUCTION VEHICLE
2.
3.
1.SINGLE LANE RAMP CLOSURE
(1 HOLD VEHICLE REQUIRED)
CONSTRUCTION VEHICLE
MFP25002456
NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVSafaa Al Neema(425) 398-6077safaa.alneema@pse.com3 OF 41-405 & WA-900, Renton, WA 980560 51593412501/24/2025TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Safaa Al NeemaCard No. IS 6 100072Card Exp. 10/10/2028Safaa.alneema@pse.com(425)398-60775.2.3.4.1.VEHICLE TO HOLDRAMP TRAFFICTEMPORARY ON-RAMP HOLDS (CLOSURES) NB I-4051.SUNSET BLVD N.2.MAPLE VALLEY HWY.3.TALBOT RD S.4.167 (E+WB RAMPS- NORTH).5.INTERURBAN AVE S & W VALLEY HWY.SINGLE LANE RAMP CLOSURE(1 HOLD VEHICLE REQUIRED)SINGLE LANE RAMP CLOSURE(1 HOLD VEHICLE REQUIRED)2 LANES MERGE INTO 11 HOLD VEHICLE REQUIREDCONSTRUCTION VEHICLESINGLE LANE RAMP CLOSURE(1 HOLD VEHICLE REQUIRED)WSP - SB HEADING EASTSINGLE LANE RAMP CLOSURE(1 HOLD VEHICLE REQUIRED)WSP - NB HEADING EASTSINGLE LANE RAMP CLOSURE(1 HOLD VEHICLE REQUIRED)WSP - NB HEADING EASTW VALLEY HWYMFP25002456
TEMPORARY TRAFFIC CONTROL PLAN
WSDOT NOTES & TABLES
””
–
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
Safaa Al Neema
(425) 398-6077
safaa.alneema@pse.com
4 OF 41-405 & WA-900, Renton, WA 98056
0
515934125
01/24/2025
Puget Sound Energy
Traffic Control Supervisor:Safaa Al NeemaCard No. IS 6 100072
Card Exp. 10/10/2028
Safaa.alneema@pse.com
(425)398-6077
WORK AREA
VICINITY MAP
MFP25002456
I-405WA-900 I-405THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES
CALL (800)424-5555 2 BUSINESS DAYS BEFORE YOU DIG
PROJECT PHASE ORDER#POWERNOTIFICATION
SUPERIOR
CAPITAL
REMOVAL
EXPENSE
510603942
"Locates Required"
"Outages Required"
"Flagging Required"
Yes
Yes
Yes
No
No
No
DESCRIPTIONREV#DATE BY
3
2
1
FUNCTION CONTACT PHONE NO DATE
PROJECT MGR
ENGR-POWER
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
REAL ESTATE/EASEMENT PERMIT
FOREMAN (Check Box if Complete)
INSTALLED & VERIFIED
LOCKED/SECURED CLEAN/SAFE
RED-LINED
CHANGES
PRIMARY
RECORDED
PHASEFUSE SIZE
GRID, CABLE AND SWITCH NUMBERS .
FIELD CHANGES ON AS-BUILTS.
MATERIAL VERIFIED AND NOTED ON PAPERWORK.
TOTAL CABLE NOTED ON AS-BUILT.
COMPANY ID #'s IN CORRECT LOCATION ON AS-BUILT.
Foreman's Signature
Company Employee ID#
DEVIATIONS NOTED ON THE AS-BUILT AND THEIR REASON
PSE EQUIPMENT & WORK AREA LEFT IN CONDITION.
INDICATE CORRECT ON AS-BUILT & VERIFY PROPER .
UTILITIES
CONTACT
PHONE#
INCIDENT #
SAP ORDER NUMBER
JOINT FACILITIES ARRANGEMENTS
PAGESCALE
REV #
INTERNAL USE
TLN #COUNTY TSG MAP POWER WK CTR
1/4 SEC OH CIRC MAP UG CIRC MAP
U-MAP CIRCUIT NO.
Sec15 T24 R06E
0
DIST EXPENSE
ENGINEERING
TRANSMISSION
ELECTRIC
111026396
245KING
LAKE TRADITION - SAHALEE (115 KV)
K. KORS
J. ANDERSON
ISSAQUAH-PINE LAKE RD SE & SE 44TH ST
SAMMAMISH, WA 98075
111026396
108126575
571017998
2406E059
07C
G. LINDER 425-457-3067
425-732-0829
425-396-3809
/2 1"=100'
4/26/21
1 1ASBUILT TO:1T-01202111026396TRANSMISSION DRAWING SOURCE:T-01202 sh 1571018148T-0732 sh 2T-0732 sh 2571018148
571018148
11760229
355
V. TROFIMENKO 425-457-9001
425-732-0829K. KORS
425-732-0829K. KORS
4/28/21
4/28/21
SHUFFLETON - RENTON #1 (55 KV DE-ENERGIZED)
I-405 & WA-900
RENTON, 98056
100°C
34' HIGHWAY CLEARA
N
C
E
CONDUCTOR NOTES:
PHASE 1: REMOVAL
REMOVE THREE PHASE SPAN OF 1272 KCMIL ACSR BITTERN
PHASE 2: INSTALLATION
INSTALL THREE PHASE SPAN OF 795 KCMIL ACSR TERN PER SAG TABLE 1
INSTALL DOUBLE STRAIN ASSEMBLY PER DETAIL 2
60-TON PRESS AND 12CD ALUMINUM DIE NEEDED FOR COMPRESSION DEs
INSTALL TWO STOCKBRIDGE DAMPERS (MID 8820700) ON EACH DEADEND
CENTER DAMPER AT 30" FROM DEADEND AND 33" FROM FIRST DAMPER PER FIGURE 1
BOLT DIAMETER: 1/2"
TORQUE TO 25 FT-LBS
DETAIL 1: DAMPER LOCATIONS
795 KCMIL ACSR TERN
8000# NESC MEDIUM, RS=716
INSTALL PER SAG TABLE 1
718
PROJECT NOTES:
WSDOT REQUIRES PSE TO TEMP REMOVE SPAN ACROSS I-405
REMOVE SPAN OF 1272 BITTERN (2016 LiDAR VERIFICATION SHOWS
FIELD RATING OF SPAN IS LESS THAN 50°C)
PER PLANNING INSTALL SPAN OF 795 TERN WITH SAG RATED AT 100°C
ANCHOR SHACKLE
ANCHOR SHACKLE
YOKE PLATE
COMPRESSION DEADEND
SOCKET CLEVIS-SHORT
PLAN VIEW
ELEVATION VIEW
DETAIL 1
SCALE: NONE
115KV DOUBLE STRAIN INSULATOR ASSEMBLY
SUSPENSION INSULATOR
115kV Y-CLEVIS BALL YOKE PLATE
15° JUMPER TERMINAL
FOR CLARITY
PAD ROTATED 90°
MID 9052600
MID 9388000
MID 2170064
MID 8970400
MID 9262200
MID 9052600
MID 8970400
MID 9996767
2
05 93
97
97
76
5/04/21
1/10/25
1/10/25
1/10/25
B. PARKER 253-243-4165
571021933 571021933515934125
571021933
MFP25002456