Loading...
HomeMy WebLinkAboutC_KC Metro_Comments_250609_v1CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. From:Jennifer Cisneros To:tmarkwell@kingcounty.gov Cc:Jill Ding Subject:RE: City of Renton DS Issuance: Longacres Campus Master Plan, LUA25-000100, SA-M, ECF Date:Monday, June 9, 2025 8:05:00 AM Attachments:Outlook-mf3njyfc.png Outlook-bo4jnz20.png Outlook-xvnwxiji.png Outlook-imgfhcwu.png CONSTRUCTION INFORMATION REQUEST.docx CONSTRUCTION INFORMATION REQUEST PDF.pdf Hi Thi, We have received your comments and added them to the official file for consideration. You have also been added as a party of record for this project and will receive future notifications. Best, JENNY CISNEROS, Planning Technician City of Renton // Community and Economic Development Virtual Permit Center // Online Applications and Inspections office 425-430-6583 NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56 From: Markwell, Thi <tmarkwell@kingcounty.gov> Sent: Friday, June 6, 2025 10:40 AM To: Jennifer Cisneros <JCisneros@Rentonwa.gov> Subject: Fw: City of Renton DS Issuance: Longacres Campus Master Plan, LUA25-000100, SA-M, ECF Good morning, King County Metro received the notice referenced in the subject line above and has forwarded for internal review. Please see below for comments from the construction coordination office: To All Contractors and Agencies performing construction work in Metro Transit Bus Stops and Roadways: Contractors or Agencies doing work that impact transit routes or bus stops, must reach out to this office directly by sending an email to construction.coord@kingcounty.gov, with the following information: Construction Request Form (Attached) All Approved TCPs and permits, (Required) Please send all pertinent TCPs for this work along with a completed copy of the attached construction request form. Notification Guidelines: Please note that King County Metro requires all contractors and agencies to follow notification guidelines. Visit KC Metro System Impacts web site for more details at: Transit System Impacts - King County, Washington Your project is not approved until you are notified by the KC Metro Construction Impacts office in writing. We will contact you if we require additional information or T-39 No Parking Signs. The contractor is responsible for providing permitted no-park signage for the placement of temporary bus stop placement or for the safe movement of coaches on a planned reroute. No-Parks must be placed 72 hours prior to the start of work to be enforceable. Once we receive all required information, your request will be reviewed and final written approval will be sent via email. Once approval is received, the contractor may contact the permitting agency as necessary. KCM Construction Coordinators will arrange for the coordination of all bus stops closures and the placement of temporary bus stops if necessary. More notification lead time will be needed when impacting a KC Metro Layover and access to Comfort Stations. Station.comfort@kingcounty.gov 206-477-9959 TCPs need to accurately dipict your traffic control and work site set up. This includes noting the location of impacted bus stops. Precon, Construction and Site Meetings: · KCM Construction Coordinators are available to attend meetings. Please send all meeting invites to construction.coord@kingcounty.gov Site meetings can be coordinated with Construction Coordinators and Metro Service Quality Field Supervisors. Bus Stop Construction and Long-Term Bus Stop Impacts: If the contractor needs to remove/reinstall bus stop equipment/structures, such as zone flags, bus stop shelters, benches, and KC garbage cans, our Transit Route Facilities group will work with you to coordinate this work.They can be reached at: RFDOTTransitRouteFacilities@kingcounty.gov If the contractor needs to find information on bus stop specifications, please contact our Bus Stop Projects group at: busstopprojects@kingcounty.gov NOTE: All work that will require the construction, removal or installation of bus stop amenities requires 30 business days notification lead time. Timely notification allows us to plan, mitigate, and most importantly, notify our riders and operators of your work. Single Bus Stop Closures: 5 business days (Not including holidays) Projects that require multiple bus stop closures: 10 business days (Not including holidays) Street Closures that impact transit: 10 business days (Not including holidays) Long-term