ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC Meeting Date: June 2, 2025
Project File Number: PR25-000023
Project Name: Fountain of Hope Ministries International Church
Land Use File
Number:
LUA25-000077, CU-H, ECF
Project Manager: Jill Ding, Senior Planner
Owner: Nhi Nguyen & Toan Ngo, 18312 112th Ave SE, Renton, WA 98055
Applicant/Contact: Dawa Loga Kamanga, Fountain of Hope Ministries International Church, 7911
165th St Ct E, Puyallup, WA 98375
Project Location: 300 S 3rd St, Renton, WA 98057 (APN 0007200184 and 0007200157)
Project Summary: The applicant is requesting a Hearing Examiner Conditional Use Permit and
Environmental (SEPA) Review for the change of use of an existing building into a
religious institution. The project site is comprised of two (2) parcels (parcel nos.
0007200184 and 0007200157) located at the northeast corner of the intersection
of S 3rd St and Shattuck Ave S, a former funeral home. The project site totals
27,666 square feet (0.64 acres) in area and is located within the Center Downtown
(CD) zone and Urban Design District A. The existing building totals 7,005 square
feet in area with 23 surface parking stalls. No expansion of the existing building is
proposed. The proposal would include converting the existing garage into a
community outreach support space with a recreation area, commercial kitchen,
shower, and two (2) bathrooms. The commercial kitchen would also provide space
to expand meal service and food pantry. A portion of the existing parking lot and
pavement space is proposed to be developed with picnic tables, a gardening
space, and outdoor futsal/basketball court. The futsal and basketball court would
be used for parking during church services. A church use was permitted
temporarily under Temporary Use Permit (LUA10-062) that was granted on
September 20, 2010 and expired September 20, 2011. According to City of Renton
(COR) Maps, high seismic hazard areas and Downtown Wellhead Protection Area
Zone 2 are mapped on the project site.
Exist. Bldg. Area SF: 7,005 square feet Proposed New Bldg. Area (footprint):
Proposed New Bldg. Area (gross):
N/A
N/A
Site Area: 27,666 square
feet (0.64 acres)
Total Building Area GSF: 7,005 square feet
STAFF
RECOMMENDATION:
Staff Recommends that the Environmental Review Committee issue a
Determination of Non-Significance (DNS).
Docusign Envelope ID: 0FF3A98A-233A-4E6F-BCEB-F7878118FE93
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Environmental Review Committee
LUA25-000077, CU-H, ECF
Report of June 2, 2025 Page 2 of 4
ERC_Fountain of Hope_FINAL
ENVIRONMENTAL REVIEW
In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those
project impacts that are not adequately addressed under existing development standards and environmental
regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible
Officials:
Issue a DNS with a 14-day appeal period.
B. Exhibits
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Site Plan
Exhibit 3: Utilities Plan
Exhibit 4: Floor Plan
Exhibit 5: SEPA Environmental Checklist, prepared May 7, 2025
Exhibit 6: Duwamish Tribe Comment Letter, dated April 8, 2025
Exhibit 7: Duwamish Tribe City Response Email, dated April 16, 2025
Exhibit 8: King County Wastewater Treatment Division (KCWTD) Comment Letter, dated
April 16, 2025
Exhibit 9: KCWTD City Response Email, dated April 18, 2025
Exhibit 10: Transportation Concurrency Memorandum, dated April 15, 2025
Exhibit 11: Advisory Notes
C. Environmental Impacts
The proposal was circulated and reviewed by various City Departments and Divisions to determine
whether the applicant has adequately identified and addressed environmental impacts anticipated to
occur in conjunction with the proposed development. Staff reviewers have identified that the proposal is
likely to have the following probable impacts:
1. Earth
Impacts: The project site is located within a high seismic hazard area. A Geotechnical Report was
not included with the land use application materials as no exterior improvements to the existing
building are proposed. The proposed project is limited to a change of use and interior tenant
improvements.
It is anticipated that the city’s adopted building code and construction standards would
adequately mitigate any impacts of the proposed tenant improvements on the project site;
therefore, no further mitigation is recommended.
Mitigation Measures: None recommended.
Nexus: Not applicable.
