HomeMy WebLinkAboutC_KC Metro_City Response1
Jill Ding
From:Jill Ding
Sent:Thursday, June 12, 2025 10:57 AM
To:tmarkwell@kingcounty.gov
Subject:RE: City of Renton DS Issuance: Longacres Campus Master Plan, LUA25-000100, SA-M,
ECF
Thi,
Thank you for your comments regarding the Longacres Campus Master Plan project (LUA25-000100).
Your comments have been included in the official file and you have been added as a party of record for
this project. I have also provided your comments regarding construction policies for impacts to metro
bus service to the project applicant for further coordination.
Please feel free to reach out if you have additional questions.
Thanks,
JILL DING, Senior Planner
City of Renton // Planning
Virtual Permit Center // Online Applications and Inspections
office 425-430-6598
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56
From: Jennifer Cisneros <JCisneros@Rentonwa.gov>
Sent: Monday, June 9, 2025 8:05 AM
To: tmarkwell@kingcounty.gov
Cc: Jill Ding <JDing@Rentonwa.gov>
Subject: RE: City of Renton DS Issuance: Longacres Campus Master Plan, LUA25-000100, SA-M, ECF
Hi Thi,
We have received your comments and added them to the o7icial file for consideration. You have also been added
as a party of record for this project and will receive future notifications.
Best,
JENNY CISNEROS, Planning Technician
City of Renton // Community and Economic Development
Virtual Permit Center // Online Applications and Inspections
o7ice 425-430-6583
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56
From: Markwell, Thi <tmarkwell@kingcounty.gov>
Sent: Friday, June 6, 2025 10:40 AM
2
To: Jennifer Cisneros <JCisneros@Rentonwa.gov>
Subject: Fw: City of Renton DS Issuance: Longacres Campus Master Plan, LUA25-000100, SA-M, ECF
Good morning,
King County Metro received the notice referenced in the subject line above and has forwarded for
internal review.
Please see below for comments from the construction coordination office:
To All Contractors and Agencies performing construction work in Metro Transit Bus Stops and
Roadways:
Contractors or Agencies doing work that impact transit routes or bus stops, must reach out to this
office directly by sending an email to construction.coord@kingcounty.gov, with the following
information:
· Construction Request Form (Attached)
· All Approved TCPs and permits, (Required)
· Please send all pertinent TCPs for this work along with a completed copy of the attached
construction request form.
Notification Guidelines:
· Please note that King County Metro requires all contractors and agencies to follow notification
guidelines.
· Visit KC Metro System Impacts web site for more details at: Transit System Impacts - King
County, Washington
· Your project is not approved until you are notified by the KC Metro Construction Impacts
office in writing.
· We will contact you if we require additional information or T-39 No Parking Signs. The
contractor is responsible for providing permitted no-park signage for the placement of
temporary bus stop placement or for the safe movement of coaches on a planned reroute. No-
Parks must be placed 72 hours prior to the start of work to be enforceable.
· Once we receive all required information, your request will be reviewed and final written
approval will be sent via email.
· Once approval is received, the contractor may contact the permitting agency as necessary.
· KCM Construction Coordinators will arrange for the coordination of all bus stops closures and
the placement of temporary bus stops if necessary.
· More notification lead time will be needed when impacting a KC Metro Layover and access to
Comfort Stations. Station.comfort@kingcounty.gov 206-477-9959
· TCPs need to accurately dipict your traffic control and work site set up. This includes noting
the location of impacted bus stops.
Precon, Construction and Site Meetings:
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless
you know the content is safe.
3
· KCM Construction Coordinators are available to attend meetings.
o Please send all meeting invites to construction.coord@kingcounty.gov
o Site meetings can be coordinated with Construction Coordinators and Metro Service
Quality Field Supervisors.
Bus Stop Construction and Long-Term Bus Stop Impacts:
· If the contractor needs to remove/reinstall bus stop equipment/structures, such as zone flags,
bus stop shelters, benches, and KC garbage cans, our Transit Route Facilities group will work
with you to coordinate this work.They can be reached at:
RFDOTTransitRouteFacilities@kingcounty.gov
· If the contractor needs to find information on bus stop specifications, please contact our Bus
Stop Projects group at: busstopprojects@kingcounty.gov
· NOTE: All work that will require the construction, removal or installation of bus stop amenities
requires 30 business days notification lead time.
Timely notification allows us to plan, mitigate, and most importantly, notify our riders and
operators of your work.
· Single Bus Stop Closures: 5 business days (Not including holidays)
· Projects that require multiple bus stop closures: 10 business days (Not including
holidays)
· Street Closures that impact transit: 10 business days (Not including holidays)
· Long-term Bus Stop moves that require the closure and relocation of a layover or
access to Metro facilities: 30 business days (Not including holidays)
See our website for details.
Please download, complete, and return the attached Bus Stop/Route Impact Request form. If your
project has multiple phases, please complete one form for each phase.
Be sure to include all approved TCPs and permits for this impact with your request form.
Please be sure to reach out to the permitting agency (if applicable) for prior approval of your project.
We appreciate you working with us so we can help you safely complete your project.
Thank you.
If you have any questions or concerns, please reach out.
Thanks!
4
Thi Markwell (She/Her)
Transit Environmental Planner II
Transit Real Estate and Environmental (TREE)
P 206-263-2659
tmarkwell@kingcounty.gov
From: Chung, Lawrence <lachung@kingcounty.gov>
Sent: Tuesday, June 3, 2025 10:05 AM
To: Markwell, Thi <tmarkwell@kingcounty.gov>
Subject: OAP: City of Renton DS Issuance: Longacres Campus Master Plan, LUA25-000100, SA-M, ECF
From: Jennifer Cisneros <JCisneros@Rentonwa.gov>
Sent: Monday, June 2, 2025 5:21 PM
To: ktsang@muckleshoot.nsn.us; Laura Murphy <Laura.murphy@muckleshoot.nsn.us>; sepacenter@dnr.wa.gov;
Planning@TukwilaWA.gov; Mark Hofman <markh@newcastlewa.gov>; sepa@pscleanair.org; Ishimaru, Jim
<Jim.Ishimaru@kingcounty.gov>; McColloch, Duffy <McCollD@wsdot.wa.gov>; NSchildmeyer
<NSchildmeyer@kentwa.gov>; Madura, Jalaine <Jalaine.Madura@seattle.gov>; 'katherine.fischer@kingcounty.gov';
SEPA@dahp.wa.gov; culturalpreservation@duwamishtribe.org; R4Splanning@dfw.wa.gov;
NWS.Compliance@usace.army.mil; KCWTD Other Agency Planning <KCWTD_otheragencyplanning@kingcounty.gov>;
Chung, Lawrence <lachung@kingcounty.gov>
Cc: Jill Ding <JDing@Rentonwa.gov>; Muang Saelee <MSaelee@rentonwa.gov>; Margarette Bravo
<MBravo@rentonwa.gov>
Subject: City of Renton DS Issuance: Longacres Campus Master Plan, LUA25-000100, SA-M, ECF
[EXTERNAL Email Notice! ] External communication is important to us. Be cautious of phishing attempts. Do not click or open
suspicious links or attachments.
Hello,
Please see linked City of Renton DS issuance and related documents for Longacres Campus Master Plan,
LUA25-000100, SA-M, ECF. You may access them following this link. You can also find the ERC Memo and
Exhibits 1-3 in that same folder.
Best,
JENNY CISNEROS, Planning Technician
City of Renton // Community and Economic Development