Bus Stop moves that require the closure and relocation of a layover or access to Metro facilities: 30 business days (Not including holidays) See our website for details. Please download, complete, and return the attached Bus Stop/Route Impact Request form. If your project has multiple phases, please complete one form for each phase. Be sure to include all approved TCPs and permits for this impact with your request form. Please be sure to reach out to the permitting agency (if applicable) for prior approval of your project. We appreciate you working with us so we can help you safely complete your project. Thank you. If you have any questions or concerns, please reach out. Thanks! Thi Markwell (She/Her) Transit Environmental Planner II Transit Real Estate and Environmental (TREE) P 206-263-2659 tmarkwell@kingcounty.gov From: Chung, Lawrence <lachung@kingcounty.gov> Sent: Tuesday, June 3, 2025 10:05 AM To: Markwell, Thi <tmarkwell@kingcounty.gov> Subject: OAP: City of Renton DS Issuance: Longacres Campus Master Plan, LUA25-000100, SA-M, ECF From: Jennifer Cisneros <JCisneros@Rentonwa.gov> Sent: Monday, June 2, 2025 5:21 PM To: ktsang@muckleshoot.nsn.us; Laura Murphy <Laura.murphy@muckleshoot.nsn.us>; sepacenter@dnr.wa.gov; Planning@TukwilaWA.gov; Mark Hofman <markh@newcastlewa.gov>; sepa@pscleanair.org; Ishimaru, Jim <Jim.Ishimaru@kingcounty.gov>; McColloch, Duffy <McCollD@wsdot.wa.gov>; NSchildmeyer <NSchildmeyer@kentwa.gov>; Madura, Jalaine <Jalaine.Madura@seattle.gov>; 'katherine.fischer@kingcounty.gov'; SEPA@dahp.wa.gov; culturalpreservation@duwamishtribe.org; R4Splanning@dfw.wa.gov; NWS.Compliance@usace.army.mil; KCWTD Other Agency Planning <KCWTD_otheragencyplanning@kingcounty.gov>; Chung, Lawrence <lachung@kingcounty.gov> Cc: Jill Ding <JDing@Rentonwa.gov>; Muang Saelee <MSaelee@rentonwa.gov>; Margarette Bravo <MBravo@rentonwa.gov> Subject: City of Renton DS Issuance: Longacres Campus Master Plan, LUA25-000100, SA-M, ECF [EXTERNAL Email Notice! ] External communication is important to us. Be cautious of phishing attempts. Do not click or open suspicious links or attachments. Hello, Please see linked City of Renton DS issuance and related documents for Longacres Campus Master Plan, LUA25-000100, SA-M, ECF. You may access them following this link. You can also find the ERC Memo and Exhibits 1-3 in that same folder. Best, JENNY CISNEROS, Planning Technician City of Renton // Community and Economic Development Virtual Permit Center // Online Applications and Inspections office 425-430-6583 NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56 CONSTRUCTION INFORMATION REQUEST Bus Stops/Route Impact Date Submitted: Minimum notification: •5 full business days required to close/move bus stops. •10 full business days required to reroute buses for road closures. •Changes to work scope or rescheduling your project is subject to the same notifications listed here. •You must receive written notice from this office to proceed with your project. Email this form to construction.coord@kingcounty.gov. All requests must include approved TCPs and Permits. If you have questions, please call (206)477-1140. If your work is to be in or around Trolley Bus Right of Way or Trolley Wire Overhead: Contact Trolley Impacts Coordinators at trolley.impacts@kingcounty.gov (206)477-1150. New Request ☐ Revised Request ☐ Description of work: APPROVED Traffic Control & APPROVED Permits TCP’s are required for all construction requests.: Approved TCP: ☐ Yes ☐ No Approved TCP Submitted: ☐ Yes ☐ No Date(s) of work: Start Work Date: End Work Date: Start Work Time: ☐AM ☐ PM End Work Time: ☐AM ☐ PM Type of closure: ☐Daily ☐ Nightly ☐ Continuous (24 Hr/Day) If Continuous (24 hr/Day) Are you working on: ☐Weekdays ☐ Weekends ☐ Both Work weather dependent: ☐Yes ☐ No If yes: Contingency Date: 2nd Contingency Date: Location (include nearest cross streets and/or intersecting streets): Street/Road/Address work to be done on: Direction: ☐North ☐ East ☐ South ☐ West Cross Street(s): Lane shifts with Flaggers/UPO? ☐Yes ☐ No Full Road Closure: ☐Yes ☐ No Partial Road Closure: ☐Yes ☐ No Bus Stop Closure: ☐Yes ☐ No If yes, provide bus stop number (Bus stop numbers can be found on OneBusAway: Contact Information: Project Lead: Project Lead Company: Project Lead Phone: Project Lead Email: Onsite contacts (Contacts must be onsite and available during work hours.): Primary Contact: Primary Phone: Secondary Contact: Secondary Phone: