Clark Close
From:Jennifer Cisneros
Sent:Thursday, June 5, 2025 2:42 PM
To:Markwell, Thi
Cc:Clark Close
Subject:RE: City of Renton DNS-M Issuance: 116th Ave SE Sidewalk Project, LUA25-000107, ECF
Attachments:CONSTRUCTION INFORMATION REQUEST PDF.pdf; CONSTRUCTION INFORMATION
REQUEST.docx
Hi Thi,
Thank you for sharing your comments regarding this project. While there is no open comment period for this
decision, I appreciate you taking the time to provide this information. I will pass your feedback along to the project
manager for consideration.
Best,
JENNY CISNEROS, Planning Technician
City of Renton // Community and Economic Development
Virtual Permit Center // Online Applications and Inspections
o)ice 425-430-6583
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56
From: Markwell, Thi <tmarkwell@kingcounty.gov>
Sent: Thursday, June 5, 2025 1:36 PM
To: Jennifer Cisneros <JCisneros@Rentonwa.gov>
Subject: Fw: City of Renton DNS-M Issuance: 116th Ave SE Sidewalk Project, LUA25-000107, ECF
Good afternoon,
King County Metro received the notice in the subject line and forwarded it for internal review.
Please see below for comments:
From the Facility planner: This project will impact bus stop 60022 and as such should include full ADA
front door accessibility improvements and 47’ of clear area on the sidewalk for all-door access.
From Construction Coordination: To All Contractors and Agencies performing construction work in
Metro Transit Bus Stops and Roadways:
Contractors or Agencies doing work that impact transit routes or bus stops, must reach out to this office directly
by sending an email to construction.coord@kingcounty.gov, with the following information:
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless
you know the content is safe.
2
· Construction Request Form (Attached)
· All Approved TCPs and permits, (Required)
· Please send all pertinent TCPs for this work along with a completed copy of the attached
construction request form.
Notification Guidelines:
· Please note that King County Metro requires all contractors and agencies to follow notification
guidelines.
· Visit KC Metro System Impacts web site for more details at: Transit System Impacts - King
County, Washington
· Your project is not approved until you are notified by the KC Metro Construction Impacts
office in writing.
· We will contact you if we require additional information or T-39 No Parking Signs. The
contractor is responsible for providing permitted no-park signage for the placement of
temporary bus stop placement or for the safe movement of coaches on a planned reroute. No-
Parks must be placed 72 hours prior to the start of work to be enforceable.
· Once we receive all required information, your request will be reviewed and final written
approval will be sent via email.
· Once approval is received, the contractor may contact the permitting agency as necessary.
· KCM Construction Coordinators will arrange for the coordination of all bus stops closures and
the placement of temporary bus stops if necessary.
· More notification lead time will be needed when impacting a KC Metro Layover and access to
Comfort Stations. Station.comfort@kingcounty.gov 206-477-9959
· TCPs need to accurately dipict your traffic control and work site set up. This includes noting
the location of impacted bus stops.
Precon, Construction and Site Meetings:
· KCM Construction Coordinators are available to attend meetings.
o Please send all meeting invites to construction.coord@kingcounty.gov
o Site meetings can be coordinated with Construction Coordinators and Metro Service
Quality Field Supervisors.
Bus Stop Construction and Long-Term Bus Stop Impacts:
· If the contractor needs to remove/reinstall bus stop equipment/structures, such as zone flags,
bus stop shelters, benches, and KC garbage cans, our Transit Route Facilities group will work
with you to coordinate this work.They can be reached at:
RFDOTTransitRouteFacilities@kingcounty.gov
· If the contractor needs to find information on bus stop specifications, please contact our Bus
Stop Projects group at: busstopprojects@kingcounty.gov
· NOTE: All work that will require the construction, removal or installation of bus stop amenities
requires 30 business days notification lead time.
Timely notification allows us to plan, mitigate, and most importantly, notify our riders and operators of
your work.
· Single Bus Stop Closures: 5 business days (Not including holidays)
3
· Projects that require multiple bus stop closures: 10 business days (Not including
holidays)
· Street Closures that impact transit: 10 business days (Not including holidays)
· Long-term Bus Stop moves that require the closure and relocation of a layover or
access to Metro facilities: 30 business days (Not including holidays)
See our website for details.
Please download, complete, and return the attached Bus Stop/Route Impact Request form. If your project has
multiple phases, please complete one form for each phase.
Be sure to include all approved TCPs and permits for this impact with your request form.
Please be sure to reach out to the permitting agency (if applicable) for prior approval of your project.
We appreciate you working with us so we can help you safely complete your project.
Thank you.
If you have any questions or concerns, please reach out. Thank you!
Thi Markwell (She/Her)
Transit Environmental Planner II
Transit Real Estate and Environmental (TREE)
P 206-263-2659
tmarkwell@kingcounty.gov
From: Chung, Lawrence <lachung@kingcounty.gov>
Sent: Wednesday, May 28, 2025 9:36 AM
To: Markwell, Thi <tmarkwell@kingcounty.gov>
Subject: OAP: City of Renton DNS-M Issuance: 116th Ave SE Sidewalk Project, LUA25-000107, ECF
From: Jennifer Cisneros <JCisneros@Rentonwa.gov>
Sent: Tuesday, May 27, 2025 4:52 PM
To: ktsang@muckleshoot.nsn.us; Laura Murphy <Laura.murphy@muckleshoot.nsn.us>; sepacenter@dnr.wa.gov;
Planning@TukwilaWA.gov; Mark Hofman <markh@newcastlewa.gov>; sepa@pscleanair.org; Ishimaru, Jim
<Jim.Ishimaru@kingcounty.gov>; McColloch, Duffy <McCollD@wsdot.wa.gov>; NSchildmeyer
<NSchildmeyer@kentwa.gov>; Madura, Jalaine <Jalaine.Madura@seattle.gov>; 'katherine.fischer@kingcounty.gov';
SEPA@dahp.wa.gov; culturalpreservation@duwamishtribe.org; R4Splanning@dfw.wa.gov;
NWS.Compliance@usace.army.mil; KCWTD Other Agency Planning <KCWTD_otheragencyplanning@kingcounty.gov>;
Chung, Lawrence <lachung@kingcounty.gov>
Cc: Clark Close <CClose@Rentonwa.gov>; Muang Saelee <MSaelee@rentonwa.gov>
Subject: City of Renton DNS-M Issuance: 116th Ave SE Sidewalk Project, LUA25-000107, ECF
4
[EXTERNAL Email Notice! ] External communication is important to us. Be cautious of phishing attempts. Do not click or open
suspicious links or attachments.
Hello,
Please see linked City of Renton DNS-M issuance and related documents for 116th Ave SE Sidewalk Project,
LUA25-000107, ECF. You may access them following this link. You can also find the ERC Report (Exhibits 1-12) in
that same folder.
Best,
JENNY CISNEROS, Planning Technician
City of Renton // Community and Economic Development
Virtual Permit Center // Online Applications and Inspections
office 425-430-6583
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56
CONSTRUCTION INFORMATION REQUEST
Bus Stops/Route Impact
Date Submitted:
Minimum notification:
•5 full business days required toclose/move bus stops.
•10 full business days required to reroutebuses for road closures.
•Changes to work scope or rescheduling your project issubject to the same notifications listed here.
•You must receive written notice from this office to proceedwith your project.
Email this form to construction.coord@kingcounty.gov. All requests must include approved TCPs and Permits. If you
have questions, please call (206)477-1140.
If your work is to be in or around Trolley Bus Right of Way or Trolley Wire Overhead: Contact Trolley Impacts Coordinators at trolley.impacts@kingcounty.gov (206)477-1150.
New Request ☐ Revised Request ☐
Description of work:
APPROVED Traffic Control & APPROVED Permits TCP’s are required for all construction requests.:
Approved TCP: ☐ Yes ☐ No Approved TCP Submitted: ☐ Yes ☐ No
Date(s) of work: Start Work Date: End Work Date: Start Work Time:
☐AM ☐ PM End Work Time:
☐AM ☐ PM
Type of closure:
☐Daily ☐ Nightly ☐ Continuous (24 Hr/Day)
If Continuous (24 hr/Day) Are you working on:
☐Weekdays ☐ Weekends ☐ Both
Work weather dependent:
☐Yes ☐ No If yes: Contingency Date: 2nd Contingency Date:
Location (include nearest cross streets and/or intersecting streets):
Street/Road/Address work to be done on: Direction:
☐North ☐ East ☐ South ☐ West
Cross Street(s): Lane shifts with Flaggers/UPO?
☐Yes ☐ No
Full Road Closure:
☐Yes ☐ No
Partial Road Closure:
☐Yes ☐ No
Bus Stop Closure:
☐Yes ☐ No If yes, provide bus stop number (Bus stop numbers can be found on OneBusAway:
Contact Information:
Project Lead: Project Lead Company:
Project Lead Phone: Project Lead Email:
Onsite contacts (Contacts must be onsite and available during work hours.): Primary Contact: Primary Phone: Secondary Contact: Secondary Phone: