HomeMy WebLinkAboutContract - 2 pagesContract No. CAG-25-044
World Cup Legacy Square -Phase 1 May 2025
AGREEMENT FOR WORLD CUP LEGACY SQUARE -PHASE 1
CONTRACT NO. CAG-25-044
THIS AGREEMENT, made and entered into this 20 day of May, 2025 by and between the CITY
OF RENTON, Washington, a municipal corporation of the State of Washington, hereinafter
ACTIVE CONSTRUCTION, INC., hereinafter referred to as "Contractor."
Now, therefore the parties agree as follows:
1.Agreement. This agreement incorporates the following documents as if fully set forth herein:
the latest Standard Specifications for the City of Renton and for Road, Bridge, and Municipal
Construction, as prepared by the Washington State Department of Transportation including
of Renton Public Works Design and Construction Standard Plans (Current Edition); the
imited to Addenda, Proposal
Form, Special Provisions, Contract Plans, and Amendments to the Standard Specifications;
Proposal and all documents submitted therewith in response to the
for Bids Documents; and any additional documents referenced as comprising the Contract
and Contract Documents of the Standard Specifications, as revised by the Amendments
Documents.
2.Project. Contractor shall complete all Work and furnish all labor, tools, materials, and
equipment for the Project entitled World Cup Legacy Square Phase 1, CAG-25-044,
including all changes to the Work and force account work, in accordance with the Contract
Documents.
3.Payments.City shall pay Contractor at the unit and lump sum prices, and by force account
as specified in the Proposal according to the Contract Documents as to time, manner, and
condition of payment of a Contract Sum not to exceed $1,501,501.00, unless modified by
an approved Change Order or addendum and in accordance with the Contract terms. The
payments to Contractor include the costs for all labor, tools, materials and equipment for the
Work
Work.
4.Completion Date. Contract Time shall commence upon City's Notice to Proceed to
Contractor. The Work under this Agreement shall be completed within the time specified in
the Contract Documents. If the Physical Work under this Agreement is not completed within
the Contract Time, Contractor shall pay liquidated damages and all engineering inspection
and supervision costs to City as specified in the Contract Documents.
5.Attorney's Fees.In the event litigation is commenced to enforce this Agreement, the
prevailing party shall be entitled to recover its costs, including reasonable attorney's and
expert witnessfees.
6.Disclaimer. No liability of Contractor shall attach to City by reason of entering into this
Agreement, except as expressly provided in this Agreement.
7.Counterparts. This Agreement is executed in two (2) identical counterparts, by the parties,
each of which shall for all purposes be deemed an original.
IN WITNESS WHEREOF, the City has caused the Agreement to be signed by its Mayor and
CAG-25-044
Contract No. CAG-25-044
World Cup Legacy Square -Phase 1 May 2025
attested by its City Clerk and the Contractor has hereunto set its hand and seal the day and
year first above-written.
CONTRACTOR: CITY OF RENTON:
President/Partner/Owner Armondo Pavone, Mayor
ATTEST
Secretary Jason Seth, City Clerk
FIRM INFORMATION
d/b/a Active Construction, Inc.
CHECK ONE: Limited Liability Company Partnership Corporation
STATE OF
INCORPORATION: Washington
CONTRACTOR CONTACT INFORMATION: CITY CONTACT INFORMATION:
Active Construction, Inc. City of Renton
5110 River Road E. 1055 South Grady Way
Tacoma, WA 98443 Renton, WA 98057
253-248-1091 425-757-6807
davidc@activeconstruction.com econley@rentonwa.gov
Attention:
If business is a CORPORATION, the name of the corporation should be listed in full and both the President
and Secretary must sign the contract. OR, if one signature is permitted by corporation by-laws, a copy of
the by-laws shall be furnished to the City and made a part of the contract document.
If the business is a PARTNERSHIP, the full name of each partner should be listed followed by d/b/a (doing
business as) and firm or trade name. Any one partner may sign the contract.
If the business is an limited Liability Company, an authorized managing member or manager must sign
followed by his/her title.
Contract Template Updated 12/29/2017-
modified May 3, 2022
6/9/2025