HomeMy WebLinkAboutAPPROVED_Civil_Construction_TIR_250605 Borealis City of Renton, Washington Technical Information Report (FINAL) May 2025 | Civil Construction Permit Report Borealis – City of Renton i Technical Information Report May 2025 Prepared for: City of Renton Prepared by: KPFF Consulting Engineers 1601 Fifth Avenue, Suite 1600 Seattle, WA 98101 Heather Lewison, PE Mariam Saghafian 2025-05-08 Borealis – City of Renton ii Table of Contents 1. Project Overview .......................................................................................................................................... 1 Existing Conditions ......................................................................................................................................... 1 Proposed Conditions ...................................................................................................................................... 2 2. Conditions and Requirements Summary .................................................................................................. 3 Core Requirement No. 1: Discharge at the Natural Location ........................................................................ 3 Core Requirement No. 2: Off-Site Analysis ................................................................................................... 3 Core Requirement No. 3: Flow Control .......................................................................................................... 3 Core Requirement No. 4: Conveyance System ............................................................................................. 3 Core Requirement No. 5: Construction Stormwater Pollution Prevention ..................................................... 3 Core Requirement No. 6: Maintenance and Operations ................................................................................ 3 Core Requirement No. 7: Financial Guarantees and Liability ........................................................................ 3 Core Requirement No. 8: Water Quality ........................................................................................................ 3 Core Requirement No. 9: On-Site BMPs ....................................................................................................... 4 Special Requirement No. 1: Other Adopted Area-Specific Requirements .................................................... 4 Special Requirement No. 2: Flood Hazard Area Delineation ......................................................................... 4 Special Requirement No. 3: Flood Protection Facilities ................................................................................. 4 Special Requirement No. 4: Source Control .................................................................................................. 4 Special Requirement No. 5: Oil Control ......................................................................................................... 4 Special Requirement No. 6: Aquifer Protection Area ..................................................................................... 4 3. Off-Site Analysis (N/A) ................................................................................................................................. 5 4. Flow Control, Low Impact Development (LID), and Water Quality Facility Analysis and Design (N/A)5 5. Conveyance System Analysis and Design (N/A) ...................................................................................... 5 6. Special Reports and Studies (N/A) ............................................................................................................. 5 7. Other Permits ............................................................................................................................................... 5 8. Construction Stormwater Pollution Prevention Plan (CSWPPP) Analysis and Design........................ 5 Part 8.A: Erosion and Sediment Control Plan Analysis and Design .............................................................. 5 Part 8.B: Stormwater Pollution Prevention and Spill Control Plan Design .................................................... 6 9. Bond Quantities, Facility Summaries, and Declaration of Covenant ..................................................... 7 10. Operations and Maintenance Manual (N/A) ............................................................................................... 7 List of Figures Figure 1-1: Vicinity Map ........................................................................................................................................ 1 List of Tables Table 1-1: Project’s Existing Surface Areas ......................................................................................................... 2 Table 1-2: Project’s Proposed Surface Areas ...................................................................................................... 2 Table 7-1: Required Permits ................................................................................................................................. 5 Borealis – City of Renton iii Appendices Appendix A – TIR Worksheet Appendix B – Existing and Proposed Conditions Map Drainage Sub Basins COR GIS Map USDA Soil Map Appendix C – Drainage Review Flow Chart Critical Areas COR GIS Map Appendix D – Civil Plans Appendix E – FEMA FIRM Panel Flood Hazard Zones Map Topographic Survey BFE to Existing Grades Relationship Exhibit Appendix F – Bond Quantity Worksheet Borealis – City of Renton 1 1. Project Overview The Borealis project is located at 1301 Southwest 16th Street in Renton, Washington. The project site is bounded by Southwest 16th Street to the north, Oakesdale Avenue Southwest to the east, an existing lake and lake wildlife area to the west, and an existing building to the south. The site is located on parcel Nos. 2423049022 and 2423049055 per parcel records of King County, Washington. The site contains the existing Borealis building, asphalt roads and parking lots, concrete pedestrian walkways, trees, and landscaping. Refer to Figure 1-1 for a vicinity map. The project proposes minor site improvements associated with the renovation of the existing Borealis building. Site improvements consist of sidewalk replacement for ADA accessibility at the building main entrance and food truck pedestrian access path, along with electrical trenching for proposed EV charging stalls and food truck power supply. Refer to Appendix A for the TIR Worksheet. Figure 1-1: Vicinity Map EXISTING CONDITIONS The site slopes from northwest to southeast at 1.0 to 5.0 percent. Runoff from the site is collected via existing conveyance system of catch basins and storm drainage pipes on-site. The existing storm drainage system discharges into existing wet ponds, which then discharge into wetlands located to the south and southeast of the building. The site is part of the Springbrook Creek subbasin and Black River basin. Borealis – City of Renton 2 The on-site improvements area is approximately 1,952 square feet (0.04 acres). Refer to Appendix B for an existing conditions map and COR GIS map showing drainage subbasins. Refer to Table 1-1 for a summary of existing surfaces. Table 1-1: Project’s Existing Surface Areas No. Surface Description Area 1 Impervious Surface 1,368 sq. ft. 2 Pervious Surface 584 sq. ft. Total 1,952 sq. ft 0.04 acres Soil conditions for the site are interpreted to be Urban Land soil category per the USDA Web Soil Survey. Refer to Appendix B for the USDA Soil Map. PROPOSED CONDITIONS The project proposes to perform maintenance activities to improve accessibility to the building, by replacing and regrading portions of existing pedestrian concrete pavement at the main entrance sidewalk to the west and food truck access pathway to the east of the building. Other site improvements include maintenance of the existing curb, which has separated from the sidewalk, at the main entrance sidewalk, providing an ADA curb ramp at the pathway to the parking area at the food truck location, and trenching for electrical routing from the existing building to the proposed EV charging stalls to the north of the building and food trucks at the parking lot to the east. The proposed site improvements will continue to maintain the existing drainage pattern. Refer to Table 1-2 for a summary of the project’s proposed surface areas. Table 1-2: Project’s Proposed Surface Areas No. Surface Description Area 1 Non-Pollution-Generating Impervious Surface (NPGIS): Pedestrian Pavement 1,314 sq. ft. 2 Pollution-Generating Impervious Surface (PGIS): Road and Driveway 54 sq. ft. 3 Pollution-Generating Pervious Surface (PGPS): Landscape 584 sq. ft. Total 1,952 sq. ft. 0.04 acres Refer to Appendix B for a proposed conditions exhibit. The proposed project follows the requirements of the 2022 City of Renton Surface Water Design Manual (RSWDM). The minimum requirements for drainage review were determined using the manual and are detailed in the following sections of this report. Borealis – City of Renton 3 2. Conditions and Requirements Summary The proposed redevelopment project results in less than 2,000 square feet of new plus replaced impervious surface, however, the site is located within a flood hazard area and therefore requires a Targeted Drainage Review per the RSWDM, Section 1.1.2.4. The project is required to provide Core Requirement No. 5 (Construction Stormwater Pollution Prevention) and all six special requirements under a Category 1 Targeted Drainage Review. The following is a summary of how the project will comply with these requirements. Refer to Appendix C for minimum requirements and Appendix D for civil plans. CORE REQUIREMENT NO. 1: DISCHARGE AT THE NATURAL LOCATION This requirement is not applicable to the project as noted above. CORE REQUIREMENT NO. 2: OFF-SITE ANALYSIS This requirement is not applicable to the project as noted above. CORE REQUIREMENT NO. 3: FLOW CONTROL This requirement is not applicable to the project as noted above. CORE REQUIREMENT NO. 4: CONVEYANCE SYSTEM This requirement is not applicable to the project as noted above. CORE REQUIREMENT NO. 5: CONSTRUCTION STORMWATER POLLUTION PREVENTION Temporary Erosion and Sediment Control (TESC) best management practices (BMPs) will be implemented during construction to prevent the transport of sediment from the project site to the maximum extent practicable. TESC BMPs are anticipated to include silt fences, straw wattles, catch basin inserts, and other measures as necessary. Refer to Appendix D for Civil TESC plans. Refer to Section 8 of this report for the Construction Stormwater Pollution Prevention Plan (CSWPPP) analysis and design. CORE REQUIREMENT NO. 6: MAINTENANCE AND OPERATIONS This requirement is not applicable to the project as noted above. CORE REQUIREMENT NO. 7: FINANCIAL GUARANTEES AND LIABILITY This requirement is not applicable to the project as noted above. CORE REQUIREMENT NO. 8: WATER QUALITY This requirement is not applicable to the project as noted above. Borealis – City of Renton 4 CORE REQUIREMENT NO. 9: ON-SITE BMPS This requirement is not applicable to the project as noted above. SPECIAL REQUIREMENT NO. 1: OTHER ADOPTED AREA -SPECIFIC REQUIREMENTS There are no adopted area-specific regulations for the site. Therefore, Special Requirement No. 1 is not applicable to the project. SPECIAL REQUIREMENT NO. 2: FLOOD HAZARD AREA DELINEATION Per the City of Renton GIS Maps, the project contains a flood hazard area. Per the FEMA Flood Map Service Center, the project site is within the Special Flood Areas (SFHAs) Zone AE, with the annotation of 100-year flood chance. While the site is located in the FEMA Floodplain, it is not within the floodway. The Base Flood Elevation (BFE) is determined to be approximately 19.9 feet, as indicated by FEMA's data for Springbrook Creek adjacent to the site. The topographic survey provided by Bush, Roed & Hitchings (BRH), dated 2024-10-06, confirms that the majority of the site is situated above the BFE. All proposed improvements included in this Civil Construction Permit are located within the areas that are above the BFE. The project does not alter the BFE or boundaries of the special flood hazard area; therefore, the project does not require flood analysis. Refer to Appendix E for the FEMA FIRM Panel, and Flood Profiles and Data documenting Flood Hazard Zones, topographic survey, and BFE to existing grades relationship exhibit. SPECIAL REQUIREMENT NO. 3: FLOOD PROTECTION FACILITIES As mentioned in Special Requirement No. 2, the project site is located in the FEMA floodplain with a BFE of 19.9’. Proposed mechanical equipment including the EV charging station pedestals are designed to be elevated one foot above the BFE to protect against flood hazards. Refer to Appendix D for civil plans. SPECIAL REQUIREMENT NO. 4: SOURCE CONTROL Water quality source control is not applicable to proposed project work. SPECIAL REQUIREMENT NO. 5: OIL CONTROL The site is not considered high-use because its anticipated average daily traffic count is less than 100 vehicles per 1,000 square feet of gross building area; therefore, Special Requirement No. 5 is not applicable. SPECIAL REQUIREMENT NO. 6: AQUIFER PROTECTION AREA Per the City of Renton GIS Maps, the site is not located within the Aquifer Protection Area. Refer to Appendix F for the City of Renton Critical Areas Map. Borealis – City of Renton 5 3. Off-Site Analysis (N/A) As mentioned in Section 2, Core Requirement No. 2, off-site analysis is not required for this project. 4. Flow Control, Low Impact Development (LID), and Water Quality Facility Analysis and Design (N/A) As mentioned in the Core Requirements summary, flow control, LID, and water quality analysis is not required for this project. 5. Conveyance System Analysis and Design (N/A) As mentioned in Section 2, Core Requirement No. 4, conveyance analysis is not required for this project. 6. Special Reports and Studies (N/A) This section is not applicable to the project. 7. Other Permits The required permits associated with the project are listed below. This report covers the requirements pertaining to the Civil Construction Permit submitted to the City of Renton. Table 7-1: Required Permits Agency Permit/Approval City of Renton Civil Construction Permit City of Renton Building Permit 8. Construction Stormwater Pollution Prevention Plan (CSWPPP) Analysis and Design PART 8.A: EROSION AND SEDIMENT CONTROL PLAN ANALYSIS AND DESIGN Temporary and permanent erosion and sediment control (ESC) measures will be implemented per Appendix D, Section D.2.1, of the RSWDM. 1. Clearing Limits: Prior to any site clearing or grading, areas to remain undisturbed during project construction shall be delineated on the project’s ESC plan and physically marked on the project site. 2. Cover Measures: Temporary and permanent cover measures shall be provided when necessary to protect disturbed areas. The intent of these measures is to prevent erosion by having as much area as possible covered during any period of precipitation. Borealis – City of Renton 6 3. Perimeter Protection: Perimeter protection to filter sediment from sheet flow shall be provided downstream of all disturbed areas prior to upslope grading. 4. Traffic Area Stabilization: Unsurfaced entrances, roads, and parking areas used by construction traffic shall be stabilized to minimize erosion and tracking of sediment off-site. 5. Sediment Retention: Surface water collected from all disturbed areas of the site shall be routed through a sediment pond or trap prior to release from the site, except those areas at the perimeter of the site small enough to be treated solely with perimeter protection. Sediment retention facilities shall be installed prior to grading any contributing area. 6. Surface Water Collection: Surface water collection measures (e.g., ditches, berms, etc.) shall be installed to intercept all surface water from disturbed areas, convey it to a sediment pond or trap, and discharge it downstream of any disturbed areas. Areas at the perimeter of the site, which are small enough to be treated solely with perimeter protection, do not require surface water collection. Significant sources of upstream surface water that drain onto disturbed areas shall be intercepted and conveyed to a stabilized discharge point downstream of the disturbed areas. Surface water collection measures shall be installed concurrently with or immediately following rough grading and shall be designed, constructed, and stabilized as needed to minimize erosion. 7. Dewatering Control: The water resulting from construction site dewatering activities must be treated prior to discharge or disposed of as specified. 8. Dust Control: Preventative measures to minimize wind transport of soil shall be implemented when a traffic hazard may be created or when sediment transported by wind is likely to be deposited in water resources. 9. Flow Control: Surface water from disturbed areas must be routed through the project’s on-site flow control facility or other provisions must be made to prevent increases in the existing site conditions’ 2-year and 10- year runoff peaks discharging from the project site during construction (flow control facility, runoff treatment facility, and on-site BMP areas [existing or proposed] shall not be used for this purpose). 10. Control Pollutants: Stormwater pollution prevention and spill control (SWPPS) measures are required to prevent, reduce, or eliminate the discharge of pollutants to on-site or adjacent stormwater systems or watercourses from construction-related activities such as materials delivery and storage, on-site equipment fueling and maintenance, demolition of existing buildings and disposition of demolition materials and other waste, and concrete handling, washout and disposal. Section D.2.2 describes BMPs specific to this purpose; additionally, several of the ESC BMPs described herein are applicable. 11. Protect Existing and Proposed Stormwater Facilities and On-Site BMPs: Sedimentation and soil compaction reduce the infiltration capacity of native and engineered soils. Protection measures shall be applied/installed and maintained so as to prevent adverse impacts to existing stormwater facilities and on- site BMPs and areas of proposed stormwater facilities and on-site BMPs for the project. Adverse impacts can prompt the requirement to restore or replace affected stormwater facilities and on-site BMPs. 12. Maintain Protective BMPs: Protection measures shall be maintained to ensure continued performance of their intended function, to prevent adverse impacts to existing BMPs/facilities and areas of proposed BMPs/facilities, and protect other disturbed areas of the project. 13. Manage the Project: Coordination and timing of site development activities relative to ESC concerns, and timely inspection, maintenance, and update of protective measures are necessary to effectively manage the project and ensure the success of protective ESC and SWPPS design and implementation. PART 8.B: STORMWATER POLLUTION PREVENTION AND SPILL CONTROL PLAN DESIGN Stormwater pollution prevention and spill control (SWPPS) measures will be implemented per Section D.2.2 of the RSWDM. The following measures will be followed: Borealis – City of Renton 7 • Follow effective pollutant handling and disposal procedures. • Provide cover and containment for materials, fuel, and other pollutants. • Manage the project site to maximize pollutant control and minimize pollutant sources. • Protect from spills and drips of petroleum products and other pollutants. • Avoid overapplication or untimely application of chemicals and fertilizers. • Prevent or treat contamination of stormwater runoff by pH modifying sources. 9. Bond Quantities, Facility Summaries, and Declaration of Covenant The Site Improvement Bond Quantity Worksheet is included in Appendix F. Flow control and water quality facility summary sheets are not applicable to this project, since flow control, LID, and water quality analysis is not required for this project. 10. Operations and Maintenance Manual (N/A) This section is not applicable since the project is not proposing any stormwater facilities or on-site BMPs. Borealis – City of Renton Appendix A Appendix A TIR Worksheet CITY OF RENTON SURFACE WATER DESIGN MANUAL 2022 City of Renton Surface Water Design Manual 6/22/2022 8-A-1 REFERENCE 8-A TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 1 PROJECT OWNER AND PROJECT ENGINEER Part 2 PROJECT LOCATION AND DESCRIPTION Project Owner _____________________________ Phone ___________________________________ Address __________________________________ _________________________________________ Project Engineer ___________________________ Company _________________________________ Phone ___________________________________ Project Name __________________________ CED Permit # ________________________ Location Township ________________ Range __________________ Section _________________ Site Address __________________________ _____________________________________ Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS  Land Use (e.g., Subdivision / Short Subd.)  Building (e.g., M/F / Commercial / SFR)  Grading  Right-of-Way Use  Other _______________________  DFW HPA  COE 404  DOE Dam Safety  FEMA Floodplain  COE Wetlands  Other ________  Shoreline Management  Structural Rockery/Vault/_____  ESA Section 7 Part 5 PLAN AND REPORT INFORMATION Technical Information Report Site Improvement Plan (Engr. Plans) Type of Drainage Review (check one): Date (include revision dates): Date of Final:  Full  Targeted  Simplified  Large Project  Directed __________________ __________________ __________________ Plan Type (check one): Date (include revision dates): Date of Final:  Full  Modified  Simplified __________________ __________________ __________________ Project Borealis 23 North 24 04 EastHeather Lewison KPFF Consulting Engineers 206.926.0648 City of Renton 425.430.6400 ü ü Civil Construction Permit ü 5/8/2025 ü 5/8/2025 1301 SW 16th Street, Renton, WA 98057 ü REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 6/22/2022 2022 City of Renton Surface Water Design Manual 8-A-2 Part 6 SWDM ADJUSTMENT APPROVALS Type (circle one): Standard / Blanket Description: (include conditions in TIR Section 2) ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ Approved Adjustment No. ______________________ Date of Approval: _______________________ Part 7 MONITORING REQUIREMENTS Monitoring Required: Yes / No Start Date: _______________________ Completion Date: _______________________ Describe: _________________________________ _________________________________________ _________________________________________ Re: SWDM Adjustment No. ________________ Part 8 SITE COMMUNITY AND DRAINAGE BASIN Community Plan: ____________________________________________________________________ Special District Overlays: ______________________________________________________________ Drainage Basin: _____________________________________________________________________ Stormwater Requirements: _____________________________________________________________ Part 9 ONSITE AND ADJACENT SENSITIVE AREAS  River/Stream ________________________  Lake ______________________________  Wetlands ____________________________  Closed Depression ____________________  Floodplain ___________________________  Other _______________________________ _______________________________  Steep Slope __________________________  Erosion Hazard _______________________  Landslide Hazard ______________________  Coal Mine Hazard ______________________  Seismic Hazard _______________________  Habitat Protection ______________________  _____________________________________ ü Black River N/A Springbrook Creek REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 2022 City of Renton Surface Water Design Manual 6/22/2022 Ref 8-A-3 Part 10 SOILS Soil Type ______________________ ______________________ ______________________ ______________________ Slopes ________________________ ________________________ ________________________ ________________________ Erosion Potential _________________________ _________________________ _________________________ _________________________  High Groundwater Table (within 5 feet)  Other ________________________________  Sole Source Aquifer  Seeps/Springs  Additional Sheets Attached Part 11 DRAINAGE DESIGN LIMITATIONS REFERENCE  Core 2 – Offsite Analysis_________________  Sensitive/Critical Areas__________________  SEPA________________________________  LID Infeasibility________________________  Other________________________________  _____________________________________ LIMITATION / SITE CONSTRAINT _______________________________________ _______________________________________ _______________________________________ _______________________________________ _______________________________________ _______________________________________  Additional Sheets Attached Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area) Threshold Discharge Area: (name or description) Core Requirements (all 9 apply): Discharge at Natural Location Number of Natural Discharge Locations: Offsite Analysis Level: 1 / 2 / 3 dated:__________________ Flow Control (include facility summary sheet) Standard: _______________________________ or Exemption Number: ____________ Conveyance System Spill containment located at: _____________________________ Erosion and Sediment Control / Construction Stormwater Pollution Prevention CSWPP/CESCL/ESC Site Supervisor: _____________________ Contact Phone: _________________________ After Hours Phone: _________________________ Maintenance and Operation Responsibility (circle one): Private / Public If Private, Maintenance Log Required: Yes / No Financial Guarantees and Liability Provided: Yes / No Urban Land N/A N/A N/A N/A N/A N/A The project is required to provide Core Requirement No. 5 (Construction Stormwater Pollution Prevention) and all six special requirements under a Category 1 Targeted Drainage Review. TBD TBD TBD REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 6/22/2022 2022 City of Renton Surface Water Design Manual 8-A-4 Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area) Water Quality (include facility summary sheet) Type (circle one): Basic / Sens. Lake / Enhanced Basic / Bog or Exemption No. _______________________ On-site BMPs Describe: Special Requirements (as applicable): Area Specific Drainage Requirements Type: SDO / MDP / BP / Shared Fac. / None Name: ________________________ Floodplain/Floodway Delineation Type (circle one): Major / Minor / Exemption / None 100-year Base Flood Elevation (or range): _______________ Datum: Flood Protection Facilities Describe: Source Control (commercial / industrial land use) Describe land use: Describe any structural controls: Oil Control High-Use Site: Yes / No Treatment BMP: _________________________________ Maintenance Agreement: Yes / No with whom? _____________________________________ Other Drainage Structures Describe: N/A N/A N/A N/A 19.9' Water quality source controls applicable to this project will be applied in accordance with the King County Stormwater Pollution Prevention Manual and Renton Municipal Code, Title IV. Commercial Mechanical equipment including the EV chargers are located 1' above the BFE. REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 2022 City of Renton Surface Water Design Manual 6/22/2022 Ref 8-A-5 Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION  Clearing Limits  Cover Measures  Perimeter Protection  Traffic Area Stabilization  Sediment Retention  Surface Water Collection  Dewatering Control  Dust Control  Flow Control  Control Pollutants  Protect Existing and Proposed BMPs/Facilities  Maintain Protective BMPs / Manage Project MINIMUM ESC REQUIREMENTS AFTER CONSTRUCTION  Stabilize exposed surfaces  Remove and restore Temporary ESC Facilities  Clean and remove all silt and debris, ensure operation of Permanent BMPs/Facilities, restore operation of BMPs/Facilities as necessary  Flag limits of sensitive areas and open space preservation areas  Other _______________________ Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch) Flow Control Description Water Quality Description On-site BMPs Description  Detention  Infiltration  Regional Facility  Shared Facility  Other _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________  Vegetated Flowpath  Wetpool  Filtration  Oil Control  Spill Control  Other _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________  Full Dispersion  Full Infiltration  Limited Infiltration  Rain Gardens  Bioretention  Permeable Pavement  Basic Dispersion  Soil Amendment  Perforated Pipe Connection  Other _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ ü ü ü ü üü ü ü ü ü ü ü ü ü ü ü N/A N/A N/A REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET 6/22/2022 2022 City of Renton Surface Water Design Manual 8-A-6 Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS  Drainage Easement  Covenant  Native Growth Protection Covenant  Tract  Other ____________________________  Cast in Place Vault  Retaining Wall  Rockery > 4′ High  Structural on Steep Slope  Other _______________________________ Part 17 SIGNATURE OF PROFESSIONAL ENGINEER I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were incorporated into this worksheet and the attached Technical Information Report. To the best of my knowledge the information provided here is accurate. ____________________________________________________________________________________ Signed/Date N/A N/A 2025-05-08 Borealis – City of Renton Appendix B Appendix B Existing and Proposed Conditions Map Drainage Sub Basins COR GIS Map USDA Soil Map 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. OWNER: UNICO LONGACRES NORTH BUILD ADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 OWNER: UNICO LONGACRES NORTH BUILDADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 OWNER: UNICO LONGACRES NORTH BUILDADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 PARCEL A PARCEL A PARCEL B PARCEL B PARCEL B OWNER: UNICO LONGACRES NORTH BUILDADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 OWNER: CITY OF RENTONADDRESS: SW 16TH STPARCEL NO.: 242304-9138 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. 3 - STORY STRUCTURAL STEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. SW 16TH ST SW 16 T H S T OA K S D A L E A V E S W L O N G A C R E S D R S W BOREALIS SITE SURFACE AREA (SF) IMPERVIOUS AREA 1,368 PERVIOUS AREA 817 TOTAL ON-SITE AREA 2,185-SF 0.05-AC LIMITS OF WORK 0 1 inch = 60 feet 30'60'120' BOREALIS EXISTING CONDITIONS MAY 2025 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. OWNER: UNICO LONGACRES NORTH BUILD ADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 OWNER: UNICO LONGACRES NORTH BUILDADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 OWNER: UNICO LONGACRES NORTH BUILDADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 PARCEL A PARCEL A PARCEL B PARCEL B PARCEL B OWNER: UNICO LONGACRES NORTH BUILDADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 OWNER: CITY OF RENTONADDRESS: SW 16TH STPARCEL NO.: 242304-9138 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. 3 - STORY STRUCTURAL STEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. SW 16TH ST SW 16 T H S T OA K S D A L E A V E S W L O N G A C R E S D R S W BOREALIS SITE MAINTENANCE & UTILITY IMPROVEMENTS SURFACE AREA (SF) NPGIS 1,314 PGIS 54 PGPS 817 TOTAL ON-SITE AREA 2,185-SF 0.05-AC LIMITS OF WORK 0 1 inch = 60 feet 30'60'120' BOREALIS PROPOSED CONDITIONS MAY 2025 9,028 752 WGS_1984_Web_Mercator_Auxiliary_Sphere COR GIS Map Notes None Legend 512 0 256 512 Feet All data, information, and maps are provided "as is" without warranty or any representation of accuracy, timeliness of completeness. The burden for determining accuracy, completeness, timeliness, merchantability and fitness for or the appropriateness for use rests solely on the user. Pump Station Public Pump Station Private Pump Station Discharge Point Public Discharge Point Private Discharge Point Pipe Public Pipe Private Pipe Public Culvert Private Culvert Public Roofdrain Private Roofdrain Open Drains Facility Outline Vegetated Non-Vegetated Facility Transfer Drainage Sub Basin Black River Boren Creek Cabbage Creek Cedar Grove Cedar Main Urban China Creek Country Creek Duamish East Fork May Creek Garrison Creek Ginger Creek Greenes Creek Gypsy Honey Creek Jenkins Creek Main Lake Kathleen Lake Washington - East Lake Washington - West Johns Creek Lake Washington South Little Soos Creek Long Marsh Creek Lower May Creek Madsen Creek Maplewood Creek COR GIS Map - Drainage Sub Basins Project Site Soil Map—King County Area, Washington Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/12/2025 Page 1 of 3 52 5 5 8 0 0 52 5 6 2 0 0 52 5 6 6 0 0 52 5 7 0 0 0 52 5 7 4 0 0 52 5 7 8 0 0 52 5 8 2 0 0 52 5 5 8 0 0 52 5 6 2 0 0 52 5 6 6 0 0 52 5 7 0 0 0 52 5 7 4 0 0 52 5 7 8 0 0 52 5 8 2 0 0 555700 556100 556500 556900 557300 557700 558100 558500 558900 559300 559700 555700 556100 556500 556900 557300 557700 558100 558500 558900 559300 559700 47° 28' 35'' N 12 2 ° 1 5 ' 4 3 ' ' W 47° 28' 35'' N 12 2 ° 1 2 ' 1 9 ' ' W 47° 27' 5'' N 12 2 ° 1 5 ' 4 3 ' ' W 47° 27' 5'' N 12 2 ° 1 2 ' 1 9 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84 0 500 1000 2000 3000 Feet 0 250 500 1000 1500 Meters Map Scale: 1:19,600 if printed on A landscape (11" x 8.5") sheet. Project Site MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: King County Area, Washington Survey Area Data: Version 20, Aug 27, 2024 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 31, 2022—Aug 8, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—King County Area, Washington Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/12/2025 Page 2 of 3 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 988 Urban land, 0 to 5 percent slopes 166.9 10.2% 999 Water, fresh 1.0 0.1% 3056 Urban land-Alderwood complex, 5 to 12 percent slopes 42.4 2.6% 3057 Urban land-Alderwood complex, 12 to 35 percent slopes 54.1 3.3% 3059 Alderwood-Everett-Urban land complex, 12 to 35 percent slopes 2.7 0.2% 3063 Alderwood-Everett complex, 35 to 60 percent slopes 13.2 0.8% AgC Alderwood gravelly sandy loam, 8 to 15 percent slopes 19.2 1.2% AgD Alderwood gravelly sandy loam, 15 to 30 percent slopes 5.4 0.3% BeC Beausite gravelly sandy loam, 6 to 15 percent slopes 110.6 6.8% BeD Beausite gravelly sandy loam, 15 to 30 percent slopes 21.3 1.3% Ng Newberg silt loam 84.2 5.1% Pu Puget silty clay loam 97.1 5.9% Py Puyallup fine sandy loam 55.4 3.4% Sk Seattle muck 6.3 0.4% So Snohomish silt loam 20.8 1.3% Tu Tukwila muck 25.2 1.5% Ur Urban land 697.6 42.7% W Water 27.3 1.7% Wo Woodinville silt loam 184.5 11.3% Totals for Area of Interest 1,635.2 100.0% Soil Map—King County Area, Washington Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/12/2025 Page 3 of 3 Borealis – City of Renton Appendix C Appendix C Drainage Review Flow Chart Critical Areas COR GIS Map SECTION 1.1 DRAINAGE REVIEW 6/22/2022 2022 City of Renton Surface Water Design Manual 1-14 FIGURE 1.1.2.A FLOW CHART FOR DETERMINING TYPE OF DRAINAGE REVIEW REQUIRED 1.1.2 DRAINAGE REVIEW TYPES AND REQUIREMENTS 2022 City of Renton Surface Water Design Manual 6/22/2022 1-15 TABLE 1.1.2.A REQUIREMENTS APPLIED UNDER EACH DRAINAGE REVIEW TYPE Simplified Single family residential projects that result in 2,000 sf of new plus replaced impervious surface or 7,000 sf of land disturbing activity but do not exceed the new plus replaced PGIS, new PGPS, and new pervious surface thresholds specified in Sec. 1.1.2.1. Note: The project may also be subject to Targeted Drainage Review. Directed Single family residential projects that result in 2,000 sf of new plus replaced impervious surface or 7,000 sf of land disturbing activity that are not subject to Simplified Drainage Review or Large Project Drainage Review. The project may also be subject to Targeted Drainage Review. Targeted New and redevelopment projects that are not subject to Directed, Full or Large Project Drainage Review, AND have characteristics of one or more of the following categories of projects: 1. Projects containing or adjacent to a flood, erosion, or steep slope hazard area; or projects within a Landslide Hazard Drainage Area or Aquifer Protection Area. 2. Projects that construct or modify a drainage pipe/ditch that is 12″ or larger or receive runoff from a 12″ or larger drainage pipe/ditch. 3. Redevelopment projects with $100,000 in improvements to a high-use site.(1) Full All projects that result in 2,000 sf of new plus replaced impervious surface or 7,000 sf of land disturbing activity but are not subject to Simplified Drainage Review, Directed Drainage Review, OR Large Project Drainage Review. Large Project Projects that result in 50 acres of new impervious surface within a subbasin or multiple subbasins that are hydraulically connected. DRAINAGE REVIEW TYPE Simplified Directed Targeted Full Large Project Categ 1 Categ 2 Categ 3 SIMPLIFIED DRAINAGE REQUIREMENTS SEE NOTE 4 CORE REQUIREMENT #1 Discharge at Natural Location (4)  (2,3) *(2)    CORE REQUIREMENT #2 Offsite Analysis (4)  (2,3) *(2) (3) (3) (3) CORE REQUIREMENT #3 Flow Control Facilities (4)  (2,3) *(2) (3) (3) CORE REQUIREMENT #4 Conveyance System (4)  (2,3) *(2)    CORE REQUIREMENT #5 Construction Stormwater Pollution Prevention (4)  (2,3)      CORE REQUIREMENT #6 Maintenance & Operations (4)  (2,3) *(2)     CORE REQUIREMENT #7 Financial Guarantees & Liability (4)  (2,3) *(2) (3) (3) (3) (3) CORE REQUIREMENT #8 Water Quality Facilities (4)  (2,3) *(2) (3) (3) CORE REQUIREMENT #9 On-site BMPs (4)    SECTION 1.1 DRAINAGE REVIEW 6/22/2022 2022 City of Renton Surface Water Design Manual 1-16 TABLE 1.1.2.A REQUIREMENTS APPLIED UNDER EACH DRAINAGE REVIEW TYPE DRAINAGE REVIEW TYPE Simplified Directed Targeted Full Large Project Categ 1 Categ 2 Categ 3 SPECIAL REQUIREMENT #1 Other Adopted Area-Specific Requirements (4)  (2,3) (3) (3) (3) SPECIAL REQUIREMENT #2 Flood Hazard Area Delineation (4)  (2,3) (3) (3) (3) SPECIAL REQUIREMENT #3 Flood Protection Facilities (4)  (2,3) (3) (3) (3) SPECIAL REQUIREMENT #4 Source Control (4)  (2,3) (3) (3) (3) (3) (3) SPECIAL REQUIREMENT #5 Oil Control (4)  (2,3) (3) (3) (3) SPECIAL REQUIREMENT #6 Aquifer Protection Areas  (2,3) (3) (3) (3) (3) (3) (1) Category 3 projects installing oil controls that construct or modify a 12-inch pipe/ditch are also Category 2 projects. (2) May be applied by CED based on project or site-specific conditions. Documentation of compliance required. (3) These requirements have exemptions or thresholds that may preclude or limit their application to a specific project. (4) A proposed project subject to Simplified Drainage Review that complies with the Simplified drainage requirements detailed in Appendix C is presumed to comply with all the core and special requirements in Sections 1.2 and 1.3 except those requirements that would apply to the project if it is subject to Targeted Drainage Review as specified in Section 1.1.2.2. 1.1.2.1 SIMPLIFIED DRAINAGE REVIEW Simplified Drainage Review is for small residential building projects or clearing projects that meet the threshold requirements below. The core and special requirements applied under Full Drainage Review are replaced with simplified drainage requirements that can be applied by a non-engineer. These requirements include simple stormwater dispersion, infiltration, and site design techniques called flow control Best Management Practices (BMPs), which provide the necessary mitigation of flow and water quality impacts for small projects. Also included are simple measures for erosion and sediment control (ESC). This simplified form of drainage review acknowledges that drainage impacts for many small project proposals can be effectively mitigated without construction of costly flow control and water quality facilities. The Simplified Drainage Review process minimizes the time and effort required to design, submit, review, and approve drainage facilities for these proposals. In most cases, the requirements can be met with submittals prepared by contractors, architects, or homeowners without the involvement of a civil engineer. Note: some projects subject to Simplified Drainage Review may also require Targeted Drainage Review if they meet any of the threshold criteria in Section 1.1.2.2. Threshold Simplified Drainage Review is required for any single family residential project that will result in 2,000 square feet8 or more of new impervious surface, replaced impervious surface, or new plus replaced 8 The thresholds of 2,000 and 7,000 square feet shall be applied by project site. All other thresholds specified in terms of square feet of impervious or pervious surface shall be applied by threshold discharge area and in accordance with the definitions of these surfaces in Section 1.1. Note: the calculation of total impervious surface may exclude any such added impervious surface that is confirmed by CED staff to be already mitigated by a City approved and inspected flow control facility or on-site BMP. 9,028 752 WGS_1984_Web_Mercator_Auxiliary_Sphere COR GIS Map Notes None Legend 512 0 256 512 Feet All data, information, and maps are provided "as is" without warranty or any representation of accuracy, timeliness of completeness. The burden for determining accuracy, completeness, timeliness, merchantability and fitness for or the appropriateness for use rests solely on the user. City and County Labels Parcels City and County Boundary Renton <all other values> Wellhead Protection Area Zones Zone 1 Zone 1 Modified Zone 2 Coalmines High Moderate Unclassified Erosion Hazard - High Floodway Special Flood Hazard Areas (100 year flood) Landslide Very High High Moderate Unclassified Slope City of Renton >15% & <=25% >25% & <=40% (Sensitive) >40% & <=90% (Protected) >90% (Protected) Environment Designations Natural Shoreline High Intensity Shoreline Isolated High Intensity Shoreline Residential Urban Conservancy Jurisdictions Streams (Classified) S - Shoreline F - Fish Np - Non-Fish Ns - Non-Fish Seasonal Unclassfied Wetlands Seismic Hazard Areas Faults Streets 2023.sid Project site COR GIS Map - Critical Areas Borealis – City of Renton Appendix D Appendix D Civil Plans SOUTHCENTER MALL SW GR A D Y WAY TUKWILA PKWY SO U T H C E N T E R P K W Y 6 5 T H A V E S W V A L L E Y H W Y OA K E S D A L E A V E S W O A K E S D A L E A V E S W FORT DENT PARK I N T E R U R B A N A V E S LO N G A C R E S DR S W SW 16TH ST M O N S T E R R D S W GR E E N R I V E R 1815 405 SITE IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION COVER SHEET INDEX SHEET NO.SHEET NO.DWG TITLE C100 COVER C101 NOTES C102 NOTES C200 CIVIL OVERVIEW PLAN C300 DEMO AND TESC ENLARGEMENTS C301 DEMO AND TESC ENLARGEMENTS C302 DEMO AND TESC ENLARGEMENTS C310 DEMO AND TESC DETAILS C400 CIVIL ENLARGEMENTS C401 CIVIL ENLARGEMENTS C402 CIVIL ENLARGEMENTS C403 CIVIL ENLARGEMENTS C500 CIVIL DETAILS C600 ELECTRIAL SITE PLAN PROJECT BOREALIS CIVIL PERMIT #C25001530 RENTON, WASHINGTON PROJECT INFORMATION PROJECT ADDRESS: 1301 SW 16TH STREET, SUITE 2501 RENTON, WASHINGTON 98057 PROPERTY ID: BOEING LONGACRES PARK 25-01 LONGACRES NORTH BUILD OFFICE PARK - PARCEL ID #2423049022. CITY OF RENTON MUNICIPAL CODE ZONING: CO-COMMERCIAL OFFICE. PROJECT TEAM OWNER ALASKA AIRLINES, INC. 19300 INTERNATIONAL BOULEVARD SEATAC, WA 98188 OWNER'S REPRENSENTATIVE SENECA GROUP 1191 2ND AVENUE #1500 SEATTLE, WA 98101 ARCHITECT ENGINEER NBBJ 223 YALE AVENUE NORTH SEATTLE, WA 98109 CIVIL ENGINEER KPFF CONSULTING ENGINEERS 1601 FIFTH AVENUE, SUITE 1600 SEATTLE, WA 98101 ELECTRICAL ENGINEER STANTEC 720 3RD AVENUE SUITE 1500 SEATTLE, WA98104 VICINITY MAP SCALE: 1" = 1000' 1 2 3 4 5 6 7 8 9 10 11 12 13 14 CONTRACTOR IS ALERTED TO THE FACT THAT WORK WILL BE ACCOMPLISHED AROUND ENERGIZED PUGET SOUND ENERGY (PSE) FACILITIES THAT ARE SERVING EXISTING CUSTOMERS. CONTRACTOR SHALL COORDINATE WITH PSE TO DETERMINE WHICH FACILITIES ARE ACTIVE AND ENERGIZED AND SHALL IMPLEMENT SAFETY PROCEDURES PER PSE REQUIREMENTS. CONTRACTOR SHALL COORDINATE WITH PSE TO ENSURE THAT FACILITIES ARE IN PLACE TO MAINTAIN SERVICE TO CUSTOMERS THROUGHOUT CONSTRUCTION. EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES: (COR STANDARD PLAN 268.00) 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE- CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT' S CONTRACTOR. 2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. 3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST- PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK- OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. 6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF- SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON- SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS. 7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/ OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/ OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON- SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON- SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. 8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. 9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES. 11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY. 14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY. 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216. 30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION. 17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT- LADEN WATER INTO THE DOWNSTREAM SYSTEM. 18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 19.AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON- SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION. 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. 21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT- LADEN WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON- SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST. 22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS- OF- WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS- OF- WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION NOTES CITY OF RENTON SURFACE WATER STANDARD NOTES: (COR STANDARD PLAN 267.00 AND 267.10) 1.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE- CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT' S CONTRACTOR. 2.THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY, STATE, AND FEDERAL PERMITS PRIOR TO CONSTRUCTION. 3.ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL ( RENTON SWDM), RENTON MUNICIPAL CODE ( RMC), AND THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION ( APWA). IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT TO CORRECT ANY ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO THE CITY. 4.APPROVAL OF THE ROAD, GRADING, PARKING, BUILDING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AS APPROVAL OF ANY OTHER CONSTRUCTION ( E.G. WATER, SEWER, GAS, ELECTRICAL. ETC.). PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION. THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE COORDINATION FOLLOWED BY WRITTEN APPROVAL FROM THE CITY. 5.A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 6.THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHALL THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE APPLICANT' S CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE APPLICANT SHALL RECORD ON THE AS- BUILT DRAWINGS ALL UNDOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TO THE APPROVED PLANS. THE APPLICANT SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD IF A CONFLICT EXISTS. 7.VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL DATUM SHALL BE NAD 83 ( WA STATE PLANE, NORTH), UNLESS OTHERWISE APPROVED BY THE CITY. REFERENCE BENCHMARK, DATUM, AND ELEVATIONS SHALL BE NOTED ON THE PLANS. 8.ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY PER SECTION 2-03.3(14)D - COMPACTION AND MOISTURE CONTROL TESTS OF THE WSDOT STANDARD SPECIFICATIONS. IN PERMEABLE PAVEMENT AND OTHER INFILTRATION AREAS, ALL TRENCH BACKFILL SHALL BE FIRM AND UNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO MORE THAN 92% OF MAXIMUM DRY DENSITY. 9.OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY TRENCH RESTORATION STANDARDS. 10.ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START OF CONSTRUCTION. WHERE SHOWN ON THE PLANS OR WHERE DIRECTED BY THE CITY, THE EXISTING MANHOLES, CATCH BASINS, OR INLETS SHALL BE ADJUSTED TO THE GRADE AS STAKED. 11.ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO, OR IN CONJUNCTION WITH, ANY CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE CITY. 12.ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND BACKFILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN 220. 00, 220. 10, AND 220. 20. 13.STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR 5 INSIDE AND OUTSIDE. 14.ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED WITH DUCTILE IRON, BOLT- LOCKING LIDS PER THE CITY STANDARD PLAN 204. 10, 204. 20, 204. 30, 204. 40, AND 204. 50. STRUCTURES SHALL HAVE: ·RECTANGULAR OR ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND OUTSIDE OF THE ROADWAY. ·ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND LOCATED WITHIN THE ROADWAY, BUT OUTSIDE OF THE CURB/ GUTTER LINE. ·ROUND, SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC RIGHT- OF- WAY OR IN AN EASEMENT TO THE CITY. PRIVATE STRUCTURE LIDS OUTSIDE PUBLIC RIGHT- OF- WAY AND EASEMENTS TO THE CITY SHALL NOT DISPLAY THE CITY LOGO. 15.BUILDINGS AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES OF THE RENTON SWDM. 16.LIDS OF MANHOLES/ CATCH BASINS WITHIN PUBLIC RIGHT- OF- WAY SHALL NOT BE ADJUSTED TO FINAL GRADE UNTIL AFTER PAVING. ALL MANHOLE/ CATCH BASIN RIMS SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED GRADES, UNLESS OTHERWISE SHOWN. 17.ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT- OF- WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE DRIVEWAY TO THE BOTTOM OF THE DITCH. 18.ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A MINIMUM DEPTH OF ONE (1) FOOT AND SHALL MEET THE FOLLOWING SPECIFICATIONS: •4 - 8 INCH ROCK / 40 - 70% PASSING; •2 - 4 INCH ROCK / 30 - 40% PASSING; AND •LESS THAN 2 INCH ROCK / 10 - 20% PASSING. 19.FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE INTERCONNECTED AND SHALL SEPARATELY CONVEY COLLECTED FLOWS TO THE CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE, UNLESS APPROVED BY THE CITY. FOOTING DRAINS SHALL NOT BE CONNECTED TO ON- SITE BMPS. 20.THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED WITH A BOLT- LOCKING LID MARKED " STORM” OR " DRAIN" SHALL BE LOCATED AT THE PROPERTY LINE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM PER THE CITY STANDARD PLAN 227. 00. 21.ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR LICENSED IN WASHINGTON STATE, AND CUT SHEETS SHALL BE PROVIDED TO THE CITY PRIOR TO CONSTRUCTION. 22.ALL NEWLY- INSTALLED AND NEWLY- REHABILITATED ( PUBLIC AND PRIVATE) STORM CONVEYANCE SYSTEMS SHALL BE INSPECTED BY MEANS OF REMOTE CCTV ACCORDING TO THE CITY STANDARD PLAN 266. 00. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS AND/ OR PAVEMENT. 23.ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN ACCORDANCE WITH SECTION 7-04.3(1) OF THE WSDOT STANDARD SPECIFICATIONS AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY. STORM DRAIN STUBS SHALL BE TESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS TESTED. 24.FOR ALL DISTURBED PERVIOUS AREAS ( COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL EITHER STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN 264. 00. 25.ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE APPLICANT OF THE CONTINUING LEGAL OBLIGATION AND/ OR LIABILITY CONNECTED WITH STORMWATER DISPOSAL. THE CITY DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM SYSTEM PROVIDED DURING CONSTRUCTION. 26.ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER ACTIONS NEEDED TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED RIGHT- OF- WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-10 TEMPORARY TRAFFIC CONTROL SHALL APPLY. 27.PROJECTS LOCATED WITHIN THE CITY' S AQUIFER PROTECTION AREA ( APA) SHALL COMPLY WITH SPECIAL REQUIREMENT # 6 OF THE RENTON SWDM AND AQUIFER PROTECTION REGULATIONS ( RMC 4-3-050). 28.PLACEMENT OF SURFACE APPURTENANCES ( CATCH BASIN/ MANHOLE LIDS, CLEANOUTS, INLETS, ETC.) IN THE STREET TRAVEL LANE WHEEL PATH, INTERSECTIONS OF STREET TRAVEL LANES, BIKE LANES, SIDEWALKS, AND CROSSWALKS SHALL BE AVOIDED WHENEVER POSSIBLE. ANY SURFACE APPURTENANCE PLACED IN A SIDEWALK OR CROSSWALK SHALL BE FITTED WITH A NON- SLIP OR NON- SKID LID PER ADA REQUIREMENTS. 29.CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS SHALL BE MAINTAINED BY THE APPLICANT. 30.MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1.A2 OF THE RENTON SWDM. 31.CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A MINIMUM RATE OF 20 INCHES PER HOUR IMMEDIATELY AFTER THE PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES. COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO CONSTRUCTION APPROVAL OF THE PAVEMENT. COMPLIANCE MAY BE CHECKED USING A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF WATER IS POURED ONTO THE PAVEMENT SURFACE ALL AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS OR RUNS OFF THE SURFACE, THEN THE PAVEMENT IS CONSIDERED TO MEET THE MINIMUM RATE OF ABSORPTION. AT LEAST ONE TEST SHALL BE CONDUCTED PER 1,000 SQUARE FEET OF PERMEABLE PAVEMENT. IF THIS TEST IS NOT CONCLUSIVE, THEN ANOTHER TEST PER ASTM C1701 SHALL BE CONDUCTED. FOR LARGE AREAS ( E.G., PARKING AREAS), TESTING OBSERVATION MAY BE ACCOMPLISHED WHILE WALKING BEHIND A SLOWLY MOVING WATER TRUCK DISCHARGING WATER AT A RATE SIMILAR TO THE BUCKET TEST. PERMEABLE PAVERS SHALL BE TESTED USING ASTM C1781. CITY OF RENTON CCTV INSPECTION STANDARD NOTES: 1.ALL NEWLY- INSTALLED AND NEWLY- REHABILITATED ( PUBLIC AND PRIVATE) SANITARY SEWER AND STORM DRAIN MAIN LINES SHALL BE INSPECTED BY MEANS OF REMOTE CCTV. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY OF RENTON INSPECTOR ASSIGNED TO THE PROJECT PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS, AND/ OR PAVEMENT. 2.THE CONTRACTOR SHALL PERFORM ALL CCTV INSPECTIONS IN ACCORDANCE WITH THE NATIONAL ASSOCIATION OF SEWER SERVICE COMPANIES ( NASSCO) PIPELINE ASSESSMENT CERTIFICATION PROGRAM ( PACP). 3.ALL CCTV OPERATORS SHALL HAVE CURRENT NASSCO PACP CERTIFICATION. 4.CCTV INSPECTIONS SHALL BE RECORDED IN A GRANITENET COMPATIBLE FORMAT DATABASE USING THE LATEST SOFTWARE VERSION AND SUBMITTED WITH ELECTRONIC LINKS BETWEEN THE DATA AND THE VIDEO ON AN EXTERNAL HDD, DVD, OR FLASH DRIVE. 5.ALL CCTV INSPECTION REPORTS SHALL BE WITHIN +/- TWO ( 2) FEET OF THE MEASURED LINEAR FOOTAGE BETWEEN MANHOLES ALONG THE EXISTING PIPELINE CENTERLINE FROM THE START OF PIPE TO END OF PIPE. 6.ALL OWNER AND PACP REQUIRED HEADER INFORMATION MUST BE FULLY AND ACCURATELY ENTERED ON ALL CCTV REPORTS. WORK NOT FOLLOWING THESE SPECIFICATIONS WILL BE REJECTED AND THE CONTRACTOR SHALL BE REQUIRED TO RE- CCTV THE WORK. 7.THE DOCUMENTATION OF THE WORK SHALL CONSIST OF PACP CCTV REPORTS, PACP DATABASE, LOGS, ELECTRONIC REPORTS, ETC. NOTING IMPORTANT FEATURES ENCOUNTERED DURING THE INSPECTION. THE SPEED OF TRAVEL SHALL BE SLOW ENOUGH TO INSPECT EACH PIPE JOINT, TEE CONNECTION, STRUCTURAL DETERIORATION, INFILTRATION AND INFLOW SOURCES, AND DEPOSITS, BUT SHOULD NOT, AT ANY TIME, BE FASTER THAN 30 FEET PER MINUTE, EXCEPT AS NOTED OTHERWISE IN THIS DOCUMENT. 8.THE CAMERA MUST BE CENTERED IN THE PIPE TO PROVIDE ACCURATE DISTANCE MEASUREMENTS TO PROVIDE LOCATIONS OF FEATURES IN THE SEWER AND THESE FOOTAGE MEASUREMENTS SHALL BE DISPLAYED AND DOCUMENTED ON THE VIDEO. ALL PACP OBSERVATIONS SHALL BE IDENTIFIED BY AUDIO AND ON A PACP LOG. ALL VIDEO MUST BE CONTINUOUSLY METERED FROM MANHOLE TO MANHOLE. ALL VIDEO RECORDING SHALL BE CONTINUOUS FROM STRUCTURE TO STRUCTURE WITH NO " PAUSING" OF THE VIDEO RECORDING DURING EACH PIPELINE INSPECTION. THE PIPE SHALL BE CLEANED PRIOR TO THE CCTV INSPECTION TO ENSURE ALL DEFECTS, FEATURE, AND OBSERVATIONS ARE SEEN AND LOGGED. 9.JUST PRIOR TO BEGINNING THE CCTV INSPECTION, WHILE THE CCTV CAMERA IS IN PLACE AND RECORDING, WATER ( CONTAINING DYE) SHALL BE INTRODUCED INTO THE UPSTREAM MANHOLE OF EACH PIPE SEGMENT UNTIL IT IS OBSERVED AND RECORDED FLOWING PAST THE CAMERA' S FIELD OF VISION IN ITS ENTIRETY. 10.THE CCTV CAMERA SHALL HAVE A WATER- LEVEL MEASURING DEVICE ( BALL, CYLINDER, ETC.) ATTACHED THAT HAS 1/4" MARKINGS TO SHOW THE DEPTH OF WATER IN THE PIPE DURING THE CCTV INSPECTION. 11.ALL MANHOLES SHALL BE CHANNELED AND COATED PRIOR TO CCTV INSPECTION. 12.PER CITY OF RENTON SPECIFICATION 7-08. 3(2)B, SEWER AND STORM DRAIN PIPELINE SHALL HAVE NO MORE THAN 1/2" OF PONDING TO BE CONSIDERED ACCEPTABLE. BASIS OF DESIGN: CIVIL DESIGN IS BASED ON THE FOLLOWING DOCUMENTS: TOPOGRAPHIC SURVEY PROVIDED BY BRH, DATED 2024-10-06 IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION NOTES 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA: ±190,693 SQ. FT. OWNER: UNICO LONGACRES NORTH BUILDADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 OWNER: UNICO LONGACRES NORTH BUILD ADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 OWNER: UNICO LONGACRES NORTH BUILDADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 PARCE L A PARCEL A PARCEL B PARCEL B PARCEL B OWNER: UNICO LONGACRES NORTH BUILDADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 OWNER: CITY OF RENTON ADDRESS: SW 16TH STPARCEL NO.: 242304-9138 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. 3 - STORY STRUCTURALSTEEL BUILDINGFOOTPRINT AREA:±190,693 SQ. FT. SW 16TH ST SW 16 T H S T OA K S D A L E A V E S W L O N G A C R E S D R S W MAIN ENTRANCE ENLARGEMENT EV CHARGING STALLS ENLARGEMENT 3 C301, C402 2 C300, C401 1 C300, C400 FOOD TRUCK ACCESS PATH ENLARGEMENT SIGNAGE ENLARGEMENT 4 C302, C403 LEGEND: RIGHT-OF-WAY LINE LIMITS OF WORK 0 1 inch = 60 feet 30'60'120' NOTES: 1.REFER TO C100 AND C101 FOR GENERAL NOTES. 2.CONTRACTOR SHALL CONFIRM POC'S, LOCATION, AND ELEVATIONS WHEN CONNECTING TO EXISTING SYSTEMS AND GRADES. NOTIFY ENGINEER OF ANY DISCREPANCIES. 3.REFER TO ELECTRICAL PERMIT FOR PSE AND ELECTRICAL INFRASTRUCTURE. 4.PRIOR TO DEMOLITION, CONTRACTOR SHALL FIELD VERIFY AND LOCATE ALL EXISTING UTILITIES TO REMAIN WITHIN AND ADJACENT TO LIMIT OF WORK. 5.ALL EXISTING PAVEMENT STRIPING DISTURBED DURING CONSTRUCTION SHALL BE REPLACED IN KIND. PRODUCTS SHALL BE PER CITY OF RENTON PUBLIC WORKS DEPARTMENT STANDARD PLANS AND SPECIFICATIONS, AND WSDOT STANDARD PLANS AND SPECIFICATIONS. 6.FULL DEPTH PAVEMENT REPLACEMENT, AND TRENCH RESTORATION AT UTILITY CUTS, SHALL BE PER CITY OF RENTON STD DETAILS. PAVEMENT SECTION SHALL BE PER CITY OF RENTON STD. PLAN 101, OR MATCH EXISTING WHICHEVER IS GREATER. 7.THE BOREALIS PROJECT IS REQUIRED TO MEET STORMWATER REQUIREMENTS PER THE 2022 CITY OF RENTON SURFACE WATER DESIGN MANUAL (RSWDM). PROJECT SITE PARCEL IS FULLY LOCATED WITHIN THE SPECIAL FLOOD HAZARD ARAE (SFHA) PER FEMA FIRM MAP. THEREFORE, THE PROJECT IS REQUIRED TO MEET FLOOD PLAIN REQUIREMENTS. ALL THE IMPROVEMENTS ARE ABOVE THE BASE FLOOD ELEVATION (BFE). 8.ALL REGULATORY SIGNAGE AND PAVEMENT STRIPING SHALL CONFORM TO CITY OF RENTON AND MUTCD SPECIFICATIONS. IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION CIVIL OVERVIEW PLAN LEGEND: RIGHT-OF-WAY LINE CONSTRUCTION FENCE TREE PROTECTION FENCE STRAW WATTLE CATCH BASIN INSERT REMOVE FULL DEPTH CONCRETE PAVING REMOVE LANDSCAPE REMOVE ASPHALT SAWCUT LINE DEMOLISH EXISTING CURB CB INLET PROTECTION (TYP) 1 C310 SAWCUT TO NEAREST JOINT (TYP) REMOVE CONCRETE SIDEWALK (TYP) EXISTING BUILDING OUTLINE (TYP) EXISTING BUILDING OVERHANG (TYP) DEMO EXISTING CURB (TYP) REMOVE LANDSCAPE (TYP) PROTECT EXISTING TREE 3 C310 SAWCUT TO NEAREST JOINT (TYP) CONSTRUCTION FENCE (TYP) STRAW WATTLE (TYP) 2 C310 REMOVE CONCRETE SIDEWALK (TYP) EXISTING BUILDING OUTLINE (TYP) EXISTING PARKING (TYP) EXISTING BUILDING OVERHANG (TYP) DEMO EXISTING CURB (TYP) ENTRY CIRCLE 0 1 inch = 10 feet 5'10'20' 1 C200 MAIN ENTRANCE ENLARGEMENT SCALE: 1" = 10' 2 C200 FOOD TRUCK ACCESS PATH ENLARGEMENT SCALE: 1" = 10' NOTES: 1.CONTRACTOR SHALL OBTAIN AND PAY FOR NECESSARY PERMITS TO EXECUTE DEMOLITION, INCLUDING PERMIT TO USE PUBLIC WATER SUPPLY FOR DUST SUPPRESSION. 2.DEMOLITION SHALL BE IN CONFORMANCE WITH APPLICABLE REGULATION, CODES, AND DEMOLITION PERMIT REQUIREMENTS. 3.CONTRACTOR SHALL DISPOSE OF EXCESS DEMOLITION MATERIAL OFF-SITE IN A SAFE AND LEGAL MANNER. 4.MAKE VERTICAL SAWCUTS BETWEEN ALL EXISTING PAVEMENT TO REMAIN AND THE PORTION TO BE REMOVED. PROTECT PAVEMENT TO REMAIN OUTSIDE OF SAWCUT LINE. 5.CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL UTILITIES AND CONDUCT EXISTING BUILDING PRE-CONSTRUCTION SURVEYS, PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 6.CONTRACTOR SHALL PROVIDE TRAFFIC AND PEDESTRIAN REROUTES AS NECESSARY TO COMPLETE THE WORK, AND OBTAIN APPROVAL FROM THE CITY PRIOR TO BEGINNING WORK. 7.ANY DAMAGE RESULTING FROM PROJECT DEMOLITION ACTIVITIES TO EXISTING IMPROVEMENTS OR VEGETATION OUTSIDE OF WORK INDICATED ON PLAN SHALL BE REPAIRED/REPLACED IN KIND AT CONTRACTOR'S EXPENSE. 8.CONTRACTOR SHALL COORDINATE WITH ALL AFFECTED UTILITY PROVIDERS AND CITY TO KEEP ADJOINING PROPERTY SERVICES UNINTERRUPTED, AND TO PERFORM DEMOLITION ACTIVITIES IN ACCORDANCE TO APPLICABLE STANDARDS. 9.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT AND SEDIMENT LADEN RUNOFF FROM LEAVING THE SITE. CONTRACTOR SHALL ADJUST AND ADD BMPS AS NECESSARY TO ADDRESS FIELD CONDITIONS AND PROGRESSION OF WORK. EROSION AND SEDIMENT CONTROL MEASURES SHALL MEET COR REQUIREMENTS. TESC MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH COR. 10.REMOVE AND DISPOSE OF ALL TESC MEASURES AT THE COMPLETION OF THE PROJECT WHEN ALL DISTURBED AREAS HAVE BEEN FULLY AND FINALLY STABILIZED. 11.FENCE LIMITS SHOWN ARE APPROXIMATE AND SHALL BE ADJUSTED AS NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH THE WORK. PREVENT DISTURBANCE BEYOND THE LIMITS OF WORK. IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION DEMO AND TESC ENLARGEMENTS PROTECT EXISTING 8" SSS PROTECT EXISTING 8" SSS PROTECT EXISTING CTV SAWCUT TO NEAREST JOINT (TYP) REMOVE CONCRETE SIDEWALK (TYP) EXISTING BUILDING OUTLINE (TYP) EXISTING BUILDING OVERHANG (TYP) REMOVE LANDSCAPE (TYP) PROTECT EXISTING TREE TYP 3 C310 CONSTRUCTION FENCE (TYP) STRAW WATTLE (TYP) 2 C310 CB INLET PROTECTION (TYP) 1 C310 APROXIMATE LOCATION OF EXISTING TREE, TYP 1 LEGEND: RIGHT-OF-WAY LINE CONSTRUCTION FENCE TREE PROTECTION FENCE STRAW WATTLE CATCH BASIN INSERT REMOVE FULL DEPTH CONCRETE PAVING REMOVE LANDSCAPE REMOVE ASPHALT SAWCUT LINE DEMOLISH EXISTING CURB 0 1 inch = 10 feet 5'10'20' 3 C200 EV CHARGING STALLS ENLARGEMENT SCALE: 1" = 10' NOTES: 1.CONTRACTOR SHALL OBTAIN AND PAY FOR NECESSARY PERMITS TO EXECUTE DEMOLITION, INCLUDING PERMIT TO USE PUBLIC WATER SUPPLY FOR DUST SUPPRESSION. 2.DEMOLITION SHALL BE IN CONFORMANCE WITH APPLICABLE REGULATION, CODES, AND DEMOLITION PERMIT REQUIREMENTS. 3.CONTRACTOR SHALL DISPOSE OF EXCESS DEMOLITION MATERIAL OFF-SITE IN A SAFE AND LEGAL MANNER. 4.MAKE VERTICAL SAWCUTS BETWEEN ALL EXISTING PAVEMENT TO REMAIN AND THE PORTION TO BE REMOVED. PROTECT PAVEMENT TO REMAIN OUTSIDE OF SAWCUT LINE. 5.CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL UTILITIES AND CONDUCT EXISTING BUILDING PRE-CONSTRUCTION SURVEYS, PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 6.CONTRACTOR SHALL PROVIDE TRAFFIC AND PEDESTRIAN REROUTES AS NECESSARY TO COMPLETE THE WORK, AND OBTAIN APPROVAL FROM THE CITY PRIOR TO BEGINNING WORK. 7.ANY DAMAGE RESULTING FROM PROJECT DEMOLITION ACTIVITIES TO EXISTING IMPROVEMENTS OR VEGETATION OUTSIDE OF WORK INDICATED ON PLAN SHALL BE REPAIRED/REPLACED IN KIND AT CONTRACTOR'S EXPENSE. 8.CONTRACTOR SHALL COORDINATE WITH ALL AFFECTED UTILITY PROVIDERS AND CITY TO KEEP ADJOINING PROPERTY SERVICES UNINTERRUPTED, AND TO PERFORM DEMOLITION ACTIVITIES IN ACCORDANCE TO APPLICABLE STANDARDS. 9.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT AND SEDIMENT LADEN RUNOFF FROM LEAVING THE SITE. CONTRACTOR SHALL ADJUST AND ADD BMPS AS NECESSARY TO ADDRESS FIELD CONDITIONS AND PROGRESSION OF WORK. EROSION AND SEDIMENT CONTROL MEASURES SHALL MEET COR REQUIREMENTS. TESC MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH COR. 10.REMOVE AND DISPOSE OF ALL TESC MEASURES AT THE COMPLETION OF THE PROJECT WHEN ALL DISTURBED AREAS HAVE BEEN FULLY AND FINALLY STABILIZED. 11.FENCE LIMITS SHOWN ARE APPROXIMATE AND SHALL BE ADJUSTED AS NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH THE WORK. PREVENT DISTURBANCE BEYOND THE LIMITS OF WORK. DEMOLITION NOTES: CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF EXISTING TREES PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 1 IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION DEMO AND TESC ENLARGEMENTS OWNER: UNICO LONGACRES NORTH BUILD ADDRESS: 1301 SW 16TH ST PARCEL NO.: 242304-9022 SW 1 6 T H S T L O N G A C R E S D R S W REMOVE LANDSCAPE (TYP) PROTECT EXISTING TREES TYP 3 C310 CONSTRUCTION FENCE (TYP)STRAW WATTLE (TYP) 2 C310 PROVIDE CB INLET PROTECTION IN CBS ADJACENT TO WORK (TYP)1 C310 1 PROTECT EXISTING SIDEWALK AND LIGHT POLE (TYP) FUTURE ENTRY SIGN, APPROXIMATE LOCATION, UNDER SEPARATE PERMIT PROPERTY LINE (TYP) LEGEND: RIGHT-OF-WAY LINE CONSTRUCTION FENCE TREE PROTECTION FENCE STRAW WATTLE CATCH BASIN INSERT REMOVE FULL DEPTH CONCRETE PAVING REMOVE LANDSCAPE REMOVE ASPHALT SAWCUT LINE DEMOLISH EXISTING CURB 0 1 inch = 10 feet 5'10'20' 4 C200 SIGNAGE ENLARGEMENT SCALE: 1" = 10' IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION DEMO AND TESC ENLARGEMENTS NOTES: 1.CONTRACTOR SHALL OBTAIN AND PAY FOR NECESSARY PERMITS TO EXECUTE DEMOLITION, INCLUDING PERMIT TO USE PUBLIC WATER SUPPLY FOR DUST SUPPRESSION. 2.DEMOLITION SHALL BE IN CONFORMANCE WITH APPLICABLE REGULATION, CODES, AND DEMOLITION PERMIT REQUIREMENTS. 3.CONTRACTOR SHALL DISPOSE OF EXCESS DEMOLITION MATERIAL OFF-SITE IN A SAFE AND LEGAL MANNER. 4.MAKE VERTICAL SAWCUTS BETWEEN ALL EXISTING PAVEMENT TO REMAIN AND THE PORTION TO BE REMOVED. PROTECT PAVEMENT TO REMAIN OUTSIDE OF SAWCUT LINE. 5.CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL UTILITIES AND CONDUCT EXISTING BUILDING PRE-CONSTRUCTION SURVEYS, PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 6.CONTRACTOR SHALL PROVIDE TRAFFIC AND PEDESTRIAN REROUTES AS NECESSARY TO COMPLETE THE WORK, AND OBTAIN APPROVAL FROM THE CITY PRIOR TO BEGINNING WORK. 7.ANY DAMAGE RESULTING FROM PROJECT DEMOLITION ACTIVITIES TO EXISTING IMPROVEMENTS OR VEGETATION OUTSIDE OF WORK INDICATED ON PLAN SHALL BE REPAIRED/REPLACED IN KIND AT CONTRACTOR'S EXPENSE. 8.CONTRACTOR SHALL COORDINATE WITH ALL AFFECTED UTILITY PROVIDERS AND CITY TO KEEP ADJOINING PROPERTY SERVICES UNINTERRUPTED, AND TO PERFORM DEMOLITION ACTIVITIES IN ACCORDANCE TO APPLICABLE STANDARDS. 9.CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT AND SEDIMENT LADEN RUNOFF FROM LEAVING THE SITE. CONTRACTOR SHALL ADJUST AND ADD BMPS AS NECESSARY TO ADDRESS FIELD CONDITIONS AND PROGRESSION OF WORK. EROSION AND SEDIMENT CONTROL MEASURES SHALL MEET COR REQUIREMENTS. TESC MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH COR. 10.REMOVE AND DISPOSE OF ALL TESC MEASURES AT THE COMPLETION OF THE PROJECT WHEN ALL DISTURBED AREAS HAVE BEEN FULLY AND FINALLY STABILIZED. 11.FENCE LIMITS SHOWN ARE APPROXIMATE AND SHALL BE ADJUSTED AS NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH THE WORK. PREVENT DISTURBANCE BEYOND THE LIMITS OF WORK. DEMOLITION NOTES: CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF EXISTING TREES PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 1 1CATCH BASIN INSERT 2STRAW WATTLE 3TREE PROTECTION TREE PROTECTION MEASURES A.CONSTRUCTION STORAGE PROHIBITED: THE APPLICANT MAY NOT FILL, EXCAVATE, STACK OR STORE ANY EQUIPMENT, DISPOSE OF ANY MATERIALS, SUPPLIES OR FLUIDS, OPERATE ANY EQUIPMENT, INSTALL IMPERVIOUS SURFACES, OR COMPACT THE EARTH IN ANY WAY WITHIN THE AREA DEFINED BY THE DRIP LINE OF ANY TREE TO BE RETAINED. B.FENCED PROTECTION AREA REQUIRED: PRIOR TO DEVELOPMENT ACTIVITIES, THE APPLICANT SHALL ERECT AND MAINTAIN SIX-FOOT (6') HIGH CHAIN LINK TEMPORARY CONSTRUCTION FENCING AROUND THE DRIP LINES OF ALL RETAINED TREES OR AT A DISTANCE SURROUNDING THE TREE EQUAL TO ONE AND ONE-QUARTER FEET (1.25') FOR EVERY ONE INCH (1”) OF TRUNK CALIPER, WHICHEVER IS GREATER, OR ALONG THE PERIMETER OF A TREE PROTECTION TRACT. PLACARDS SHALL BE PLACED ON FENCING EVERY FIFTY FEET (50') INDICATING THE WORDS, “NO TRESPASSING - PROTECTED TREES,” OR ON EACH SIDE OF THE FENCING IF LESS THAN FIFTY FEET (50'). SITE ACCESS TO INDIVIDUALLY PROTECTED TREES OR GROUPS OF TREES SHALL BE FENCED AND SIGNED. INDIVIDUAL TREES SHALL BE FENCED ON FOUR (4) SIDES. IN ADDITION, THE APPLICANT SHALL PROVIDE SUPERVISION WHENEVER EQUIPMENT OR TRUCKS ARE MOVING NEAR TREES. C.PROTECTION FROM GRADE CHANGES: IF THE GRADE LEVEL ADJOINING TO A TREE TO BE RETAINED IS TO BE RAISED, THE APPLICANT SHALL CONSTRUCT A DRY ROCK WELL AROUND THE TREE. THE DIAMETER OF THIS WALL OR WELL MUST BE EQUAL TO THE TREE'S DRIP LINE. D.IMPERVIOUS SURFACES PROHIBITED WITHIN THE DRIP LINE: THE APPLICANT MAY NOT INSTALL IMPERVIOUS SURFACE MATERIAL WITHIN THE AREA DEFINED BY THE DRIP LINE OF ANY TREE TO BE RETAINED. E.RESTRICTIONS ON GRADING WITHIN THE DRIP LINES OF RETAINED TREES: THE GRADE LEVEL AROUND ANY TREE TO BE RETAINED MAY NOT BE LOWERED WITHIN THE GREATER OF THE FOLLOWING AREAS: (I) THE AREA DEFINED BY THE DRIP LINE OF THE TREE, OR (II) AN AREA AROUND THE TREE EQUAL TO ONE AND ONE-HALF FEET (1-1/2') IN DIAMETER FOR EACH ONE INCH (1”) OF TREE CALIPER. A LARGER TREE PROTECTION ZONE BASED ON TREE SIZE, SPECIES, SOIL, OR OTHER CONDITIONS MAY BE REQUIRED. F.MULCH LAYER REQUIRED: ALL AREAS WITHIN THE REQUIRED FENCING SHALL BE COVERED COMPLETELY AND EVENLY WITH A MINIMUM OF THREE INCHES (3”) OF BARK MULCH PRIOR TO INSTALLATION OF THE PROTECTIVE FENCING. EXCEPTIONS MAY BE APPROVED IF THE MULCH WILL ADVERSELY AFFECT PROTECTED GROUND COVER PLANTS. G.MONITORING REQUIRED DURING CONSTRUCTION: THE APPLICANT SHALL RETAIN A CERTIFIED ARBORIST OR LICENSED LANDSCAPE ARCHITECT TO ENSURE TREES ARE PROTECTED FROM THE DEVELOPMENT ACTIVITIES AND/OR TO PRUNE BRANCHES AND ROOTS, FERTILIZE, AND WATER AS APPROPRIATE FOR ANY TREES AND GROUND COVER THAT ARE TO BE RETAINED. TREE PROTECTION NOTES 1.6-FOOT HIGH TEMPORARY CHAIN LINK FENCE SHALL BE PLACED AT THE DRIPLINE OF THE TREE TO BE SAVED. FENCE SHALL COMPLETELY ENCIRCLE THE TREE(S). INSTALL FENCE POSTS USING PIER BLOCKS ONLY. AVOID DRIVING POSTS OR STAKES INTO MAJOR ROOTS. 2.FOR ROOTS OVER 1-INCH IN DIAMETER THAT ARE DAMAGED DURING CONSTRUCTION, MAKE A CLEAN, STRAIGHT CUT TO REMOVE THE DAMAGED PORTION. ALL EXPOSED ROOTS SHALL BE TEMPORARILY COVERED WITH DAMP BURLAP TO PREVENT DRYING, AND SHALL BE COVERED WITH SOIL AS SOON AS POSSIBLE. 3.WORK WITHIN PROTECTION FENCE SHALL BE DONE MANUALLY. NO STOCKPILING OF MATERIALS, VEHICULAR TRAFFIC, OR STORAGE OF EQUIPMENT OR MACHINERY SHALL BE ALLOWED WITHIN THE LIMIT OF THE FENCING. IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION DEMO AND TESC DETAILS NOTES: 1.REFER TO C100 AND C101 FOR GENERAL NOTES. 2.REFER TO C200 FOR PLAN NOTES. 1 2 BC 2 1 . 1 7 ± ( E X ) BC 21 . 0 7 ± ( E X ) TC 21 . 5 1 ± ( E X ) TC 2 1 . 5 4 ± ( E X ) TC 2 1 . 4 7 ± ( E X ) BC 2 1 . 0 7 ± ( E X ) BC 20 . 9 5 ± ( E X ) TC 21 . 3 6 ± ( E X ) TC 2 1 . 4 0 ± ( E X ) BC 2 0 . 9 8 ± ( E X ) 21.59 ± ( E X ) 21. 6 0 ± ( E X ) 21.60 ± ( E X ) 21. 6 0 ± ( E X ) 0. 6 2 % ± ( E X ) 0.05% ±(EX) 21.51 ± (EX) 40.0'20.3' PEDESTRIAN CONCRETE PAVEMENT (TYP) 12" WIDE CONCRETE CURB AND GUTTER. MATCH GRADES AT EXISTING SIDEWALK AND EXISTING FLOW LINE MATCH EXISTING GRADES AT EXIST PAVEMENT, TYP EXISTING BUILDING OUTLINE (TYP) EXISTING BUILDING OVERHEAD (TYP) 1. 0 0 % ± ( E X ) 1. 8 6 % ± ( E X ) 1. 5 5 % ± ( E X ) 12 . 9 ' ± TY P 0 1 inch = 10 feet 5'10'20' 1 C200 MAIN ENTRANCE ENLARGEMENT SCALE: 1" = 10' CONSTRUCTION NOTES: GRADE IN PLANAR FASHION BETWEEN SPOTS PROVIDED. REPLACE SIDEWALK SECTION PER COR STD PLAN 102. REPLACE EXISTING CURB PER COR STD PLAN 101, MATCH EXISTING DIMENSIONS FOR VISUAL CONSISTENCY. 1 2 IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT CIVIL ENLARGEMENTS LEGEND: PROPERTY LINE CONCRETE PAVEMENT NOTES: 1.REFER TO C100 AND C101 FOR GENERAL NOTES. 2.REFER TO C200 FOR PLAN NOTES. 1 20. 7 7 ± ( E X ) 20.85 ± ( E X ) 19.84 19. 9 3 BC 1 9 . 8 6 ± ( E X ) TC 2 0 . 3 5 ± ( E X ) 1.75% 1. 8 0 % 5. 0 ' 21.24 ± ( E X ) 21. 2 7 ± ( E X ) 21.32 ± ( E X ) 21.34 ± ( E X ) 20 . 3 4 20.5 4 ( G B ) 20. 3 9 1. 8 0 % 1.25%5.38% 5.38% 1. 8 0 % 1. 8 0 % 20. 4 5 ± ( E X ) 19.7 6 ( E X ) 19.97 (EX) 19.69 ± (EX) 2.24% 1.44% 2.18% 8.0'2.0' 20 . 4 3 REPLACE LANDSCAPE IN KIND (TYP) MATCH EXISTING GRADE AT EXISTING PAVEMENT AND LANDSCAPE (TYP) PEDESTRIAN CONCRETE PAVEMENT (TYP) 4' x 5' UPPER LANDING 4' x 5' LOWER LANDING EXISTING BUILDING OVERHANG (TYP) CONNECT CONDUIT TO PROPOSED ELEC OUTLET, REFER TO ELEC (1) - 2" PVC CONDUIT, REFER TO ELEC CONNECT CONDUIT TO EXISTING ELEC OUTLET, REFER TO ELEC 9. 0 ' 2.0' TYP 20.59 ± ( E X ) 20. 5 6 ± ( E X ) 1. 0 ' (T Y P ) 14.2'0. 6 1 % ± ( E X ) 0. 4 1 % ± ( E X ) 21. 2 8 ± ( E X ) 21.11 ± ( E X ) 21.12 ± ( E X ) 21.23 ± ( E X ) 2.00%± (EX) 1.75%± (EX) 1.75% 19.95 1.25% 1. 6 3 % ± ( E X ) MATCH EXISTING GRADE AT EXISTING LANDSCAPE (TYP) MATCH EXISTING GRADE AT EXISTING PAVEMENT (TYP) 20 . 4 8 B C 1 9 . 7 7 ± ( E X ) TC 20.20 ± (EX) 2.04% 1. 8 0 % 2 0 19 . 8 0 19. 8 9 4.2' 0 1 inch = feet 1.5'3'6' 3 2 C200 FOOD TRUCK ACCESS PATH ENLARGEMENT SCALE: 1" = 3' CONSTRUCTION NOTES: GRADE IN PLANAR FASHION BETWEEN SPOTS PROVIDED. REPLACE SIDEWALK SECTION PER COR STD PLAN 102 AND MATCH EXISTING HORIZONTAL DIMENSIONS. 1 IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT CIVIL ENLARGEMENTS LEGEND: PROPERTY LINE CONCRETE PAVEMENT LANDSCAPE D 5 C500 3 C500 1 4. 5 ' ± 19.9' ± 4. 0 ' T Y P 3. 0 ' TY P PROPOSED PARKING STALLS WITH EV CHARGING (TYP) REPLACE LANDSCAPE IN KIND PEDESTRIAN CONCRETE PAVEMENT AND LANDSCAPE (TYP) MATCH EXISTING GRADE AT EXISTING PAVEMENT (TYP) BUILDING ELEC POC, REFER TO ELEC (1) - 1 1/4" PVC CONDUITS (TYP) REFER TO ELEC (5) - 1 1/4" PVC CONDUITS, REFER TO ELEC EV CHARGING STATION PEDESTAL, (TYP) REFER TO ELEC (TYP) R=5 (TYP) APPROXIMATE LOCATION OF EXISTING TREE (TYP) WHEEL STOP (TYP) PROTECT EXISTING SIDEWALK (TYP) 2'X2' HANDHOLD WITH OPEN BOTTOM, REFER TO ELEC ROUTE CONDUITS BETWEEN EXISTING TREES PROTECT EXISTING 12" SD, CONTRACTOR TO CONFIRM LOCATION AND ELEVATION PRIOR TO CONSTRUCTION 20. 2 9 ± ( E X ) 20. 3 2 ± ( E X ) 20. 5 0 ± ( E X ) 20. 4 7 ± ( E X ) 20. 3 3 ± ( E X ) 20. 2 9 ± ( E X ) 20. 4 3 ± ( E X ) 20. 4 0 ± ( E X ) 20. 9 0 ± ( E X ) 20. 9 9 ± ( E X ) PROTECT EXIST CURB NOTES: 1.REFER TO C100 AND C101 FOR GENERAL NOTES. 2.REFER TO C200 FOR PLAN NOTES. 0 1 inch = 5 feet 2.5'5'10' LEGEND: PROPERTY LINE CONCRETE PAVEMENT LANDSCAPE 3 C200 EV CHARGING STALLS ENLARGEMENT SCALE: 1" = 5' IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT CIVIL ENLARGEMENTS CONSTRUCTION NOTES: CONTRACTOR SHALL FEILD VERIFY THE LOCATION OF EXISTING TREES AND EXISTING UTILITES PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 1 NOTES: 1.REFER TO C100 AND C101 FOR GENERAL NOTES. 2.REFER TO C200 FOR PLAN NOTES. SW 1 6 T H S T L O N G A C R E S D R S W FUTURE ENTRY SIGN, APPROXIMATE LOCATION, UNDER SEPARATE PERMIT PROPERTY LINE (TYP)CAP CONDUIT TO FUTURE ENTRY SIGN, REFER TO ELEC CONNECT CONDUIT TO EXISTING ELEC HH, REFER TO ELEC 20.86 ± ( E X ) 1 REPLACE LANDSCAPE IN KIND (TYP) MATCH EXISTING GRADE AT EXISTING PAVEMENT AND LANDSCAPE (TYP) R=5 (TYP) PROTECT EXISTING SIDEWALK (TYP) REFER TO ELEC FOR NUMBER AND SIZE OF CONDUITS, ROUTE CONDUITS BETWEEN EXISTING TREES 4.0' TY P 20.95 ± ( E X ) 19.71 ± (EX) 19.86 ± (EX) 0 1 inch = 10 feet 5'10'20' IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT CIVIL ENLARGEMENTS LEGEND: PROPERTY LINE LANDSCAPE CONSTRUCTION NOTES: CONTRACTOR SHALL FEILD VERIFY THE LOCATION OF EXISTING TREES AND EXISTING UTILITES PRIOR TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 1 4 C200 SIGNAGE ENLARGEMENT SCALE: 1" = 10' 1CEMENT CONCRETE CURBS NTS 2CEMENT CONCRETE SIDEWALK NTS IN COMPLIANCE WITH CITY OF RENTON STANDARDS C2 5 0 0 1 5 3 0 Call 811 two business days before you dig R 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www.kpff.com IN COMPLIANCE WITH CITY OF RENTON STANDARDS PROJECT BOREALIS CIVIL CONSTRUCTION PERMIT FOR CONSTRUCTION CIVIL DETAILS 4TYPICAL ELECTRICAL CONDUIT TRENCH NTS NOTES: 1.THE NON-SHRINK GROUT USED TO ATTACH THE PRECAST CURB SHALL CONSIST OF 3:1 SAND AND CEMENT. GROUT TO A DEPTH OF 1" FROM THE TOP OF THE CURB. 2.CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI AT 28 DAYS. #3 BARS (2) 5" ELEVATION 2 1/2" 2 1/2" 2" CLEAR (TYP.) 1.0 1.0 2.0 6.0 9" MAX. 6" MIN. 13/16" DIA. HOLES PLAN ATTACHMENT DETAIL 18 " MI N 6" 10" MAX. 8" MIN. #3 BARS (2) ATTACH WITH #6 BAR (2) RECESS BAR 1" AND PLACE NON-SHRINK GROUT AROUND BAR TO FILL RECESS. 3 PRECAST CONCRETE PARKING CURB DETAIL NTS 6" 6" MI N . 6" MI N . 6" MIN. TYP 36 " M I N . CONDUITS PER PLAN SAND BEDDING LANDSCAPING, REPLACE IN KIND 5EV PEDESTAL DETAIL NTS TOP OF PEDESTAL ELEV 21.0 VA R I E S 10 " M A X 24 " 24"EXIST SIDEWALK EXIST CURB PLAN VIEW SECTION 42 " M I N 1"± EV CHARGING STATION, REFER TO ELEC INSTALL STATION SUPPORT PER MANUFACTURES REQUIREMENT LANDSCAPING REPLACE IN KIND, TYP 4" 2" REINFORCING, TYP REFER TO NOTE NOTE: REINFORCE PEDESTAL WITH (4) #8 VERTICAL BARS AND #4 TIES AT 12” O.C. AT THE TOP OF THE PEDESTAL TIE SPACING TO (3) TIES @ 2” O.C. EACH. CONTRACTOR TO SUBMIT SHOP DRAWINGS OF REINFORCING PRIOR TO CONSTRUCTION 3" CLR, TYP Borealis – City of Renton Appendix E Appendix E FEMA FIRM Panel Flood Hazard Zones Map Flood Profiles and Data Topographic Survey BFE to Existing Grades Relationship Exhibit National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOODHAZARD AREAS Without Base Flood Elevation (BFE)Zone A, V, A99With BFE or Depth Zone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areasof 1% annual chance flood with averagedepth less than one foot or with drainageareas of less than one square mile Zone X Future Conditions 1% Annual Chance Flood Hazard Zone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood Hazard Zone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below.The basemap shown complies with FEMA's basemapaccuracy standards The flood hazard information is derived directly from theauthoritative NFHL web services provided by FEMA. This mapwas exported on 2/20/2025 at 12:28 AM and does notreflect changes or amendments subsequent to this date andtime. The NFHL and effective information may change orbecome superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximatepoint selected by the user and does not representan authoritative property location. 1:6,000 122°14'24"W 47°28'6"N 122°13'46"W 47°27'42"N Basemap Imagery Source: USGS National Map 2023 Project Site 0.00 74 342 3.2 18.5 10.0 11.0 1.0 0.07 26 173 6.4 18.5 10.5 11.1 0.6 0.16 76 436 2.5 18.5 11.3 12.2 0.9 0.17 67 380 2.9 18.5 11.3 12.3 1.0 0.32 37 168 6.6 18.5 12.2 12.6 0.4 0.41 48 274 4.0 18.5 13.5 14.5 1.0 0.49 11 100 11.0 18.5 14.9 15.9 1.0 0.55 25 331 3.3 19.9 19.0 19.4 0.4 0.57 39 440 2.5 19.9 19.0 19.6 0.6 0.59 59 576 1.9 19.9 19.1 19.7 0.6 0.63 28 346 3.2 19.9 19.1 19.7 0.6 0.67 24 270 4.1 19.9 19.1 19.7 0.6 1.25 50 439 2.9 19.3 19.3 19.8 0.5 1.49 83 638 2.0 19.5 19.5 20.1 0.6 1.62 25 297 4.0 19.5 19.5 20.2 0.7 1.99 63 581 2.1 20.1 20.1 20.9 0.8 2.57 44 325 3.8 20.5 20.5 21.4 0.9 2.61 43 383 3.2 20.8 20.8 21.7 0.92.67 56 476 2.6 20.9 20.9 21.8 0.92.76 88 881 1.4 21.1 21.1 22.0 0.93.03 80 477 2 .6 21.3 21.3 22.3 1.03.17 70 561 1.2 21.5 21.5 22.5 1.03.49 75 520 1.3 21.7 21.7 22.7 1.03.80 88 453 1.5 22.1 22.1 23.1 1.03.95 59 328 2.0 22.7 22.7 23.7 1.04.08 100 733 0.9 26.5 26.5 27.5 1.0 1 Miles Above Mouth SPRINGBROOK CREEK V W X Y Z U I KLM N O P Q R S T J H A B C D EFG FLOODING SOURCE FLOODWAY 1-PERCENT-ANNUAL-CHANCE FLOOD WATER SURFACE ELEVATION (FEET NAVD 88) DISTANCE1 WIDTH (FEET) SECTION AREA (SQ. FEET MEAN VELOCITY (FEET/SEC. REGULATORY WITHOUT FLOODWAY WITH FLOODWAY INCREASE CROSS SECTION (FEET NAVD) (FEET NAVD) (FEET NAVD)(FEET) FEDERAL EMERGENCY MANAGEMENT AGENCY KING COUNTY, WA AND INCORPORATED AREAS TA B L E 6 FLOODWAY DATA 257 From:FEMA King County, Washington Flood Insurance Study -5 5 5 10 10 15 15 20 20 25 25 30 30 35 35 0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2.2 2.4 EL E V A T I O N I N F E E T ( N A V D ) STREAM DISTANCE IN MILES ABOVE MOUTH FE D E R A L E M E R G E N C Y M A N A G E M E N T A G E N C Y KI N G C O U N T Y , W A AN D I N C O R P O R A T E D A R E A S FL O O D P R O F I L E S SP R I N G B R O O K C R E E K LEGEND 0.2% ANNUAL CHANCE FLOOD* 1% ANNUAL CHANCE FLOOD 2% ANNUAL CHANCE FLOOD* 10% ANNUAL CHANCE FLOOD STREAM BED CROSS SECTION LOCATION * DATA NOT AVAILABLEAB C D EFG H I J K L MNO P Q R SO U T H W E S T 7 T H S T R E E T SO U T H W E S T G R A D Y W A Y IN T E R S T A T E H I G H W A Y 4 0 5 SO U T H W E S T 1 6 T H S T R E E T BR I D G E U N D E R C O N S T R U C T I O N SO U T H W E S T 2 7 T H S T R E E T AB A N D O N E D R A I L R O A D CO N F L U E N C E W I T H P - 1 S T O R A G E P O N D BU R L I N G T O N N O R T H E R N R A I L R O A D UN N A M E D R O A D 0 252P 1%: 19.3 1%:19.9 From:FEMA King County, Washington Flood Insurance Study 3 - STORY STRUCTURAL STEEL BUILDING FOOTPRINT AREA: ±190,693 SQ. FT. 3 - STORY STRUCTURAL STEEL BUILDING FOOTPRINT AREA: ±190,693 SQ. FT. OWNER: UNICO LONGACRES NORTH BUILD ADDRESS: 1301 SW 16TH ST PARCEL NO.: 242304-9022 OWNER: UNICO LONGACRES NORTH BUILD ADDRESS: 1301 SW 16TH ST PARCEL NO.: 242304-9022 PARCE L A PARCE L B VICINITY MAP LEGEND 98 0 0 7 - 6 5 4 6 BU S H , R O E D & H I T C H I N G S , I N C . 15 4 0 0 S E 3 0 T H P L , S T E 1 0 0 BE L L E V U E , W a s h i n g t o n LA N D S U R V E Y O R S & C I V I L E N G I N E E R S WW W . B R H I N C . C O M (2 0 6 ) 3 2 3 - 4 1 4 4 1- 8 0 0 - 9 3 5 - 0 5 0 8 AL T A / N S P S L A N D T I T L E S U R V E Y AL A S K A A I R L I N E S 13 0 1 S W 1 6 T H S T RE N T O N KI N G C O U N T Y WA S H I N G T O N IN THE N.W. 1/4 OF THE S.E. 1/4 OF SECTION 24, TOWNSHIP 23 N., RANGE 04 E., W.M. AREA 1A - MAIN ENTRY PARCE L B OWNER: CITY OF RENTON ADDRESS: SW 16TH ST PARCEL NO.: 242304-9138 98 0 0 7 - 6 5 4 6 BU S H , R O E D & H I T C H I N G S , I N C . 15 4 0 0 S E 3 0 T H P L , S T E 1 0 0 BE L L E V U E , W a s h i n g t o n LA N D S U R V E Y O R S & C I V I L E N G I N E E R S WW W . B R H I N C . C O M (2 0 6 ) 3 2 3 - 4 1 4 4 1- 8 0 0 - 9 3 5 - 0 5 0 8 AL T A / N S P S L A N D T I T L E S U R V E Y AL A S K A A I R L I N E S 13 0 1 S W 1 6 T H S T RE N T O N KI N G C O U N T Y WA S H I N G T O N IN THE N.W. 1/4 OF THE S.E. 1/4 OF SECTION 24, TOWNSHIP 23 N., RANGE 04 E., W.M. SEE SHEET 1 AREA 1A - MAIN ENTRY AREA 1B - SOUTH PATIO AREA 1C - NORTH ENTRY AREA 1D - EAST ENTRY 3 - STORY STRUCTURAL STEEL BUILDING FOOTPRINT AREA: ±190,693 SQ. FT. PARCE L B 3 - STORY STRUCTURAL STEEL BUILDING FOOTPRINT AREA: ±190,693 SQ. FT. 98 0 0 7 - 6 5 4 6 BU S H , R O E D & H I T C H I N G S , I N C . 