May 20, 2025
MICHAEL S. SIPPO, Civil Engineer III
City of Renton City Hall
Development Engineering
1055 S Grady Way
Renton, WA 98057
Re: Longacres Master Plan - Preliminary Trip Distribution and Study Intersections
Dear Mr. Sippo:
Thank you for your recent comments regarding the Longacres Development project trip
distribution study and street sections configuration. Please refer to the following responses to
your questions which were sent to Amy Wasserman on March 13, 2025. Your complete
comments are represented below with the team responses following:
Trip Distribution:
1. Study sections should include all shown in addition to the notes on the figure. See split
at SW 27th St.
· The noted intersections will be added as EIS study intersections.
2. A recent photograph shared from our Transportation department shows that the
underpass from the site west onto Longacres Way has been closed to traffic. At this
point we are unsure if this is the permanent condition or if Tukwila or owner of the
tracks has been contacted. If this is a permanent closure, the distribution may need to
be adjusted.
· Access through the underpass has been restored. There were some structural
members being replaced which looks to now be complete.
3. Volumes in the north direction seem a bit low. Volumes up Monster Rd will need to be
verified.
· Acknowledged. TENW will review existing peak hour volumes and adjust the
anticipated project trip distribution if warranted. TENW will ensure that City
approves of final estimated project trip distribution.
4. Signal warrants should occur at the intersections of the southern site
entrance/Oakesdale, Oakesdale/SE 34th and Oakesdale/SE 41st. Signal warrant may be
needed at Grady/Longacres or analysis of left turn restrictions.
· Acknowledged. EIS traffic analysis will include signal warrants at the requested
intersections.
MICHAEL S. SIPPO, Civil Engineer III
May 20, 2025
Page 2 of 5
5. Trip generation numbers do not appear to coincide with the number of Alt. 2 proposed
total number units + commercial + office uses and more information will be required.
Specifically, the AM trips going out appears quite low considering the number of
residential units being proposed. A detailed description of the trip generation
procedure will need to be provided.
· Acknowledged. The procedure to estimate trip generation and detailed trip
generation estimates will be provided to the City for review and approval before
proceeding with the EIS traffic analysis.
6. Mitigation for cyclists will need to be considered.
· Acknowledged. The EIS traffic analysis will consider mitigation for cyclists.
Other notes:
1. Note, new treatments will likely be required on the “Boeing Access Rd” on the north of
the site extending along SW 16th and Longacres Dr. SW.
· We propose this topic to be part of larger site wide conversation including
street Improvement, city projects and use of impact Fees. We would also like to
confirm the location of the suggested improvements and get specifics as to
what the treatments should be.
2. Bike and Trails Master Plan calls for bike lanes from 16th to 27th and protected bike lane
south of 27th to City limits.
· In review of the City of Renton Bikes and Trails Master Plan it is understood
where bike lanes are requested and how the network is projected to be
completed. In review of the necessary improvements, we are Interested in
creating a protected bike lane along Oakesdale and would like to look at
alternative options to create bike lanes in this section. We understand the
implications these have on other modes of transit, for example, it might be
possible to use an internal multi-use path as an alternative.
3. Oakesdale and 16th do not have adequate “complete street” facilities and will require
upgrades.
· Further discussion is requested for clarification to make sure the request is
being correctly interpreted. We propose this topic to be part of larger site wide
conversation including street Improvement, city projects and use of impact
Fees.
Sections comments for discussion (this is a work in progress but wanted to get some initial
feedback):
1. 4-ft sidewalks will not be acceptable at any locations. Suggest removing planter and
having street trees with grates and small planter areas like on Williams and Wells Ave S.
in downtown where the sidewalk narrows to 5’ only for small portions.
· It is possible to reduce the planter width from 4-feet to 3-feet and use partial
tree grates to get an extra 1-foot of width. Goal of this is to give a sense that the
development ‘reads green’ and suggests that the central wetland is not the only
place where lush verdant landscapes occur.
MICHAEL S. SIPPO, Civil Engineer III
May 20, 2025
Page 3 of 5
2. Internal Access Road: 2-10’ lanes is likely too narrow and should be 11’. Proposed ROW
width seems incompatible with proposed usage of street – if the internal access road is
intended for larger vehicles, trucks, service vehicles the 10ft lanes seem incompatible.
Site plans showing internal circulation prior to city’s approval of concept will need to be
provided.
· There is no longer an “Internal Access Road” between parcels 9 and 10. This has
been updated in the latest street section package. This is now a Fire Access
Road which can be used for building access by future building developments. It
is our understanding that (2) 10-foot lanes is adequate for access and reduced
speeds for safety. (Updated Drawing Example - M_Street Profiles_250520_v2)
3. Esplanade: Consider requiring FedEx/Amazon dropoffs to use the Internal Access Road
instead. The esplanade should have an esplanade/stroll feel free from interruptions
from ongoing daily parcel drop-offs
· It looks like this question is referring to the “West Access Road” instead. Please
find attached an example ground floor plan for Parcel 14 which shows access is
possible off the West Access Road. (Updated Drawing Example -
P_Parcel_14_Floor_Plans_250520_v1)
4. Esplanade: 42’ ROW seems too narrow for the nature of how the street is being used by
vehicles, especially if business’ parcel drop-offs would be allowed. Consider matching
ROW width with the Retail Street cross section
· Although the proposed street section does not look exactly like a traditional
section, it does contain the elements necessary. Since the Esplanade is a single
loaded street, the project is utilizing the shared use path around the wetland
and pond to provide necessary pedestrian and bike circulation on the east side
of the street. This fully integrates that circulation into the common space that
makes this such a unique section.
5. Esplanade: If planter strip is required, suggest considering paved strip between tree
wells allowing for more sidewalk width in certain areas. Example – see Northgate mall
· The current plan and section already integrate both landscape and paving into
this area. The project is trying to reduce impervious areas where possible, while
maintaining appropriate pedestrian circulation and access.
6. West Access Road North: Sidewalk should be 5ft min and placed on both sides of road
since it is continuing from South Access Road; crosswalks should be lit and reflective
· It is possible to reduce the planter width from 4-feet to 3-feet and use partial
tree grates to get an extra 1-foot of width. This is the section which has tracks
adjacent rather than buildings or the train station. Crosswalks will be lit and
reflective once further development has been completed. (Updated Drawing
Example - M_Street Profiles_250520_v2)
7. West Access Road South: Sidewalk should be 5ft min and placed on both sides of road;
crosswalks should be lit and reflective (if sidewalk on east side of road can be widened
per above may consider removing sidewalk on west due to proximity to train tracks).
MICHAEL S. SIPPO, Civil Engineer III
May 20, 2025
Page 4 of 5
· It is possible to reduce the planter width from 4-feet to 3-feet and use partial
tree grates to get an extra 1-foot of width. We are proposing having sidewalks
both sides in the south section of the West Access Road to provide continuity to
the South Access Road and connection to the train station. We would like to
widen the sidewalk to 5-feet and remove the sidewalk on the West side of the
North portion of the West Access Road because of the proximity of the train
tracks. Crosswalks will be lit and reflective once further development has been
completed. (Updated Drawing Example - M_Street Profiles_250520_v2)
8. Retail Street: Is there a min spacing between street trees and crosswalks for better
visibility? I looked at NACTO, didn’t find what I wanted, also looked here; Consider 8 ft
spacing between trees and crosswalks.
· We will investigate this and provide a minimum spacing as suggested at 8-feet.
This is understood as an acceptable tree spacing will be included as part of
further development.
9. Internal Access Road: If planter strip is required, suggest considering paved strip
between tree wells like Northgate example to accommodate more sidewalk width
· There is no longer an “Internal Access Road” between parcels 9 and 10. This has
been updated in the latest street section package. The current plan and section
already integrate both landscape and paving into this area. The project is trying
to reduce impervious areas where possible. (Updated Drawing Example –
M_Street Profiles_250520_v2)
10. Internal Access Road: Some level of lighting should be provided for ped circulation
Adequate levels of lighting will be provided throughout the project site to
support safe pedestrian circulation. (Updated Drawing Example – M_Street
Profiles_250520_v2)
11. Internal Access Road: Will need to discuss if this is a dedicated or private road.
· There is no longer an “Internal Access Road” between parcels 9 and 10. This has
been updated in the latest street section package. (Updated Drawing Example –
M_Street Profiles_250520_v2)
12. Oakesdale: Separate discussion is needed to coincide with City project and meet
complete streets.
· As suggested, we will continue the discussion with the City of Renton as
required to bring the Oakesdale design and scope of work to resolution.
Sincerely,
John F. Williamson, AIA LEED BD&C
Associate
Enclosures
MICHAEL S. SIPPO, Civil Engineer III
May 20, 2025
Page 5 of 5
M_Street Profiles_250520_v2
P_Parcel_14_Floor_Plans_250520_v1