HomeMy WebLinkAbout6430.01 S 2025 0528
Geotechnical Engineering
Environmental Services
Earthwork Observation & Testing
CESCL & Stormwater Services
REDMOND 425-449-4704 PASCO 509-905-0275 SILVERDALE 360-722-5081 esnw.com
FIELD REPORT
Project No. 6430.01 Page 1 of 3 Report ID 6430.01 S 2025 0528
Date Wed 5/28/2025 Weather 63°F, Cloudy
Arrival/Departure Time(s) 8:15 AM – 9:00 AM Travel Time (hr) 0.75
Project Name Grant Place
Location 1600 Grant Ave S, Renton
ESNW Rep., CESCL No.,
Phone No. & Report Statement
Ethan Taskey | (206) 795-8281 | ECO-3-3102501
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Client Info/Contact Apex Enterprises Group, LLC | Siki Chang
Permit No(s). WAR304993
Reviewed By MLP
Initials/Date
N/A
Field Supervisor Project Manager Initials/Date
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s
observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for
obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible
for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations,
is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Type of visit: Daily Weekly Monthly Other
Precipitation since last inspection (approximate): 0.35 inches
Precipitation in last 24 hours (approximate): 0.00 inches
Phase of active construction (check all that apply):
Pre-construction Clearing, demolition, or grading Infrastructure or roads
Concrete handling Vertical construction Utilities
Off-site improvements Site temporarily stabilized Final stabilization
Was water quality sampling part of this inspection? Yes No
If “Yes”:
• Record results in the table below.
• Hanna Turbidity Meter No. 19
Monitoring
Point Monitoring Location Turbidity
(NTU) pH Description of
Discharge Notes
MP 1 Storm Vault (North Access) - - N/A No discharge from site
MP 2 Storm Vault (South Access) - - N/A No discharge from site
MP 3 Northern Construction Access - - N/A No discharge from site
5 '0 1'
3$
i 9 5 '$ esn w.com
*HRWHFKQLFDO(QJLQHHULQJ
(QYLURQPHQW DO6HUYLFHV
(DUWKZRUN2EVHUYDWLRQ 7HVWLQJ
&(6&/ 6WRUPZDWHU6HUYLFHV
Report ID 6430.01 S 2025 0528 Page 2 of 3
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1. Preserve Vegetation; Mark Clearing Limits
• Buffer zones around sensitive areas • Fence G N -Silt fence along the site perimeter
2. Establish Construction Access
• Fabric; quarry spalls
• Wheel wash
• Sweeper truck
F Y -Site entrances are stabilized with quarry spalls
-Track out at North and South entrances; sweep frequently
3. Control Flow Rates • Stormwater vault; facility
• Straw wattles
• Check dams
G N -Underground storm system installed
-Storm vault onsite
-Check dams along southern runoff channel
4. Install Sediment Controls
• Silt fence
• Vegetation
• Sediment ponds; traps • Treatment
F Y -Silt fence along the site perimeter
-Channeling and evidence of previous discharge
at north construction access; add silt fence
5. Stabilize Soils
• Nets and blankets
• Mulch; bark; rock • Vegetation
• Plastic covering
• Water truck
F Y
-Cover any exposed soil that is unworked for 2+
days
-All lots are vegetated
-Straw on exposed soil
-Reduced straw coverage was in some areas;
add more straw
-Storm vault area is covered with gravel -Inactive stockpiles are covered with plastic sheeting
6. Protect Slopes
• Benching; track-walking
• Pipe slope drains
• Plastic covering
- - N/A
7. Protect Drain Inlets • Catch basin inserts G N -CB inserts are installed
8. Stabilize Channels and Outlets • Channel lining
• Check dams
• Outlet protection
G N -Check dams along runoff channel preventing
further erosion
9. Control Pollutants • Chemical storage area covered
• Concrete handling - - N/A
10. Control Dewatering - - -Notify ESNW prior to any discharging from site
11. Maintain BMPs F Y -See any details below
12. Maintain SWPPP & Site Logbook G N -Available upon request
13. Protect Low-Impact Development (LID BMPs) • Bioretention rain garden facilities
• Permeable pavement
- - N/A
Do existing BMPs need to be modified or removed, or do other BMPs need to be installed? Yes No
List the action items in the table below:
Element
# Description and Location Action Required Completion
Date
2 Track out at North and South construction entrance Sweep frequently
4 Channeling and evidence of previous discharge at north
construction access Add silt fence
5 Reduced straw coverage in some areas Add more straw
7 CB inserts are filled Empty the CB inserts 5/30/25
Report ID 6430.01 S 2025 0528 Page 3 of 3
BMP LEGEND
MONITORING POINT
STRAW
VERTICAL CONSTRUCTION
STORMWATER VAULT
STABILIZED CONSTRUCTION ACCESS
SILT FENCE
STOCKPILE
PLASTIC COVERING
RUNOFF CHANNEL
CATCH BASIN INSERT
CHECK DAM
Reduced straw
MP 1
MP 2
MP 3
Track out
Add silt
fence