15 4 0 0 S E 3 0 T H P L , S T E 1 0 0 BE L L E V U E , W a s h i n g t o n LA N D S U R V E Y O R S & C I V I L E N G I N E E R S WW W . B R H I N C . C O M (2 0 6 ) 3 2 3 - 4 1 4 4 1- 8 0 0 - 9 3 5 - 0 5 0 8 AL T A / N S P S L A N D T I T L E S U R V E Y AL A S K A A I R L I N E S 13 0 1 S W 1 6 T H S T RE N T O N KI N G C O U N T Y WA S H I N G T O N IN THE N.W. 1/4 OF THE S.E. 1/4 OF SECTION 24, TOWNSHIP 23 N., RANGE 04 E., W.M. AREA 1F - BOHAREA 1E - BOH SW 16TH ST SW 16 T H S T OA K S D A L E A V E S W L O N G A C R E S D R S W LEGEND: Elevations below elevation +19.9' (FEMA Base Flood Elevation) Elevations 0'-1' above elevation +19.9' (FEMA Base Flood Elevation) Elevations 1'-2' above elevation +19.9' (FEMA Base Flood Elevation) Elevations 2'+ elevation +19.9' (FEMA Base Flood Elevation) NOTES: 1.Spot elevations are the grade delta between existing grade and elevation +19.9' (FEMA Base Flood Elevation). 2.Topography based on BRH Survey received December 2024. 3 - STORY STRUCTURAL STEEL BUILDING FOOTPRINT AREA: ±190,693 SQ. FT. 3 - STORY STRUCTURAL STEEL BUILDING FOOTPRINT AREA:±190,693 SQ. FT. 3 - STORY STRUCTURAL STEEL BUILDING FOOTPRINT AREA: ±190,693 SQ. FT. OWNER: UNICO LONGACRES NORTH BUILDADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 OWNER: UNICO LONGACRES NORTH BUILD ADDRESS: 1301 SW 16TH ST PARCEL NO.: 242304-9022 OWNER: UNICO LONGACRES NORTH BUILDADDRESS: 1301 SW 16TH STPARCEL NO.: 242304-9022 PARCE L A PARCE L A PARCE L B PARCE L B PARCE L B OWNER: UNICO LONGACRES NORTH BUILD ADDRESS: 1301 SW 16TH ST PARCEL NO.: 242304-9022 OWNER: CITY OF RENTONADDRESS: SW 16TH STPARCEL NO.: 242304-9138 3 - STORY STRUCTURAL STEEL BUILDING FOOTPRINT AREA:±190,693 SQ. FT. 3 - STORY STRUCTURAL STEEL BUILDING FOOTPRINT AREA:±190,693 SQ. FT. 0.21 0.01 0.34 -0.01 -0.52 -0.59 0.28 0.12 -0.61 -1.33 -1.36 0.31 0.19 -0.27 -1.08 -1.72 -1.89 -1.46 0.19 -0.03 -0.52 -1.19 -1.74 -2.07 -1.85 -1.37 -0.24 -0.33 -0.36 -0.74 -1.31 -1.83 -2.27 -2.36 -1.84 -0.69 -0.92 -1.37 -1.15 -1.66 -2.09 -2.37 -2.26 -1.88 -1.59 -0.86 -2.42 -2.45 -2.41 -2.30 -2.90 -2.73 -2.28 -1.82 -1.58 -0.70 -1.94 -2.40 -2.43 -2.44 -2.00 -1.93 -1.89 -1.41 -1.38 -1.69 -0.95 -1.21 -0.86 -1.00 -0.96 -0.93 -0.48 -0.29 -0.91 -1.16 -1.71 -0.94 -1.03 -0.68 -0.43 -0.30 -0.28 -0.22 -0.15 -0.64 -0.78 -1.35 -0.92 -1.01 -0.81 -0.48 -0.42 -0.43 -0.86 -0.87 -1.01 -0.57 -0.55 -1.62 -0.95 -1.22 -1.05 -0.60 -0.36 -0.33 -0.33 -0.20 -0.31 -0.29 -0.31 -1.23 -0.26 -0.92 -1.08 -0.65 -0.40 -0.43 -0.41 -0.36 -0.43 -0.48 -0.40 -0.77 0.45 -1.01 -1.05 -0.75 -0.46 -0.39 -0.34 -0.38 -0.27 -0.23 -0.39 -0.39 -1.83 0.70 -0.93 -0.98 -0.63 -0.29 -0.20 -0.20 -0.13 -0.18 -0.22 -0.18 -0.38 -1.42 0.75 -1.05 -0.84 -0.45 -0.47 -0.67 -0.67 -0.72 -0.85 -0.44 -0.90 -0.35 -0.60 0.69 -0.79 -0.80 -0.45 -0.29 -0.26 -0.33 -0.15 -0.09 -0.16 -0.37 -0.15 -0.29 0.31 -0.84 -0.76 -0.42 -0.35 -0.36 -0.34 -0.18 -0.25 -0.34 -0.53 -0.45 -0.25 -0.08 -0.92 -0.91 -0.42 -0.32 -0.27 -0.41 -0.28 -0.87 -0.57 -0.43 -0.36 -0.38 -0.89 -0.04 -0.72 -0.81 -0.46 -0.34 -0.28 -0.27 -0.16 -0.13 -0.17 -0.23 -0.26 -0.22 -0.82 -0.40 -0.56 -0.66 -0.49 -0.43 -0.48 -0.86 -0.48 -0.44 -0.49 -0.53 -0.55 -0.72 -1.07 -0.64 -0.63 -0.64 -0.49 -0.38 -0.42 -0.36 -0.30 -0.29 -0.39 -0.40 -0.42 -0.51 -0.84 -0.74 -0.71 -0.67 -0.51 -0.35 -0.37 -0.37 -0.29 -0.20 -0.30 -0.31 -0.30 -0.30 -0.70 -0.68 -1.09 -0.93 -0.54 -0.58 -0.63 -1.08 -0.57 -1.00 -0.93 -0.88 -0.63 -0.67 -1.23 -0.38 -0.75 -0.76 -0.74 -0.78 -0.72 -0.98 -0.63 -0.63 -0.58 -0.60 -0.74 -0.94 -0.84 -0.12 -1.22 -1.25 -1.02 -0.99 -1.20 -1.24 -1.33 -0.64 -1.47 -0.86 -1.18 -0.73 -0.72 0.26 -1.32 -0.66 -0.80 -0.68 -0.66 -0.76 -0.45 -0.40 -0.40 -0.50 -0.53 -0.54 -0.67 -0.20 -1.27 -0.66 -0.44 -0.73 -0.45 -0.29 -0.10 -0.19 -0.13 -0.18 -0.43 -0.36 -0.58 -0.31 -1.28 -0.66 -0.38 -0.91 -0.93 -0.92 -0.83 -0.68 -0.51 -0.59 -0.69 -0.49 -0.51 0.52 -0.49 -1.27 -0.62 -0.21 -0.35 -0.12 -0.23 -0.16 -0.17 -0.11 -0.05 -0.17 -0.30 -0.49 0.31 -0.70 -1.33 -0.67 -0.34 -0.36 -0.33 -0.33 -0.21 -0.11 -0.11 -0.08 -0.23 -0.35 -0.53 0.08 -0.35 -1.30 -1.24 -1.25 -1.17 -1.19 -1.14 -1.10 -0.89 -0.42 -0.23 -0.17 -0.23 -0.55 0.09 -0.91 -0.55 -1.26 -1.61 -1.64 -1.63 -1.63 -1.64 -1.62 -1.37 -0.92 -0.40 -0.05 -0.17 -0.46 -0.93 -1.66 -1.11 -1.34 -1.67 -0.42 -0.09 -0.25 -0.42 -0.27 -1.14 -1.41 -1.23 -0.83 -1.65 -0.48 -0.16 -0.22 -0.39 -0.26 -1.05 -1.29 -1.32 -1.16 -0.75 -1.64 -0.51 -0.25 -0.33 -0.34 -0.19 -1.00 -1.21 -1.24 -1.16 -1.21 -0.79 -1.67 -0.50 -0.27 -0.23 -0.36 -0.13 -0.92 -1.12 -1.25 -1.25 -1.12 -1.22 -0.76 -1.67 -0.41 -0.15 -0.15 -0.34 -0.15 -0.97 -1.21 -1.31 -1.24 -1.16 -1.04 -1.19 -0.75 -1.67 -0.83 -0.17 -0.18 -0.40 -0.10 -0.44 -0.60 -1.24 -1.21 -1.37 -1.26 -1.15 -1.13 -0.85 -1.67 -0.85 -0.22 -0.23 -0.78 0.32 -0.63 -1.14 -0.62 -0.75 -0.78 -0.86 -0.84 -0.81 -0.82 -0.83 -0.98 -1.68 -1.21 -0.34 -0.39 -1.37 0.94 0.56 -0.33 -1.04 -1.60 -1.47 -1.43 -1.49 -1.49 -1.53 -1.51 -1.54 -1.56 -1.58 -1.49 -1.69 -1.19 -0.33 -0.45 -1.35 0.76 0.24 -0.35 -0.91 -1.27 -1.48 -1.57 -1.57 -1.56 -1.56 -1.57 -1.55 -1.57 -1.54 -1.46 -1.69 -1.45 -1.67 -1.19 -0.31 -0.68 -1.22 0.14 -0.74 -0.95 -1.11 -1.20 -1.30 -1.22 -0.46 -0.60 -0.73 0.08 -1.02 -1.29 -1.41 -1.33 -1.41 -1.66 -1.27 -0.41 -0.70 -1.45 1.11 0.17 -0.90 -1.54 -1.57 -1.54 -1.55 -1.71 -1.39 -0.54 -0.64 -1.52 1.19 0.29 -0.45 -1.67 -0.80 -0.67 -1.32 1.98 1.45 0.35 -0.34 -1.70 -0.79 -0.54 -0.98 2.01 1.53 0.50 -0.40 -1.71 -0.79 -0.59 -0.79 2.43 1.90 1.57 0.42 -0.43 -1.71 -0.72 -0.59 -1.04 0.52 0.56 1.53 0.30 -0.46 -1.68 -1.39 2.11 -1.73 -1.33 -0.75 -0.49 -1.10 -1.02 -1.41 -1.44 -1.41 -1.47 -1.61 -1.48 -1.31 -1.24 -1.49 -1.63 -1.64 -1.64 -1.65 -1.64 -1.64 -1.63 -1.08 1.99 -1.38 -1.04 -0.85 -0.65 -0.97 -1.32 -1.81 -2.90 -2.99 -1.37 -1.21 -1.26 -1.12 -1.22 -0.89 -0.84 -0.78 -1.06 -1.08 -1.06 -1.14 -1.08 -0.85 1.26 -1.09 -0.98 -0.85 -0.67 -0.99 -1.23 -2.18 -3.99 -4.03 -1.33 -0.69 -0.40 -0.34 -0.34 -0.10 0.20 0.16 -0.53 -0.74 -0.74 -0.84 -0.94 -0.61 0.41 -0.78 -0.91 -0.83 -0.64 -1.04 -1.35 -2.11 -4.53 -4.25 -0.63 0.17 0.10 0.06 0.17 0.37 0.88 0.64 0.22 0.18 0.09 0.03 0.14 0.21 -0.04 -0.23 -0.88 -0.79 -0.60 -1.04 -1.31 -2.40 -4.35 -4.22 -0.65 0.01 -0.11 -0.12 -0.10 -0.03 0.28 0.28 -0.03 -0.16 -0.16 0.01 -0.02 0.00 -0.22 -0.57 -0.91 -0.74 -0.53 -1.05 -1.21 -1.94 -4.06 -4.25 -0.66 -0.20 -0.38 -0.39 -0.39 -0.39 -0.28 -0.18 -0.26 -0.36 -0.23 -0.06 -0.22 -0.61 -0.45 -0.70 -0.94 -0.69 -0.47 -1.06 -1.15 -1.75 -3.71 -3.82 -0.69 -0.22 -0.28 -0.34 -0.31 -0.19 -0.19 -0.35 -0.41 -0.53 -0.32 -0.19 -0.40 -0.15 -0.17 -0.68 -0.95 -0.67 -0.32 -1.50 -1.14 -1.72 -3.29 -3.17 -1.54 -0.51 -0.64 -0.65 -0.67 -0.65 -0.60 -0.59 -0.61 -0.69 -0.55 -0.56 -0.54 -0.60 -0.47 -0.82 -0.95 -1.69 -1.73 -1.54 -1.14 -0.79 -0.53 -1.46 -2.07 -0.73 -1.45 -2.63 -1.67 -1.01 -0.58 -0.53 -0.63 -0.65 -0.61 -0.59 -0.59 -0.70 -0.71 -0.75 -0.73 -0.56 -0.51 -0.64 -0.71 -0.93 -0.90 -0.89 -0.89 -0.87 -0.82 -0.84 -0.81 -1.35 -0.92 -0.80 -1.57 -1.85 -0.01 -0.83 -1.31 -0.27 -0.47 -0.53 -0.31 -0.52 -0.58 -0.42 -0.38 -0.40 -0.49 -0.68 -0.73 -0.62 -0.54 -0.50 -0.56 -0.68 -0.81 -0.75 -0.64 -0.66 -0.68 -0.61 -0.58 -0.48 -0.45 -0.84 -0.93 -0.99 -2.11 0.60 -0.59 -1.01 -0.78 -1.17 -0.89 -1.14 -1.31 -1.32 -1.12 -0.65 -0.73 -0.73 -0.73 -0.69 -0.64 -0.65 -0.63 -0.67 -0.75 -0.70 -0.70 -0.71 -0.73 -0.73 -0.72 -0.75 -0.73 -0.76 -0.86 -0.69 -1.12 -2.39 0.43 -1.50 -1.42 -1.34 -1.40 -1.48 -1.75 -1.92 -2.30 -1.96 -0.67 -0.42 -0.47 -0.57 -0.42 -0.49 -0.50 -0.36 -0.33 -0.43 -0.45 -0.40 -0.38 -0.46 -0.49 -0.51 -0.52 -0.51 -0.52 -0.53 -0.56 -1.08 -2.33 -1.72 -2.07 -2.48 -2.61 -2.31 -1.73 -1.18 -1.28 -1.32 -0.64 -0.60 -0.65 -0.59 -0.61 -0.66 -0.56 -0.57 -0.63 -0.66 -0.62 -0.62 -0.64 -0.66 -0.67 -0.68 -0.67 -0.64 -0.65 -0.71 -1.59 -2.29 -4.81 -3.85 -3.46 -2.31 -2.13 -2.41 -2.94 -3.06 -3.00 -3.09 -3.01 -2.99 -2.80 -2.16 -1.21 -1.20 -0.70 -0.79 -0.95 -1.25 -1.72 -1.47 -7.44 -6.30 -5.38 -5.10 -5.31 -4.98 -2.17 2.61 5.36 5.13 4.14 -7.44 -6.44 -4.14 6.43 6.66 0.63 0 1 inch = 40 feet 20'40'80' MAY 2025 EV Charging Stalls Site Improvements Main Entrance Site Improvements Food Truck Access Path Site Improvements Signage Installation Site Improvements Borealis – City of Renton Appendix F Appendix F Bond Quantity Worksheet 1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200 Date Prepared: Name: PE Registration No: Firm Name: Firm Address: Phone No. Email Address: Project Name: Project Owner: CED Plan # (LUA): Phone: CED Permit # (C): Address: Site Address: Street Intersection: Addt'l Project Owner: Parcel #(s): Phone: Address: Clearing and grading greater than or equal to 5,000 board feet of timber? Yes/No:NO Water Service Provided by: If Yes, Provide Forest Practice Permit #:Sewer Service Provided by: SITE IMPROVEMENT BOND QUANTITY WORKSHEET PROJECT INFORMATION CITY OF RENTON CITY OF RENTON 1 Select the current project status/phase from the following options: For Approval - Preliminary Data Enclosed, pending approval from the City; For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City; Project Closeout - Final Costs and Quantities Enclosed for Project Close-out Submittal Engineer Stamp Required (all cost estimates must have original wet stamp and signature) Clearing and Grading Utility Providers N/A Project Location and Description Project Owner Information Project Borealis SeaTac, WA 98188 2423049022 and 2423049055 Alaska Air Group, INC./TERI SATO 206-399-8788 5/8/2025 Prepared by: FOR APPROVALProject Phase 1 jenifer.clapham@kpff.com Jenifer Clapham 40799 KPFF Consulting Engineers 1601 5th Ave, Suite 1600, Seattle, WA 98101 206.926.0549 1301 SW 16th St, Renton, WA 98057 19300 International Boulevard SW 16th St/Oakesdale Ave SW -$ Abbreviated Legal Description: Total Estimated Construction Costs E A + B + C + D 30,816.55$ Estimated Civil Construction Permit - Construction Costs2 Stormwater (Drainage)C -$ As outlined in City Ordinance No. 4345, 50% of the plan review and inspection fees are to be paid at Permit Submittal. The balance is due at Permit Issuance. Significant changes or additional review cycles (beyond 3 cycles) during the review process may result in adjustments to the final review fees. Roadway (Erosion Control + Transportation)D 30,816.55$ Water A -$ Wastewater (Sanitary Sewer)B Page 2 of 15 Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION Version 4/1/2024 Printed 5/8/2025 2025-05-08 10.3%2 All prices include labor, equipment, materials, overhead, profit, and taxes. City of Renton Sales Tax is: Page 3 of 15 Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION Version 4/1/2024 Printed 5/8/2025 CED Permit #: Unit Reference #Price Unit Quantity Cost Backfill & compaction-embankment ESC-1 7.50$ CY Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 90.00$ Each Catch Basin Protection ESC-3 145.00$ Each 10 1,450.00 Crushed surfacing 1 1/4" minus ESC-4 WSDOT 9-03.9(3)110.00$ CY Ditching ESC-5 10.50$ CY Excavation-bulk ESC-6 2.30$ CY Fence, silt ESC-7 SWDM 5.4.3.1 5.00$ LF Fence, Temporary (NGPE)ESC-8 1.75$ LF 1080 1,890.00 Geotextile Fabric ESC-9 3.00$ SY Hay Bale Silt Trap ESC-10 0.60$ Each Hydroseeding ESC-11 SWDM 5.4.2.4 0.90$ SY Interceptor Swale / Dike ESC-12 1.15$ LF Jute Mesh ESC-13 SWDM 5.4.2.2 4.00$ SY Level Spreader ESC-14 2.00$ LF Mulch, by hand, straw, 3" deep ESC-15 SWDM 5.4.2.1 2.90$ SY Mulch, by machine, straw, 2" deep ESC-16 SWDM 5.4.2.1 2.30$ SY Piping, temporary, CPP, 6"ESC-17 13.75$ LF Piping, temporary, CPP, 8"ESC-18 16.00$ LF Piping, temporary, CPP, 12"ESC-19 20.50$ LF Plastic covering, 6mm thick, sandbagged ESC-20 SWDM 5.4.2.3 4.60$ SY Rip Rap, machine placed; slopes ESC-21 WSDOT 9-13.1(2)51.00$ CY Rock Construction Entrance, 50'x15'x1'ESC-22 SWDM 5.4.4.1 2,050.00$ Each Rock Construction Entrance, 100'x15'x1'ESC-23 SWDM 5.4.4.1 3,675.00$ Each Sediment pond riser assembly ESC-24 SWDM 5.4.5.2 2,525.00$ Each Sediment trap, 5' high berm ESC-25 SWDM 5.4.5.1 22.00$ LF Sed. trap, 5' high, riprapped spillway berm section ESC-26 SWDM 5.4.5.1 80.00$ LF Seeding, by hand ESC-27 SWDM 5.4.2.4 1.15$ SY Sodding, 1" deep, level ground ESC-28 SWDM 5.4.2.5 9.20$ SY Sodding, 1" deep, sloped ground ESC-29 SWDM 5.4.2.5 11.50$ SY TESC Supervisor ESC-30 125.00$ HR Water truck, dust control ESC-31 SWDM 5.4.7 160.00$ HR Unit Reference #Price Unit Quantity Cost SWDM D.2.1.2.5 4.00$ LF 970 3,880.00 EROSION/SEDIMENT SUBTOTAL:7,220.00 SALES TAX @ 10.3%743.66 EROSION/SEDIMENT TOTAL:7,963.66 (A) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR EROSION & SEDIMENT CONTROL Description No. (A) Straw Wattle WRITE-IN-ITEMS Page 4 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.a EROSION_CONTROL Version: 4/01/2024 Printed 5/8/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost GENERAL ITEMS Backfill & Compaction- embankment GI-1 7.00$ CY Backfill & Compaction- trench GI-2 10.25$ CY 147 1,506.75 Clear/Remove Brush, by hand (SY)GI-3 1.15$ SY 133 152.95 Bollards - fixed GI-4 275.00$ Each Bollards - removable GI-5 520.00$ Each Clearing/Grubbing/Tree Removal GI-6 11,475.00$ Acre Excavation - bulk GI-7 2.30$ CY Excavation - Trench GI-8 5.75$ CY 147 845.25 Fencing, cedar, 6' high GI-9 23.00$ LF Fencing, chain link, 4'GI-10 44.00$ LF Fencing, chain link, vinyl coated, 6' high GI-11 23.00$ LF Fencing, chain link, gate, vinyl coated, 20' GI-12 1,600.00$ Each Fill & compact - common barrow GI-13 28.75$ CY Fill & compact - gravel base GI-14 31.00$ CY Fill & compact - screened topsoil GI-15 44.75$ CY Gabion, 12" deep, stone filled mesh GI-16 74.50$ SY Gabion, 18" deep, stone filled mesh GI-17 103.25$ SY Gabion, 36" deep, stone filled mesh GI-18 172.00$ SY Grading, fine, by hand GI-19 2.90$ SY Grading, fine, with grader GI-20 2.30$ SY 133 305.90 Monuments, 3' Long GI-21 1,025.00$ Each Sensitive Areas Sign GI-22 8.00$ Each Sodding, 1" deep, sloped ground GI-23 9.25$ SY 96 888.00 Surveying, line & grade GI-24 975.00$ Day Surveying, lot location/lines GI-25 2,050.00$ Acre Topsoil Type A (imported)GI-26 32.75$ CY Traffic control crew ( 2 flaggers )GI-27 137.75$ HR Trail, 4" chipped wood GI-28 9.15$ SY Trail, 4" crushed cinder GI-29 10.25$ SY Trail, 4" top course GI-30 13.75$ SY Conduit, 2"GI-31 5.75$ LF Wall, retaining, concrete GI-32 63.00$ SF Wall, rockery GI-33 17.25$ SF SUBTOTAL THIS PAGE:3,698.85 (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B) (C) Page 5 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Version: 4/1/2024 Printed 5/8/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B) (C) ROAD IMPROVEMENT/PAVEMENT/SURFACING AC Grinding, 4' wide machine < 1000sy RI-1 34.50$ SY AC Grinding, 4' wide machine 1000-2000sy RI-2 18.25$ SY AC Grinding, 4' wide machine > 2000sy RI-3 11.50$ SY AC Removal/Disposal RI-4 40.00$ SY Barricade, Type III ( Permanent )RI-5 64.25$ LF Guard Rail RI-6 34.50$ LF Curb & Gutter, rolled RI-7 19.50$ LF Curb & Gutter, vertical RI-8 14.25$ LF 192 2,736.00 Curb and Gutter, demolition and disposal RI-9 20.50$ LF 192 3,936.00 Curb, extruded asphalt RI-10 6.25$ LF Curb, extruded concrete RI-11 8.00$ LF Sawcut, asphalt, 3" depth RI-12 3.00$ LF Sawcut, concrete, per 1" depth RI-13 5.00$ LF Sealant, asphalt RI-14 2.25$ LF Shoulder, gravel, 4" thick RI-15 17.25$ SY Sidewalk, 4" thick RI-16 43.50$ SY 127 5,524.50 Sidewalk, 4" thick, demolition and disposal RI-17 37.00$ SY 127 4,699.00 Sidewalk, 5" thick RI-18 47.00$ SY Sidewalk, 5" thick, demolition and disposal RI-19 46.00$ SY Sign, Handicap RI-20 97.00$ Each Striping, per stall RI-21 8.00$ Each Striping, thermoplastic, ( for crosswalk )RI-22 3.50$ SF Striping, 4" reflectorized line RI-23 0.55$ LF Additional 2.5" Crushed Surfacing RI-24 4.15$ SY HMA 1/2" Overlay 1.5" RI-25 16.00$ SY HMA 1/2" Overlay 2"RI-26 20.75$ SY 6 124.50 HMA Road, 2", 4" rock, First 2500 SY RI-27 32.25$ SY HMA Road, 2", 4" rock, Qty. over 2500SY RI-28 24.00$ SY HMA Road, 4", 6" rock, First 2500 SY RI-29 51.75$ SY HMA Road, 4", 6" rock, Qty. over 2500 SY RI-30 42.50$ SY HMA Road, 4", 4.5" ATB RI-31 43.50$ SY Gravel Road, 4" rock, First 2500 SY RI-32 17.25$ SY Gravel Road, 4" rock, Qty. over 2500 SY RI-33 11.50$ SY Thickened Edge RI-34 10.00$ LF SUBTOTAL THIS PAGE:17,020.00 (B)(C)(D)(E) Page 6 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Version: 4/1/2024 Printed 5/8/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B) (C) PARKING LOT SURFACING No. 2" AC, 2" top course rock & 4" borrow PL-1 24.00$ SY 2" AC, 1.5" top course & 2.5" base course PL-2 32.00$ SY 4" select borrow PL-3 5.75$ SY 1.5" top course rock & 2.5" base course PL-4 16.00$ SY SUBTOTAL PARKING LOT SURFACING: (B)(C)(D)(E) LANDSCAPING & VEGETATION No. Street Trees LA-1 Median Landscaping LA-2 Right-of-Way Landscaping LA-3 Wetland Landscaping LA-4 SUBTOTAL LANDSCAPING & VEGETATION: (B)(C)(D)(E) TRAFFIC & LIGHTING No. Signs TR-1 Street Light System ( # of Poles)TR-2 Traffic Signal TR-3 Traffic Signal Modification TR-4 SUBTOTAL TRAFFIC & LIGHTING: (B)(C)(D)(E) WRITE-IN-ITEMS SUBTOTAL WRITE-IN ITEMS: STREET AND SITE IMPROVEMENTS SUBTOTAL:20,718.85 SALES TAX @ 10.3%2,134.04 STREET AND SITE IMPROVEMENTS TOTAL:22,852.89 (B)(C)(D)(E) Page 7 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Version: 4/1/2024 Printed 5/8/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost DRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.) Access Road, R/D D-1 30.00$ SY * (CBs include frame and lid) Beehive D-2 103.00$ Each Through-curb Inlet Framework D-3 460.00$ Each CB Type I D-4 1,725.00$ Each CB Type IL D-5 2,000.00$ Each CB Type II, 48" diameter D-6 3,500.00$ Each for additional depth over 4' D-7 550.00$ FT CB Type II, 54" diameter D-8 4,075.00$ Each for additional depth over 4'D-9 570.00$ FT CB Type II, 60" diameter D-10 4,225.00$ Each for additional depth over 4'D-11 690.00$ FT CB Type II, 72" diameter D-12 6,900.00$ Each for additional depth over 4'D-13 975.00$ FT CB Type II, 96" diameter D-14 16,000.00$ Each for additional depth over 4'D-15 1,050.00$ FT Trash Rack, 12"D-16 400.00$ Each Trash Rack, 15"D-17 470.00$ Each Trash Rack, 18"D-18 550.00$ Each Trash Rack, 21"D-19 630.00$ Each Cleanout, PVC, 4"D-20 170.00$ Each Cleanout, PVC, 6"D-21 195.00$ Each Cleanout, PVC, 8"D-22 230.00$ Each Culvert, PVC, 4" D-23 11.50$ LF Culvert, PVC, 6" D-24 15.00$ LF Culvert, PVC, 8" D-25 17.00$ LF Culvert, PVC, 12" D-26 26.00$ LF Culvert, PVC, 15" D-27 40.00$ LF Culvert, PVC, 18" D-28 47.00$ LF Culvert, PVC, 24"D-29 65.00$ LF Culvert, PVC, 30" D-30 90.00$ LF Culvert, PVC, 36" D-31 150.00$ LF Culvert, CMP, 8"D-32 22.00$ LF Culvert, CMP, 12"D-33 33.00$ LF SUBTOTAL THIS PAGE: (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) Page 8 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Version: 4/1/2024 Printed 5/8/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) DRAINAGE (Continued) Culvert, CMP, 15"D-34 40.00$ LF Culvert, CMP, 18"D-35 47.00$ LF Culvert, CMP, 24"D-36 64.00$ LF Culvert, CMP, 30"D-37 90.00$ LF Culvert, CMP, 36"D-38 150.00$ LF Culvert, CMP, 48"D-39 218.00$ LF Culvert, CMP, 60"D-40 310.00$ LF Culvert, CMP, 72"D-41 400.00$ LF Culvert, Concrete, 8"D-42 48.00$ LF Culvert, Concrete, 12"D-43 55.00$ LF Culvert, Concrete, 15"D-44 89.00$ LF Culvert, Concrete, 18"D-45 100.00$ LF Culvert, Concrete, 24"D-46 120.00$ LF Culvert, Concrete, 30"D-47 145.00$ LF Culvert, Concrete, 36"D-48 175.00$ LF Culvert, Concrete, 42"D-49 200.00$ LF Culvert, Concrete, 48"D-50 235.00$ LF Culvert, CPE Triple Wall, 6" D-51 16.00$ LF Culvert, CPE Triple Wall, 8" D-52 18.00$ LF Culvert, CPE Triple Wall, 12" D-53 27.00$ LF Culvert, CPE Triple Wall, 15" D-54 40.00$ LF Culvert, CPE Triple Wall, 18" D-55 47.00$ LF Culvert, CPE Triple Wall, 24" D-56 64.00$ LF Culvert, CPE Triple Wall, 30" D-57 90.00$ LF Culvert, CPE Triple Wall, 36" D-58 149.00$ LF Culvert, LCPE, 6"D-59 69.00$ LF Culvert, LCPE, 8"D-60 83.00$ LF Culvert, LCPE, 12"D-61 96.00$ LF Culvert, LCPE, 15"D-62 110.00$ LF Culvert, LCPE, 18"D-63 124.00$ LF Culvert, LCPE, 24"D-64 138.00$ LF Culvert, LCPE, 30"D-65 151.00$ LF Culvert, LCPE, 36"D-66 165.00$ LF Culvert, LCPE, 48"D-67 179.00$ LF Culvert, LCPE, 54"D-68 193.00$ LF SUBTOTAL THIS PAGE: (B)(C)(D)(E) Page 9 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Version: 4/1/2024 Printed 5/8/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) DRAINAGE (Continued) Culvert, LCPE, 60"D-69 206.00$ LF Culvert, LCPE, 72"D-70 220.00$ LF Culvert, HDPE, 6"D-71 48.00$ LF Culvert, HDPE, 8"D-72 60.00$ LF Culvert, HDPE, 12"D-73 85.00$ LF Culvert, HDPE, 15"D-74 122.00$ LF Culvert, HDPE, 18"D-75 158.00$ LF Culvert, HDPE, 24"D-76 254.00$ LF Culvert, HDPE, 30"D-77 317.00$ LF Culvert, HDPE, 36"D-78 380.00$ LF Culvert, HDPE, 48"D-79 443.00$ LF Culvert, HDPE, 54"D-80 506.00$ LF Culvert, HDPE, 60"D-81 570.00$ LF Culvert, HDPE, 72"D-82 632.00$ LF Pipe, Polypropylene, 6"D-83 96.00$ LF Pipe, Polypropylene, 8"D-84 100.00$ LF Pipe, Polypropylene, 12"D-85 100.00$ LF Pipe, Polypropylene, 15"D-86 103.00$ LF Pipe, Polypropylene, 18"D-87 106.00$ LF Pipe, Polypropylene, 24"D-88 119.00$ LF Pipe, Polypropylene, 30"D-89 136.00$ LF Pipe, Polypropylene, 36"D-90 185.00$ LF Pipe, Polypropylene, 48"D-91 260.00$ LF Pipe, Polypropylene, 54"D-92 381.00$ LF Pipe, Polypropylene, 60"D-93 504.00$ LF Pipe, Polypropylene, 72"D-94 625.00$ LF Culvert, DI, 6"D-95 70.00$ LF Culvert, DI, 8"D-96 101.00$ LF Culvert, DI, 12"D-97 121.00$ LF Culvert, DI, 15"D-98 148.00$ LF Culvert, DI, 18"D-99 175.00$ LF Culvert, DI, 24"D-100 200.00$ LF Culvert, DI, 30"D-101 227.00$ LF Culvert, DI, 36"D-102 252.00$ LF Culvert, DI, 48"D-103 279.00$ LF Culvert, DI, 54"D-104 305.00$ LF Culvert, DI, 60"D-105 331.00$ LF Culvert, DI, 72"D-106 357.00$ LF SUBTOTAL THIS PAGE: (B)(C)(D)(E) Page 10 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Version: 4/1/2024 Printed 5/8/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) Specialty Drainage Items Ditching SD-1 10.90$ CY Flow Dispersal Trench (1,436 base+)SD-3 32.00$ LF French Drain (3' depth)SD-4 30.00$ LF Geotextile, laid in trench, polypropylene SD-5 3.40$ SY Mid-tank Access Riser, 48" dia, 6' deep SD-6 2,300.00$ Each Pond Overflow Spillway SD-7 18.25$ SY Restrictor/Oil Separator, 12"SD-8 1,320.00$ Each Restrictor/Oil Separator, 15"SD-9 1,550.00$ Each Restrictor/Oil Separator, 18"SD-10 1,950.00$ Each Riprap, placed SD-11 48.20$ CY Tank End Reducer (36" diameter)SD-12 1,375.00$ Each Infiltration pond testing SD-13 143.00$ HR Permeable Pavement SD-14 Permeable Concrete Sidewalk SD-15 Culvert, Box __ ft x __ ft SD-16 SUBTOTAL SPECIALTY DRAINAGE ITEMS: (B)(C)(D)(E) STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch) Detention Pond SF-1 Each Detention Tank SF-2 Each Detention Vault SF-3 Each Infiltration Pond SF-4 Each Infiltration Tank SF-5 Each Infiltration Vault SF-6 Each Infiltration Trenches SF-7 Each Basic Biofiltration Swale SF-8 Each Wet Biofiltration Swale SF-9 Each Wetpond SF-10 Each Wetvault SF-11 Each Sand Filter SF-12 Each Sand Filter Vault SF-13 Each Linear Sand Filter SF-14 Each Proprietary Facility SF-15 Each Bioretention Facility SF-16 Each SUBTOTAL STORMWATER FACILITIES: (B)(C)(D)(E) Page 11 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Version: 4/1/2024 Printed 5/8/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs) WI-1 WI-2 WI-3 WI-4 WI-5 WI-6 WI-7 WI-8 WI-9 WI-10 WI-11 WI-12 WI-13 WI-14 WI-15 SUBTOTAL WRITE-IN ITEMS: DRAINAGE AND STORMWATER FACILITIES SUBTOTAL: SALES TAX @ 10.3% DRAINAGE AND STORMWATER FACILITIES TOTAL: (B) (C) (D) (E) Page 12 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Version: 4/1/2024 Printed 5/8/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Connection to Existing Watermain W-1 3,400.00$ Each Ductile Iron Watermain, CL 52, 4 Inch Diameter W-2 58.00$ LF Ductile Iron Watermain, CL 52, 6 Inch Diameter W-3 65.00$ LF Ductile Iron Watermain, CL 52, 8 Inch Diameter W-4 75.00$ LF Ductile Iron Watermain, CL 52, 10 Inch Diameter W-5 80.00$ LF Ductile Iron Watermain, CL 52, 12 Inch Diameter W-6 145.00$ LF Gate Valve, 4 inch Diameter W-7 1,225.00$ Each Gate Valve, 6 inch Diameter W-8 1,350.00$ Each Gate Valve, 8 Inch Diameter W-9 1,550.00$ Each Gate Valve, 10 Inch Diameter W-10 2,100.00$ Each Gate Valve, 12 Inch Diameter W-11 2,500.00$ Each Fire Hydrant Assembly W-12 5,000.00$ Each Permanent Blow-Off Assembly W-13 1,950.00$ Each Air-Vac Assembly, 2-Inch Diameter W-14 3,050.00$ Each Air-Vac Assembly, 1-Inch Diameter W-15 1,725.00$ Each Compound Meter Assembly 3-inch Diameter W-16 9,200.00$ Each Compound Meter Assembly 4-inch Diameter W-17 10,500.00$ Each Compound Meter Assembly 6-inch Diameter W-18 11,500.00$ Each Pressure Reducing Valve Station 8-inch to 10-inch W-19 23,000.00$ Each WATER SUBTOTAL: SALES TAX @ 10.3% WATER TOTAL: (B) (C) (D) (E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR WATER Quantity Remaining (Bond Reduction) (B)(C) Page 13 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.d WATER Version: 4/1/2024 Printed 5/8/2025 CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Clean Outs SS-1 1,150.00$ Each Grease Interceptor, 500 gallon SS-2 9,200.00$ Each Grease Interceptor, 1000 gallon SS-3 11,500.00$ Each Grease Interceptor, 1500 gallon SS-4 17,200.00$ Each Side Sewer Pipe, PVC. 4 Inch Diameter SS-5 92.00$ LF Side Sewer Pipe, PVC. 6 Inch Diameter SS-6 110.00$ LF Sewer Pipe, PVC, 8 inch Diameter SS-7 120.00$ LF Sewer Pipe, PVC, 12 Inch Diameter SS-8 144.00$ LF Sewer Pipe, DI, 8 inch Diameter SS-9 130.00$ LF Sewer Pipe, DI, 12 Inch Diameter SS-10 150.00$ LF Manhole, 48 Inch Diameter SS-11 6,900.00$ Each Manhole, 54 Inch Diameter SS-13 6,800.00$ Each Manhole, 60 Inch Diameter SS-15 7,600.00$ Each Manhole, 72 Inch Diameter SS-17 10,600.00$ Each Manhole, 96 Inch Diameter SS-19 16,000.00$ Each Pipe, C-900, 12 Inch Diameter SS-21 205.00$ LF Outside Drop SS-24 1,700.00$ LS Inside Drop SS-25 1,150.00$ LS Sewer Pipe, PVC, ____ Inch Diameter SS-26 Lift Station (Entire System)SS-27 LS SANITARY SEWER SUBTOTAL: SALES TAX @ 10.3% SANITARY SEWER TOTAL: (B) (C) (D) (E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR SANITARY SEWER Quantity Remaining (Bond Reduction) (B)(C) Page 14 of 15 Ref 8-H Bond Quantity Worksheet SECTION II.e SANITARY SEWER Version: 4/1/2024 Printed 5/8/2025 1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200 Date: Name:Project Name: PE Registration No:CED Plan # (LUA): Firm Name:CED Permit # (C): Firm Address:Site Address: Phone No.Parcel #(s): Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal (a) Existing Right-of-Way Improvements Subtotal (b) (b)-$ Future Public Improvements Subtotal (c)-$ Stormwater & Drainage Facilities (Public & Private) Subtotal (d) (d)-$ (e) (f) Site Restoration Existing Right-of-Way and Storm Drainage Improvements Maintenance Bond -$ Bond Reduction 2 Construction Permit Bond Amount 3 Minimum Bond Amount is $10,000.00 1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering. 2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will cover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering. * Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton. ** Note: All prices include labor, equipment, materials, overhead, profit, and taxes. 206.926.0549 jenifer.clapham@kpff.com Project Borealis 1301 SW 16th St, Renton, WA 98057 2423049022 and 2423049055 FOR APPROVAL 1601 5th Ave, Suite 1600, Seattle, WA 98101 10,000.00$ P (a) x 100% SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONS 5/8/2025 Jenifer Clapham 40799 KPFF Consulting Engineers R ((b x 150%) + (d x 100%)) S (e) x 150% + (f) x 100% Bond Reduction: Existing Right-of-Way Improvements (Quantity Remaining)2 Bond Reduction: Stormwater & Drainage Facilities (Quantity Remaining)2 T (P +R - S) Prepared by:Project Information CONSTRUCTION BOND AMOUNT */** (prior to permit issuance) EST1 ((b) + (c) + (d)) x 20% -$ MAINTENANCE BOND */** (after final acceptance of construction) 7,963.66$ -$ -$ 7,963.66$ -$ -$ -$ Page 15 of 15 Ref 8-H Bond Quantity Worksheet SECTION III. BOND WORKSHEET Version: 4/1/2024 Printed 5/8/2025