Loading...
HomeMy WebLinkAboutAPPROVED_Civil_Construction_Plans_250605SOUTHCENTER MALL SW GR A D Y WAY TUKWILA PKWY SO U T H C E N T E R P K W Y 6 5 T H A V E S W V A L L E Y H W Y OA K E S D A L E A V E S W O A K E S D A L E A V E S W FORT DENT PARK I N T E R U R B A N A V E S LO N G A C R E S DR S W SW 16TH ST M O N S T E R R D S W GR E E N R I V E R 1815 405 SITE IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION COVER SHEET INDEX SHEET NO.SHEET NO.DWG TITLE C100 COVER C101 NOTES C102 NOTES C200 CIVIL OVERVIEW PLAN C300 DEMO AND TESC ENLARGEMENTS C301 DEMO AND TESC ENLARGEMENTS C302 DEMO AND TESC ENLARGEMENTS C310 DEMO AND TESC DETAILS C400 CIVIL ENLARGEMENTS C401 CIVIL ENLARGEMENTS C402 CIVIL ENLARGEMENTS C403 CIVIL ENLARGEMENTS C500 CIVIL DETAILS C600 ELECTRIAL SITE PLAN PROJECT BOREALIS CIVIL PERMIT #C25001530 RENTON, WASHINGTON PROJECT INFORMATION PROJECT ADDRESS: 1301 SW 16TH STREET, SUITE 2501 RENTON, WASHINGTON 98057 PROPERTY ID: BOEING LONGACRES PARK 25-01 LONGACRES NORTH BUILD OFFICE PARK - PARCEL ID #2423049022. CITY OF RENTON MUNICIPAL CODE ZONING: CO-COMMERCIAL OFFICE. PROJECT TEAM OWNER ALASKA AIRLINES, INC. 19300 INTERNATIONAL BOULEVARD SEATAC, WA 98188 OWNER'S REPRENSENTATIVE SENECA GROUP 1191 2ND AVENUE #1500 SEATTLE, WA 98101 ARCHITECT ENGINEER NBBJ 223 YALE AVENUE NORTH SEATTLE, WA 98109 CIVIL ENGINEER KPFF CONSULTING ENGINEERS 1601 FIFTH AVENUE, SUITE 1600 SEATTLE, WA 98101 ELECTRICAL ENGINEER STANTEC 720 3RD AVENUE SUITE 1500 SEATTLE, WA98104 VICINITY MAP SCALE: 1" = 1000' 1 2 3 4 5 6 7 8 9 10 11 12 13 14 2025-05-08 DEVELOPMENT ENGINEERING msippo 06/04/2025 Surface Water Enginering jfarah 06/04/2025 REGIONAL FIRE AUTHORITY cthomas 06/05/2025 APPROVED jding 06/05/2025 CURRENT PLANNING CONTRACTOR IS ALERTED TO THE FACT THAT WORK WILL BE ACCOMPLISHED AROUND ENERGIZED PUGET SOUND ENERGY (PSE) FACILITIES THAT ARE SERVING EXISTING CUSTOMERS. CONTRACTOR SHALL COORDINATE WITH PSE TO DETERMINE WHICH FACILITIES ARE ACTIVE AND ENERGIZED AND SHALL IMPLEMENT SAFETY PROCEDURES PER PSE REQUIREMENTS. CONTRACTOR SHALL COORDINATE WITH PSE TO ENSURE THAT FACILITIES ARE IN PLACE TO MAINTAIN SERVICE TO CUSTOMERS THROUGHOUT CONSTRUCTION. EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES: (COR STANDARD PLAN 268.00) 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE- CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT' S CONTRACTOR. 2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. 3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST- PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK- OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. 6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF- SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON- SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS. 7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/ OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/ OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON- SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON- SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. 8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. 9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES. 11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY. 14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY. 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216. 30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION. 17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT- LADEN WATER INTO THE DOWNSTREAM SYSTEM. 18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 19.AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON- SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION. 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. 21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT- LADEN WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON- SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST. 22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS- OF- WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS- OF- WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION NOTES 2025-05-08 DEVELOPMENT ENGINEERING msippo 06/04/2025 CITY OF RENTON SURFACE WATER STANDARD NOTES: (COR STANDARD PLAN 267.00 AND 267.10) 1.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE- CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT' S CONTRACTOR. 2.THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY, STATE, AND FEDERAL PERMITS PRIOR TO CONSTRUCTION. 3.ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL ( RENTON SWDM), RENTON MUNICIPAL CODE ( RMC), AND THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION ( APWA). IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT TO CORRECT ANY ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO THE CITY. 4.APPROVAL OF THE ROAD, GRADING, PARKING, BUILDING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AS APPROVAL OF ANY OTHER CONSTRUCTION ( E.G. WATER, SEWER, GAS, ELECTRICAL. ETC.). PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION. THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE COORDINATION FOLLOWED BY WRITTEN APPROVAL FROM THE CITY. 5.A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 6.THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHALL THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE APPLICANT' S CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE APPLICANT SHALL RECORD ON THE AS- BUILT DRAWINGS ALL UNDOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TO THE APPROVED PLANS. THE APPLICANT SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD IF A CONFLICT EXISTS. 7.VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL DATUM SHALL BE NAD 83 ( WA STATE PLANE, NORTH), UNLESS OTHERWISE APPROVED BY THE CITY. REFERENCE BENCHMARK, DATUM, AND ELEVATIONS SHALL BE NOTED ON THE PLANS. 8.ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY PER SECTION 2-03.3(14)D - COMPACTION AND MOISTURE CONTROL TESTS OF THE WSDOT STANDARD SPECIFICATIONS. IN PERMEABLE PAVEMENT AND OTHER INFILTRATION AREAS, ALL TRENCH BACKFILL SHALL BE FIRM AND UNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO MORE THAN 92% OF MAXIMUM DRY DENSITY. 9.OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY TRENCH RESTORATION STANDARDS. 10.ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START OF CONSTRUCTION. WHERE SHOWN ON THE PLANS OR WHERE DIRECTED BY THE CITY, THE EXISTING MANHOLES, CATCH BASINS, OR INLETS SHALL BE ADJUSTED TO THE GRADE AS STAKED. 11.ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO, OR IN CONJUNCTION WITH, ANY CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE CITY. 12.ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND BACKFILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN 220. 00, 220. 10, AND 220. 20. 13.STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR 5 INSIDE AND OUTSIDE. 14.ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED WITH DUCTILE IRON, BOLT- LOCKING LIDS PER THE CITY STANDARD PLAN 204. 10, 204. 20, 204. 30, 204. 40, AND 204. 50. STRUCTURES SHALL HAVE: ·RECTANGULAR OR ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND OUTSIDE OF THE ROADWAY. ·ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND LOCATED WITHIN THE ROADWAY, BUT OUTSIDE OF THE CURB/ GUTTER LINE. ·ROUND, SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC RIGHT- OF- WAY OR IN AN EASEMENT TO THE CITY. PRIVATE STRUCTURE LIDS OUTSIDE PUBLIC RIGHT- OF- WAY AND EASEMENTS TO THE CITY SHALL NOT DISPLAY THE CITY LOGO. 15.BUILDINGS AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES OF THE RENTON SWDM. 16.LIDS OF MANHOLES/ CATCH BASINS WITHIN PUBLIC RIGHT- OF- WAY SHALL NOT BE ADJUSTED TO FINAL GRADE UNTIL AFTER PAVING. ALL MANHOLE/ CATCH BASIN RIMS SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED GRADES, UNLESS OTHERWISE SHOWN. 17.ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT- OF- WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE DRIVEWAY TO THE BOTTOM OF THE DITCH. 18.ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A MINIMUM DEPTH OF ONE (1) FOOT AND SHALL MEET THE FOLLOWING SPECIFICATIONS: •4 - 8 INCH ROCK / 40 - 70% PASSING; •2 - 4 INCH ROCK / 30 - 40% PASSING; AND •LESS THAN 2 INCH ROCK / 10 - 20% PASSING. 19.FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE INTERCONNECTED AND SHALL SEPARATELY CONVEY COLLECTED FLOWS TO THE CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE, UNLESS APPROVED BY THE CITY. FOOTING DRAINS SHALL NOT BE CONNECTED TO ON- SITE BMPS. 20.THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED WITH A BOLT- LOCKING LID MARKED " STORM” OR " DRAIN" SHALL BE LOCATED AT THE PROPERTY LINE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM PER THE CITY STANDARD PLAN 227. 00. 21.ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR LICENSED IN WASHINGTON STATE, AND CUT SHEETS SHALL BE PROVIDED TO THE CITY PRIOR TO CONSTRUCTION. 22.ALL NEWLY- INSTALLED AND NEWLY- REHABILITATED ( PUBLIC AND PRIVATE) STORM CONVEYANCE SYSTEMS SHALL BE INSPECTED BY MEANS OF REMOTE CCTV ACCORDING TO THE CITY STANDARD PLAN 266. 00. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS AND/ OR PAVEMENT. 23.ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN ACCORDANCE WITH SECTION 7-04.3(1) OF THE WSDOT STANDARD SPECIFICATIONS AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY. STORM DRAIN STUBS SHALL BE TESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS TESTED. 24.FOR ALL DISTURBED PERVIOUS AREAS ( COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL EITHER STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN 264. 00. 25.ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE APPLICANT OF THE CONTINUING LEGAL OBLIGATION AND/ OR LIABILITY CONNECTED WITH STORMWATER DISPOSAL. THE CITY DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM SYSTEM PROVIDED DURING CONSTRUCTION. 26.ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER ACTIONS NEEDED TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED RIGHT- OF- WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-10 TEMPORARY TRAFFIC CONTROL SHALL APPLY. 27.PROJECTS LOCATED WITHIN THE CITY' S AQUIFER PROTECTION AREA ( APA) SHALL COMPLY WITH SPECIAL REQUIREMENT # 6 OF THE RENTON SWDM AND AQUIFER PROTECTION REGULATIONS ( RMC 4-3-050). 28.PLACEMENT OF SURFACE APPURTENANCES ( CATCH BASIN/ MANHOLE LIDS, CLEANOUTS, INLETS, ETC.) IN THE STREET TRAVEL LANE WHEEL PATH, INTERSECTIONS OF STREET TRAVEL LANES, BIKE LANES, SIDEWALKS, AND CROSSWALKS SHALL BE AVOIDED WHENEVER POSSIBLE. ANY SURFACE APPURTENANCE PLACED IN A SIDEWALK OR CROSSWALK SHALL BE FITTED WITH A NON- SLIP OR NON- SKID LID PER ADA REQUIREMENTS. 29.CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS SHALL BE MAINTAINED BY THE APPLICANT. 30.MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1.A2 OF THE RENTON SWDM. 31.CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A MINIMUM RATE OF 20 INCHES PER HOUR IMMEDIATELY AFTER THE PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES. COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO CONSTRUCTION APPROVAL OF THE PAVEMENT. COMPLIANCE MAY BE CHECKED USING A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF WATER IS POURED ONTO THE PAVEMENT SURFACE ALL AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS OR RUNS OFF THE SURFACE, THEN THE PAVEMENT IS CONSIDERED TO MEET THE MINIMUM RATE OF ABSORPTION. AT LEAST ONE TEST SHALL BE CONDUCTED PER 1,000 SQUARE FEET OF PERMEABLE PAVEMENT. IF THIS TEST IS NOT CONCLUSIVE, THEN ANOTHER TEST PER ASTM C1701 SHALL BE CONDUCTED. FOR LARGE AREAS ( E.G., PARKING AREAS), TESTING OBSERVATION MAY BE ACCOMPLISHED WHILE WALKING BEHIND A SLOWLY MOVING WATER TRUCK DISCHARGING WATER AT A RATE SIMILAR TO THE BUCKET TEST. PERMEABLE PAVERS SHALL BE TESTED USING ASTM C1781. CITY OF RENTON CCTV INSPECTION STANDARD NOTES: 1.ALL NEWLY- INSTALLED AND NEWLY- REHABILITATED ( PUBLIC AND PRIVATE) SANITARY SEWER AND STORM DRAIN MAIN LINES SHALL BE INSPECTED BY MEANS OF REMOTE CCTV. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY OF RENTON INSPECTOR ASSIGNED TO THE PROJECT PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS, AND/ OR PAVEMENT. 2.THE CONTRACTOR SHALL PERFORM ALL CCTV INSPECTIONS IN ACCORDANCE WITH THE NATIONAL ASSOCIATION OF SEWER SERVICE COMPANIES ( NASSCO) PIPELINE ASSESSMENT CERTIFICATION PROGRAM ( PACP). 3.ALL CCTV OPERATORS SHALL HAVE CURRENT NASSCO PACP CERTIFICATION. 4.CCTV INSPECTIONS SHALL BE RECORDED IN A GRANITENET COMPATIBLE FORMAT DATABASE USING THE LATEST SOFTWARE VERSION AND SUBMITTED WITH ELECTRONIC LINKS BETWEEN THE DATA AND THE VIDEO ON AN EXTERNAL HDD, DVD, OR FLASH DRIVE. 5.ALL CCTV INSPECTION REPORTS SHALL BE WITHIN +/- TWO ( 2) FEET OF THE MEASURED LINEAR FOOTAGE BETWEEN MANHOLES ALONG THE EXISTING PIPELINE CENTERLINE FROM THE START OF PIPE TO END OF PIPE. 6.ALL OWNER AND PACP REQUIRED HEADER INFORMATION MUST BE FULLY AND ACCURATELY ENTERED ON ALL CCTV REPORTS. WORK NOT FOLLOWING THESE SPECIFICATIONS WILL BE REJECTED AND THE CONTRACTOR SHALL BE REQUIRED TO RE- CCTV THE WORK. 7.THE DOCUMENTATION OF THE WORK SHALL CONSIST OF PACP CCTV REPORTS, PACP DATABASE, LOGS, ELECTRONIC REPORTS, ETC. NOTING IMPORTANT FEATURES ENCOUNTERED DURING THE INSPECTION. THE SPEED OF TRAVEL SHALL BE SLOW ENOUGH TO INSPECT EACH PIPE JOINT, TEE CONNECTION, STRUCTURAL DETERIORATION, INFILTRATION AND INFLOW SOURCES, AND DEPOSITS, BUT SHOULD NOT, AT ANY TIME, BE FASTER THAN 30 FEET PER MINUTE, EXCEPT AS NOTED OTHERWISE IN THIS DOCUMENT. 8.THE CAMERA MUST BE CENTERED IN THE PIPE TO PROVIDE ACCURATE DISTANCE MEASUREMENTS TO PROVIDE LOCATIONS OF FEATURES IN THE SEWER AND THESE FOOTAGE MEASUREMENTS SHALL BE DISPLAYED AND DOCUMENTED ON THE VIDEO. ALL PACP OBSERVATIONS SHALL BE IDENTIFIED BY AUDIO AND ON A PACP LOG. ALL VIDEO MUST BE CONTINUOUSLY METERED FROM MANHOLE TO MANHOLE. ALL VIDEO RECORDING SHALL BE CONTINUOUS FROM STRUCTURE TO STRUCTURE WITH NO " PAUSING" OF THE VIDEO RECORDING DURING EACH PIPELINE INSPECTION. THE PIPE SHALL BE CLEANED PRIOR TO THE CCTV INSPECTION TO ENSURE ALL DEFECTS, FEATURE, AND OBSERVATIONS ARE SEEN AND LOGGED. 9.JUST PRIOR TO BEGINNING THE CCTV INSPECTION, WHILE THE CCTV CAMERA IS IN PLACE AND RECORDING, WATER ( CONTAINING DYE) SHALL BE INTRODUCED INTO THE UPSTREAM MANHOLE OF EACH PIPE SEGMENT UNTIL IT IS OBSERVED AND RECORDED FLOWING PAST THE CAMERA' S FIELD OF VISION IN ITS ENTIRETY. 10.THE CCTV CAMERA SHALL HAVE A WATER- LEVEL MEASURING DEVICE ( BALL, CYLINDER, ETC.) ATTACHED THAT HAS 1/4" MARKINGS TO SHOW THE DEPTH OF WATER IN THE PIPE DURING THE CCTV INSPECTION. 11.ALL MANHOLES SHALL BE CHANNELED AND COATED PRIOR TO CCTV INSPECTION. 12.PER CITY OF RENTON SPECIFICATION 7-08. 3(2)B, SEWER AND STORM DRAIN PIPELINE SHALL HAVE NO MORE THAN 1/2" OF PONDING TO BE CONSIDERED ACCEPTABLE. BASIS OF DESIGN: CIVIL DESIGN IS BASED ON THE FOLLOWING DOCUMENTS: TOPOGRAPHIC SURVEY PROVIDED BY BRH, DATED 2024-10-06 IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION NOTES 2025-05-08 DEVELOPMENT ENGINEERING msippo 06/04/2025 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA: ±190,693 SQ. FT. OWNER: UNICO LONGACRES NORTH BUILDADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 OWNER: UNICO LONGACRES NORTH BUILD ADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 OWNER: UNICO LONGACRES NORTH BUILDADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 PARCE L A PARCEL A PARCEL B PARCEL B PARCEL B OWNER: UNICO LONGACRES NORTH BUILDADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 OWNER: CITY OF RENTON ADDRESS: SW 16TH STPARCEL NO.: 242304-9138 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. SW 16TH ST SW 16 T H S T OA K S D A L E A V E S W L O N G A C R E S D R S W MAIN ENTRANCE ENLARGEMENT EV CHARGING STALLS ENLARGEMENT 3 C301, C402 2 C300, C401 1 C300, C400 FOOD TRUCK ACCESS PATH ENLARGEMENT SIGNAGE ENLARGEMENT 4 C302, C403 LEGEND: RIGHT-OF-WAY LINE LIMITS OF WORK 0 1 inch = 60 feet 30'60'120' NOTES: 1.REFER TO C100 AND C101 FOR GENERAL NOTES. 2.CONTRACTOR SHALL CONFIRM POC'S, LOCATION, AND ELEVATIONS WHEN CONNECTING TO EXISTING SYSTEMS AND GRADES. NOTIFY ENGINEER OF ANY DISCREPANCIES. 3.REFER TO ELECTRICAL PERMIT FOR PSE AND ELECTRICAL INFRASTRUCTURE. 4.PRIOR TO DEMOLITION, CONTRACTOR SHALL FIELD VERIFY AND LOCATE ALL EXISTING UTILITIES TO REMAIN WITHIN AND ADJACENT TO LIMIT OF WORK. 5.ALL EXISTING PAVEMENT STRIPING DISTURBED DURING CONSTRUCTION SHALL BE REPLACED IN KIND. PRODUCTS SHALL BE PER CITY OF RENTON PUBLIC WORKS DEPARTMENT STANDARD PLANS AND SPECIFICATIONS, AND WSDOT STANDARD PLANS AND SPECIFICATIONS. 6.FULL DEPTH PAVEMENT REPLACEMENT, AND TRENCH RESTORATION AT UTILITY CUTS, SHALL BE PER CITY OF RENTON STD DETAILS. PAVEMENT SECTION SHALL BE PER CITY OF RENTON STD. PLAN 101, OR MATCH EXISTING WHICHEVER IS GREATER. 7.THE BOREALIS PROJECT IS REQUIRED TO MEET STORMWATER REQUIREMENTS PER THE 2022 CITY OF RENTON SURFACE WATER DESIGN MANUAL (RSWDM). PROJECT SITE PARCEL IS FULLY LOCATED WITHIN THE SPECIAL FLOOD HAZARD ARAE (SFHA) PER FEMA FIRM MAP. THEREFORE, THE PROJECT IS REQUIRED TO MEET FLOOD PLAIN REQUIREMENTS. ALL THE IMPROVEMENTS ARE ABOVE THE BASE FLOOD ELEVATION (BFE). 8.ALL REGULATORY SIGNAGE AND PAVEMENT STRIPING SHALL CONFORM TO CITY OF RENTON AND MUTCD SPECIFICATIONS. IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION CIVIL OVERVIEW PLAN 2025-05-08 DEVELOPMENT ENGINEERING msippo 06/04/2025 LEGEND: RIGHT-OF-WAY LINE CONSTRUCTION FENCE TREE PROTECTION FENCE STRAW WATTLE CATCH BASIN INSERT REMOVE FULL DEPTH CONCRETE PAVING REMOVE LANDSCAPE REMOVE ASPHALT SAWCUT LINE DEMOLISH EXISTING CURB CB INLET PROTECTION (TYP) 1 C310 SAWCUT TO NEAREST JOINT (TYP) REMOVE CONCRETE SIDEWALK (TYP) EXISTING BUILDING OUTLINE (TYP) EXISTING BUILDING OVERHANG (TYP) DEMO EXISTING CURB (TYP) REMOVE LANDSCAPE (TYP) PROTECT EXISTING TREE 3 C310 SAWCUT TO NEAREST JOINT (TYP) CONSTRUCTION FENCE (TYP) STRAW WATTLE (TYP) 2 C310 REMOVE CONCRETE SIDEWALK (TYP) EXISTING BUILDING OUTLINE (TYP) EXISTING PARKING (TYP) EXISTING BUILDING OVERHANG (TYP) DEMO EXISTING CURB (TYP) ENTRY CIRCLE 0 1 inch = 10 feet 5'10'20' 1 C200 MAIN ENTRANCE ENLARGEMENT SCALE: 1" = 10' 2 C200 FOOD TRUCK ACCESS PATH ENLARGEMENT SCALE: 1" = 10' NOTES: 1.CONTRACTOR SHALL OBTAIN AND PAY FOR NECESSARY PERMITS TO EXECUTE DEMOLITION, INCLUDING PERMIT TO USE PUBLIC WATER SUPPLY FOR DUST SUPPRESSION. 2.DEMOLITION SHALL BE IN CONFORMANCE WITH APPLICABLE REGULATION, CODES, AND DEMOLITION PERMIT REQUIREMENTS. 3.CONTRACTOR SHALL DISPOSE OF EXCESS DEMOLITION MATERIAL OFF-SITE IN A SAFE AND LEGAL MANNER. 4.MAKE VERTICAL SAWCUTS BETWEEN ALL EXISTING PAVEMENT TO REMAIN AND THE PORTION TO BE REMOVED. PROTECT PAVEMENT TO REMAIN OUTSIDE OF SAWCUT LINE. 5.CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL UTILITIES AND CONDUCT EXISTING BUILDING PRE-CONSTRUCTION SURVEYS, PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 6.CONTRACTOR SHALL PROVIDE TRAFFIC AND PEDESTRIAN REROUTES AS NECESSARY TO COMPLETE THE WORK, AND OBTAIN APPROVAL FROM THE CITY PRIOR TO BEGINNING WORK. 7.ANY DAMAGE RESULTING FROM PROJECT DEMOLITION ACTIVITIES TO EXISTING IMPROVEMENTS OR VEGETATION OUTSIDE OF WORK INDICATED ON PLAN SHALL BE REPAIRED/REPLACED IN KIND AT CONTRACTOR'S EXPENSE. 8.CONTRACTOR SHALL COORDINATE WITH ALL AFFECTED UTILITY PROVIDERS AND CITY TO KEEP ADJOINING PROPERTY SERVICES UNINTERRUPTED, AND TO PERFORM DEMOLITION ACTIVITIES IN ACCORDANCE TO APPLICABLE STANDARDS. 9.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT AND SEDIMENT LADEN RUNOFF FROM LEAVING THE SITE. CONTRACTOR SHALL ADJUST AND ADD BMPS AS NECESSARY TO ADDRESS FIELD CONDITIONS AND PROGRESSION OF WORK. EROSION AND SEDIMENT CONTROL MEASURES SHALL MEET COR REQUIREMENTS. TESC MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH COR. 10.REMOVE AND DISPOSE OF ALL TESC MEASURES AT THE COMPLETION OF THE PROJECT WHEN ALL DISTURBED AREAS HAVE BEEN FULLY AND FINALLY STABILIZED. 11.FENCE LIMITS SHOWN ARE APPROXIMATE AND SHALL BE ADJUSTED AS NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH THE WORK. PREVENT DISTURBANCE BEYOND THE LIMITS OF WORK. IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION DEMO AND TESC ENLARGEMENTS 2025-05-08 DEVELOPMENT ENGINEERING msippo 06/04/2025 PROTECT EXISTING 8" SSS PROTECT EXISTING 8" SSS PROTECT EXISTING CTV SAWCUT TO NEAREST JOINT (TYP) REMOVE CONCRETE SIDEWALK (TYP) EXISTING BUILDING OUTLINE (TYP) EXISTING BUILDING OVERHANG (TYP) REMOVE LANDSCAPE (TYP) PROTECT EXISTING TREE TYP 3 C310 CONSTRUCTION FENCE (TYP) STRAW WATTLE (TYP) 2 C310 CB INLET PROTECTION (TYP) 1 C310 APROXIMATE LOCATION OF EXISTING TREE, TYP 1 LEGEND: RIGHT-OF-WAY LINE CONSTRUCTION FENCE TREE PROTECTION FENCE STRAW WATTLE CATCH BASIN INSERT REMOVE FULL DEPTH CONCRETE PAVING REMOVE LANDSCAPE REMOVE ASPHALT SAWCUT LINE DEMOLISH EXISTING CURB 0 1 inch = 10 feet 5'10'20' 3 C200 EV CHARGING STALLS ENLARGEMENT SCALE: 1" = 10' NOTES: 1.CONTRACTOR SHALL OBTAIN AND PAY FOR NECESSARY PERMITS TO EXECUTE DEMOLITION, INCLUDING PERMIT TO USE PUBLIC WATER SUPPLY FOR DUST SUPPRESSION. 2.DEMOLITION SHALL BE IN CONFORMANCE WITH APPLICABLE REGULATION, CODES, AND DEMOLITION PERMIT REQUIREMENTS. 3.CONTRACTOR SHALL DISPOSE OF EXCESS DEMOLITION MATERIAL OFF-SITE IN A SAFE AND LEGAL MANNER. 4.MAKE VERTICAL SAWCUTS BETWEEN ALL EXISTING PAVEMENT TO REMAIN AND THE PORTION TO BE REMOVED. PROTECT PAVEMENT TO REMAIN OUTSIDE OF SAWCUT LINE. 5.CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL UTILITIES AND CONDUCT EXISTING BUILDING PRE-CONSTRUCTION SURVEYS, PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 6.CONTRACTOR SHALL PROVIDE TRAFFIC AND PEDESTRIAN REROUTES AS NECESSARY TO COMPLETE THE WORK, AND OBTAIN APPROVAL FROM THE CITY PRIOR TO BEGINNING WORK. 7.ANY DAMAGE RESULTING FROM PROJECT DEMOLITION ACTIVITIES TO EXISTING IMPROVEMENTS OR VEGETATION OUTSIDE OF WORK INDICATED ON PLAN SHALL BE REPAIRED/REPLACED IN KIND AT CONTRACTOR'S EXPENSE. 8.CONTRACTOR SHALL COORDINATE WITH ALL AFFECTED UTILITY PROVIDERS AND CITY TO KEEP ADJOINING PROPERTY SERVICES UNINTERRUPTED, AND TO PERFORM DEMOLITION ACTIVITIES IN ACCORDANCE TO APPLICABLE STANDARDS. 9.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT AND SEDIMENT LADEN RUNOFF FROM LEAVING THE SITE. CONTRACTOR SHALL ADJUST AND ADD BMPS AS NECESSARY TO ADDRESS FIELD CONDITIONS AND PROGRESSION OF WORK. EROSION AND SEDIMENT CONTROL MEASURES SHALL MEET COR REQUIREMENTS. TESC MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH COR. 10.REMOVE AND DISPOSE OF ALL TESC MEASURES AT THE COMPLETION OF THE PROJECT WHEN ALL DISTURBED AREAS HAVE BEEN FULLY AND FINALLY STABILIZED. 11.FENCE LIMITS SHOWN ARE APPROXIMATE AND SHALL BE ADJUSTED AS NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH THE WORK. PREVENT DISTURBANCE BEYOND THE LIMITS OF WORK. DEMOLITION NOTES: CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF EXISTING TREES PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 1 IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION DEMO AND TESC ENLARGEMENTS 2025-05-08 DEVELOPMENT ENGINEERING msippo 06/04/2025 OWNER: UNICO LONGACRES NORTH BUILD ADDRESS: 1301 SW 16TH ST PARCEL NO.: 242304-9022 SW 1 6 T H S T L O N G A C R E S D R S W REMOVE LANDSCAPE (TYP) PROTECT EXISTING TREES TYP 3 C310 CONSTRUCTION FENCE (TYP)STRAW WATTLE (TYP) 2 C310 PROVIDE CB INLET PROTECTION IN CBS ADJACENT TO WORK (TYP)1 C310 1 PROTECT EXISTING SIDEWALK AND LIGHT POLE (TYP) FUTURE ENTRY SIGN, APPROXIMATE LOCATION, UNDER SEPARATE PERMIT PROPERTY LINE (TYP) LEGEND: RIGHT-OF-WAY LINE CONSTRUCTION FENCE TREE PROTECTION FENCE STRAW WATTLE CATCH BASIN INSERT REMOVE FULL DEPTH CONCRETE PAVING REMOVE LANDSCAPE REMOVE ASPHALT SAWCUT LINE DEMOLISH EXISTING CURB 0 1 inch = 10 feet 5'10'20' 4 C200 SIGNAGE ENLARGEMENT SCALE: 1" = 10' IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION DEMO AND TESC ENLARGEMENTS NOTES: 1.CONTRACTOR SHALL OBTAIN AND PAY FOR NECESSARY PERMITS TO EXECUTE DEMOLITION, INCLUDING PERMIT TO USE PUBLIC WATER SUPPLY FOR DUST SUPPRESSION. 2.DEMOLITION SHALL BE IN CONFORMANCE WITH APPLICABLE REGULATION, CODES, AND DEMOLITION PERMIT REQUIREMENTS. 3.CONTRACTOR SHALL DISPOSE OF EXCESS DEMOLITION MATERIAL OFF-SITE IN A SAFE AND LEGAL MANNER. 