2. Historic and Cultural Preservation
Docusign Envelope ID: 0FF3A98A-233A-4E6F-BCEB-F7878118FE93
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Environmental Review Committee
LUA25-000077, CU-H, ECF
Report of June 2, 2025 Page 3 of 4
ERC_Fountain of Hope_FINAL
Impacts: Staff received comments from the Duwamish Tribe (Exhibit 6) during the 14-day public
comment period. The Duwamish Tribe requested that an inadvertent discovery plan (IDP) be
provided for the proposed project. As the project proposal does not include any exterior additions
requiring excavation, rather is limited to a change of use with interior tenant improvements, staff
is not recommending that an IDP be required at this time. If the scope of work changes and
construction is proposed, the proposal would be subject to additional Environmental Review and
an IDP could be required at that time.
Mitigation Measures: None recommended.
Nexus: Not applicable.
3. Transportation
Impacts: The project proposal was subjected to the Transportation Concurrency Test (Exhibit 10).
The proposed development is anticipated to generate a decrease of approximately one (1)
weekday daily trip. During the weekday AM peak hour, the project would generate a decrease of
51 weekday AM peak hour trips (25 in, 26 out). During the weekday PM peak hour, the project
would generate a decrease of approximately one (1) net new trip (1 in, -2 out). The proposed
project passes the City of Renton Traffic Concurrency Test. A Traffic Impact Analysis was not
required to be submitted with the application materials as the proposal would not generate 20
new AM or PM peak hour trips. The proposal is not anticipated to result in new transportation
impacts to the city’s transportation system, therefore, no further mitigation is recommended.
Mitigation Measures: None recommended.
Nexus: Not applicable.
4. Utilities
Impacts: Staff received comments from the King County Wastewater Treatment Division
(KCWTD) (Exhibit 8). The comments received from the Environmental Planner note that a capacity
charge is to be applied to any project that results in a new connection to the sewer system or any
change in use of a building that includes an increase in plumbing fixtures. King County requested
that their comments be provided to the sewer department to ensure that proper fees were
collected in the event that the work proposed falls within the scope of work noted above. These
comments were provided to the city’s Development Engineering Division for consideration.
Mitigation Measures: None recommended.
Nexus: Not applicable.
D. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their
comments have been incorporated into the text of this report and/or “Advisory Notes to Applicant.”
✓ Copies of all Review Comments are contained in the Official File and may be attached to
this report.
The Environmental Determination decision will become final if the decision is not appealed within
the 14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680).
Environmental Determination Appeal Process: Appeals of the environmental determination must be
filed in writing on or before 5:00 p.m. on June 16, 2025. Appeals must be submitted electronically to the
City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday.
The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your
Docusign Envelope ID: 0FF3A98A-233A-4E6F-BCEB-F7878118FE93
City of Renton Department of Community & Economic Development
Fountain of Hope Ministries International Church
Staff Report to the Environmental Review Committee
LUA25-000077, CU-H, ECF
Report of June 2, 2025 Page 4 of 4
ERC_Fountain of Hope_FINAL
appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our
Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional
information regarding the appeal process may be obtained from the City Clerk’s Office,
cityclerk@rentonwa.gov.
Docusign Envelope ID: 0FF3A98A-233A-4E6F-BCEB-F7878118FE93
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE
EXHIBITS
Project Name:
Fountain of Hope Ministries International Church
Land Use File Number:
LUA25-000077, CU-H, ECF
Date of Meeting
June 2, 2025
Staff Contact
Jill Ding
Senior Planner
Project Contact
Dawa Loga Kamanga
Fountain of Hope
Ministries International
Church
7911 165th St Ct E,
Puyallup, WA 98375
Project Location
300 S 3rd St, Renton, WA
98057
The following exhibits are included with the ERC Report:
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Site Plan
Exhibit 3: Utilities Plan
Exhibit 4: Floor Plan
Exhibit 5: SEPA Environmental Checklist, prepared May 7, 2025
Exhibit 6: Duwamish Tribe Comment Letter, dated April 8, 2025
Exhibit 7: Duwamish Tribe City Response Email, dated April 16, 2025
Exhibit 8: King County Wastewater Treatment Division (KCWTD) Comment Letter, dated
April 16, 2025
Exhibit 9: KCWTD City Response Email, dated April 18, 2025
Exhibit 10: Transportation Concurrency Memorandum, dated April 15, 2025
Exhibit 11: Advisory Notes