4.MAKE VERTICAL SAWCUTS BETWEEN ALL EXISTING PAVEMENT TO REMAIN AND THE PORTION TO BE REMOVED. PROTECT PAVEMENT TO REMAIN OUTSIDE OF SAWCUT LINE. 5.CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL UTILITIES AND CONDUCT EXISTING BUILDING PRE-CONSTRUCTION SURVEYS, PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 6.CONTRACTOR SHALL PROVIDE TRAFFIC AND PEDESTRIAN REROUTES AS NECESSARY TO COMPLETE THE WORK, AND OBTAIN APPROVAL FROM THE CITY PRIOR TO BEGINNING WORK. 7.ANY DAMAGE RESULTING FROM PROJECT DEMOLITION ACTIVITIES TO EXISTING IMPROVEMENTS OR VEGETATION OUTSIDE OF WORK INDICATED ON PLAN SHALL BE REPAIRED/REPLACED IN KIND AT CONTRACTOR'S EXPENSE. 8.CONTRACTOR SHALL COORDINATE WITH ALL AFFECTED UTILITY PROVIDERS AND CITY TO KEEP ADJOINING PROPERTY SERVICES UNINTERRUPTED, AND TO PERFORM DEMOLITION ACTIVITIES IN ACCORDANCE TO APPLICABLE STANDARDS. 9.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT AND SEDIMENT LADEN RUNOFF FROM LEAVING THE SITE. CONTRACTOR SHALL ADJUST AND ADD BMPS AS NECESSARY TO ADDRESS FIELD CONDITIONS AND PROGRESSION OF WORK. EROSION AND SEDIMENT CONTROL MEASURES SHALL MEET COR REQUIREMENTS. TESC MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH COR. 10.REMOVE AND DISPOSE OF ALL TESC MEASURES AT THE COMPLETION OF THE PROJECT WHEN ALL DISTURBED AREAS HAVE BEEN FULLY AND FINALLY STABILIZED. 11.FENCE LIMITS SHOWN ARE APPROXIMATE AND SHALL BE ADJUSTED AS NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH THE WORK. PREVENT DISTURBANCE BEYOND THE LIMITS OF WORK. DEMOLITION NOTES: CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF EXISTING TREES PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 1 2025-05-08 DEVELOPMENT ENGINEERING msippo 06/04/2025 1CATCH BASIN INSERT 2STRAW WATTLE 3TREE PROTECTION TREE PROTECTION MEASURES A.CONSTRUCTION STORAGE PROHIBITED: THE APPLICANT MAY NOT FILL, EXCAVATE, STACK OR STORE ANY EQUIPMENT, DISPOSE OF ANY MATERIALS, SUPPLIES OR FLUIDS, OPERATE ANY EQUIPMENT, INSTALL IMPERVIOUS SURFACES, OR COMPACT THE EARTH IN ANY WAY WITHIN THE AREA DEFINED BY THE DRIP LINE OF ANY TREE TO BE RETAINED. B.FENCED PROTECTION AREA REQUIRED: PRIOR TO DEVELOPMENT ACTIVITIES, THE APPLICANT SHALL ERECT AND MAINTAIN SIX-FOOT (6') HIGH CHAIN LINK TEMPORARY CONSTRUCTION FENCING AROUND THE DRIP LINES OF ALL RETAINED TREES OR AT A DISTANCE SURROUNDING THE TREE EQUAL TO ONE AND ONE-QUARTER FEET (1.25') FOR EVERY ONE INCH (1”) OF TRUNK CALIPER, WHICHEVER IS GREATER, OR ALONG THE PERIMETER OF A TREE PROTECTION TRACT. PLACARDS SHALL BE PLACED ON FENCING EVERY FIFTY FEET (50') INDICATING THE WORDS, “NO TRESPASSING - PROTECTED TREES,” OR ON EACH SIDE OF THE FENCING IF LESS THAN FIFTY FEET (50'). SITE ACCESS TO INDIVIDUALLY PROTECTED TREES OR GROUPS OF TREES SHALL BE FENCED AND SIGNED. INDIVIDUAL TREES SHALL BE FENCED ON FOUR (4) SIDES. IN ADDITION, THE APPLICANT SHALL PROVIDE SUPERVISION WHENEVER EQUIPMENT OR TRUCKS ARE MOVING NEAR TREES. C.PROTECTION FROM GRADE CHANGES: IF THE GRADE LEVEL ADJOINING TO A TREE TO BE RETAINED IS TO BE RAISED, THE APPLICANT SHALL CONSTRUCT A DRY ROCK WELL AROUND THE TREE. THE DIAMETER OF THIS WALL OR WELL MUST BE EQUAL TO THE TREE'S DRIP LINE. D.IMPERVIOUS SURFACES PROHIBITED WITHIN THE DRIP LINE: THE APPLICANT MAY NOT INSTALL IMPERVIOUS SURFACE MATERIAL WITHIN THE AREA DEFINED BY THE DRIP LINE OF ANY TREE TO BE RETAINED. E.RESTRICTIONS ON GRADING WITHIN THE DRIP LINES OF RETAINED TREES: THE GRADE LEVEL AROUND ANY TREE TO BE RETAINED MAY NOT BE LOWERED WITHIN THE GREATER OF THE FOLLOWING AREAS: (I) THE AREA DEFINED BY THE DRIP LINE OF THE TREE, OR (II) AN AREA AROUND THE TREE EQUAL TO ONE AND ONE-HALF FEET (1-1/2') IN DIAMETER FOR EACH ONE INCH (1”) OF TREE CALIPER. A LARGER TREE PROTECTION ZONE BASED ON TREE SIZE, SPECIES, SOIL, OR OTHER CONDITIONS MAY BE REQUIRED. F.MULCH LAYER REQUIRED: ALL AREAS WITHIN THE REQUIRED FENCING SHALL BE COVERED COMPLETELY AND EVENLY WITH A MINIMUM OF THREE INCHES (3”) OF BARK MULCH PRIOR TO INSTALLATION OF THE PROTECTIVE FENCING. EXCEPTIONS MAY BE APPROVED IF THE MULCH WILL ADVERSELY AFFECT PROTECTED GROUND COVER PLANTS. G.MONITORING REQUIRED DURING CONSTRUCTION: THE APPLICANT SHALL RETAIN A CERTIFIED ARBORIST OR LICENSED LANDSCAPE ARCHITECT TO ENSURE TREES ARE PROTECTED FROM THE DEVELOPMENT ACTIVITIES AND/OR TO PRUNE BRANCHES AND ROOTS, FERTILIZE, AND WATER AS APPROPRIATE FOR ANY TREES AND GROUND COVER THAT ARE TO BE RETAINED. TREE PROTECTION NOTES 1.6-FOOT HIGH TEMPORARY CHAIN LINK FENCE SHALL BE PLACED AT THE DRIPLINE OF THE TREE TO BE SAVED. FENCE SHALL COMPLETELY ENCIRCLE THE TREE(S). INSTALL FENCE POSTS USING PIER BLOCKS ONLY. AVOID DRIVING POSTS OR STAKES INTO MAJOR ROOTS. 2.FOR ROOTS OVER 1-INCH IN DIAMETER THAT ARE DAMAGED DURING CONSTRUCTION, MAKE A CLEAN, STRAIGHT CUT TO REMOVE THE DAMAGED PORTION. ALL EXPOSED ROOTS SHALL BE TEMPORARILY COVERED WITH DAMP BURLAP TO PREVENT DRYING, AND SHALL BE COVERED WITH SOIL AS SOON AS POSSIBLE. 3.WORK WITHIN PROTECTION FENCE SHALL BE DONE MANUALLY. NO STOCKPILING OF MATERIALS, VEHICULAR TRAFFIC, OR STORAGE OF EQUIPMENT OR MACHINERY SHALL BE ALLOWED WITHIN THE LIMIT OF THE FENCING. IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION DEMO AND TESC DETAILS 2025-05-08 DEVELOPMENT ENGINEERING msippo 06/04/2025 NOTES: 1.REFER TO C100 AND C101 FOR GENERAL NOTES. 2.REFER TO C200 FOR PLAN NOTES. 1 2 BC 2 1 . 1 7 ± ( E X ) BC 21 . 0 7 ± ( E X ) TC 21 . 5 1 ± ( E X ) TC 2 1 . 5 4 ± ( E X ) TC 2 1 . 4 7 ± ( E X ) BC 2 1 . 0 7 ± ( E X ) BC 20 . 9 5 ± ( E X ) TC 21 . 3 6 ± ( E X ) TC 2 1 . 4 0 ± ( E X ) BC 2 0 . 9 8 ± ( E X ) 21.59 ± ( E X ) 21. 6 0 ± ( E X ) 21.60 ± ( E X ) 21. 6 0 ± ( E X ) 0. 6 2 % ± ( E X ) 0.05% ±(EX) 21.51 ± (EX) 40.0'20.3' PEDESTRIAN CONCRETE PAVEMENT (TYP) 12" WIDE CONCRETE CURB AND GUTTER. MATCH GRADES AT EXISTING SIDEWALK AND EXISTING FLOW LINE MATCH EXISTING GRADES AT EXIST PAVEMENT, TYP EXISTING BUILDING OUTLINE (TYP) EXISTING BUILDING OVERHEAD (TYP) 1. 0 0 % ± ( E X ) 1. 8 6 % ± ( E X ) 1. 5 5 % ± ( E X ) 12 . 9 ' ± TY P 0 1 inch = 10 feet 5'10'20' 1 C200 MAIN ENTRANCE ENLARGEMENT SCALE: 1" = 10' CONSTRUCTION NOTES: GRADE IN PLANAR FASHION BETWEEN SPOTS PROVIDED. REPLACE SIDEWALK SECTION PER COR STD PLAN 102. REPLACE EXISTING CURB PER COR STD PLAN 101, MATCH EXISTING DIMENSIONS FOR VISUAL CONSISTENCY. 1 2 IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT CIVIL ENLARGEMENTS LEGEND: PROPERTY LINE CONCRETE PAVEMENT 2025-05-08 DEVELOPMENT ENGINEERING msippo 06/04/2025 NOTES: 1.REFER TO C100 AND C101 FOR GENERAL NOTES. 2.REFER TO C200 FOR PLAN NOTES. 1 20. 7 7 ± ( E X ) 20.85 ± ( E X ) 19.84 19. 9 3 BC 1 9 . 8 6 ± ( E X ) TC 2 0 . 3 5 ± ( E X ) 1.75% 1. 8 0 % 5. 0 ' 21.24 ± ( E X ) 21. 2 7 ± ( E X ) 21.32 ± ( E X ) 21.34 ± ( E X ) 20 . 3 4 20.5 4 ( G B ) 20. 3 9 1. 8 0 % 1.25%5.38% 5.38% 1. 8 0 % 1. 8 0 % 20. 4 5 ± ( E X ) 19.7 6 ( E X ) 19.97 (EX) 19.69 ± (EX) 2.24% 1.44% 2.18% 8.0'2.0' 20 . 4 3 REPLACE LANDSCAPE IN KIND (TYP) MATCH EXISTING GRADE AT EXISTING PAVEMENT AND LANDSCAPE (TYP) PEDESTRIAN CONCRETE PAVEMENT (TYP) 4' x 5' UPPER LANDING 4' x 5' LOWER LANDING EXISTING BUILDING OVERHANG (TYP) CONNECT CONDUIT TO PROPOSED ELEC OUTLET, REFER TO ELEC (1) - 2" PVC CONDUIT, REFER TO ELEC CONNECT CONDUIT TO EXISTING ELEC OUTLET, REFER TO ELEC 9. 0 ' 2.0' TYP 20.59 ± ( E X ) 20. 5 6 ± ( E X ) 1. 0 ' (T Y P ) 14.2'0. 6 1 % ± ( E X ) 0. 4 1 % ± ( E X ) 21. 2 8 ± ( E X ) 21.11 ± ( E X ) 21.12 ± ( E X ) 21.23 ± ( E X ) 2.00%± (EX) 1.75%± (EX) 1.75% 19.95 1.25% 1. 6 3 % ± ( E X ) MATCH EXISTING GRADE AT EXISTING LANDSCAPE (TYP) MATCH EXISTING GRADE AT EXISTING PAVEMENT (TYP) 20 . 4 8 B C 1 9 . 7 7 ± ( E X ) TC 20.20 ± (EX) 2.04% 1. 8 0 % 2 0 19 . 8 0 19. 8 9 4.2' 0 1 inch = feet 1.5'3'6' 3 2 C200 FOOD TRUCK ACCESS PATH ENLARGEMENT SCALE: 1" = 3' CONSTRUCTION NOTES: GRADE IN PLANAR FASHION BETWEEN SPOTS PROVIDED. REPLACE SIDEWALK SECTION PER COR STD PLAN 102 AND MATCH EXISTING HORIZONTAL DIMENSIONS. 1 IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT CIVIL ENLARGEMENTS LEGEND: PROPERTY LINE CONCRETE PAVEMENT LANDSCAPE 2025-05-08 DEVELOPMENT ENGINEERING msippo 06/04/2025 D 5 C500 3 C500 1 4. 5 ' ± 19.9' ± 4. 0 ' T Y P 3. 0 ' TY P PROPOSED PARKING STALLS WITH EV CHARGING (TYP) REPLACE LANDSCAPE IN KIND PEDESTRIAN CONCRETE PAVEMENT AND LANDSCAPE (TYP) MATCH EXISTING GRADE AT EXISTING PAVEMENT (TYP) BUILDING ELEC POC, REFER TO ELEC (1) - 1 1/4" PVC CONDUITS (TYP) REFER TO ELEC (5) - 1 1/4" PVC CONDUITS, REFER TO ELEC EV CHARGING STATION PEDESTAL, (TYP) REFER TO ELEC (TYP) R=5 (TYP) APPROXIMATE LOCATION OF EXISTING TREE (TYP) WHEEL STOP (TYP) PROTECT EXISTING SIDEWALK (TYP) 2'X2' HANDHOLD WITH OPEN BOTTOM, REFER TO ELEC ROUTE CONDUITS BETWEEN EXISTING TREES PROTECT EXISTING 12" SD, CONTRACTOR TO CONFIRM LOCATION AND ELEVATION PRIOR TO CONSTRUCTION 20. 2 9 ± ( E X ) 20. 3 2 ± ( E X ) 20. 5 0 ± ( E X ) 20. 4 7 ± ( E X ) 20. 3 3 ± ( E X ) 20. 2 9 ± ( E X ) 20. 4 3 ± ( E X ) 20. 4 0 ± ( E X ) 20. 9 0 ± ( E X ) 20. 9 9 ± ( E X ) PROTECT EXIST CURB NOTES: 1.REFER TO C100 AND C101 FOR GENERAL NOTES. 2.REFER TO C200 FOR PLAN NOTES. 0 1 inch = 5 feet 2.5'5'10' LEGEND: PROPERTY LINE CONCRETE PAVEMENT LANDSCAPE 3 C200 EV CHARGING STALLS ENLARGEMENT SCALE: 1" = 5' IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT CIVIL ENLARGEMENTS CONSTRUCTION NOTES: CONTRACTOR SHALL FEILD VERIFY THE LOCATION OF EXISTING TREES AND EXISTING UTILITES PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 1 2025-05-08 DEVELOPMENT ENGINEERING msippo 06/04/2025 NOTES: 1.REFER TO C100 AND C101 FOR GENERAL NOTES. 2.REFER TO C200 FOR PLAN NOTES. SW 1 6 T H S T L O N G A C R E S D R S W FUTURE ENTRY SIGN, APPROXIMATE LOCATION, UNDER SEPARATE PERMIT PROPERTY LINE (TYP)CAP CONDUIT TO FUTURE ENTRY SIGN, REFER TO ELEC CONNECT CONDUIT TO EXISTING ELEC HH, REFER TO ELEC 20.86 ± ( E X ) 1 REPLACE LANDSCAPE IN KIND (TYP) MATCH EXISTING GRADE AT EXISTING PAVEMENT AND LANDSCAPE (TYP) R=5 (TYP) PROTECT EXISTING SIDEWALK (TYP) REFER TO ELEC FOR NUMBER AND SIZE OF CONDUITS, ROUTE CONDUITS BETWEEN EXISTING TREES 4.0' TY P 20.95 ± ( E X ) 19.71 ± (EX) 19.86 ± (EX) 0 1 inch = 10 feet 5'10'20' IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT CIVIL ENLARGEMENTS LEGEND: PROPERTY LINE LANDSCAPE CONSTRUCTION NOTES: CONTRACTOR SHALL FEILD VERIFY THE LOCATION OF EXISTING TREES AND EXISTING UTILITES PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 1 4 C200 SIGNAGE ENLARGEMENT SCALE: 1" = 10' 2025-05-08 DEVELOPMENT ENGINEERING msippo 06/04/2025 1CEMENT CONCRETE CURBS NTS 2CEMENT CONCRETE SIDEWALK NTS IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION CIVIL DETAILS 4TYPICAL ELECTRICAL CONDUIT TRENCH NTS NOTES: 1.THE NON-SHRINK GROUT USED TO ATTACH THE PRECAST CURB SHALL CONSIST OF 3:1 SAND AND CEMENT. GROUT TO A DEPTH OF 1" FROM THE TOP OF THE CURB. 2.CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI AT 28 DAYS. #3 BARS (2) 5" ELEVATION 2 1/2" 2 1/2" 2" CLEAR (TYP.) 1.0 1.0 2.0 6.0 9" MAX. 6" MIN. 13/16" DIA. HOLES PLAN ATTACHMENT DETAIL 18 " MI N 6" 10" MAX. 8" MIN. #3 BARS (2) ATTACH WITH #6 BAR (2) RECESS BAR 1" AND PLACE NON-SHRINK GROUT AROUND BAR TO FILL RECESS. 3 PRECAST CONCRETE PARKING CURB DETAIL NTS 6" 6" MI N . 6" MI N . 6" MIN. TYP 36 " M I N . CONDUITS PER PLAN SAND BEDDING LANDSCAPING, REPLACE IN KIND 5EV PEDESTAL DETAIL NTS TOP OF PEDESTAL ELEV 21.0 VA R I E S 10 " M A X 24 " 24"EXIST SIDEWALK EXIST CURB PLAN VIEW SECTION 42 " M I N 1"± EV CHARGING STATION, REFER TO ELEC INSTALL STATION SUPPORT PER MANUFACTURES REQUIREMENT LANDSCAPING REPLACE IN KIND, TYP 4" 2" REINFORCING, TYP REFER TO NOTE NOTE: REINFORCE PEDESTAL WITH (4) #8 VERTICAL BARS AND #4 TIES AT 12” O.C. AT THE TOP OF THE PEDESTAL TIE SPACING TO (3) TIES @ 2” O.C. EACH. CONTRACTOR TO SUBMIT SHOP DRAWINGS OF REINFORCING PRIOR TO CONSTRUCTION 3" CLR, TYP 2025-05-08 DEVELOPMENT ENGINEERING msippo 06/04/2025 DATUMCall 811two business days before you dig R K-1 EASEMENT PER BLA K-1 EASEMENT PER BLA LCP T T T T TT T T T T T T T T T T T T TT T T T T T T T T T T T T T T T T T T T T T LC P LCP LC P LCP LC P L C P LCP LCP LC P LC P LC P LCP LC P LCPLCP LCP LC P T T T LC P LCP T T T T T T T T TT T T T T T TT HH HH LC P LC P T T T T T T 14-50R,WP 14-50R,WP 14-50R,WP 1 2 3 CAR CHARGING STATIONS 4 CHRG-1,3 CHRG-5,7 CHRG-9,11 CHRG-13,15 CHRG-17,19 V22-6-31,33 V22-6-35,37 V22-6-39,41 1 1/4"C-3#2,1#4G THWN 1 1/4"C-3#3,1#6G THWN 1 1/4"C-3#3,1#6G THWN EXTERIOR SIGNAGE 3/4"C-1#12,1#12N,1#12G THWN APPROXIMATE LOCATION OF ELECTRIC ROOM 1W-942 EXTERIOR SIGNAGE 3/4"C-1#10,1#10N,1#10G THWN 5 5 M,WP M,WP EXTERIOR SIGNAGE 3/4"C-1#8,1#8N,1#10G THWN 6 M,WP 1 1" = 50'-0"E100-EXT 1 ELECTRICAL SITE PLAN - CIVIL PERMIT SHEET NOTES - E100 # NOTE 1 PROVIDE NEW HANDHOLE WITH CONDUIT SIZED AS NOTED BACK TO KITCHEN ELECTRICAL ROOM 1S-561 THROUGH EXISTING HANDHOLE TO THE SOUTH. MOUNT FOOD TRUCK RECEPTACLE TO NEW PEDESTAL AND PROVIDE APPROX 60' 3#2,1#6G SOOW EXTENSION CORD FOR FOOD TRUCK CONNECTION TO PEDESTAL OUTLETS. 2 ROUTE CONDUCTORS IN EXISTING CONDUIT BACK TO KITCHEN ELECTRICAL ROOM 1S-561. MOUNT FOOD TRUCK RECEPTACLE TO NEW PEDESTAL AND PROVIDE APPROX 110' 3#3,1#6G SOOW EXTENSION CORD FOR FOOD TRUCK CONNECTION TO PEDESTAL OUTLETS. 3 ROUTE CONDUCTORS IN EXISTING CONDUIT BACK TO KITCHEN ELECTRICAL ROOM 1S-561. MOUNT FOOD TRUCK RECEPTACLE TO NEW PEDESTAL AND PROVIDE APPROX 150' 3#2,1#4G SOOW EXTENSION CORD FOR FOOD TRUCK CONNECTION TO PEDESTAL OUTLETS. 4 PROVIDE CHARGEPOINT DUAL HEAD 80A CP SERIES PEDESTAL CHARGERS WITH POWERSHARE. ROUTE (1)1-1/4"C WITH 3#4,1#8G FROM EACH CHARGER TO CAR CHARGING PANEL IN ELECTRICAL ROOM 1W-942. 5 CONNECT EXTERIOR SIGNAGE LIGHTING, SIZE AS INDICATED, TO EXISTING EXTERIOR RECEPTACLE CIRCUIT IN EXISTING HANDHOLE AT THIS APPROXIMATE LOCATION. 6 CONNECT EXTERIOR SIGNAGE LIGHTING, MATCH EXISTING CIRCUIT CONDUCTOR SIZE, TO EXISTING 480V SITE LIGHTING CIRCUIT IN EXISTING HANDHOLE AT THIS APPROXIMATE LOCATION. FI L E N A M E : XX X X ELECTRICAL SITE PLAN XX LR LR BY BY IN COMPLIANCE WITH CITY OF RENTON STANDARDS 14 IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT 05/08/2025 14 DATE: FIELDBOOK: DRAWING NO: PAGE: SHEET: OF: SCALE: DESIGNED: DRAWN: CHECKED: APPROVED:NO.REVISION BY DATE APPR SURVEYED: VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY Planning/Building/Public Works Dept. CITY OF RENTON FOR REFERENCE ONLY AS NOTED 1 SIGNAGE REVISION LGR 5/16/2025 BTY 1 C600 electrical work not approved by development engineering and this sheet is for reference only. electrical work to be permitting by city building department.